HANNIBAL – The Missouri Highways and Transportation Commission awarded contracts for Northeast District projects during its regular meeting on May 4. Awarded contracts include resurfacing, bridge painting, bridge replacement and sidewalk improvements, which are being completed as part of MoDOT’s initiative for compliance with the current standards of the Americans with Disabilities Act (ADA).
Contracts include the following:
- A $2,406,259 contract was awarded to Emery Sapp & Sons, Inc., for resurfacing at the following locations:
- Missouri Route 149 in Macon County from Missouri Route 139 in Downing to the Adair County line, 1 mile south of Route T, the total length of improvement being 16 miles.
- Route OO in Macon County from Hornet Street in Barnesville to Route O in Bloomington, the total length of improvement being 8 miles.
- A $845,250 contract was awarded to Steel City Contractors, LLC, for bridge painting at the following locations:
- U.S. Route 54 in Pike County on the bridge over Bus. 61 near Bowling Green.
- U.S. Route 61 (Northbound) in Ralls County on the bridge over Salt River, just south of Route O, near New London.
- Route A in Marion County on the bridge over the S. Fabius River
- Route A in Ralls County on the bridge over the Salt River near New London
- Route H in Ralls County on the bridge over the Salt River near Spalding.
- U.S. Route 24 in Monroe County on the bridge over Middle Fork Salt River near Paris.
- A $685,846 contract was awarded to S&A Equipment & Builders, LLC, for sidewalk improvements at the following locations:
- Route C in Randolph County from just north of Hayden Street to Clay Street in Huntsville.
- Route Z in Randolph County from east of Rose Drive to 0.1 mile west of U.S. 63 in Cairo
- A $746,312 contract was awarded to S&A Equipment & Builders, LLC, for sidewalk improvements on Route EE in Randolph County from Bus. 63 to Mayo Street in Moberly.
- A $1,043,218 contract was awarded to Bleigh Construction Company, for bridge replacement on Route C in Scotland County located over South Wyaconda River, 1.3 miles west of Route DD near Brock.
Additional information, regarding timelines and impacts to traffic, will be released prior to the start of construction. These projects and more detailed information can also be viewed online under the Northeast District construction guide.
For more information, please contact MoDOT’s Customer Service Center toll-free at 1-888-ASK-MODOT (1-888-275-6636). All work zones are online at www.modot.org/northeast, and you can receive the latest news about road work in your area by signing up for e-updates, receiving emails or text messages about road work that’s happening on the roads, projects or counties you want!