HANNIBAL – The bridge replacement project on Scotland County Route B, over the North Fork North Fabius River, located 0.1 mile west of Route JJ, is now complete, just in time for Thanksgiving holiday travel. Contractors from Mera Excavating, LLC of Bonnots Mill, Missouri, working with the Missouri Department of Transportation, began the project July 25, which brought the bridge up to current standards and removed the previous load and speed postings. The bridge reopened to traffic today, November 16.
MoDOT asks drivers to work with us by always buckling up, keeping your phone down, slowing down and moving over in work zones. Know before you go and check what work zones you might encounter at traveler.modot.org.
While at modot.org, sign up online for work zone updates. Information is also available 24/7 at 888-ASK-MODOT (275-6636) or via social media.
Winter is right around the corner! Are you prepared? The predictions for the weather this winter include a lot of snow, and MoDOT needs your help to stay safe. Follow these safety tips to help us get through the season: Winter Driving Tips | Missouri Department of Transportation (modot.org).