Where: Missouri Route 125 between I-44 in Strafford and Missouri Route 76 in Bradleyville
When: 8 a.m. until 6 p.m. Tuesday-Tuesday, August 11-18. Crews will not work on Saturday or Sunday.
What: Contractor crews sealing pavement with a mixture of rock and oil
Traffic Impacts:
- Drivers can expect one-lane traffic with flaggers and a pilot vehicle guiding them through the work zones. Drivers on side roads are encouraged to wait for the pilot vehicle before entering the state routes.
- Drivers may be stopped for up to 15 minutes
- Drivers are encouraged to avoid route if possible during the project
- Local residents will be able to get to driveway and entrances along the road
Additional info: A chip-seal is planned for this roads as an economical way to maintain and preserve the roadway. The treatments keep a road from deteriorating and extends its life.
(Weather and/or construction delays will alter the work schedule)
END
(For more information, call MoDOT in Springfield at 417-895-7600 or visit www.modot.org/southwest)
(Follow MoDOT's Southwest District: Facebook | Twitter | Instagram |YouTube)