JACKSON COUNTY – The Missouri Department of Transportation will be conducting bridge work along east and westbound Interstate 70 at Crysler Ave. beginning at 6 p.m. on Thursday, Sept. 13, until 6 a.m. the following morning. Crews will be setting bridge beams for the Crysler Ave. bridge over I-70. Royals fans traveling to and from the stadiums should plan ahead and expect to see traffic delays. This work is extensive and involves the following:
- I-70 in the vicinity of Crysler Ave. will be reduced to one lane in both directions. The two inside lanes of eastbound and westbound I-70 in this area will be closed.
- There will be rolling road blocks that will completely close I-70 in each direction near Crysler Ave. for approximately ten minutes per direction while beams are set. The exact time of the closures in each direction will vary.
- The ramp from eastbound U.S. 40 to eastbound I-70 will be
This is all part of the bridge replacement work along I-70 at Crysler, Pittman, and Phelps Roads. All work is weather permitting.
Please remember that all work zones are NO PHONE zones. Buckle up. Phone down. Arrive Alive.
Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can be moving operations, such as striping, patching or mowing. They can also be short term, temporary lane closures to make quick repairs or remove debris from the roadway.
For more information about MoDOT news, projects or events, please visit our website at www.modot.mo.gov/kansascity. For instant updates, follow MoDOT_KC on Twitter, or share posts and comments on our Facebook at www.facebook.com/MoDOT.KansasCity. MoDOT Kansas City maintains more than 7,000 miles of state roadway in nine counties. Sign up online for work zone updates or call 888-ASK-MODOT (275-6636).