| Item |
Date Posted |
Response Date |
Vendor/Bid Information |
| SL13-073-R7 Tire Chains |
December 27, 2012 |
10:00 a.m. |
Tabulation |
| SL13-071-RWPavementMarking |
December 21, 2012 |
10:00 a.m. |
Tabulation SL13-071-RW |
SL13-066-RW ITS Network Relocation
FinalPlansSL13066RW
REQUIRED MATERIALS
General Wage Order #56
Contractor Pre-Qualification Required
Addendum001 ITS Relocation
Addendum 002-SL13-066-RW |
December 21, 2012 |
10:00 a.m. |
SummaryTab SL13-066-RW |
| SL13-070-R7 On-Call Portland Cement |
December 17, 2012 |
10:00 a.m. |
Tabulation |
| SL13-069-R7 On-Call Rapid Set Cement |
December 17, 2012 |
10:00 a.m. |
Tabulation |
SL13-067-R7 St. Peters Parking Lot Paving and Striping Project
Site Plan
Annual Wage Order #19-St. Charles County
Addendum 001 |
December 12, 2012 |
10:00 a.m. |
Tabulation |
| SL13-068-R7 Black Magnum |
December 11, 2012 |
2:00 p.m. |
Tabulation |
| SL13-062-RW Weekly Trash Service |
December 5, 2012 |
10:00 a.m. |
Tabulation |
SL13-061-RWRollOff Trash Service.doc
Addendum 001 |
December 4, 2012 |
10:00 a.m. |
Tabulation |
SL13-063-RW.67 Crack Sealingdocx
General Wage Order #56
Contractor Pre-Qualification Required |
November 29, 2012 |
10:00 a.m. |
Crack Seal Tabulation |
| SL13-064-RW Trackhoe Rental |
November 28, 2012 |
10:00 a.m. |
Tabulation |
| SL13-065-RW Hydraulic Motors |
November 26, 2012
November 29, 2012 |
10:00 a.m. |
Tabulation |
SL13-037-RW Retaining Wall Repair
Exhibit A
Exhibit C
General Wage Order #56
Addendum 001-SL13-037-RW |
November 19, 2012
November 28, 2012 |
10:00 a.m. |
|
| SL13-060-R7 Holophanes |
November 9, 2012 |
10:00 a.m. |
Tabulation |
SL13-059-R7 St. Peters Parking Lot Paving Project
Site Plan
Annual Wage Order #19-St. Charles County
Addendum 001 |
November 7, 2012 |
10:00 a.m. |
Withdrawn-Will be rebid |
| SL13-056-RWREMOTEMOWER |
November 6, 2012 |
10:00 a.m. |
Tabulation |
| SL13-058-RW Gel Cell Batteries |
November 5, 2012
November 7, 2012 |
10:00 a.m. |
Tabulation |
SL13-055-RW Quick Obstruction Clearance
Addendum 001
Traffic Control Plan-Blanchette Bridge |
October 30, 2012 |
10:00 a.m. |
WITHDRAWN |
SL13-052-RWPavementMarkerRepair
General Wage Order #56
ExhibitB, ExhibitC, ExhibitD |
October 29, 2012 |
10:00 a.m. |
REJECTED |
SL13-054-R7 Janitorial Service-Project Offices
Attachment I-Festus Floor Plan
Attachment II-Maryland Heights Floor Plan
Attachment III-Chesterfield Floor Plan
Attachment IV-Hampton Floor Plan
Addendum 001 |
October 25, 2012 |
10:00 a.m. |
Tabulation |
SL13-053-RW Culvert StCharles
Route D Location Map
Plans
General Wage Order #56
Contractor Pre-Qualification Required
Addendum 001 |
Ocotber 17, 2012 |
10:00 a.m. |
Tabulation |
SL13-051-RWBRIDGEWallRepair
StLouisAveExhibitA
StLouisAveExhibittC
StLouisAveExhibitD
General Wage Order #56
Contractor Pre-Qualification Required
Addendum 001 |
October 16, 2012 |
10:00 a.m. |
Tabulation |
RFP SL13-031-RW CCTV
Addendum 001 |
October 12, 2012 |
10:00 a.m. |
|
| SL13-050-RWBlankOutSign |
October 9, 2012 |
10:00 a.m. |
Tabulation |
| SL13-049-R7 Tailgate Spreaders |
September 28, 2012 |
10:00 a.m. |
Tabulation |
| SL13-048-R7 Flu Vaccinations |
September 27, 2012 |
10:00 a.m. |
Tabulation |
SL13-046-RWInsulation
PrevailingWage19
Addendum 001-SL13-046-RW |
September 27, 28, 2012 |
10:00 a.m. |
This project will be re-bid |
| SL13-047-R7 Trailer |
September 25, 2012 |
10:00 a.m. |
Tabulation |
SL13-041-R7 Bridge Epoxy Overlay North St. Louis County
General Wage Order #56
Contractor Pre-Qualification Required |
September 24, 2012 |
10:00 a.m. |
Tabulation |
| SL13-040-RW On Call Hauling |
September 24, 2012 |
10:00 a.m. |
On-Call Hauling Service Tabulation |
SL13-043-RW Carbide Cutter Drum
Quotation may be faxed or emailed. |
September 20, 2012 |
10:00 a.m. |
Tabulation |
SL13-039-RWDrainage Improvement Holmes
ExhibitATitleSheet (Exhibit B- Scope of
Work embedded in Solicitation Document)
ExhibitCPlanSheet
ExhibitDCulvertSection
ExhibitECrossSection
ExhibitFProfile
Wage Order #56
Contractor Pre-Qualification Required |
September 19, 2012 |
10:00 a.m. |
DrainageImprovementTab |
SL13-045-R7 TVs/Monitors
Addendum 001 |
September 18, 2012 |
8:00 a.m. |
Tabulation |
SL13-042-R7 Tractor Parts
Addendum 001 |
September 18, 2012
September 19, 2012 |
10:00 a.m. |
Tabulation |
SL13-035-RW Brdge Epoxy Overlay Stlouis
Wage Order #56
Contractor Pre-Qualification Required |
September 14, 2012 |
10:00 a.m. |
Bridge Overlay Tabulation |
SL13-034-RW Brdge Epoxy Overlay StCharles
Wage Order #56
Contractor Pre-Qualification Required |
September 14, 2012 |
10:00 a.m. |
WITHDRAWN- THIS MAY BE RE-BID AT A LATER DATE |
SL13-033-R7 Lighting Poles
Traffic Approved Products List |
September 13, 2012 |
10:00 a.m. |
Tabulation |
| SL13-027-RW Tree Trimming on Right of Way |
September 6, 2012 |
10:00 a.m. |
Tabulation |
SL12-036-RWOverhead Garage Doors
Annual Wage Order #19-St. Louis County |
September 4, 2012 |
10:00 a.m. |
Tabulation |
SL13-032-RWSeedProject
Exhibit B Seeding
Exhibit-C_Gravel ARockLining
Exhibit DTraffic Control
Exhibit Eerosion Control |
September 10, 2012 |
10:00 a.m. |
Soil Preparation Tab |
| RFP SL13-021-RW Out of Pavement Dectectors |
August 23, 2012 |
1:00 p.m. |
|
SL13-029-R7 Overhead Garage Doors
Annual Wage Order #19-St. Louis County
Addendum 001 |
August 23, 2012 |
10:00 a.m. |
All bids rejected -To be rebid |
| SL13-030-RWSweeper parts |
August 21, 2012 |
10:00 a.m. |
Tabulation |
SL13-028-R7 Computer Monitor Mounts
Addendum 001 |
August 20, 2012
August 21, 2012 |
10:00 a.m.
