Districts Impacted
Project Summary
MoDOT is implementing a project to address aging pavement and traffic signals, the lack of connectivity for pedestrians and all modes of transportation, and drainage improvements on Route D (Page Ave.) from east of Pennsylvania Avenue to the St. Louis City limits. The project will study needs of this specific segment, including a possible road diet. MoDOT will perform a Road Safety Audit (RSA) and will be soliciting feedback from the public in several ways throughout the project.
Project Milestones
4-6 p.m.
Midwest BankCentre, 6801 Page Ave. 63133
Below are meeting slides.
4-6 p.m.
Carter Commons Food Hall Event Space
6746 Page Ave. 63133
This was a combined open-house style meeting with St. Louis County and their Pennsylvania Avenue Improvement Project. Preliminary designs were shared. You may view the designs below.
What improvements will be made?
- Pavement resurfacing and new pavement markings.
- Upgraded sidewalks to meet ADA requirements.
- Additional sidewalks along the corridor to accommodate pedestrians.
- Upgraded traffic signals at intersections to meet ADA standards from Pennsylvania to Skinker/Kienlen.
- Drainage system improvements.
What will be the impact to traffic?
Right now, MoDOT is still studying the corridor. Once construction begins (anticipated 2025), every reasonable effort will be made to reduce delays due to construction. However, motorists using the route can anticipate daily lane closures and some night operations.
How much will the project cost?
This project construction amount is estimated at $12.5 million.
Public Meeting #2
These slides, that include preliminary designs, were shared with attendees during the Route D public meeting on Sept. 28, 2024. If you weren't able to attend the meeting, please review for additional information.
Public Meeting #1
These slides were available to attendees during the Route D public meeting on Dec. 13, 2023. If you weren't able to attend the meeting, please review for additional information. To view the complete slide, click on the link at the bottom of each.
WHO TO CONTACT
Tabitha Locke
Title
Area Engineer, North St. Louis County
Department
St. Louis District
Contact Info
Office: (314) 453-1749
Email: Tabitha.Locke@modot.mo.gov
Office: (314) 453-1749
Email: Tabitha.Locke@modot.mo.gov
Jamie Rana
Title
Transportation Project Manager
Department
St. Louis District
Contact Info
Phone: 314-624-5035
Email: Jamie.Rana@modot.mo.gov
Phone: 314-624-5035
Email: Jamie.Rana@modot.mo.gov