| Title |
Closing Date |
Closing Time
(DST) |
Award |
| CD-13-024B CMP - Callaway County |
November 20, 2012 |
1:00 PM CST |
Bid Tab CD-13-024B CMP - Callaway County |
| CD-13-022Q Corrugated Metal Pipe |
November 8, 2012 |
1:00 PM CST |
Bid Tab CD-13-022Q CMP - Iberia |
| CD-13-021B Front Mount Brooms |
November 6, 2012 |
1:00 PM CDST |
Bid Tab CD-13-021B Front Mount Brooms |
| CD-13-019Q Epoxy Coated Dowel Bars |
September 25, 2012 |
10:00 AM CDST |
Bid Tab CD-13-019Q Dowel Bars - Epoxy Coated |
| CD-13-017Q Culvert Materials |
September 25, 2012 |
1:00 PM CDST |
Bid Tab CD-13-017Q Culvert Materials |
| CD-13-016Q Corrugated Metal Pipe |
September 13, 2012 |
1:00 PM CDST |
Bid Tab CD-13-016Q CMP |
CD-13-015B Seal Asphalt Parking Lot
Annual Wage Order #19 |
September 18, 2012 |
1:00 PM CDST |
Bid Tab CD-13-014B Seal Asphalt Parking Lot |
CD-13-014Q St. Robert Remodel Material
Complete Addendum 01 for RFQ CD-13-014Q |
September 10, 2012
NEW DATE
September 11, 2012 |
10:00 AM CDST |
Bid Tab CD-13-014B St Robert Remodel |
| CD-13-012Q Whelen Beacons |
August 24, 2012 |
1:00 PM CDST |
Bid Tab CD-13-012Q Whelen Beacons |
| CD-13-011 Used Oil Disposal |
August 23, 2012 |
1:00 PM CDST |
Bid Tab CD-13-011Q Used Oil Disposal |
| RFB CD-13-004B Welding and Fabrication |
August 28, 2012 |
1:00 PM CDST |
Bid Tab CD-13-014B Welding and Fabrication |
| CD-13-010Q On-Call Hauling |
August 16, 2012 |
1:00 PM CDST |
Bid Tab CD-13-010Q On-Call Hauling |
| RFB CD-13-003B Propane |
August 9, 2012 |
10:00 AM CDST |
Bid Tab CD-13-003B Propane |
CD-13-008B Motorgraders and loaders with operators
Addendum 01 |
August 9, 2012
August 16, 2012 |
1:00 PM CDST
10:00 AM CDST |
NO BIDS RECEIVED |
RFQ CD-13-009Q Bridge Replacement Parts
Addendum 01 letter
Addendum 01 REVISED PAGE 3 01_retrofit_details_A0201_0 |
July 27, 2012
July 31, 2012 |
10:00 AM CDST |
Bid Tab CD-13-009Q Girder Repair Parts |
| CD-13-007Q Corrugated Metal Pipe |
July 23, 2012 |
10:00 AM CDST |
Bid Tab CD-13-007Q CMP |
| CD-12-039Q 1235 Gal Poly Tanks |
July 10, 2012 |
1:00 PM CDST |
Bid Tab CD-12-039Q 1235 gal Poly Tank |
RFQ CD-12-051 Hauling of Bridge Sections
Addendum 01 |
June 18, 2012 |
10:00 AM CDST |
Bid Tab CD-12-051Q Hauling of Bridge Sections |
CD Chip Seal - CRS2P Asphalt
Bid Sheets
CRS2P Bid Sheets for 9-3 to 9-16
*Only Prequalified bidders through Central Office bid 5-120207FR allowed |
July 5, 2012
July 18, 2012
August 1, 2012
August 15, 2012
*August 29, 2012
September 12, 2012 |
10:00 AM CDST |
CD Oil Bid Tabulation for CRS2P Sept 3 thru Sept 16
CD Oil Bid Tabulations for CRS2P Aug 20 thru Sept 2
CD Oil Bid Tabulation for CRS2P Aug 6 thru Aug 19
CD Oil Bid Tabulation for CRS2P July 23 thru Aug 5
CD Oil Bid Tabulation for CRS2P July 9 thru July 22 |
| RFQ CD-12-048Q Disc Mower |
May 31, 2012 |
1:00 PM CDST |
Bid Tab CD-12-048Q Rotary Disc Mower |
BID CD-12-041B Guardrail Installation Gasconade County
General Wage Order 55 |
June 14, 2012 |
1:00 PM CDST |
Bid Tab CD-12-041B Guardrail Install Gasconade County |
CD-12-044Q Digitalizing Microfiche
Addendum 01 |
May 24, 2012 |
1:00 PM CDST |
|
CD-12-038B Aggregate - Trap Rock
Addendum 01
Terms and Conditions
Addendum 02
Addendum 03
Addendum 04 |
May 17, 2012 |
10:00 am CDST |
Bid Tab CD-12-038B Trap Rock |
CD-12-042B Equipment with operator
Addendum 1 |
May 22, 2012 |
1:00 pm CDST |
Bid Tab CD-12-042B Equipment with Operator |
Complete bid CD-12-046B Traffic Light Pole Replacement
GWO55 |
May 14, 2012 |
10:00 am CDST |
Bid Tab CD-12-046B Traffic Light Pole Repair |
| CD-12-043B Concrete Saw |
May 10, 2012 |
10:00 am CDST |
Bid Tab CD-12-043B Concrete Saw - Walk Behind |
CD-12-037B Balloon Lighting System
Addendum 01 |
May 8, 2012 |
10:00 am CDST |
Bid Tab CD-12-037B Balloon Lighting System |
| CD-12-040q Steel Tubing for Bollards |
April 26, 2012 |
1:00 pm CDST |
Bid Tab CD-12-040Q Bollards |
| CD-12-034Q Self Propelled Broom Rentals |
May 1, 2012 |
10:00 am CDST |
Bid Tab CD-12-034Q self propelled broom rental |
| CD-12-036Q Diamond Saw Blades |
April 17, 2012 |
10:00 am CDST |
Bid Tab CD-12-036Q Diamond Saw Blades |
| CD-12-006Q Inspections |
April 6, 2012 |
1:00 pm CDST |
Bid Tab CD-12-006Q Inspections |
CD-12-021Q Lebanon Fence Repair
Annual Wage Order No. 18 |
