MARYVILLE, Mo. – Soil borings for three planned bridge projects in Nodaway and Gentry counties will impact traffic beginning next week. The projects are all scheduled for bid lettings in late 2021 but are in the design phase right now.
- April 21: Nodaway County U.S. Route 136 at the bridge over Long Branch
- Eastbound lane closed, 8 a.m. to 4 p.m.
- Flaggers will direct motorists through the work zone
- April 22: Nodaway County U.S. Route 136 at the bridge over Mozingo Branch
- Eastbound lane closed, 8 a.m. to 4 p.m.
- Flaggers will direct motorists through the work zone
- April 27 – May 1: Gentry County Route B at the bridge over Grantham Creek
- CLOSED between Route O and County Road 245
- Monday through Friday, 8 a.m. to 4 p.m. daily
- The roadway will be open each evening
All work is weather permitting and could be rescheduled.
All work zones are No Phone Zones. MoDOT encourages all travelers to slow down and pay attention, especially in work zones, as there will be large equipment and workers near the driving lanes.
For more information about these and other MoDOT projects, visit modot.org and view the online Traveler Information Map. Also at modot.org, sign up online for work zone updates. Information is also available 24/7 at 888-ASK-MODOT (275-6636) or via social media.
Facebook | Twitter | Instagram
Take the Challenge! Buckle Up/Phone Down
###