Project Summary
The Missouri Department of Transportation is conducting a conceptual study to identify potential improvements for two adjacent sections of I-70 between the Missouri River and North Hanley Road.
Segment 1: Missouri River to west of US 67 (Lindbergh Blvd.)
- Goal of Segment 1 - Identify potential improvements to the safety and operations of the corridor that might influence the programmed 2026-2030 Statewide Transportation Improvement Program (STIP). The Improve I-70 STL Conceptual Study from the Missouri River to Lindbergh Blvd. reflects multiple “take care of the system” projects along the corridor.
 
Segment 2: West of US 67 (Lindbergh Blvd.) to North Hanley Rd.
- Goal of Segment 2 - Identify potential improvements to the safety and operations of the corridor, identify corridor needs, and coordinate with proposed improvements by local partners.
 
LAMBERT INTERNATIONAL AIRPORT
Anticipated Outcomes
Some of the outcomes of the study will likely include:
- The purpose and need for various improvements.
 - Goals, objectives, and evaluation measures for this corridor.
 - Alternative strategies to address identified problems.
 - An analysis of possible impacts of these alternatives in terms of environmental, transportation, and financial impacts.
 - An evaluation of how each alternative addresses the problems, goals, and objectives for the corridor.
 
Funding for Potential Projects
- MoDOT has identified partial funding for the potential needs in Segment 1 (FY2029) beyond the in-kind replacement of the designated I-70 bridge locations (I-270 interchange & MO 180 [St Charles Rock Road] over I-70).
 - Segment 2 does not have a project in the current 2026-2030 STIP.
 - The remaining needs in Segment 1 and all of Segment 2 are in the annually updated High Priority Unfunded Needs (HPUN) list.
 
PRINTABLE FACT SHEET
Project Milestones
Study to set a vision and strategic plan for the future of the I-70 corridor.
Data Collection, public outreach, identify purpose, needs and project goals.
 
Bridgeton Community Center
Spring 2026
Display Boards/Virtual Meeting
These display boards provide information on the project and were shared during Public Meeting #1 on Dec. 14, 2023.
Project Leaders
    
              Tabitha Locke
      
        
    
    
          
  
    Title
              Area Engineer -- North St. Louis County
          
    
  
    Department
              St. Louis District
          
    
  
    Contact Info
              Office: 314-453-1749
Email: tabitha.locke@modot.mo.gov 
          
      
  
Office: 314-453-1749
Email: tabitha.locke@modot.mo.gov 
    
              Jamie Rana 
      
        
    
    
          
  
    Title
              Transportation Project Manager 
          
    
  
    Department
              St. Louis District
          
    
  
    Contact Info
              Phone: 314-624-5035
Email:  Jamie.Rana@modot.mo.gov
          
      
  
Phone: 314-624-5035
Email:  Jamie.Rana@modot.mo.gov