April 12, 2012 |
10:00 am CDST |
Bid Tab CD-12-021Q Chain Link Fence Install - Lebanon Shed |
| CD-12-032Q Epoxy Coated Dowel Bars |
April 5, 2012 |
1:00 pm CDST |
Bid Tab CD-12-032Q Dowel Bars Epoxy Coated |
| CD-12-031Q Carbide Tipped Bits |
April 5, 2012 |
10:00 am CDST |
Bid Tab CD-12-031Q Carbide Tipped Bits |
| CD-12-029Q Conflict Monitor Tester |
March 30, 2012 |
1:00 pm CDST |
Bid Tab CD-12-029Q Conflict Monitor Tester |
| CD-12-030B Walk Behind Mowers |
April 3, 2012 |
10:00 am CDST |
Bid Tab CD-12-030B Walk Behind Mowers |
| CD-12-025B Concrete |
March 29, 2012 |
10:00 am CDST |
Bid Tab CD-12-025B Concrete |
RFQ CD-12-022 Light Pole Replacement - Columbia
General Wage Orders 55 |
March 21, 2012 |
1:00 pm CDST |
Bid Tab CD-12-022Q Lighting Repair |
| CD-12-026Q Ingersoll Rand/ARO Pumps and Pump Repair Kits |
March 15, 2012 |
1:00 pm CDST |
Bid Tab CD-12-026Q Ingersoll Rand/ARO Pumps and Pump Repair Kits |
| CD-12-024B Asphalt |
March 23, 2012 |
10:00 am CDST |
Bid Tab CD-12-024B Asphalt |
| CD-12-023B Aggregate |
March 22, 2012 |
1:00 pm CDST |
Bid Tab CD-12-023B Aggregate |
RFB CD-12-019B Plant Mix Oil Material
Addendum 01 |
February 7, 2012 |
1:00 pm CST |
RFB CD-12-019B Plant Bid Tabulation |
RFB CD-12-018B Slip In Spreader Stands
Reference Stand pictures |
January 17, 2011 |
1:00 PM CST |
CD-12-018B Spreader Stand Bid Tab |
Re-issuance of:
RFQ CD-12-016Qa 2000 Poly tank on skid.doc |
December 30, 2011 |
1:00 PM CST |
Bid Tab CD-12-016Qa Poly tanks on Skid |
RFQ CD-12-015Q Arrow Board Replacement Parts
Addendum 1
Addendum 2 |
December 22,2011 |
10:00 AM CST |
Bid Tab CD-12-015Q Arrow Board Parts |
| RFQ CD-12-016Q 2000 GAL POLY TANK W/ SKID |
December 23, 2011 |
1:00 PM CST |
Bid Tab CD-12-016Qa Poly tanks on Skid |
| RFQ CD-12-013Q Cinder Hauling |
December 5, 2011 |
10:00 AM CST |
Did Not Award due to rejection of all bids due to high cost.
(Non-Disclosed Pricing) |
| RFB CD-12-012B GPS Survey Equipment |
December 6, 2011 |
1:00 PM CST |
CD-12-012B GPS Survey Equipment |
| RFQ CD-12-010Q Snow and Ice Control Material (aggregate) |
October 28, 2011 |
1:00 PM CDST |
Bid Tab RFQ CD-12-010Q Snow/Ice Control |
RFB D5-11-059B Dump Truck Beds
Addendum 03
Addendum 02
Addendum 01 - Attachments
Attachment A
Attachment B |
September 6, 2011
September 13, 2011 |
1:00 PM CDST |
Bid Tab D5-11-059B Dump Body Beds |
| CD-12-005Q Used Oil Disposal |
August 11, 2011 |
1:00 PM CDST |
Bid Tab CD-12-005Q Used Oil Disposal |
| CD-12-004Q Rapid Set Concrete |
August 5, 2011 |
1:00 PM CDST |
Bid Tab CD-12-004Q Rapid Set |
CD-12-002 Propane
Addendum 01
Addendum 02 |
August 9, 2011 |
1:00 PM CDST |
Bid Tab CD-12-002B Propane |
UPDATED RFB D5-11-064B Guardrail Install Osage County
General Wage Order 54
General Wage Order 55 |
July 22, 2011
Extended Date
August 12, 2011
August 25, 2011 |
1:00 PM CDST |
Bid Tab D5-11-064B Guardrail Linn Osage county |
D5-11-050B Guardrail Replacement - Camden County
General Wage Order 54
Addendum 01 |
July 25, 2011 |
1:00 PM CDST |
Bid Tab D5-11-050B Guardrail
|
| RFQ D5-11-063Q Exmark Mower |
June 10, 2011 |
1:00 AM CDST |
Bid Tab D5-11-063Q Exmark Mower |
| D5-11-062Q Sand Hauling |
June 7, 2011 |
10:00 AM CDST |
Bid Tab D5-11-062Q Sand Hauling |
| RFQ D5-11-061Q Pipe Liner |
June 3, 2011 |
10:00 AM CDST |
Bid Tab D5-11-061Q Pipe Liner Buscher |
| RFQ D5-11-060Q Front Mounted Broom |
June 3, 2011 |
10:00 AM CDST |
Bid Tab D5-11-060Q Front Mount Broom |
| RFQ D5-11-058Q Pipe Liiner |
May 27, 2011 |
1:00 PM CDST |
Bid Tab D5-11-058Q Pipe Liner Belt |
D5-11-057Q Arched Pipe
Addendum 01
Addendum 02 |
May 27, 2011 |
1:00 PM CDST |
Bid Tab D5-11-057Q Arch Pipe Belt |
| D5-11-056Q Cinder Hauling - Camden County |
May 25, 2011 |
10:00 AM CDSR |
Bid Tab D5-11-056Q Cinder Hauling |
| RFQ D5-11-055Q Lighting Projects |
May 25, 2011 |
1;00 PM CDST |
Bid Tab D5-11-050Q Lighting Project |
| RFQ D5-11-051Q GPS for Rigid Locator |
May 23, 2011 |
1:00 PM CDST |
Bid Tab D5-11-051Q GPS Spectrum Attachment |
D5-11-054B Polyethylene Pipe Liner
Addendum 01 |
May 27, 2011 |
1:00 PM CDST |
Bid Tab D5-11-054B Pipe Liner |
| D5-11-053Q Cinder Hauling |
May 18, 2011 |
10:00 AM CDST |
Bid Tab D5-11-053Q Cinder Hauling |
D5-11-052Q Fence Repair - Columbia
Supporting Pictures