1:00 p.m. |
Tabulation |
| SL13-026-R7 Signal Parts |
August 7, 2012 |
1:00 p.m. |
Tabulation |
| SL13-025-RW LEDREPLACEMENTS |
August 1, 2012 |
10:00 a.m. |
Tabulation |
| SL13-024-RWCement Blocks |
July 31, 2012 |
10:00 a.m. |
tab sheet |
SL13-020-RWBridge Bearings
brdgbearingplan1
bridgebearingplans2 |
July 31, 2012 |
10:00 a.m. |
Tabulation |
| SL13-018-RWEquipment Rental |
July 30, 2012 |
10:00 a.m. |
Tabulation |
| SL13-017-RW Motorgraders and Loaders with Operators |
July 30, 2012 |
10:00 a.m. |
Tabulation |
| SL13-023-R7 Oil Absorbing Compound |
July 24, 2012 |
10:00 a.m. |
Tabulation |
| SL13-022-R7 Polymer Mortar |
July 23, 2012 |
10:00 a.m. |
Tabulation |
SL13-018-RW CHAIN LINK REPAIR
141 Helfrich 141 Helfrich a 141 Helfrich b |
July 23,2012 |
10:00 a.m |
Tabulation |
SL13-011-RWCrackSealI55- rebid
Wage Order # 55
Contractor Pre-Qualification Required
Addendum 001-SL13-011-RW |
July 20, 2012 |
10:00 a.m. |
Crack Seal Tabulation |
| SL13-016-RW BOOM MOWER PARTS |
July 16, 2012 |
10:00 a.m. |
Tabulation |
| SL13-015-R7 Skid Steer Rental |
July 13, 2012 |
10:00 a.m. |
Withdrawn |
| SL13-014-R7 Crawler Loader Rental |
July 13, 2012 |
10:00 a.m. |
Withdrawn |
SL13-009-RW Watering Service final
I64 Watering Locations
Addendum 001-SL13-009-RW |
July 12, 2012
July 20, 2012 |
10:00 a.m. |
Rejected |
| SL13-004-RWInvestigativeServices |
July 12, 2012 |
10:00 a.m. |
Tabulation |
| SL13-012-RWTrackhoe Track Replacement |
July 11, 2012 |
10:00 a.m. |
Tabulation |
SL13-010-R7 Brine Building Project
Building A & Building B Drawings
Annual Wage Order #18-St. Louis County
Annual Wage Order #18-St. Louis City
Annual Wage Order #18-St. Charles County
Addendum 001 |
July 11, 2012 |
10:00 a.m. |
Tabulation |
SL13-005-R7 Janitorial Services-Transportation Management Center
First Floor Building Plan
Second Floor Building Plan
Addendum 001
Addendum 002 |
July 9, 2012
July 12, 2012 |
10:00 a.m.
1:00 p.m. |
Tabulation |
| SL13-013-R7 Excavator Rental |
July 6, 2012 |
10:00 a.m. |
Tabulation |
SL13-008-RW Culverts Jefferson County
Rte V BoxExhibits A C D
Rte E Box Exhibits A C D
Wage Order # 55
Addendum 001-SL13-008-RW
Contractor Pre-Qualification Required |
July 2, 2012 |
10:00 a.m. |
Tabulation |
| SL13-006-R7 Drain Cleaning Service |
June 27, 2012 |
10:00 a.m. |
Tabulation |
SL13-003-RW CrackSeal I-55
Wage Order # 55
Contractor Pre-Qualification Required
Addendum001 cracksealing |
June 26, 2012 |
10:00 a.m. |
ALL BIDS REJECTED |
SL13-002-RWPavement Marker Repair
ExhibitB ExhibitC ExhibitD
Wage Order # 55
Contractor Pre-Qualification Required |
June 19, 2012 |
10:00a.m. |
MAY BE REBID |
SL13-001-RW Soil Preparation and Seed
ExhibitB, ExhibitC, ExhibitD,ExhibitE
Addendum 001
Addendum 002-SL13-001-RW
Addendum 003-SL13-001-RW |
June 27, 2012 |
10:00 a.m. |
All Bids Rejected, |
SL12-109-R7 Bridge Cameras
Addendum 001
Addendum 002 |
June 6, 2012 |
2:00 p.m. |
Tabulation |
| SL12-108-R7 Sign Stands |
May 30, 2012 |
10:00 a.m. |
Tabulation |
SL12-105-RW GUARD CABLE INSTALL
Wage Order # 55 |
May 30,2012 |
10:00 a.m. |
Tabulation |
| SL12-107-R7 Tree Removal |
May 22, 2012 |
10:00 a.m. |
Tabulation |
| SL12-104-RW CRAWLER LOADER RENTAL |
May 22, 2012 |
10:00 a.m. |
Tabulation |
| SL12-103-RW skidsteer Rental |
May 22, 2012 |
10:00 a.m. |
Tabulation |
SL12-102-RW EXCAVATOR Rental
Addendum 001 |
May 22, 2012 |
10:00 a.m. |
SL12-102-RWEXCAVATOR Rental |
| SL12-106-R7 Tailgate Spreaders |
May 18, 2012 |
10:00 a.m. |
Tabulation |
| SL12-101-R7 Tailgate Spreaders |
May 15, 2012 |
10:00 a.m. |
Tabulation |
SL12-100-R7 Retractable Changeable Message Boards
Addendum 001
Addendum 002
Addendum 003 |
May 14, 2012
May 16, 2012 |
10:00 a.m. |
Tabulation |
SL12-096-RW Inlaid Pavement Marker Repair
ExhibitB ExhibitC ExhibitD
Wage Order # 55
Contractor Pre-Qualification Required |
May 14, 2012 |
10:00 a.m. |
To be revised and reissued |
| SL12-099-R7 Push Bumpers |
May 7, 2012 |
2:00 p.m. |
Tabulation |
| SL12-098-R7 Walk-Behind Mower |
May 7, 2012 |
10:00 a.m. |
Tabulation |
SL12-097-R7 Bulk Portland Cement
Addendum 001 |
April 25, 2012
May 1, 2012 |
10:00 a.m. |
Tabulation |
| SL12-095-R7 Holophanes |
April 20, 2012 |
10:00 a.m. |
