Road Work for Mid-Missouri

July 23- August 3, 2018

 

The following is a listing of general highway maintenance and construction work in the mid-Missouri area for the two-week period of July 23 - August 3, 2018.  Weather conditions may postpone the work schedule. Many projects will include lane closures that could cause delays. 

MoDOT reminds motorists to buckle up, slow down, follow posted signs and drive safely through work areas. For more information about a project, please contact MoDOT at 1-888-ASK-MoDOT (275-6636) or visit www.modot.org/central. You can also follow MoDOT’s Central Missouri District on Twitter and Facebook at https://twitter.com/MoDOT_Central and MoDOT Central Missouri District.



All Counties
Daylight Hours
Mowing, striping, brush cutting and guardrail repair continue in various locations.  Motorists should travel with care and be alert to slow-moving equipment along the road.


Boone County
Daylight/Overnight Hours
Route B between Business Loop 70 and Brown Station Road – Roadway resurfacing and sidewalk improvements are nearing completion.
       * Asphalt work will take place south of Hallsville the week of July 23, Occasional lane closures are possible in the work area. 


Overnight Hours
Route 40 between Route UU and Route 5 in Howard County – Resurfacing and shoulder improvements continue.
       * Resurfacing operations on the west end of the project will take place the week of July 23. Concrete work is also planned at Booth Lane and Trails West. One lane will be open, and a pilot car will guide traffic through the work area. The project is scheduled to be completed in October.

Daylight Hours
Route 63 between Route 22 and Route EE in Randolph County – Roadway resurfacing in the northbound lanes is underway. One northbound lane will be open through the work area. The project is scheduled for completion in November.

Route J between Route 40 and Route 124 – Roadway paving will take place Monday, July 23 through Thursday, July 26. One lane will be open, and crews will flag traffic through the work area.


Callaway County
Daylight/Overnight Hours
Route 54 Bridge Improvements
Here is a look at traffic impacts currently in place near the U.S. Route 54 bridge improvement project:
       * Guard cable installation on the eastbound and westbound Route 54 from Holts Summit to Route HH in Fulton
       * Bridge rehabilitation work on the eastbound Route 54 bridge over Stinson Creek. One eastbound lane of Route 54 will be closed through the work area.
These traffic impacts are scheduled until the end of July.

Daylight Hours
Route A between Interstate 70 and Route B – Pavement patching will take place Monday, July 30 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Route B between Route 54 and the Montgomery County line – Roadway resurfacing continues.
       * Guardrail installation at the Harrison Branch bridge will take place the week of July 23. One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in October.

Route E between Route DD and Old Route 54 – Roadway resurfacing and sidewalk upgrades continue.
       * Resurfacing west of Auxvasse will take place the week of July 23. In addition, sidewalk work continues in the city of Auxvasse. One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in October.

Route A between Route I-70 and Route B – Pavement patching will take place Monday, July 23 through Thursday, July 26. One lane will be open, and crews will flag traffic through the work area.

Business Route 54 between Route 54 East and Route 54 West – Sidewalk and ADA improvements are underway.  One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in December.


Camden County
Daylight/Overnight Hours
Route 5 between Route 7 and Beauty Road
– Roadway resurfacing continues.
       * Striping operations will take place the week of July 23. One lane will be open, and crews will flag traffic through the work area.

Daylight Hours
Route 5 between Route 7 and Route 64 in Laclede County – Guardrail installation and replacement and pavement repair continues.
       * Paving operations will take place from 7 p.m. until 7 a.m. each weekday. One lane will be open, and crews will flag traffic through the work area.
The entire project is scheduled for completion in November.

Route O between Route 54 and Rooffner Road – Pavement repair will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area. 


