St. Louis Work Zones Sept. 29 - Oct. 5

ST. LOUIS – MoDOT crews will close two lanes in each direction of I-44 at Big Bend at 9 p.m. Friday, Sept. 30. All lanes will be closed at midnight. During the closure, interstate traffic will be routed up and over the ramps.  In addition, Big Bend over I-44 will close at midnight for the work.  All lanes will reopen by 6 a.m. Saturday, Oct. 1.

Crews will permanently close the ramp to eastbound I-270 from West Florissant at 7 a.m. Monday, Oct. 3.  The closure was originally scheduled for Sept. 26. Drivers who need to access eastbound I-270 near West Florissant will need to use the new eastbound I-270 entrance ramp from Pershall Road, between Washington/Elizabeth and West Florissant.  The new configuration and ramp location improves mobility and safety.

For more on roadway closures due to construction, additional work zone information and real-time roadway weather conditions go to http://traveler.modot.org/map. For real-time traffic, visit www.gatewayguide.com. All work is subject to change and may be shifted due to inclement weather.   

Motorists should be aware of the following on-going closures

  • I-55, St. Louis City, two lanes northbound closed between Carondelet and Arsenal until December 2022.
  • I-55, St. Louis City, left two southbound lanes closed from Gravois to Loughborough through December 2022.
  • I-55, St. Louis City, the ramp from Lafayette/Truman ramp and the ramp from Cherokee to southbound I-55 closed through December 2022.
  • I-55, St. Louis City, the northbound exit ramps to 3200 Broadway and Arsenal will be closed through December 2022.
  • I-55, St. Louis City, northbound two left lanes closed from Carondelet to Arsenal through December 2022.
  • I-55, St. Louis City, the ramp from Virginia to southbound will be closed until late September.
  • I-64, St. Louis City, one lane eastbound and westbound near Jefferson closed through mid-2022.
  • I-64, St. Louis City, one lane westbound at the entrance ramp east of Jefferson to Forest Park Avenue closed through mid-2022.
  • I-70, St Louis City, one eastbound lane closed at the Stan Musial Bridge through October.
  • I-70/44, St. Louis City, express lanes and the ramp from the express lanes to Broadway are closed until spring 2023.
  • I-70/44, St. Louis City, Biddle on-ramp to 70/44 closed until spring 2023.
  • I-70, St. Louis City, southbound Broadway bridge over the interstate is closed until spring 2023.
  • I-44, St. Louis County, one lane eastbound and westbound will be closed at Big Bend in Kirkwood tbhrough October 2022.
  • I-44, St. Louis County, one lane closed in each direction on the Big Bend bridge over the interstate in Kirkwood through October 2022.
  • I-44, St. Louis County, Lewis Road ramp to westbound I-44 closed through December 2022.
  • I-170, St. Louis County, the Midland bridge over the interstate will be closed through October.
  • I-255, St. Louis County, one lane closed eastbound and westbound over Mississippi River bridge until fall 2022.
  • I-255, St. Louis County, eastbound Koch Rd. ramp closed until fall 2022.
  • I-270, St. Louis County, the ramp from eastbound I-270 to West Florissant will be closed through late October.
  • I-270, St. Louis County, , the ramp from eastbound to New Florissant will be closed through late October.
  • Route 100, St. Louis County, one lane in each direction in Brentwood near Mary/Dorothy Avenue will be closed through mid-October.
  • Route 94, St. Charles County, the ramp from westbound Route 364 to eastbound Route 94 closed until mid-October.
  • Route 94/364, St. Charles County, exit ramp to Jungs Station Road/Heritage Crossing closed through spring 2023.
  • Route 47, Franklin County, northbound and southbound will be reduced to one lane over Interstate 44 through September. In addition, the ramp to westbound I-44 will be closed, and the ramps from westbound and eastbound I-44 to Route 47 will be closed to left-turning traffic through September.
  • I-44, Franklin County, the ramp from Route 47 to eastbound will be closed through November.
  • I-44, Franklin County, the ramp from westbound I-44 to Route 47 is closed.
  • I-44, Franklin County, the ramp from eastbound I-44 to Route 47 will be closed through late September.