Tabulation |
| SL12-094-R7 Anti-Ice Units |
April 19, 2012 |
10:00 a.m |
Tabulation |
| SL12-093-R7 Signal Parts |
April 13, 2012 |
10:00 a.m. |
Tabulation |
SL12-066-R7 Anti-Ice Units
Addendum 001 |
April 11, 2012 |
10:00 a.m. |
All bids rejected |
SL12-089-RW Fence Repair St. Louis County
Wage Order # 55
Addendum001fence
Addendum002fence
Addendum003fence |
April 11, 2012 |
10:00 a.m. |
Tabulation |
| SL12-091-RW Rotomill Wheels |
April 11, 2012 |
10:00 a.m. |
Tabulation |
| SL12-086-RW CDL RECRUITMENT |
April 10, 2012 |
10:00 a.m |
Tabulation |
| SL12-092-R7 Tree Removal-Ballas |
April 4, 2012 |
1:00 p.m. |
Tabulation |
SL12-090-R7 Erosion Control
Exhibit A Map of Work Location
Exhibit C Plan Sheet
Exhibit D Temporary Traffic Control |
April 2, 2012 |
10:00 a.m. |
Tabulation |
SL12-085-RW BRIDGE OVERLAY
EXHIBIT A Pics,EXHIBIT B A6941Close-Up
EXHIBITC A6698 Close-Up,Location Map
Contractor Pre-Qualification Required
Wage Order # 55
Addendum001 Epoxy |
April 2, 2012 |
10:00 a.m. |
Bridge Overlay Tabulation |
RFP SL12-074-RW Traffic Mgt. Center Console Design
Addendum001TMC
Addendum002TMC
Addendum003TMC
Addendum004TMC |
March 29, 2012 |
1:00 p.m. |
All proposals rejected |
RFP SL12-071-RW Dynamic Message Sign Assemblies
Addendum001 DMS |
March 28, 2012 |
1:00 p.m. |
|
| SL12-088-RWPump Repair |
March 21, 2012 |
10:00 a.m. |
Tabulation |
| SL12-083-R7 Skid Steer Rental |
March 9, 2012 |
10:00 a.m. |
Tabulation |
SL12-068-R7 Video Streaming Solution
Addendum 001
Addendum 002 |
March 8, 2012
March 12, 2012 |
10:00 a.m. |
All Bids Rejected |
SL12-084-R7 Skid Steer w/Cold Planer Rental
Addendum 001 |
March 5, 2012 |
10:00 a.m. |
Tabulation |
SL12-086-RW TREE REMOVAL
Addendum 001
Addendum 002 |
March 2, 2012
March 5, 2012 |
10:00 a.m.
2:00 p.m.
10:00 a.m. |
Tabulation |
| SL12-081-RW Pedestrian LED |
February 29, 2012 |
10:00 a.m. |
Tabulation |
SL12-076-RW Guardrail Installation
Traffic Control Plans f
Proposed Guardrail Design
Wage Order # 55
Addendum001 Guardrail |
February 28, 2012 |
10:00 a.m. |
Tabulation |
| SL12-080-R7 Mott/Alamo Mower Parts |
February 27, 2012 |
10:00 a.m. |
Tabulation |
| SL12-079-R7 Triumph Switchblade Mower Parts |
February 27, 2012 |
10:00 a.m. |
Tabulation |
| SL12-078-R7 Bush-Whacker Mower Parts |
February 27, 2012 |
10:00 a.m. |
Tabulation |
SL12-075-RW SIGNAL UPRIGHT
Photo026,Photo027,Photo028,Photo029
WageOrderNo.18
Addendum001 signalupright
Addendum002 |
February 23, 2012
March 2, 2012 |
10:00 a.m. |
Tabulation |
SL12-062-RW Mowing StLouis PROJECT H
Exhibit A mowingproject H
Exhibit B Project H
Addendum001 Mowing E-F-G-H |
February 23, 2012
February 27, 2012 |
1:00 p.m. |
All bids rejected. |
SL12-061-RW Mowing StLouis PROJECT G
Exhibit A mowing project G
Exhibit B Project G
Addendum001 Mowing E-F-G-H |
February 23, 2012
February 27, 2012 |
1:00 p.m. |
Tabulation G |
SL12-060-RW Mowing StLouisStCharles PROJECT F
ExhibitA mowing project F
Addendum001 Mowing E-F-G-H |
February 23, 2012
February 27, 2012 |
1:00 p.m. |
Tabulation F |
SL12-059-RW Mowing STLOUISCOUNTY PROJECT E
ExhibitA mowingproject E
Addendum001 Mowing E-F-G-H |
February 23, 2012
February 27, 2012 |
1:00 p.m. |
Tabulation E |
SL12-082-R7 CMP-Beaufort
Addendum 001 |
February 24, 2012 |
10:00 a.m. |
Tabulation |
| SL12-077-R7 Breakout Post Hardware |
February 22, 2012 |
10:00 a.m. |
Withdrawn-will not be rebid |
SL12-058-RW Mowing STCHARLES PROJECT D
Exhibit A mowing project D |
February 17, 2012 |
1:00 p.m. |
Tabulation D |
SL12-057A-RW Mowing Project C revised
EXHIBIT A PROJECT C REVISED
ExhibitB Project C |
March 1, 2012 |
1:00 p.m |
No response |
SL12-057-RWMowing STLOUISCOUNTY PROJECT C
Exhibit A mowing project C
ExhibitB Project C |
February 17, 2012 |
1:00 p.m. |
All Bids Rejected, will be Re-bid with change in specifications |
SL12-056-RW Mowing STLOUIS COUNTY PROJECT B
Exhibit A mowing project B
EXHIBIT B PROJECT B |
February 17, 2012 |
1:00 p.m. |
Tabulation B |
SL12-055-RWMowing STLCOUNTY PROJECT A
EXHIBITA mowing project.Apdf |
February 17, 2012 |
1:00 p.m. |
Tabulation A |
| SL12-072-R7 Wood Chipper Rentals |
February 17, 2012 |
10:00 a.m. |
Tabulation |
SL12-073-R7 Line Bore
Exhibit A
