Project Summary

The Missouri Department of Transportation (MoDOT) has a plan to address deficient infrastructure along the entire Route 67 (Lindbergh Blvd.) corridor.  This specific project addresses needs between Route D (Page Ave.) and Interstate 70.  

The project will rehabilitate existing roadway by resurfacing pavement and making updates to the corridor's pedestrian infrastructure to meet current Americans with Disabilities Act (ADA) requirements.  Some sections of the existing sidewalk will be replaced to meet slope or width requirements; other sidewalk will be added to create connections for mobility; still others will be modified or replaced in conjunction with the replacement of aging traffic signals at various intersections within the corridor.  

Project Milestones

Complete
Conceptual Design
milestone_icon
Complete
Public Meeting
January 29, 2025
4-6 p.m.
St. Ann Community Center
1 Community Center Dr. 63074

milestone_icon
Right of Way Acquisitions
Spring 2025
milestone_icon
Contract Awarded
Winter 2025/2026
milestone_icon
Construction Begins
Spring 2026
milestone_icon
Construction Complete
Spring 2027
milestone_icon

What improvements are being made?

Proposed improvements include:

  • Resurface approximately three miles of pavement 
  • Remove existing raised shoulder and replace with new, ADA compliant sidewalks 
  • Upgrade existing sidewalks and curb ramps to meet ADA requirements
  • Construct new sidewalks on south end of project to connect Route 67 to Dorsett Rd. via Adie Rd.
  • Replace existing entrances to meet ADA requirements
  • Reconstruct traffic signals at Blake Dr. and add lighting to improve safety at night
  • Replace all ground mounted and affected overhead corridor signage 

Project Design Strip Maps

Click on the links below to view design strip maps that were shared during the Jan. 29 public meeting.  After viewing the maps, please share with us any thoughts on the project you may have by completing the comment form.  The deadline for submitting comments is Wednesday, Feb. 12.

Strip Map 1

Strip Map 2

Strip Map 3

COMMENT FORM

What is the cost of this project?

The estimated cost of the project is $13 million.

 

 

 

WHO TO CONTACT

Contact Photo
Photo of Tabitha Locke
Tabitha Locke
Title
Area Engineer, North St. Louis County
Department
St. Louis District
Contact Info

Office:  (314) 453-1749