General Wage Order 54 |
May 13, 2011 |
1:00 PM CDST |
Bid Tab D5-11-052Q Fence Repair -Columbia |
| RFQ D5-11-040Q Silica Fume Concrete Mix |
CANCELLED |
|
|
| D5-11-049Q MO Coalition for Roadway Safety TV Ad placement |
April 25, 2011 |
1:00 PM CDST |
Bid Tab D5-11-049Q Coalition Ad Placement |
| D5-11-048B On-Call Concrete |
May 3, 2011 |
1:00 PM CDST |
Bid Tab D5-11-048B On-Call Concrete |
| D5-11-037B Jetter |
May 2, 2011 |
1:00 PM CDST |
Bid Tab D5-11-037B Jetter |
D5-11-039B Bridge Deck Hydro Demolition Surface Prep
General Wage Order 54
Addendum 01 |
April 18, 2011
|
1:00 PM CDST |
Bid Tab D5-11-039Q Hydro Demolition
CONTRACT CANCELLED |
| RFQ D5-11-045Q 21000 lb Trailer |
March 29, 2011 |
1:00 PM CDST |
Bid Tab D5-11-045Q Trailer |
| D5-11-041Q Welder Generator |
March 18, 2011 |
1:00 PM CDST |
Bid Tab D5-11-041Q Welder Generator |
| D5-11-044B Aggregate |
March 30, 2011 |
1:00 PM CDST |
Bid Tab D5-11-044B Aggregate |
D5-11-043B Equipment with Operator
General Wage Order 54
Addendum 01 |
March 29, 2011
April 4, 2010 |
1:00 PM CDST |
Bid Tab D5-11-043B Equipment with Operator |
| D5-11-042B Asphalt |
March 24, 2011 |
1:00 PM CDST |
Bid Tab D5-11-042B Asphalt
(posted 3/28/11 2:15 PM)
Bid Tab - D5-11-042B Asphalt (updated prices 6/1/11 - 6/30/11 |
| D5-11-038Q SCAG Hydro-drive Walk Behind Mower |
March 16, 2011 |
1:00 PM CDST |
Bid Tab D5-11-038Q Scag Mower |
RFB D5-11-021B Plant Mix Oil Material
Addendum 01
Addendum 02 |
March 8, 2011 |
10:00 AM CST |
UPDATED BID TABULATION
Bid Tab RFB D5-10-021B PLANT MIX |
| D5-11-030Q Diamond Saw Blades |
February 28, 2011 |
1:00 PM CST |
Bid Tab D5-11-030Q Diamond Saw Blades |
| D5-11-031B Mower Parts |
February 22, 2011 |
1:00 PM CST |
Bid Tab D5-11-031B Mower Parts |
RFQ D5-11-027Q Used Shipping Containers
Addendum 01
Addendum 02 |
February 9, 2011 |
1:00 PM CST |
Bid Tab D5-11-027Q Cargo Containers |
D5-11-026Q Street Light Pole Install Columbia
General Wage Order 53 Boone County
Addendum 01 |
February 22, 2011 |
10:00 AM CST |
Bid Tab D5-11-026Q Street Pole Replacement |
D5-11-025B Tires
Addendum 01
Addendum 02 |
February 3 , 2011
February 7, 2011 |
1:00 PM CST |
Bid Tab D5-11-025B Tires |
| D5-11-024Q Dowel Bars |
February 2, 2011 |
1:00 PM CST |
Bid Tab D5-11-024Q Dowel Bars |
| D5-11-023Q Street Light Heads |
January 26, 2011 |
1:00 PM CST |
Bid Tab D5-11-023Q Street light heads |
| D5-11-020Q Interlocking Concrete Blocks |
December 10, 2010 |
10:00 AM CST |
Bids Rejected |
| D5-11-019Q Portable Air Powered Oil Handlers |
December 10, 2010 |
1:00 PM CST |
Bid Tab D5-11-09Q Portable Air Powered Oil Handlers |
| D5-11-017Q Cameras for Signal Shop |
December 9, 2010 |
1:00 PM CST |
Bid Tab D5-11-017Q Traffic Cameras |
| D5-11-018Q Tire Chains |
December 3, 2010 |
10:00 AM CST |
Bid Tab D5-11-018Q Tire Chains |
| D5-11-015Q Pulverize Rubble Bid quote |
December 8, 2010 |
1:00 PM CST |
Bid Tab D5-11-015Q Pulverize Concrete |
| D5-11-012Q Traffic Camera Pole Installation |
November 22, 2010 |
1:00 PM CST |
Bid Tab D5-11-012Q Traffic Camera Pole Installation |
| D5-11-014Q Spreader/GL400 Parts |
November 19, 2010 |
10:00 AM CST |
Bid Tab D5-11-014Q Spreader/GL400 Parts |
| D5-11-013Q Snap-Tite Corrugated Metal Pipe Liner |
November 12, 2010 |
10:00 AM CST |
Bid Tab D5-11-013Q Snap-Tite Corrugated Metal Pipe Liner |
D5-11-009B Guardrail Installation
General Wage Order 54 |
October 5, 2010 |
1:00 PM CDST |
Bid Tab D5-11-009B Guardrail Installation |
| D5-11-010B Aggregate |
October 5, 2010 |
1:00 PM CDST |
Bid Tab D5-11-010B Aggregate |
| |
|
|
|
D5-11-008B Light Pole Installation
Addendum 01
General Wage Order 54 |
September 28, 2010 |
1:00 PM CDST |
Bid Tab D5-11-008B Light Pole Installation |
D5-11-007B Lane Addition
Addendum 01
General Wage Order 54 |
September 20, 2010 |
1:00 PM CDST |
Bid Tab D5-11-007B Lane Addition |
D5-11-005B Fuel Tanks
Addendum 01 |
September 21, 2010 |
1:00 PM CDST |
Bid Tab D5-11-005B Fuel Tanks |
| D5-11-006Q Used Oil Disposal |
August 24, 2010 |
1:00 PM CDST |
Bid Tab D5-11-006Q Used Oil Disposal |
D5-10-004Q - Chain Link Fence Repair - Columbia
Supporting Pictures
General Wage Order 53 |
August 6, 2010 |
1:00 PM CDST |
Bid Tab D5-11-004Q Chain Link Fence Repair - Columbia |