Annual Prevailing Wage #18 |
February 15, 2012 |
10:00 a.m. |
Tabulation |
| SL12-070-R7 On-Call Portland Cement |
February 14, 2012 |
10:00 a.m. |
Tabulation |
| SL12-069-R7 On-Call Rapid Set Cement |
February 14, 2012 |
10:00 a.m. |
Tabulation |
| SL12-067-RW Telescopic Crane |
February 14, 2012 |
10:00 a.m. |
Tabulation |
SL12-065-RW Lighting Poles
TrafficApprovedProductList |
February 9, 2012 |
10:00 a.m. |
Tabulation |
| SL12-064-R7 Anti-Ice Unit |
February 3, 2012 |
10:00 a.m. |
Withdrawn-to be rebid |
| SL12-054-RW On Call Rock |
February 3, 2012 |
10:00 a.m. |
Tabulation |
| SL12-053-RW Commercial Mix |
January 25, 2012 |
10:00 a.m. |
Tabulation |
SL12-052-RW Radio Microwave
prevailing wage18 |
January 11, 2012 |
10:00 a.m. |
Tabulation |
| SL12-050-RWEquipment Rental |
December 27, 2011
t |
10:00 a.m. |
N/A |
RFPSL12-046-RW AsNeededCDL Drivers
Addendum 001 Contract Drivers
Addendum 002 CDL DRIVERS |
January 20, 2012
January 25, 2012 |
2:00 p.m. |
All Proposals Rejected |
| SL12-49-RW Motorgraders and Loaders with Operators |
December 23, 2011 |
1:00 p.m. |
Tabulation |
| SL12-048-RWTransformer |
December 23, 2011 |
10:00 a.m. |
Tabulation |
| SL12-047-RW Brine Unit Shelter |
December 6, 2011 |
10:00 a.m. |
Tabulation |
SL12-043-R7 Tire Repair Service
Addendum 001 |
November 15, 2011 |
10:00 a.m. |
Tabulation |
SL12-039-RW Bridge Overlay Jefferson County
Contractor Pre-Qualification Required
General Wage Order 55
A4044 location
picture1
Picture2
Picture3 |
November 9, 2011 |
10:00 a.m. |
Tabulation |
SL12-044-RW On-Call Hauling Service
Attachment I |
November 8, 2011 |
10:00 a.m. |
On-Call Hauling Service Tabulation |
| SL12-045-R7 Spreader Box Parts for Wet System |
November 7, 2011 |
10:00 a.m. |
Tabulation |
SL12-041-RW UBAWS Resurface
Contractor Pre-Qualification Required
General Wage Order 55
Picture
A4229 location |
November 3, 2011 |
10:00 a.m. |
Tabulation |
SL12-023-RW Retaining Wall
Contractor Pre-Qualification Required
General Wage Order 55
EXHIBIT C PLANS
Route 270 Exhibit D
RoadwayPlan1Wall
RoadwayPlan2Wall
Wallplan1l, Wallplan2
Wallplan3, Wallplan4
|
November 2, 2011 |
10:00 a.m. |
Tabulation |
SL12-33-RW Bridge Expansion Joint
Contractor Pre-Qualification Required
General Wage Order 55
EXHIBIT VII
EXHIBIT VIII
Addendum 001
Addendum 002 |
November 1, 2011 |
10:00 a.m. |
Tabulation |
SL12-037-R7 Sand
Attachment I |
October 20, 2011 |
10:00 a.m. |
Tabulation |
SL12-038-RW Line Bore
Annual Prevailing Wage #18
Incremental Increase Letter |
October 18, 2011 |
10:00 a.m. |
Tabulation |
SL12-042-RWShotRock
Route 141 and Riverside Rock Deliverly Location
Addendum 001 |
October 14, 2011 |
10:00 a.m. |
Tabulation |
SL12-036-RW Resurface MoDOT Lot
Site Plan
Annual Wage Order #18 St. LouisLCity
Incremental Increase Letter
|
October 17, 2011 |
10:00 a.m. |
Tabulation |
| SL12-040-RWLiquidStorageTank |
October 12, 2011 |
10:00 a.m. |
WITHDRAWN |
| SL12-034-R7 Trackhoe Rental |
October 11, 2011 |
10:00 a.m. |
Tabulation |
SL12-035-RW Holophanes
Addendum 001 |
October 6, 2011 |
10:00 a.m. |
Tabulation |
| SL12-029-R7 Flu Vaccinations |
October 4, 2011 |
10:00 a.m. |
Tabulation |
| SL12-032-RW GlowbugLighting |
September 29,2011 |
10:00 a.m. |
Tabulation |
| SL12-031RW Lifter Scissor Clamps |
September 21, 2011 |
10:00 a.m. |
Tabulation |
| SL12-030-RW HIGHLIFT Rental |
September 20, 2011 |
10:00 a.m. |
Tabulation |
SL12-026-R7 Hydraulic System and Snow Plow
Addendum 001
Addendum 002 |
September 19, 2011 |
10:00 a.m. |
Tabulation |
SL12- 027-RW Hot Water Washer
Addendum 001 |
September 16, 2011 |
10:00 a.m. |
Tabulation |
| SL12-028-R7 Tree Removal-Hwy 55 |
September 15, 2011 |
10:00 a.m. |
Tabulation |
SL12-021-RW ASBESTOS REMOVAL
ExhibitA Greyhound Asbestos Plan
ExhibitB Greyhound Asbestos Survey
ExhibitC Greyhound Asbestos Specs
General Wage Order 55
Contractor Pre-Qualification Required |
September 9, 2011 |
10:00 a.m. |
Tabulation |
SL12-025-R7 Wire
Addendum 001 |
September 6, 2011 |
12:00 p.m. |
Tabulation |
| SL12-024-R7 Truck Inspections |
September 6, 2011 |
10:00 a.m. |
Tabulation |
| SL12- 022-RW Fullriver Batteries |
August 25, 2011 |
10:00 a.m. |
Tabulation |