Please see the list of daily road closures, weather permitting:

Thursday, September 29

  • I-70, St. Louis County, 8 p.m. to 6 a.m., two westbound lanes closed east of St. Charles Rock Rd.
  • I-170, St. Louis County, 6 a.m. to 1 p.m., one northbound lane closed south of Route 180 (St. Charles Rock Road).
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one eastbound lane closed at New Halls Ferry Road.
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one lane closed eastbound and westbound at New Florissant Road.
  • I-270, St. Louis County, 7 p.m. to 6 a.m., various eastbound and westbound lanes closed between Lindbergh and I-170.
  • Route 67 (Lindbergh), St. Louis County, 7 p.m. to 5 a.m., southbound lanes closed.
  • Route 100, St. Louis County, 6 a.m. to 2 p.m., one lane closed eastbound from Tallie Drive/Bopp Road to Woodgate Drive.
  • Route 100, St. Louis County, 6 a.m. to 3 p.m., one lane closed eastbound between McKnight and Brentwood.
  • Route 180, St. Louis County, 8 p.m. to 6 a.m., westbound ramp to westbound I-70 closed.
  • Route 180, St. Louis County, 9 a.m. to 3 p.m., one lane closed in each direction between I-170 and Route 67.
  • Route 340, St. Louis County, 9 a.m. to 3 p.m., one lane closed eastbound between the north end of Chesterfield Parkway East and Appalachian Trail.
  • Route 367, St. Louis County, 8p.m. to 5 a.m., one southbound lane at Dunn Rd. closed.
  • I-70, St. Charles County, 9 a.m. to 3 p.m., one eastbound lane closed at Cave Springs.
  • I-70, St. Charles County, 6 a.m. to 3 p.m., one lane closed westbound at Zumbehl.
  • Route 79, St. Charles County, 9 a.m. to 3 p.m., one northbound lane closed at railroad and Peruque Creek.
  • Route 61, St. Charles County, 8 p.m. to 6 a.m., one northbound and southbound lane closed between Lincoln County line and I-70.
  • Route 94, St. Charles County, 8 p.m. to 6 a.m., one westbound lane closed between Route 364 and I-64.
  • Route 47, Route WW/Route FF/Route EE, Franklin County, 7 a.m. to 6 p.m., one lane closed in various locations for resurfacing. A flagger or pilot car will direct traffic through the work zone.
  • Route 50, Franklin County, 8 a.m. to 3 p.m.., one eastbound and westbound lane closed between Route BB and Route C.
  • I-55, Jefferson County, 8 p.m. to 6 a.m., one lane closed in both directions between Route Z and Route 67.
  • I-55, Jefferson County, 9 a.m. to 3 p.m., one northbound and one southbound lane closed from Route Z to Lindbergh.
  • Route 61/67, Jefferson County, 7:30 a.m. to 3:30 p.m., one lane closed southbound from Meramec River to Tenbrook.
  • Route AA, Jefferson County, 7 a.m. to 5 p.m., one lane closed at the bridge over Muddy Creek. Automated flaggers will direct drivers through the work zone.