Cole County
Daylight/Overnight Hours
Route 54 between Broadway Street and Stadium Boulevard – Roadway resurfacing, pavement repair, guard rail replacement and bridge repair continues.  
       * The project is in its third stage, which includes rehabilitation of the westbound Route 54 bridges over Stadium Boulevard and Broadway Street and work on the Route 54 on-ramp from the Madison Street bridge.
       *During the work, westbound Route 54 is reduced to one lane 24 hours a day from north of Broadway to south of Stadium.
       * The Route 54 on-ramp from Madison Street is closed during the work.
The work on Westbound Route 54 and Madison Street exit is scheduled for completion in early August.
The entire project is scheduled for completion in November.

Daylight Hours
Route 17 between Route 54 and Route 52 Miller County – Roadway resurfacing and shoulder widening continues.
       * Concrete replacement will take place just north of the Saline Creek bridge the week of July 23. One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in November.


Cooper County
Daylight/Overnight Hours
Route 87 over Interstate 70 – Bridge replacement is underway. 
       * Grading operations will take place the week of July 23. Minimal traffic interruptions are expected.
       * The removal of the Route 87 overpass bridge over I-70 will begin on July 27. I-70 will be closed in both directions at 10 p.m. that night and re-opened by 5 a.m. on Monday, July 30. During the closure, I-70 traffic will be detoured onto the exit and entrance ramps at the interchange, while there will be no access to Interstate 70 from Route 87.
The entire project is scheduled for completion in November.

Daylight Hours
Route U over Petite Saline Creek, south of Debo Road – Bridge maintenance will take place Monday, July 23 and Tuesday, July 24. One lane will be open, and crews will flag traffic through the work area.

Route BB between Route A and Morgan Street – Sidewalk improvements continue. Much of the work will take place off the roadway. Minimal traffic interruptions are expected. 


Crawford County
Daylight Hours
Route 19 between Route 8 and Route 49 – Drainage repair will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Route 19 between Route O and Route P – Pavement marking will take place Monday, July 23 through Thursday, July 26. One lane will be open, and crews will flag traffic through the work area.

Route 49 between Route V and Route Y in Iron County – Drainage repair will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Route E between Route 8 and Cave Road – Drainage repair will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Route F between Route 19 and Route EE – Pavement patching will take place Monday, July 23 through Thursday, July 26. One lane will be open, and crews will flag traffic through the work area.

Route M between Route 8 and Route VV – Culvert pipe replacement in various locations will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Interstate 44 North Outer Road between Route F and the Phelps County line – Paving will take place Tuesday, July 24 through Thursday, July 26. One lane will be open, and crews will flag traffic through the work area.


Dent County
Daylight/Overnight Hours
Route F over Dry Fork Creek, south of Route NN – Bridge replacement continues. The road is closed. Motorists should use the signed detour around the work area. The project is scheduled for completion in August.

Daylight Hours
Route 32 between Route 72 and Route 63 in Texas County – Roadway microsurfacing continues. 
       * Striping and surface repair operations are scheduled for the week of July 23. One lane will be open and crews will guide traffic through the work area. The project is scheduled for completion in the fall.

Route 119 between Route 32 and County Road 6670 – Roadway microsurfacing continues. 
       * Striping and surface repair operations are scheduled for the week of July 23. One lane will be open and crews will guide traffic through the work area. The project is scheduled for completion in the fall.


Gasconade County
Daylight Hours

Route 19 between Route 28 and Route 50 – Shoulder addition and asphalt paving continues. One lane will be open, and crews will flag traffic through the work area.

Route 100 between Route 19 and Route N – Chip sealing the roadway surface to extend pavement life continues the week of July 23. Motorists should expect to encounter loose gravel on the road surface for several days after the seal coat is complete. At that time, crews will sweep the roadway. Motorists should expect delays and lower their speeds through the area. One lane will be open, and crews will flag traffic through the work area.  One lane will be open, and crews will flag traffic through the work area.


Howard County
Overnight Hours
Route 40 between Route 5 and Route UU in Boone County – Resurfacing and shoulder improvements continue.
       * Resurfacing operations on the west end of the project will take place the week of July 23. Concrete work is also planned at Booth Lane and Trails West. One lane will be open, and a pilot car will guide traffic through the work area. The project is scheduled to be completed in October.