SL12-020-RW Pipe Liner
Addendum 001
Addendum 002 |
August 18, 2011 |
10:00 a.m. |
Tabulation |
| SL-019-RW Brine Production System |
August 17, 2011 |
10:00 a.m. |
Tabulation |
| SL12-018-RB Posts etc St. Clair Ramp |
August 11, 2011 |
10:00 a.m. |
Tabulation |
| SL12-017-RB On Call Sweeping |
August 16, 2011 |
10:00 a.m. |
Tabulation |
| SL12-016-RW Trackhoe rental |
July 29, 2011 |
10:00 a.m. |
Tabulation |
SL12-015-RW Ballas Fence
General Wage Order 54
ADDENDUM 001 |
August 9,2011
August 15, 2011 |
10:00 a.m. |
Tabulation |
SL12-014-RW Cantilever Truss
General Wage Order 54 |
August 8, 2011 |
10:00 a.m. |
Tabulation |
| SL12-013-RB Tree Removal DD & Sommers Rd |
July 22, 2011 |
10:00 a.m. |
Tabulation |
SL12-012-R7 Mulching Service-I-70
Addendum 001 |
July 22, 2011 |
10:00 a.m. |
Tabulation SL12-012-R7 |
| SL12-009-RW on call Portland cement |
July 15, 2011 |
10:00 a.m. |
tab sheet |
| SL12-008-RW-RW on call rapid set cement |
July 15, 2011 |
10:00 a.m. |
SL12-008-RW Rapid Set Tab |
| SL12-007-RW Cement Blocks |
July 12, 2011 |
10:00 a.m. |
tab sheet |
SL12-011-RB CMP Pipe Wentzville MO
Addendum 001 |
July 13, 2011 |
10:00 a.m. |
Tabulation |
| SL12-010-R7 Track Type Excavator Rental |
July 11, 2011 |
12:00 p.m. |
Tabulation |
| SL12-004-RW Black Magnum |
July 11, 2011 |
10:00 a.m. |
Tabulation |
| SL12-005-R7 Anti-Icing Skid Frame |
July 8, 2011 |
10:00 a.m. |
Tabulation |
F12-002-RW Grover Demo
Addendum 001 ,ExhibitAGroverDemoPlan
ExhibitBSec202806Specs
ExhibitCGroverDemoSpecs
ExhibitDAsbSurveyRptGrover
ExhibitEDocumentChecklist
Attachment 001 - General Wage Order 54 |
July 7, 2011 |
10:00 a.m. |
Tabulation |
D612-001-RB Temporary Personnel Services
Addendum 001 RFB |
July 7, 2011 |
10:00 a.m. |
Tabulation |
| SL12-006-RB Landfill As Needed Service |
July 5, 2011 |
10:00 a.m. |
Tabulation |
D611-190-R7 Highlift Track Loader Rental
Addendum 001 |
June 24, 2011 |
12:00 p.m. |
Tabulation |
D611-180-R7 Bulk Oil
ATTACHMENT A
ATTACHMENT B |
June 24, 2011 |
10:00 a.m. |
Tabulation |
| D611-188-R7 Drain Cleaning |
June 23, 2011 |
10:00 a.m. |
Tabulation |
D611-183-RW Slope Grading
Sealed Plan Sheets
Attachment 001 - General Wage Order 54
ADDENDUM 001
ADDENDUM002QUESTIONS |
June 22, 2011 |
10:00 a.m. |
Tabulation |
D611-187-R7 Oil Absorbing Compound
Addendum 001 |
June 21, 2011 |
10:00 a.m. |
Tabulation |
| D611-186-RB Sound Meter |
June 14, 2011 |
10:00 a.m. |
Tabulation |
| D611-185-RB Mid Mount Riding Mower |
June 10, 2011 |
2:00 p.m. |
Tabulation |
| D611-184-RB Rental Bulldozers |
June 10, 2011 |
2:00 p.m. |
Tabulation |
D611-168-R7 Truck Painting
Addendum 001 |
June 10, 2011 |
10:00 a.m. |
Tabulation |
D611-182-RB Bridge Pins and Nuts
Attachment 001 Plan Sheet Pins/Nuts |
June 10, 2011 |
10:00 a.m. |
Tabulation |
D611-181-RB Bridge Hangars
Attachment 001 Plan Sheet Hangars |
June 10, 2011 |
10:00 a.m. |
Tabulation |
RFQ D611-178-RW Demo Grover
ExhibitAGroverDemoPlans
ExhibitBSec202806Specs
ExhibitCGroverDemoSpecs
ExhibitDAsbSurveyRptGrover
ExhibitEDocumentChecklist
Attachment 001 - General Wage Order 54
Addendum 001 |
June 15, 2011
June 23, 2011 |
10:00 a.m. |
All bids rejected- will be re-bid |
| D611-179-R7 Tree Removal-Highway 109 |
June 1, 2011 |
10:00 a.m. |
Tabulation |
D611-172-RW Theiss Rd Epoxy Overlay
A4751 Map,A4751pictures
Attachment 001 - General Wage Order 54 |
June 1, 2011 |
10:00 a.m. |
Tabulation |
D611-175-R7 Mulching Service
Addendum 001 |
May 25, 2011 |
1:00 p.m. |
Tabulation |
D611-165-RW Bridge Surface Sealing, St. Louis City, St. Louis County
Attachment 001 - General Wage Order 54 |
May 25, 2011 |
10:00 a.m. |
Tabulation |
| D611-177-RB Tree Removal Highway 170 |
May 24, 2011 |
2:00 p.m. |
Tabulation |
| RFQ D611-174-RW Holophanes |
May 24, 2011 |
10:00 a.m. |
Tabulation |
RFQ D611-176-RW Barrier Walls
Attachment A |
May 23, 2011 |
10:00 a.m. |
Tabulation |
| D611-173-RB Skidsteer Rental Normandy/Bellefontaine |
May 23, 2011 |
10:00 a.m. |
Tabulation |
| D611-167-RW Tower Parts |
May 20, 2011 |
10:00 a.m. |
Tabulation |
D611-157-RB Relocation Sirens in St. Charles County
Attachment 001- Annual Wage Order 17
Addendum 001 - Relocation Sirens
Addendum 002 - Relocation Sirens |
