CHILLICOTHE, Mo. – A resurfacing project through Mercer, Grundy, Livingston and Carroll counties is scheduled to start back up soon. The Missouri Department of Transportation has contracted with Vance Brothers to resurface approximately 83 miles of U.S. Route 65 between the Iowa border and the Missouri River as well as a small portion of Route 6 near Trenton.
The first part of the project, pavement repairs between Chillicothe and the Missouri River are complete. Pavement repairs to the section between Chillicothe and the Iowa state line is slated to take place from May 7 to 11. Traffic may be reduced to one lane around the area where repairs are being made. Some lane closures could remain in place overnight in some locations.
Crews plan to work during daylight hours and could work Saturday, May 12, if needed. Traffic control will be in place alerting motorists of the work. All work is weather permitting and could be rescheduled.
MoDOT encourages all travelers to slow down, especially in work zones, as there will be large equipment and workers near the driving lanes. As always, please buckle up, eliminate distractions, pay attention and drive safely so everyone is able to Arrive Alive.
For more information on this or other MoDOT projects, call 1-888-ASK-MODOT (888-275-6636) or visit www.modot.org/northwest and view the online Traveler Information Map. In addition, MoDOT provides updated information on Twitter @MoDOTNorthwest and Facebook at @MoDOTNWDistrict. Sign up for customized emails about projects in your area by visiting modot.org and clicking on “Email/Text Updates” at the top of the page.
###