Daylight Hours
Route 129 between Route 3 and Route T – Roadway paving will take place Monday, July 23 through Thursday, July 26. One lane will be open, and crews will flag traffic through the work area.

Route H over Salt Fork Creek, south of County Road 204 – Bridge maintenance will take place Monday, July 23 through Tuesday, July 31. One lane will be open, and crews will flag traffic through the work area.

Route H between Route 124 and Route B in Randolph County – Roadway paving will take place Wednesday, July 25 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Route T between Route 129 and County Road 261 – Roadway paving will take place Monday, July 23 and Tuesday, July 24. One lane will be open, and crews will flag traffic through the work area.

Route U between Route 3 and Route H – Roadway paving will take place Monday, July 30 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.


Laclede County
Daylight/Overnight Hours

Route 5 between Route 64 and Route 7 Camden County – Guardrail installation and replacement and pavement repair continues.
       * Paving operations will take place from 7 p.m. until 7 a.m. each weekday. One lane will be open, and crews will flag traffic through the work area.
The entire project is scheduled for completion in November.

Overnight Hours
Interstate 44 between Route 133 and Route D in Phelps County – Roadway resurfacing continues.
       * One lane of the eastbound bridge over Smith and Tater Hollow near mile marker 172.8 will be closed on July 25. The lane will remain closed until September.
       * The westbound exit ramp at mile marker 172 is closed for bridge repair work on the ramp. The ramp will re-open in mid-August. Motorists are advised to use the signed detour routes around the ramp closure.
       * Paving operations in the eastbound lanes will continue the week of July 23. One eastbound lane will be open through the work area.
The entire project is scheduled for completion in August, 2019.

Daylight Hours
Interstate 44 between Elm Street and Route 133 – Pavement repair in the eastbound lanes continues. One eastbound lane will be open through the work area. The project is scheduled for completion in November.

Route 5 between Route C and Farmer’s Lane – Roadway resurfacing and shoulder widening continues. One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in August.

Route 32 between Route 5 and Route 17 in Texas County – Roadway resurfacing and shoulder widening continues. One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in November.

Route C between Interstate 44 and Route 5 – Pavement patching will take place Monday, July 23 through Thursday, July 26. One lane will be open, and crews will flag traffic through the work area.

Route T between Interstate 44 and Route JJ – Pavement patching will take place Monday, July 30 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Route PP between Route C and Route J – Culvert pipe replacement in various locations will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.


Maries County
Daylight Hours
Route 28 between Route 63 and Interstate 44 in Pulaski County – Chip sealing the roadway surface to extend pavement life continues the week of July 23. Motorists should expect to encounter loose gravel on the road surface for several days after the seal coat is complete. At that time, crews will sweep the roadway. Motorists should expect delays and lower their speeds through the area. One lane will be open, and crews will flag traffic through the work area. 

Route 42 between Route 63 and Route 17 in Miller County – Roadway resurfacing, shoulder addition, and guardrail installation continue.
       * Crews will pave asphalt the week of July 23. One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in November.

Route 42 over the Gasconade River, east of County Road 335 – Bridge scour repair continues. Minimal traffic interruptions are expected. The project is scheduled for completion in August.

Route BB between Route 133 and Route 42 in Miller County – Pavement patching will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area. 


Miller County
Daylight/Overnight Hours

Route A over Tavern Creek, east of Route PP – Bridge replacement continues. The road is closed. Motorists are advised to seek alternate route. The project is scheduled for completion in mid-August.


Daylight Hours
Route 17 between Route 52 and Route 54 in Cole County – Roadway resurfacing and shoulder widening continues.
       * Concrete replacement will take place just north of the Saline Creek bridge the week of July 23. One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in November.

Route 42 between Route 17 and Route 63 in Maries County – Roadway resurfacing, shoulder addition, and guardrail installation continue.
       * Crews will pave asphalt the week of July 23. One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in November.