May 20, 2011 |
10:00 a.m. |
Tabulation |
| D611-171-R7 Skid Steer Rental |
May 18, 2011 |
10:00 a.m. |
Tabulation |
| RFB D611-170-RW UPS Systems |
May 19, 2011 |
10:00 a.m. |
Tabulation |
D611-156-RWHwyYBoxCulvert
Attachment 001 - General Wage Order 54
Note: Pre-Qualified Contractor Questionnaire w attachments must be submitted 7 days prior to bid closing)
ADDENDUM 001 REVISED QTY
Addendum 002
Addendum 003 REVISED QTY |
May 10, 2011 |
10:00 a.m. |
Tabulation |
D611-133-RW St. Louis Gateway Guide ITS Hardware Maintenance Services
Addendum 001
Addendum 002
Addendum 003
Addendum 004 |
May 11, 2011
May 25, 2011 |
1:00 p.m. |
|
D611-166-R7 Polymer Mortar
Addendum 001
Addendum 002 |
May 9, 2011
May 10, 2011 |
10:00 a.m. |
Tabulation |
| D611-169-RB Rental Roller Beaufort |
May 5, 2011 |
2:00 p.m. |
Tabulation |
| D611-164-RB Premix Window Washing Solvent |
May 2, 2011 |
10:00 a.m. |
Tabulation |
| D611-163-R7 Snow Plow |
April 29, 2011 |
10:00 a.m. |
Tabulation |
RFQ D611-159-RW Mowing Equipment
tradein walk behind,walkbehindpic2,walkbehindpic3,
trade in zero turn,zeroturnpci3,zeroturnpic1 |
April 21, 2011 |
10:00 a.m. |
Tabulation |
| D611-162-R7 Super Heavy Duty Flail Mower |
April 20, 2011 |
10:00 a.m. |
Tabulation |
D611-143-RB RPM Removal
Attachment 001 - General Wage Order 54 |
April 19, 2011 |
10:00 a.m. |
Withdrawn - rejected all bids |
D611-151-R7 Anti-Freeze
Specifications, MGS-92-04C |
April 19, 2011 |
10:00 a.m. |
Withdrawn |
| D611-161-R7 Backhoe Rental |
April 18, 2011 |
1:00 p.m. |
Withdrawn |
| D611-160-R7 Concrete Silo |
April 18, 2011 |
10:00 a.m. |
Tabulation |
D611-147-RW Modular office
EXHIBIT A Floor Plan
Addendum 001 D611-147-RW |
April 18, 2011 |
10:00 a.m. |
Tabulation |
D611-141-RW Relocate EV Cabinet Assembly
EXHIBIT A DRAWING
Exhibit B Informational Drawings,Exhibit C Informational Drawings
Addendum 001
WageOrder17 |
April 14, 2011 |
10:00 a.m. |
Tabulation |
| D611-158-R7 CMP Beaufort |
April 13, 2011 |
1:00 p.m. |
Tabulation |
| D611-155-R7 Walk-Behind Mower |
April 13, 2011 |
10:00 a.m. |
Tabulation |
| D611-154-R7 Mid Mount Zero Turn Riding Mower |
April 13, 2011 |
10:00 a.m. |
Tabulation |
D611-152-RB Diesel Generators
Addendum 001 |
April 12, 2011 |
10:00 a.m. |
Tabulation |
| D611-153-R7 Super Heavy Duty Flail Mower |
April 11, 2011 |
10:00 a.m. |
WITHDRAWN-To be rebid |
D611-150-RB Globug/Generators
Addendum 001 |
April 8, 2011 |
10:00 a.m. |
Tabulation |
| D611-142-R7 Mobile Mixer Hot Water Heater |
April 8, 2011 |
10:00 a.m. |
Tabulation |
| D611-146-RB CMP St. Clair |
April 4, 2011 |
10:00 a.m. |
Tabulation |
| D611-149-R7 Concrete Silo |
April 5, 2011 |
10:00 a.m. |
All bids rejected-to be rebid |
| RFQ D611-145-RW IceMachines |
April 5, 2011 |
10:00 a.m. |
Tabulation |
D611-140-RB Cantilever Rack System
Attachment F - Plan Sheet |
April 5, 2011 |
10:00 a.m. |
Tabulation |
D611-148A-RW Signal Replacement
Prevailing Wage Order No 17 |
April 12, 2011 |
10:00 a.m. |
Tabulation |
D611-148-RW Signal replacement
Addendum 001
Prevailing Wage Order No 17 |
April 1, 2011 |
10:00 a.m. |
WITHDRAWN- replaced by D611-148A-RW |
D611-137-R7 Mulching Service
Addendum 001 |
April 1, 2011 |
10:00 a.m. |
Tabulation |
| D611-144-R7 Loader Mount Pickup Broom |
March 29, 2011 |
10:00 a.m. |
Tabulation |
| D611-138-R7 Various Filters-Consignment |
March 25, 2011 |
2:00 p.m. |
Tabulation |
| D611-136-R7 Loader Mount Pickup Broom |
March 25, 2011 |
10:00 a.m. |
WITHDRAWN-To be rebid |
| RFQ D611-139-RW Trackloader Rental |
March 23, 2011 |
10:00 a.m. |
Tabulation |
D611-134-RB Fence repair and installation
Attachment 1 -General Wage Order 54 |
March 21, 2011 |
10:00 a.m. |
Tabulation |
D611-128-R7 Various Filters-Consignment
Addendum 001 |
March 18, 2011 |
2:00 p.m. |
WITHDRAWN |
| D611-135-RB Welder with Service Installation |
March 17, 2011 |
10:00 a.m. |
Tabulation |
D611-123-RW Bridge Epoxy Polymer Overlay Rte367 St. Louis County, MO.( incl. Exhibit B )
Exhibit A Rte 367, Exhibit C Rte 367
Exhibit D Rte 367
General Wage Order 54
Addendum 001 |
March 15, 2010
(Note: Pre-Qualified Contractor Questionnaire w attachments must be submitted 7 days prior to bid closing) |
10:00 a.m. |
