What: Crews sealing pavement with a mixture of rock and oil in Polk County
When/Where:
- 7 a.m. until 5:30 p.m. on Wednesday, July 22 – Missouri Route 32 between Missouri Route 13 in Bolivar and South 16th Road West of Fair Play
- 7 a.m. until 5:30 p.m. on Friday, July 24 – Polk County Route U between Missouri Route 13 in Bolivar and end of state maintenance
Traffic Impacts:
- Drivers can expect one-lane traffic with flaggers and a pilot vehicle guiding them through the work zones. Drivers on side roads are encouraged to wait for the pilot vehicle before entering Routes.
- Drivers may be stopped for up to 15 minutes
- Drivers are encouraged to avoid Route 32 and Route U if possible during the project
- Local residents will be able to get to driveway and entrances along the road
Additional info: A chip-seal is planned for this roads as an economical way to maintain and preserve the roadway. The treatments keep a road from deteriorating and extends its life.
(Weather and/or construction delays will alter the work schedule)
END
(For more information, call MoDOT in Springfield at 417-895-7600 or visit www.modot.org/southwest)
(Follow MoDOT's Southwest District: Facebook | Twitter | Instagram |YouTube)
(Take the Challenge! Buckle Up/Phone Down)
Districts Involved
Southwest
Published On