Future Road Work

Adair County

  • Missouri Route 6 resurfacing and adding rumblestripes from the Chariton River near Novinger to Missouri Route 129 in Green City (two disconnected sections)  $763,000 to be constructed in 2020.
  • Missouri Route 11 bridge replacement over Steer Creek 4.7 miles east of U.S. 63 near Kirksville.  $650,000 to be constructed in 2021
  • Missouri Route 149 bridge improvement over Shuteye Creek 3 miles south of Route D near Connelsville.  $821,000 to be constructed in 2022.