Tabulation |
D611-122-RW Bridge Epoxy Polymer Overlay Rte40 St. Louis County, MO.(incl. Exhibit B) Exhibit A Rte40 ,Exhibit C Rte40
Exhibit D Rte40
General Wage Order 54
Addendum 001 |
March 15, 2011
(Note: Pre-Qualified Contractor Questionnaire w attachments must be submitted 7 days prior to bid closing) |
10:00 a.m. |
Tabulation |
D611-121-RW UBAWS Bridge Resurfacing, St. Louis County, MO.(incl. Exh. B)
ExhibitARte109
ExhibitsC and D Rte109D,ExhibitE Rte 09D
General Wage Order 54
Addendum 001 |
March 15, 2011
(Note: Pre-Qualified Contractor Questionnaire w attachments must be submitted 7 days prior to bid closing) |
10:00 a.m. |
Tabulation |
| RFB D611-132-RW UPS Systems |
March 11, 2011 |
10:00 a.m. |
Tabulation |
| D611-131-R7 Tree Removal-Lone Elk Park |
March 11, 2011 |
10:00 a.m. |
Tabulation |
D611-129-RB Island Curbs St. Louis County
General Wage Order 54 Attachment 001
Addendum 001 D611-129-RB |
March 11, 2011 |
10:00 a.m. |
Tabulation |
D611-094-RW REBID I70StlouisCountyProjectS
EXHIBIT A PROJECT S
District 6 Mowing Locations 2011
Addendum 001 NOTE: THIS ADDENDUM APPLIES TO ALL MOWING REBIDS |
March 10, 2011 |
2:00 p.m. |
All bids rejected |
D611-097-RW REBID I55StLouisCountyProjectN
EXHIBIT A PROJECT N
District 6 Mowing Locations 2011 |
March 10, 2011 |
2:00 p.m |
All bids rejected. |
D611-103-RW Mowing REBID St. LouisI44K
EXHIBIT A PROJECT K
District 6 Mowing Locations 2011 |
March 10, 2011 |
2:00 p.m. |
Tabulation |
D611-102-RWI44 Rebid StLouisCoProjectJ
EXHIBIT A PROJECT J
District 6 Mowing Locations 2011 |
March 10, 2011 |
2:00 p.m. |
All bids rejected |
D611-099-RW REBID I255StLouisCountyProjectG
EXHIBIT A Project G
District 6 Mowing Locations 2011 |
March 10, 2011 |
2:00 p.m |
All bids rejected. |
D611-090-RW REBID I270StLouisCoProjectD
EXHIBIT A PROJECT D
District 6 Mowing Locations 2011 |
March 10, 2011 |
2:00 p.m. |
Tabulation |
D611-120-RW UBAWS Bridge Resurfacing, Pike County, MO.
D611-120-RW Location Map
D611-120-RW Pictures
General Wage Order 54
Addendum 001
Addendum 002 |
March 9, 2011
(Note: Pre-Qualified Contractor Questionnaire w attachments must be submitted 7 days prior to bid closing) |
10:00 a.m. |
Tabulation |
D611-119-RW UBAWS Bridge Resurfacing, Pike County, MO.
D611-119-RW Location Map
D611-119-RW Pictures
General Wage Order 54
Addendum 001
Addendum 002 |
March 9, 2011
(Note: Pre-Qualified Contractor Questionnaire w attachments must be submitted 7 days prior to bid closing) |
10:00 a.m. |
Tabulation |
D611-118-RW UBAWS Bridge Resurfacing Pike County MO
D611-118-RW Location Map
D611-118-RW Pictures
General Wage Order 54
Addendum 001
Addendum 002 |
March 9, 2011
(Note: Contractor Questionnaire per bid must be submitted 7 days prior to bid closing) |
10:00 a.m. |
Tabulation |
| D611-130-RB Key Cutter |
March 8, 2011 |
10:00 a.m. |
Tabulation |
| D611-106-RW Tennant Sweeper Parts |
March 8, 2011 |
10:00 a.m. |
Tabulation |
| D611-126-R7 Skid Steer Rental |
March 4, 2011 |
10:00 a.m. |
Withdrawn |
| D611-127-RB CMP Beaufort |
March 2, 2011 |
10:00 a.m. |
Tabulation |
D611-124-R7 Drainage Improvements
Exhibit A, Exhibit C, & Exhibit D
General Wage Order #54 |
March 1, 2011 |
10:00 a.m. |
Tabulation |
| RFI Broom, pickup loader mounted |
February 25, 2011 |
----- |
|
| D611-125-RB Key Machine |
February 25, 2011 |
10:00 a.m. |
Withdrawn |
| D611-117-RW On Call Rock |
February 24, 2011 |
10:00 a.m. |
Rock Tabulation |
| RFQ D611-116-RW Holophanes |
February 10, 2011 |
10:00 a.m. |
Tabulation |
D611-105-RW Mowing I-64 StLouis County Project Q
EXHIBIT A PROJECT Q
District 6 Mowing Locations 2011 |
February 22, 2011 |
2:00 p.m. |
TabulationQ |
D611-104-RW Mowing I-64 StCharles Project A
EXHIBIT A PROJECT A
District 6 Mowing Locations 2011 |
February 22, 2011 |
2:00 p.m. |
TabulationA |
D611-103-RW Mowing I-44 St. Louis County Project K
EXHIBIT A PROJECT K
District 6 Mowing Locations 2011 |
February 22, 2011 |
2:00 p.m. |
All bids rejected- will be rebid |
D611-102-RW Mowing I-44 StLouis County Project J
EXHIBIT A PROJECT J
District 6 Mowing Locations 2011 |
February 22, 2011 |
2:00 p.m. |
All bids rejected- will be rebid |
D611-101-RW Mowing I-44 Franklin County Project I