Friday, September 30

  • I-170, St. Louis County, 6 a.m. to 1 p.m., one northbound lane closed south of Route 180 (St. Charles Rock Road).
  • I-44, St. Louis County, 9 p.m. to 12 a.m., two lanes closed eastbound and westbound at Big Bend.
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one eastbound lane closed at New Halls Ferry Road.
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one lane closed eastbound and westbound at New Florissant Road.
  • I-270, St. Louis County, 7 p.m. to 6 a.m., up to two lanes closed eastbound between Hanley and West Florissant.
  • I-270, St. Louis County, 7 p.m. to 6 a.m., various eastbound and westbound lanes closed between Lindbergh and I-170.
  • Route 67 (Lindbergh), St. Louis County, 7 p.m. to 5 a.m., southbound lanes closed.
  • Route 100, St. Louis County, 6 a.m. to 2 p.m., one lane closed eastbound from Tallie Drive/Bopp Road to Woodgate Drive.
  • Route 100, St. Louis County, 6 a.m. to 3 p.m., one lane closed eastbound between McKnight and Brentwood.
  • Route 367, St. Louis County, 8p.m. to 5 a.m., one southbound lane at Dunn Rd. closed.
  • Route 180, St. Louis County, 9 a.m. to 3 p.m., one lane closed in each direction between I-170 and Route 67.
  • Route 340, St. Louis County, 9 a.m. to 3 p.m., one lane closed eastbound between the north end of Chesterfield Parkway East and Appalachian Trail.
  • I-70, St. Charles County, 9 a.m. to 3 p.m., one eastbound lane closed at Cave Springs.
  • I-70, St. Charles County, 6 a.m. to 3 p.m., one lane closed westbound at Zumbehl.
  • Route 61, St. Charles County, 8 p.m. to 6 a.m., one northbound and southbound lane closed between Lincoln County line and I-70.
  • Route 47, Route WW/Route FF/Route EE, Franklin County, 7 a.m. to 6 p.m., one lane closed in various locations for resurfacing. A flagger or pilot car will direct traffic through the work zone.
  • Route 50, Franklin County, 8 a.m. to 3 p.m., one eastbound and westbound lane closed between Route BB and Route C.
  • I-55, Jefferson County, 9 a.m. to 3 p.m., one northbound and one southbound lane closed from Route Z to Lindbergh.
  • Route 61/67, Jefferson County, 7:30 a.m. to 3:30 p.m., one lane closed southbound from Meramec River to Tenbrook.
  • Route AA, Jefferson County, 7 a.m. to 5 p.m., one lane closed at the bridge over Muddy Creek. Automated flaggers will direct drivers through the work zone.

 Saturday, October 1

  • I-44, St. Louis County, 12 a.m. to 6 a.m., three westbound and eastbound lanes closed at Big Bend.
  • I-44, St. Louis County, 12 a.m. to 6 a.m., Big Bend Bridge closed.
  • Route 100, St. Louis City, 5 a.m. to 12 a.m., road closed from Boyle to Hemp for Grovefest.
  • I-270, St. Louis County, 7 p.m. to 6 a.m., up to two lanes closed eastbound between Hanley and West Florissant.
  • I-270, St. Louis County, 7 p.m. to 6 a.m., various eastbound and westbound lanes closed between Lindbergh and I-170.
  • Route 47, Route WW/Route FF/Route EE, Franklin County, 7 a.m. to 6 p.m., one lane closed in various locations for resurfacing. A flagger or pilot car will direct traffic through the work zone.

Sunday, October 2

  • Route 100, St. Louis City, 5 a.m. to 12 a.m., road closed from Boyle to Hemp for Grovefest.

