The Missouri Department of Transportation (MoDOT) will be replacing the Route D/Page Ave. bridges over Route 67/Lindbergh Blvd. as they have reached the end of their useful life.
The new bridges will be built to meet required vertical clearance. Connecting pavement and existing loop ramp pavement will be repaved. Horizontal alignments will be adjusted on the loop ramps to meet standards. Drainage, guardrail, signage and lighting upgrades are included in the project.
Project Milestones
What is the Average Daily Traffic (ADT) along the corridor?
An averge of 39,000 motorists use the the corridor on a daily basis.
Will there be any right of way acquisitions?
No, there will not be any right of way acquisitions.
What is the cost of constructing the new bridges?
The construction cost is $10.5 million.
When will construction begin?
Construction is anticipated to begin summer 2025.
Stakeholder Meeting Presentation
Click HERE to view the full presentation.
Who to Contact

Tabitha Locke
Title
Area Engineer, North St. Louis County
Department
St. Louis District
Contact Info
Office: (314) 453-1749
Email: Tabitha.Locke@modot.mo.gov
Office: (314) 453-1749
Email: Tabitha.Locke@modot.mo.gov

Jamie Rana
Title
Transportation Project Manager
Department
St. Louis District
Contact Info
Phone: 314-624-5035
Email: Jamie.Rana@modot.mo.gov
Phone: 314-624-5035
Email: Jamie.Rana@modot.mo.gov