| D5-11-003Q On-Call Tire Repair Services |
August 4, 2010 |
1:00 PM CDST |
Bid Tab D5-11-003Q On-Call Tire Repair Services |
| D5-11-002Q Tires |
July 28, 2010 |
10:00 AM CDST |
Bid Tab D5-11-002Q Tires |
| D5-11-001Q Rapid Set Concrete |
July 27, 2010 |
1:00 PM CDST |
Bid Tab D5-10-11-001Q Rapid Set Concrete |
| D5-10-074Q Used International 4700 or 4900 series truck cabs. |
May 10, 2010 |
10:00 AM CDST |
Bid Tab D5-10-074Q Used International 4700 or 4900 series truck cabs |
D5-10-072Q Asphalt Overlay Project
Addendum 01 |
May 7, 2010
May 10, 2010 |
1:00 PM CDST |
Bid Tab D5-10-072Q Asphalt Overlay Project |
D5-10-073Q Rental of Mobile Asphalt Millings Crusher/Screen
Addendum 01 |
April 30, 2010 |
10:00 AM CDST |
Bid Tab D5-10-073Q Rental of Mobile Asphalt Millings Crusher/Screen |
| D5-10-071Q Micro-Milling Cutter Drums for RotoGrader |
April 27, 2010 |
1:00 PM CDST |
Bid Tab D5-10-071Q Micro-Milling Cutter Drums for RotoGrader |
| D5-10-070Q Vertical Storage Tanks |
April 21, 2010 |
1:00 PM CDST |
Bid Tab D5-10-070Q Vertical Storage Tanks |
D5-10-069B On-Call Concrete
Addendum 01 |
April 22, 2010
April 28, 2010 |
1:00 PM CDST
10:00 AM CDST |
Bid Tab D5-10-069B On-Call Concrete |
| D5-10-068Q ARO Pumps |
April 9, 2010 |
10:00 AM CDST |
Bid Tab D5-10-068Q ARO Pumps |
| D5-10-065B Equipment with Operator |
March 30, 2010 |
1:00 PM CDST |
Bid Tab D5-10-068B Equipment with Operator |
| D5-10-066Q CMP |
March 29, 2010 |
1:00 PM CDST |
Bid Tab - D5-10-66Q CMP |
| D5-10-062B Aggregate |
March 23, 2010 |
1:00 PM CDST |
Bid Tab - D5-10-062B Aggregate |
| D5-10-064Q Interlocking Concrete Blocks |
March 22, 2010 |
1:00 PM CDST |
Bid Tab - D5-10-064Q Interlocking Concrete Blocks |
| D5-10-060B Rental of Mobile Screening Plant |
March 19, 2010 |
10:00 AM CDST |
Bid Tab - D5-10-060B Rental of Mobile Screening Plant |
| D5-10-061B Asphalt |
March 16, 2010 |
1:00 PM CST |
Bid Tab - D5-10-061B Asphalt |
| D5-10-059B Mower Parts |
February 16, 2010 |
1:00 PM CST |
Bid Tab D5-10-059B Mower Parts |
| D5-10-057Q Augers |
February 2, 2010 |
1:00 PM CST |
Bid Tab D5-10-057Q Augers |
| D5-10-058Q Bobcat Rental |
January 25, 2010 |
1:00 PM CST |
Bid Tab D5-10-058Q Bobcat Rental |
| D5-10-055B Thermoplastic Pavement Overlay Material |
January 25, 2010 |
1:00 PM CST |
Bid Tab D5-10-055B Thermoplastic Pavement Overlay Material |
| D5-10-056Q Cutting Edges, Tips, and Bolts for Motorgrader |
January 12, 2010 |
1:00 PM CST |
Bid Tab D5-10-056Q Cutting Edges, Tips, and Bolts for Motorgrader |
| D5-10-054Q Dust Collection System for EZ Drill |
January 12, 2010 |
10:00 AM CST |
Bid Tab D5-10-054Q Dust Collection System for EZ Drill |
| D5-10-053B Slip-Bases for Telespar Posts |
January 11, 2010 |
1:00 PM CST |
Bid Tab D5-10-053B Slip-Bases for Telespar Posts |
Bid D5-10-052 Grinding Asphalt Millings
Addendum 01 |
January 5, 2010 |
10:00 AM CST |
Bid Tab D5-10-10-052Q Grinding Asphalt Millings |
Bid D5-10-045B Fuel Tanks
Addendum 01
Addendum 02 |
December 30, 2009 |
1:00 PM CST |
Bid Tab D5-10-045B fuel tanks |
| D5-10-051Q Carbide Tipped Bits |
December 23, 2009 |
10:00 AM CST |
Bid Tab D5-10-051Q Carbide Tipped Bits |
D5-10-048Q Corrugated Metal Pipe
Addendum 01 |
December 22, 2009 |
1:00 PM CST |
Bid Tab D5-10-048Q Corrugated Metal Pipe |
| D5-10-046Q Hydraulic Motors for Spreader |
December 14, 2009 |
10:00 AM CST |
Bid Tab D5-10-046Q Hydraulic Motors for Spreader |
D5-10-044Q Man-lift Rental
Addendum 01 |
December 1, 2009 |
10:00 AM CST |
Bid Tab D5-10-044Q Man-lift Rental |
| RFQ D5-10-043Q MATCO Tool Box |
November 30, 2009 |
10:00 AM CST |
Bid Tab D5-10-043Q MATCO Tool Box |
D5-10-042B Corrugated Metal Pipe
Addendum 01 |
December 1, 2009 |
1:00 PM CST |
Bid Tab D5-10-042B Corrugated Metal Pipe |
| D5-10-041B Winter Asphalt Patching Material |
November 30, 2009 |
10:00 AM CST |
Bid Tab D5-10-041B Winter Asphalt Patching Material |
D5-10-039Q Chain Link Fence Repair and Replacement
Supporting Pictures
General Wage Order 53 |
November 5, 2008 |
1:00 PM CDST |
Bid Tab D5-10-039Q Chain Link Fence Repair and Replacement |
| D5-10-038Q Western Snowplow |
October 26, 2009 |
10:00 AM CDST |
Bid Tab D5-10-038Q Western Snowplow |
D5-10-037Q Fence Installation
Supporting Pictures
Arial Photo
General Wage Order 53