Monday, October 3

  • I-44, St. Louis City, 8 p.m. to 6 a.m., two westbound lanes closed east of Thurman to west of Vandeventer.
  • I-64, St. Louis County, 9 a.m. to 3 p.m., one westbound lane closed on the outer road at Route 141.
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one eastbound lane closed at New Halls Ferry Road.
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one lane closed eastbound and westbound at New Florissant Road.
  • I-270, St. Louis County, starting at 7 a.m., the ramp to eastbound from West Florissant closes permanently. Drivers can use the entrance ramp between Washington Street/Elizabeth Avenue and West Florissant Avenue to access eastbound I-270.
  • I-270, St. Louis County, 7 p.m. to 6 a.m., various eastbound and westbound lanes closed between Lindbergh and I-170.
  • Route 100, St. Louis County, 6 a.m. to 2 p.m., one lane closed eastbound from Tallie Drive/Bopp Road to Woodgate Drive.
  • Route 100, St. Louis County, 6 a.m. to 3 p.m., one lane closed eastbound between McKnight and Brentwood.
  • Route 180, St. Louis County, 9 a.m. to 3 p.m., one lane closed in each direction between I-170 and Route 67.
  • Route 340, St. Louis County, 9 a.m. to 3 p.m., one lane closed eastbound between the north end of Chesterfield Parkway East and Appalachian Trail.
  • Route 367, St. Louis County, 4 a.m. to 2 p.m., one northbound lane closed at Coldwater Creek.
  • I-70, St. Charles County, 9 a.m. to 3 p.m., one eastbound lane closed at Cave Springs.
  • I-70, St. Charles County, 6 a.m. to 3 p.m., one lane closed westbound at Zumbehl.
  • Route 61, St. Charles County, 8 p.m. to 6 a.m., one northbound and southbound lane closed between Lincoln County line and I-70.
  • Route 94, St. Charles County, 8 p.m. to 6 a.m., one westbound and one southbound lane closed between Route 364 and I-64.
  • Route K, St. Charles County, 9 a.m. to 3 p.m., one northbound lane closed at Dardenne Creek.
  • Route 47, Route WW/Route FF/Route EE, Franklin County, 7 a.m. to 6 p.m., one lane closed in various locations for resurfacing. A flagger or pilot car will direct traffic through the work zone.
  • Route 50, Franklin County, 8 a.m. to 3 p.m., one eastbound and westbound lane closed between Route BB and Route C.
  • I-55, Jefferson County, 8 p.m. to 6 a.m., one northbound and one southbound lane closed between Route Z and Route 67.
  • I-55, Jefferson County, 9 a.m. to 3 p.m., one northbound and one southbound lane closed from Route Z to Lindbergh.
  • Route 61/67, Jefferson County, 7:30 a.m. to 3:30 p.m., one lane closed southbound from Meramec River to Tenbrook.
  • Route AA, Jefferson County, 7 a.m. to 5 p.m., one lane closed at the bridge over Muddy Creek. Automated flaggers will direct drivers through the work zone.

Tuesday, October 4

  • I-44, St. Louis City, 8 p.m. to 6 a.m., two westbound lanes closed east of Thurman to west of Vandeventer.
  • I-55, St. Louis City, 8 p.m. to 5 a.m., one northbound lane closed from S. Broadway to Bates.
  • I-44, St. Louis County, 9 a.m. to 3 p.m., one westbound lane closed at Route 141.
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one eastbound lane closed at New Halls Ferry Road.
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one lane closed eastbound and westbound at New Florissant Road.
  • I-270, St. Louis County, 7 p.m. to 6 a.m., various eastbound and westbound lanes closed between Lindbergh and I-170.
  • Route 100, St. Louis County, 6 a.m. to 2 p.m., one lane closed eastbound from Tallie Drive/Bopp Road to Woodgate Drive.
  • Route 100, St. Louis County, 6 a.m. to 3 p.m., one lane closed eastbound between McKnight and Brentwood.
  • Route 180, St. Louis County, 9 a.m. to 3 p.m., one lane closed in each direction between I-170 and Route 67.
  • Route 340, St. Louis County, 9 a.m. to 3 p.m., one lane closed eastbound between the north end of Chesterfield Parkway East and Appalachian Trail.
  • Route 367, St. Louis County, 4 a.m. to 2 p.m., one northbound lane closed at Coldwater Creek.
  • I-70, St. Charles County, 9 a.m. to 3 p.m., one eastbound lane closed at Cave Springs.
  • I-70, St. Charles County, 6 a.m. to 3 p.m., one lane closed westbound at Zumbehl.
  • Route 61, St. Charles County, 8 p.m. to 6 a.m., one northbound and southbound lane closed between Lincoln County line and I-70.
  • Route 94, St. Charles County, 8 p.m. to 6 a.m., one westbound and one southbound lane closed between Route 364 and I-64.
  • Route D, St. Charles County, 9 a.m. to 3 p.m. one lane closed between Route T and Route Z. Flaggers will direct traffic through the work zone.
  • Route K, St. Charles County, 9 a.m. to 3 p.m., one northbound lane closed at Dardenne Creek.
  • Route 47, Route WW/Route FF/Route EE, Franklin County, 7 a.m. to 6 p.m., one lane closed in various locations for resurfacing. A flagger or pilot car will direct traffic through the work zone.
  • Route 50, Franklin County, 8 a.m. to 3 p.m., one eastbound and westbound lane closed between Route BB and Route C.
  • I-55, Jefferson County, 8 p.m. to 6 a.m., one lane closed in both directions between Route Z and Route 67.
  • I-55, Jefferson County, 9 a.m. to 3 p.m., one northbound and one southbound lane closed from Route Z to Lindbergh.
  • Route 61/67, Jefferson County, 7:30 a.m. to 3:30 p.m., one lane closed southbound from Meramec River to Tenbrook.
  • Route AA, Jefferson County, 7 a.m. to 5 p.m., one lane closed at the bridge over Muddy Creek. Automated flaggers will direct drivers through the work zone.