Route A between Route 17 and Route 42 – Pavement patching will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Route H between Route 17 and Marys Home Road – Roadway resurfacing continues. One lane will be open, and crews will flag traffic through the work area. The project is scheduled for completion in November.

Route BB between Route 42 and Route 133 in Maries County – Pavement patching will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Business Route 54 at Eastview Drive – Drainage repair will take place Monday, July 23 through Wednesday, July 25. One lane will be open, and crews will flag traffic through the work area.


Morgan County
Daylight Hours
Route J between Route 5 and Route 135 – Pavement patching will take place Monday, July 23 through Thursday, August 2. One lane will be open, and crews will flag traffic through the work area.

Route BB over Middle Richland Creek, south of Self Chapel Road – Bridge replacement continues. The road is closed. Motorists are advised to seek alternate route. The project is scheduled for completion in August.

Route PP over Messer Creek, east of Route D – Bridge replacement continues. The road is closed. Motorists are advised to seek alternate route. The project is scheduled for completion in August.


Phelps County
Daylight/Overnight Hours
Interstate 44 between Route D and Route 133 in Laclede County – Roadway resurfacing continues.
      * One lane of the eastbound bridge over Smith and Tater Hollow near mile marker 172.8 will be closed on July 25. The lane will remain closed until September.
      * The westbound exit ramp at mile marker 172 is closed for bridge repair work on the ramp. The ramp will re-open in mid-August. Motorists are advised to use the signed detour routes around the ramp closure.
       * Paving operations in the eastbound lanes will continue the week of July 23. One eastbound lane will be open through the work area.
The entire project is scheduled for completion in August, 2019.

Route B over the Bourbeuse River, north of County Road 1400 – Bridge replacement continues. Much of the work will take place off the roadway. Minimal traffic interruptions are expected. The project is scheduled for completion in the fall.

Route D over the Burlington Northern/Sante Fe Railroad, east of Interstate 44 – Bridge replacement continues.  Much of the work will take place off the roadway. Minimal traffic interruptions are expected. The project is scheduled for completion in the fall.

Overnight Hours
Interstate 44 between mile marker 176 and mile marker 180 – Core drilling in the westbound lanes will take place on Tuesday, July 24. One lane will be open through the work area.


Pulaski County
Daylight/Overnight Hours
Interstate 44 between Route 133 in Laclede County and Route D in Phelps County – Roadway resurfacing continues. 
       * One lane of the eastbound bridge over Smith and Tater Hollow near mile marker 172.8 will be closed on July 25. The lane will remain closed until September.
       * The westbound exit ramp at mile marker 172 is closed for bridge repair work on the ramp. The ramp will re-open in mid-August. Motorists are advised to use the signed detour routes around the ramp closure.
       * Paving operations in the eastbound lanes will continue the week of July 23. One eastbound lane will be open through the work area.
The entire project is scheduled for completion in August, 2019.

Daylight Hours
Route 28 between Interstate 44 and Route 63 in Maries County – Chip sealing the roadway surface to extend pavement life continues the week of July 23. Motorists should expect to encounter loose gravel on the road surface for several days after the seal coat is complete. At that time, crews will sweep the roadway. Motorists should expect delays and lower their speeds through the area. One lane will be open, and crews will flag traffic through the work area. 


Washington County
Daylight Hours
Route AA between Route 8 and Route 185 – Pavement patching will take place Monday, July 23 through Thursday, July 26. One lane will be open, and crews will flag traffic through the work area.


MoDOT encourages motorists to log on to www.modot.org/central to comment on their experiences traveling through highway work zones.

Districts Involved
Central
MODOT Newsroom

The newsroom is a one-stop shop for media partners to find their local and statewide communications contacts and news releases, as well as download department leadership portraits and other media.

Visit the Newsroom
Real Time Traffic

Monitor real time traffic with our online traffic map.