ADDENDUM 01 |
October 19, 2009 |
1:00 PM CDST |
Bid Tab D5-10-037Q Fence Installation |
| D5-10-036Q Used Railroad Tank Cars |
October 16, 2009 |
1:00 PM CDST |
Bid Tab D5-10-036Q Used Rail Tank Car |
| RFQ D5-10-035Q Tire Buy Back |
October 27, 2009 |
1:00 PM CDST |
Bid tab D5-10-035Q Tire Buy Back |
| D5-10-033Q PA Enclosed Trailer |
October 15, 2009 |
1:00 PM CDST |
Bid Tab - D5-10-033Q Enclosed Trailer |
D5-10-034Q Fence Installation
Supporting Pictures
General Wage Order 53 |
September 23, 2009 |
10:00 AM CDST |
No Bids Received - Will Re-Bid |
D5-10-032B On-Call Hauling Services
ADDENDUM 01
ADDENDUM 02
General Wage Order 53
|
NEW DATE
October 5, 2009 |
1:00 PM CDST |
Bid Tab D5-10-032B On-Call Hauling Services |
D5-10-030B Guardrail Installation
Supporting Pictures
General Wage Order 53 |
September 23, 2009 |
1:00 PM CDST |
Bid Tab D5-10-030B Guardrail Installation |
D5-10-031B Seeding and Mulching Project
General Wage Order 53 |
September 21, 2009 |
1:00 PM CDST |
Bid Tab D5-10-031B Seeding and Mulching Project |
| D5-10-029Q Snap-Tite Liner for Corrugated Metal Pipe |
September 8, 2009 |
10:00 AM CDST |
|
| D5-10-027B Corrugated Metal Pipe |
September 3, 2009 |
1:00 PM CDST |
Bid Tab D5-10-027B Corrugated Metal Pipe |
D5-10-024B Asphalt Overlay
General Wage Order 53 |
September 1, 2009 |
1:00 PM CDST |
Bid Tab D5-10-024B Asphalt Overlay |
RFB D5-10-025B Trailers
ADDENDUM
Addendum 01 RFB D5-10-025B |
August 31, 2009 |
1:00 PM CDST |
Bid Tab - D5-10-025B Utility Trailers |
RFQ D5-10-021Q Fuel Tanks for Hallsville and Versailles
ADDENDUM
Addendum 01 RFB D5-10-021Q |
August 25, 2009
August 27, 2009 |
1:00 PM CDST |
Bid Tab D5-10-021B fuel tanks |
| D5-10-023B Configure and Implement Traffic Equipment |
August 26, 2009 |
10:00 AM CDST |
Bid Tab D5-10-023B Configure and Implement Traffic Equipment |
| D5-10-026Q Used Oil Disposal |
August 24, 2009 |
1:00 PM CDST |
Bid Tab D5-10-026Q Used Oil Disposal |
| D5-10-013B Traffic Count Equipment |
August 27, 2009 |
1:00 PM CDST |
Bid Tab D5-10-013B Traffic Count Equipment |
| RFQ D5-10-022Q Lighting |
August 17, 2009 |
10:00 AM CDST |
Bid Tab D5-10-022Q Lighting |
| RFB D5-10-016B Unit Heaters |
August 21, 2009 |
1:00 PM CDST |
Bid Tab D5-10-016B Unit Heaters |
| RFQ D5-10-017Q Install Fencing |
August 13, 2009 |
1:00 PM CDST |
Bid Tab D5-10-017Q Install Fencing |
| D5-10-019Q Corrugated Metal Pipe |
August 10, 2009 |
10:00 AM CST |
Bid Tab D5-10-019Q Corrugated Metal Pipe |
| D5-10-018Q Rapid-Set Concrete Mix |
August 6, 2009 |
1:00 PM CDST |
Bid Tab D5-10-018Q Rapid-Set Concrete Mix |
D5-10-014B Lane Addition
Addendum 01-D5-10-014B
General Wage Order 52 |
August 11, 2009 |
1:00 PM CDST |
Bid Tab D5-10-014B Lane Addition |
Bid D5-10-015Q Vibratory Driver
Addendum 01 D5-10-015Q |
July 31, 2009 |
1:00 PM CDST |
Bid D5-10-015Q Vibratory Driver |
| D5-10-011Q Equipment Inspections |
August 4, 2009 |
10:00 AM CDST |
Bid Tab D5-10-011Q Equipment Inspections |
Bid D5-10-003B CMS Communication Equipment
Addendum 01 D5-10-003B |
August 3, 2009
NEW DATE
August 10, 2009 |
1:00 PM CDST |
Bid Tab D5-10-003B CMS Communication Equipment |
| D5-10-012Q Diamond Saw Blades |
July 28, 2009 |
10:00 AM CDST |
Bid Tab D5-10-012Q Diamond Saw Blades |
| D5-10-008B Aggregate |
July 30, 2009 |
1:00 PM CDST |
Bid Tab D5-10-008B Aggregate |
| D5-10-010Q Shot Rock and Rock for Gabion Baskets |
July 21, 2009 |
1:00 PM CDST |
Bid Tab D5-10-010Q Shot Rock and Rock for Gabion Baskets |
| D5-10-009Q Tires |
July 21, 2009 |
10:00 AM CDST |
Bid Tab D5-10-009Q Tires |
D5-10-004B Equipment with Operators
General Wage Order 52
ADDENDUM 01 |
July 24, 2009 |
1:00 PM CDST |
Bid Tab for D5-10-004B Equipment with Operators |
| D5-10-007Q Type II Rock |
July 13, 2009 |
1:00 PM CDST |
Bid Tab D5-10-007Q Type II Rock |
| D5-10-005Q Remove Federally Protected Resource |
July 8, 2009 |
10:00 AM CDST |
Bid Tab D5-10-005Q Remove Eagles Nest |
D5-10-006Q Cold Milling
ADDENDUM 01 |
July 6, 2009 |
10:00 AM CDST |
Bid Tab D5-10-006Q Cold Milling |
D5-10-002B Flat Steel Sheet Piling
ADDENDUM 01 |
July 7, 2009 |
10:00 PM CDST |
Bid Tab D5-10-002B Flat Steel Sheet Piling |
| D5-10-001Q Dowel Bars |
July 2, 2009 |
1:00 PM CDST |
Bid Tab D5-10-001Q Dowel Bars |