Wednesday, October 5

  • I-55 St. Louis City, 8 p.m. to 5 a.m., one southbound lane closed from Bates to S. Broadway.
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one eastbound lane closed at New Halls Ferry Road.
  • I-270, St. Louis County, 7 a.m. to 2 p.m., one lane closed eastbound and westbound at New Florissant Road.
  • I-270, St. Louis County, 7 p.m. to 6 a.m., various eastbound and westbound lanes closed between Lindbergh and I-170.
  • Route 100, St. Louis County, 6 a.m. to 2 p.m., one lane closed eastbound from Tallie Drive/Bopp Road to Woodgate Drive.
  • Route 100, St. Louis County, 6 a.m. to 3 p.m., one lane closed eastbound between McKnight and Brentwood.
  • Route 180, St. Louis County, 9 a.m. to 3 p.m., one lane closed in each direction between I-170 and Route 67.
  • Route 340, St. Louis County, 9 a.m. to 3 p.m., one lane closed eastbound between the north end of Chesterfield Parkway East and Appalachian Trail.
  • Route 367, St. Louis County, 4 a.m. to 2 p.m., one northbound lane closed at Coldwater Creek.
  • I-70, St. Charles County, 9 a.m. to 3 p.m., one lane closed at Route A.
  • I-70, St. Charles County, 9 a.m. to 3 p.m., one eastbound lane closed at Cave Springs.
  • I-70, St. Charles County, 6 a.m. to 3 p.m., one lane closed westbound at Zumbehl.
  • Route 61, St. Charles County, 8 p.m. to 6 a.m., one northbound and southbound lane closed between Lincoln County line and I-70.
  • Route 94, St. Charles County, 8 p.m. to 6 a.m., one westbound and one southbound lane closed between Route 364 and I-64.
  • Route D, St. Charles County, 9 a.m. to 3 p.m. one lane closed between Route T and Route Z. Flaggers will direct traffic through the work zone.
  • Route K, St. Charles County, 9 a.m. to 3 p.m., one northbound lane closed at Dardenne Creek.
  • Route 47, Route WW/Route FF/Route EE, Franklin County, 7 a.m. to 6 p.m., one lane closed in various locations for resurfacing. A flagger or pilot car will direct traffic through the work zone.
  • Route 50, Franklin County, 8 a.m. to 3 p.m., one lane eastbound and westbound lane closed between Route BB and Route C.
  • I-55, Jefferson County, 8 p.m. to 6 a.m., one lane closed in both directions between Route Z and Route 67.
  • I-55, Jefferson County, 9 a.m. to 3 p.m., one northbound and one southbound lane closed from Route Z to Lindbergh.
  • Route 61/67, Jefferson County, 7:30 a.m. to 3:30 p.m., one lane closed southbound from Meramec River to Tenbrook.
  • Route 67, Jefferson County, 8 p.m. to 6 a.m., one southbound lane closed at Buck Creek Rd.
  • Route AA, Jefferson County, 7 a.m. to 5 p.m., one lane closed at the bridge over Muddy Creek. Automated flaggers will direct drivers through the work zone.

# # #

Districts Involved
St. Louis