Districts Impacted
What is being done?
Improvements are needed on Route 61/67 in Jefferson County from north of the Meramec River to south of Collier Drive. To maintain the roadway and continue to keep motorists safe, MoDOT will resurface the pavement in the area and upgrade guardrail to meet the Federal Highway Administration safety standards.
In compliance with MoDOT's Americans with Disabilities Act (ADA) Transition plan, the department will upgrade the existing pedestrian facilities, which include constructing new concrete curb ramps and island cut-throughs and ensuring all signals within the project limits are accessible pedestrian signals. To learn more about the MoDOT ADA Transition plan, visit modot.org/ada-notice.
Construction Schedule
The public hearing was held at Arnold City Hall, 2102 Jeffco. Blvd., Arnold, MO 63010 from 4 - 7 p.m.
What are the anticipated impacts?
MoDOT will work with business owners and residents to ensure that access is available during construction. In order to ensure minimal traffic interference, lane closures will be scheduled for the absolute minimum amount of time required to complete the work.
How much will this project cost?
The cost of construction is estimated to be $9.1 million.
Is MoDOT purchasing property from landowners?
To move forward with ADA upgrades, MoDOT is purchasing some property and/or obtaining temporary easements.
Route 61/67 Project Maps
Jefferson/Franklin County Area Engineer