CANCELLED
Cancellation of Quote D5-09-056Q
D5-09-056Q Flat Steel Sheet Piling |
June 22, 2009 |
9:00 AM CDST |
|
| D5-09-055Q Carbide Tipped Bits |
June 22, 2009 |
10:00 AM CDST |
Bid Tab D5-09-055Q Carbide Tipped Bits |
| D5-09-053Q Base Rock for Howser area |
June 22, 2009 |
10:00 AM CDST |
Bid Tab D5-09-053Q Base Rock |
D5-09-050B Sign Installation
General Wage Order 52 |
June 25, 2009 |
1:00 PM CDST |
ALL BIDS REJECTED |
| D5-09-052B Fusion Splicer Kit and OTDR |
June 23, 2009 |
10:00 AM CDST |
Bid Tab D5-09-052B Fusion Splicer Kit and OTDR |
D5-09-049B Pavement Marking
General Wage Order 52 |
June 18, 2009 |
1:00 PM CDST |
Bid Tab D5-09-049B Pavement Marking |
D5-09-051Q Lane Addition
General Wage Order 52 |
June 9, 2009 |
1:00 PM CDST |
ALL BIDS REJECTED
WILL REBID |
Bid D5-09-047Q CMP
Addendum 01 |
May 27, 2009 |
1:00 PM CDST |
Bid Tab D5-09-047Q CMP |
| Bid D5-09-048Q Dowell bars |
May 27, 2009 |
1:00 PM CDST |
Bid Tab D5-09-048Q Dowel Bars |
Bid D5-09-046B Guardrail Removal and Replacement
General Wage Order 52
Supporting Pictures
Lane Closure Diagram |
May 27, 2009 |
11:00 AM CDST |
Bid Tab D5-09-046B Gauardrail Removal and Replacement |
| D5-09-045Q EZ Drill for Bobcat |
May 7, 2009 |
10:00 AM CDST |
Bid Tab D5-09-045Q EZ Drill |
CANCELLED
Cancellation of Quote D5-09-044Q
D5-09-044Q Bobcat Attachments |
May 4, 2009 |
1:00 PM CDST |
|
D5-09-043Q Pulverize Rubble
ADDENDUM 01 BELOW
Addendum 01 Letter and pricing sheet |
April 30, 2009 |
1:00 PM CDST |
Bid Tab D5-09-043Q Pulverize Concrete |
| Bid D5-09-042Q Hydraulic Hammers |
April 27, 2009 |
1:00 PM CDST |
Bid Tab D5-09-042Q Hydraulic Breakers |
| D5-09-041B Conveyor |
April 14, 2009 |
10:00 AM CDST |
Bid Tab D5-09-041B Salt Conveyor |
| D5-09-037B Cinder Hauling |
April 14, 2009 |
1:00 PM CDST |
BID WAS CANCELLED AFTER OPENING |
| D5-09-039Q Skid Sprayer |
April 9, 2009 |
1:00 PM CDST |
Bid Tab D5-09-039Q Skid Sprayer |
ADDENDUM 01 BELOW
Addendum 01 to Bid D5-09-038B Welding and Fabrication
Bid D5-09-038B On Call Welding |
April 7, 2009 |
1:00 PM CDST |
Bid Tab. D5-09-038 On Call Welding and Fab |
| D5-09-036Q Walk Behind Mowers |
March 26, 2009 |
1:00 PM CDST |
Bid Tab D5-09-036Q Walk Behind Mowers |
D5-09-031Q Drake Roof Replacement
ADDENDUM 01 |
March 24, 2009 |
1:00 PM CDST |
Bid Tab for D5-09-031Q Drake Roof Replacement |
D5-09-032Q Hughesville Roof Replacment
ADDENDUM 01 |
March 24, 2009 |
1:00 PM CDST |
Bid Tab for D5-09-032Q Hughesville Roof Replacement |
| D5-09-034Q Stover Roof Replacement |
March 24, 2009 |
1:00 PM CDST |
Bid Tab for D5-09-034Q Stover Roof Replacement |
D5-09-035B Asphalt - Plant Pick Up
MSG-93-07-A
2004 Missouri Standard Specifications for Highway Construction |
March 31, 2009 |
1:00 PM CDST |
Bid Tab for D5-09-035B Asphalt - Plant Pick Up |
Bid D5-09-033Q Camdenton Roof Replacement
ADDENDUM 01 |
March 24, 2009 |
1:00 PM CDST |
Bid Tab for D5-09-33Q Camdenton Roof Replacement |
| D5-09-027B Schulte Mower Parts |
March 23, 2009 |
1:00 PM CDST |
Bid Tab for D5-09-027B Schulte Mower Parts |
| D5-09-030B On-Call Concete |
March 24, 2009 |
1:00 PM CDST |
Bid Tab for D5-09-030B On-Call Concrete |
| D5-09-029Q Speed Detectors |
March 13, 2009 |
1:00 PM CDST |
Bid Tab for D5-09-029Q Speed Detectors |
| D5-09-024B Generator D5 |
March 16, 2009 |
1:00 PM CDST |
|
| D5-09-028Q Steel for oil tank |
March 5, 2009 |
1:00 PM CST |
Bid Tab for D5-09-028Q |
| D5-09-26Q Front Mount Broom |
February 25, 2009 |
1:00 PM CST |
Bid tab for D5-09-026Q Front Mount Broom |
| D5-09-025Q Aggregate for Chip Seal- Kerry |
February 18, 2009 |
1:00 PM CST |
Bid tab for D5-09-025Q |
| D5-09-022Q Janitorial Services - Columbia PO |
March 10, 2009 |
1:00 PM CST |
Bid Tab for D5-09-022Q Janitorial Services- Columbia PO |
| D5-09-023Q Raw Steel |
February 13, 2009 |
10:00 AM CST |
Bid tab for D5-09-023Q Raw Steel |
| D5-09-021Q Janitorial Services - Sedalia PO |
March 3, 2009 |
1:00 PM CST |
Bid Tab for D5-09-021Q Janitorial Services- Sedalia PO |
D5-09-020Q Janitorial Services - Camdenton PO
ADDENDUM 01
Addendum 01 Letter |
February 26, 2009 |
1:00 PM CST |
Bid Tab for D5-09-020Q Janitorial Services- Camdenton PO |
| Bid D5-09-019B Live Bottom Trailer |
February 11, 2009 |
1:00 PM CST |
Bid tab for D5-09-019B Live Bottom Trailers |
