Districts Impacted
Project Summary
The Missouri Department of Transportation is conducting a conceptual study to identify potential improvements for two adjacent sections of I-70 between the Missouri River and North Hanley Road.
Segment 1: Missouri River to west of US 67 (Lindbergh Blvd.)
- Goal of Segment 1 - Identify potential improvements to the safety and operations of the corridor that might influence the programmed 2024-2028 Statewide Transportation Improvement Program (STIP). The Improve I-70 STL Conceptual Study from the Missouri River to Lindbergh Blvd. reflects multiple “take care of the system” projects along the corridor.
Segment 2: West of US 67 (Lindbergh Blvd.) to North Hanley Rd.
-
Goal of Segment 2 - Identify potential improvements to the safety and operations of the corridor, identify corridor needs, and coordinate with proposed improvements by local partners.
Anticipated Outcomes
Some of the outcomes of the study will likely include:
- The purpose and need for various improvements.
- Goals, objectives, and evaluation measures for this corridor.
- Alternative strategies to address identified problems.
- An analysis of possible impacts of these alternatives in terms of environmental, transportation, and financial impacts.
- An evaluation of how each alternative addresses the problems, goals, and objectives for the corridor.
Funding for Potential Projects
- MoDOT has identified partial funding for the potential needs in Segment 1 (FY2027) beyond the in-kind replacement of the designated I-70 bridge locations (I-270 interchange & MO 180 [St Charles Rock Road] over I-70).
- Segment 2 does not have a project in the current 2024-2028 STIP.
- The remaining needs in Segment 1 and all of Segment 2 are in the annually updated High Priority Unfunded Needs (HPUN) list.
PRINTABLE FACT SHEET
Project Milestones
Study to set a vision and strategic plan for the future of the I-70 corridor.
Data Collection, public outreach, identify purpose, needs and project goals.
PUBLIC MEETING #1
December 14, 2023
Bridgeton Recreation Center
VIRTUAL MEETING/PROJECT SURVEY
Dec. 14, 2023 - Jan. 4, 2024
If you were not able to attend the Dec. 14 meeting, you may participate virtually by reviewing the displays below and completing the PROJECT SURVEY. The survey will be available through Jan. 4, 2024.
Display Boards/Virtual Meeting
These display boards provide information on the project and were shared during Public Meeting #1 on Dec. 14. If you were not able to attend the meeting, you may participate virtually by reviewing the displays and completing the PROJECT SURVEY. The survey will be available through Jan. 4, 2024.
Project Leaders
Tabitha Locke
Title
Area Engineer, North St. Louis County
Department
St. Louis District
Contact Info
Office: (314) 453-1749
Email: Tabitha.Locke@modot.mo.gov
Office: (314) 453-1749
Email: Tabitha.Locke@modot.mo.gov
Lisa Kuntz
Title
Transportation Project Manager
Contact Info
St. Louis District
Office: 314-568-7252
Email: lisa.kuntz@modot.mo.gov
St. Louis District
Office: 314-568-7252
Email: lisa.kuntz@modot.mo.gov