| D5-09-040SFS Tuff Posts for Traffic |
04/01/09 |
04/03/09
1:00 pm CDST |
|
| RFQ D5-09-018Q Truck mounted sprayer |
December 30, 2008 |
1:00 PM CST |
Bid tab D5-09-018Q Bridge Deck Sprayer |
| RFQ D5-09-017Q Oil Heater |
December 2, 2008 |
10:00 AM CST |
Bid tab for D5-09-017Q |
RFQ D5-09-014Q Linn Maintenance Roofs
Annual Wage Order Osage County
ADDENDUM ADDED
Addendum 01 to RFQ D5-09-014Q
Addendum 02 to RFQ D5-09-014Q
FAXES ACCEPTED |
December 2, 2008
NEW CLOSING DATE
December 4, 2008 |
1:00 PM CST |
Bid tab for D5-09-014Q Linn Roofs |
RFQ D5-09-015Q Versailles Roof
Annual Wage Order 15 Morgan County
ADDENDUM ADDED
Addendum 01 to RFQ D5-09-015Q
FAXES ACCEPTED |
November 25, 2008
NEW CLOSING DATE
December 2, 2008 |
1:00 PM CST |
Bid tab for D5-09-015Q |
RFQ D5-09-013Q ADIEM Modules
FAXES ACCEPTED |
November 10, 2008 |
1:00 PM CST |
Bid tab for ADIEM Modules D5-09-013Q |
| RFQ D5-09-012Q Sand for Ice Control |
November 4, 2008 |
1:00 PM CDST |
Bid tab for Sand D5-09-012Q |
RFQ D5-09-008Q Overhead Doors
Annual Wage Order 15 Moniteau
Fax Copies Accepted |
September 2, 2008 |
1:00 PM CDST |
Bid tab D5-08-008Q for Overhead Doors |
RFQ D5-09-011Q MU Trash Bags |
August 29, 2008 |
1:00 Pm CDST |
Bid tab D5-09-011Q |
RFB D5-09-009B for Trash Service
Addendum 01 |
August 28, 2008 |
1:00 pm CDST |
D5-09-009B bid tab with letter |
RFQ D5-09-010Q for Fence Replacement
General_Wage_Order 51 |
August 19, 2008 |
1:00 pm CDST |
Bid tab D5-09-010Q |
D5-09-007Q Fence Replacement
General_Wage_Order 51 |
August 12, 2008 |
1:00 pm CDST |
Bid tab D5-09-007Q |
| RFQ D5-09-006Q Used Oil Disposal |
August 7, 2008 |
1:00 pm CDST |
Bid tab D5-09-006B Used Oil |
D5-09-004Q Guardrail Hwy 17
General_Wage_Order 51 |
August 8, 2008 |
1:00 pm CDST |
Bid tab D5-09-004Q Guardrail Hwy 17 |
| D5-09-005Q CMP Benton County |
August 1, 2008 |
1:00 pm CDST |
D5-09-005Q CMP Benton County |
RFQ D5-09-003Q Hwy 63 Guardrail
General_Wage_Order 51 |
July 31, 2008 |
1:00 pm CDST |
Bid tab RFQ D5-09-003Q Hwy 63 Guardrail |
| D5-09-002SFS MU Advertising |
August 1, 2008 |
1:00 pm CDST |
SFS ~ No bid tab |
| RFQ D5-09-001Q Pavemend TR and 15.0 |
July 25, 2008 |
1:00 pm CDST |
Bid tab D5-09011Q Pavemend |
| RFQ D5-08-030Q MATCO Tool Box |
June 9, 2008 |
10:00 am CDST |
Bid tab for MATCO tool boxes |
| RFQ D5-08-048Q Walk Behind Commerical Mowers |
June 2, 2008 |
10:00 am CDST |
Bid Tabulation D5-08-048Q Mowers |
| D5-08-047Q RFQ for Tire Changer |
May 30, 2008 |
1:00 pm CDST |
Bid Tabulation for D5-08-047Q Tire Changer |
RFQ D5-08-046Q Guardrail Install
General Wage Order 51 |
May 30, 2008 |
1:00 pm CDST |
Bid Tabulation D5-08-046Q |
| RFQ D5-08-043Q Truck Inspections |
May 22,2008 |
1:00 pm CDST |
D5-08-043Q Bid tab truck inspections |
| D5-08-045Q CMP |
May 16, 2008 |
10:00 am CDST |
D5-08-045Q CMP Bid tab |
| RFQ D5-08-044Q EZ Drill |
May 9, 2008 |
10:00 am CDST |
Bid tab for EZ Drill |
| RFB D5-08-040B Asphalt |
May 15, 2008 |
1:00 pm CDST |
Bid Tab for D5-08-040B Asphalt Plant Pick up |
| Bid D5-08-039B On Call Concrete |
May 7, 2008 |
1:00 pm CDST |
On Call Concrete bid tab |
Bid D5-08-006Q Tire Repair
Addendum 01 Letter |
April 28, 2008 |
1:00 pm CDST |
Bid Tab D5-08-006Q Tire Repair |
Bid D5-08-036Q Pace Trailer
Addendum 01 Letter
Addendum 02 Letter |
April 11, 2008 |
1:00 pm CDST |
Bid tab D5-08-036Q Pace Trailer |
RFQ D5-08-034Q Ice Machine
(Above link contains corrected dates of addendum)
Addendum 01 Letter |
March 21, 2008 |
1:00 pm CDST |
Bid tab D5-08-034Q Ice Machine |
Bid D5-08-033B Lock System
Addendum 01 Letter
Addendum 02 Letter |
March 25, 2008 |
1:00 pm CDST |
Best Lock Bid tab |
| RFB D5-08-031B Hi Visibility Coats |
March 12, 2008 |
1:00 pm CST |
Hi Vis Coat Bid tab D5-08-031B |
Bid D5-08-028B for Traffic Pole Installs
General Wage Order 51 |
March 3, 2008 |
1:00 pm CST |
Bid Tab D5-08-028B Hwy 63 Poles |
Cancellation letter to bid D5-08-018Q
D5-08-018Q Retriever for Tractor and Motorgrader |
CANCELLED |
|
|
RFB D5-08-029B for Slip Bases for telespar
Addendum 01 for Bid D5-08-029B |
February 13, 2008 |
1:00 pm CST |
Slip Base Bid tab D5-08-029B |
| RFQ for Schulte FX520 Mower |
February 5, 2008 |
1:00 pm CST |
Bid tab D5-08-025Q 20ft Schulter Mower |
| RFQ for Hand Tools |
January 29, 2008 |
1:00 pm CST |
Bid tab D5-08-026Q Hand Tools |
| RFQ for Sand for Ice Contol |
January 14, 2008 |
1:00 pm CST |
Bid tab for Sand D5-08-023Q |
| RFB for three eights chip seal rock Howser |
January 22, 2008 |
11:00 am CST |
Bid tab for D5-08-022B |
Bid D5-08-018Q Surveyor Pack Toolbox
Andendum 01
|
December 10, 2007 |
1:00 pm CST |
Bid tab for Surveyor Pack |
Overhead Door D5-08-014B
Prevailing Wages Cooper Moniteau Gasconade |
December 18, 2007 |
1:00 pm CST |
Bid tab for Overhead Doors |
| D5-08-015Q RFQ Windows Replacement |
December 4, 2007 |
1:00 p.m. |
Bid Tab for Window Replacement |
D5-08-016Q Advance Solar Flashing
D5-08-016Q Addendum |
October 16, 2007 |
11:00 a.m. |
|
| D5-08-012Q CMP |
September 24, 2007 |
1:00 p.m. |
|
D5-08-009Q Fuel Pump Cabinet
Addendum 001 D5-08-009Q Fuel Pump Cabinet
Addendum 002 D5-08-009Q Fuel Pump Cabinet |
September 23, 2007 ** Date Changed to September 24, 2007 |
1:00 p.m. |
|
| D5-08-011Q Three Eights Chip Rock |
September 21, 2007 |
11:00 a.m. |
|
| D5-08-010Q Western Snowplow |
September 17, 2007 |
1:00 p.m. |
Bid Tab For Snow Plow |
| Q5-08-007B Vertical Liquid Storage Tanks |
September 6, 2007 |
1:00 pm |
Bid Tab for Liquid Storage Tanks |
D5-08-004B Argon, Acetylene and Oxygen
Addendum 01 for Air Tank bid |
August 24, 2007 |
1:00 pm |
Bid Tab for Acetylene Argon Oxygen Tanks
|
| D5-08-005 Marketing and Advertising for Missouri Coalition for Highway Safety with MU Sport Properties |
July 24, 2007 |
July 30, 2007 |
|
| D5-08-003Q Power Washer |
July 20, 2007 |
1:00 p.m. |
Q5-06-003Q Pressure Washer Tabulation |
| D5-08-001Q Mo Blvd Lane Addition |
July 11, 2007 |
1:00 p.m. |
D5-08-001 Tabulation |
| D5-08-002B Used Oil |
July 9, 2007 |
1:00 p.m. |
|
| Q5-07-043 Chip Seal Rock - Versailles |
June 20, 2007 |
1:00 p.m. |
|
| Q5-07-052 Liquid Calcium Tanks |
June 14, 2007 |
1:00 p.m. |
|
| Q5-07-051- Base Rock Blackwater |
June 14, 2007 |
1:00 p.m. |
|
| Q5-07-048 Tow Behind Rotary Sweeper |
June 11, 2007 |
1:00 p.m. |
|
| Q5-07-049 Fuel Tanks |
June 8, 2007 |
1:00 p.m. |
|
Q5-07-046 Cargo Van Box Body
Q5-07-046 Addendum 01 |
June 6, 2007 |
10:00 a.m. |
|
| Q5-07-044 Surface Stone |
June 6, 2007 |
10:00 a.m. |
|
| Q5-07-047 Cross Conveyor Spreader |
May 31, 2007 |
1:30 p.m. |
|
| Q5-07-045 Walk Behind Mowers |
May 31, 2007 |
1:00 p.m. |
Q5-07-045 Bid Tab |
| Q5-07-041 CMP |
May 18, 2007 |
1:00 p.m. |
|
Q5-07-039 Guard Cable Work
Profile Sheets with index
boone-modified
callaway-modified
cooper-modified |
May 7, 2007 |
1:00 p.m. |
|
| Q5-07-038 Asphalt |
May 1, 2007 |
1:00 p.m. |
|
| RFQ Q5-07-040 Vehicle Lift |
April 24, 2007 |
1:00 p.m. |
|
| Q5-07-035 Fuel Tanks |
April 17, 2007 |
1:00 p.m. |
|
| Q5-07-036 Pipe Liner |
April 11, 2007 |
1:00 p.m. |
Q5-07-036 Pipe Liner Tabulation |
| Q5-07-037 Street Light Poles |
April 5, 2007 |
1:00 p.m. |
Q5-07-037 Street Light Pole Tabulation |
Q5-07-030 On Call Concrete
Q5-07030 Addendum 01 |
April 03, 2007 |
1:00 p.m. |
Q5-07-030 Tabulation |
Q5-07-029 Liquid Calcium Tank
Q5-07-029 Addendum 001 |
March 29, 2007 |
1:00 p.m. |
Q5-07-029 Revised Liquid Calcium Tank tab |
Q5-07-028 Carpentry Work at Boonville Rest Area
Q5-07-028 Addendum 01 |
March 1, 2007 |
1:00 p.m. |
Q5-07-028 Tabulation |
| Q5-07-032 Spectrum Analyzer |
February 28, 2007 |
1:00 p.m. |
Q5-07-032 Bid Tab |
Q5-07-023 Bid for Logging of Right of Way
General Wage Order 50
Maps |
Februray 13, 2007 |
1:00 p.m. |
No Bids Submitted |
Q5-07-025 Aggregate Bid
for Miller and Camden Counties |
February 20, 2007 |
1:00 p.m. |
Q5-07-025 Tabulation |
| Q5-07-026 Raw Steel Bid |
January 31, 2007 |
1:00 p.m. |
Q5-07-026 Tabulation |
Q5-07-021 Janitorial Services
Q5-07-021 Addendum 01 |
January 30, 2007 |
1:00 p.m. |
Q5-07-021 Tabulation |
| Q5-07-022 Versailles Culvert Pipe |
January 4, 2007 |
1:00 p.m. |
|
| Q5-07-020 Purchase of Trees |
December 27, 2006 |
1:00 p.m. |
|
| Q5-07-019 Culvert Pipe Liner |
November 16, 2006 |
1:00 p.m. |
|
IFB Q5-07-015 Trailer Mount Changeable Message Signs |
September 25, 2006 |
10:00 a.m. |
|
Bid Q5-06-056
Addendum 01 Q5-06-056 |
June 15, 2006 |
10:00 a.m. (CDT) |
Bid tab for Steel |
RFB 6-060706D D05 District Uniform Bid
RFB 6-060706D Addendum 001 |
July 6, 2006 |
2:00 p.m. |
|