EXHIBIT A PROJECT I
District 6 Mowing Locations 2011 |
February 22, 2011 |
2:00 p.m. |
TabulationI |
D611-100-RW Mowing I-44 Franklin County Project H
EXHIBIT A PROJECT H
District 6 Mowing Locations 2011 |
February 22, 2011 |
2:00 p.m. |
TabulationH |
D611-099-RW Mowing I-255 StLouis County Project G
EXHIBIT A Project G
District 6 Mowing Locations 2011 |
February 15, 2011 |
2:00 p.m |
All bids rejected-will be re-bid at later date |
D611-098-RW Mowing I-55 StLouis City Project O
EXHIBIT A PROJECT O
District 6 Mowing Locations 2011 |
February 15, 2011 |
2:00 p.m |
TabulationO |
D611-097-RW Mowing I-55-StLouis-County Project N
EXHIBIT A PROJECT N
District 6 Mowing Locations 2011 |
February 15, 2011 |
2:00 p.m |
All bids rejected-will be re-bid at later date |
D611-096-RW Mowing I-55 Jefferson County Project M
EXHIBIT A PROJECT M
District 6 Mowing Locations 2011 |
February 15, 2011 |
2:00 p.m |
TabulationM |
D611-095-RW Mowing I-55 Jefferson County Project L
EXHIBIT A PROJECT L
District 6 Mowing Locations 2011 |
February 15, 2011 |
2:00 p.m |
TabulationL |
D611-094-RW Mowing I-270 StLouis County Project S
EXHIBIT A PROJECT S
District 6 Mowing Locations 2011 |
February 8, 2011 |
2:00 p.m |
All bids rejected-may be re-bid at later date |
D611-093-RW Mowing I-270 StLouis County Project R
EXHIBIT A Project R
District 6 Mowing Locations 2011 |
February 8, 2011 |
2:00 p.m |
TabulationR |
D611-092-RW Mowing I-70 St.Louis City Project P
EXHIBIT A PROJECT P
District 6 Mowing Locations 2011 |
February 8, 2011 |
2:00 p.m |
TabulationP |
D611-091-RW Mowing I-170 StLouis County Project E
EXHIBIT A PROJECT E
District 6 Mowing Locations 2011 |
February 8, 2011 |
2:00 p.m |
TabulationE |
D611-090-RW Mowing I-270 StLouis County Project D
EXHIBIT A PROJECT D
District 6 Mowing Locations 2011 |
February 8, 2011 |
2:00 p.m |
All bids rejected-may be re-bid at later date |
D611-089-RW Mowing I-270 StLouis Coounty ProjectC
EXHIBIT A PROJECT C
District 6 Mowing Locations 2011 |
February 8, 2011 |
2:00 p.m |
TabulationC |
D611-088-RW Mowing I-270St. Louis County Project B
EXHIBITA PROJECTB
District 6 Mowing Locations 2011 |
February 8, 2011 |
2:00 p.m. |
tabulationb |
| D611-114-RW Cold Weather joint Mortar |
February 2, 2011 |
10:00 a.m. |
Tabulation |
| D611-113-R7 Mott/Alamo Mower Parts |
February 1, 2011 |
10:00 a.m. |
Tabulation |
| D611-112-R7 Triumph Switchblade Mower Parts |
February 1, 2011 |
10:00 a.m. |
Tabulation |
| D611-111-R7 Bush-Whacker Mower Parts |
February 1, 2011 |
10:00 a.m. |
Tabulation |
D611-115-RB CMP Beaufort-Desoto
Attachment 001 - MSG CMP |
January 28, 2011 |
10:00 a.m. |
Tabulation |
| D611-108-RB Title Co Services Jefferson County |
January 26, 2011 |
10:00 a.m. |
Tabulation |
D611-109-R7 Snow Plow
Addendum 001 |
January 21, 2011 |
10:00 a.m. |
Tabulation |
| D611-107-R7 Tree Removal-Valley Park |
January 20, 2011 |
10:00 a.m. |
Tabulation |
D611-087-RW Commercial Mix
Addendum 001 |
February 2, 2011
February 7, 2011 |
10:00 a.m. |
tab sheet2011 |
D611-86-RW Pedestrian Ornamental Fence
K1066432 Bridge Plans
K1066432 Roadway Plans
Addendum 001 |
January 31, 2011 |
10:00 a.m. |
Tabulation |
| D611-082-R7 Vehicle Recovery Tow Straps |
January 7, 2011 |
10:00 a.m. |
Tabulation |
| D611-084-RW Class2Sealer |
January 6, 2011 |
10:00 a.m. |
Tabulation |
D611-085-R7 Tree Removal Services
Addendum 001
Addendum 002 |
December 30, 2010
January 6, 2011 |
10:00 a.m. |
Tabulation |
D611-083-RW Portable Signal Traffic Mast Arm
Addendum 001 MASTARM
|
December 23, 2010 |
10:00 a.m. |
Tabulation |
| D611-079-RB Anti Ice Unit |
December 8, 2010 |
10:00 a.m. |
Tabulation |
| D611-081-RW Manifold pump |
December 16, 2010 |
10:00 a.m. |
Tabulation |
| D611-080-RW Pump |
December 16, 2010 |
10:00 a.m. |
Tabulation.doc |
| D611-076-RW Portable Dynamic Travel Time System |
December 22, 2010 |
10:00 a.m. |
Tabulation |
| D611-075-RW Speed Travel Time Recording System |
December 22, 2010 |
10:00 a.m. |
Tabulation |
| D611-077-RB Crafco Equipment Rental |
December 6, 2010 |
10:00 a.m. |
Crafco Tabulation |
| D611-074-RW On Call Rapid Set |
December 17, 2010 |
10:00 a.m. |
D611-074-RW Rapid Set Tab |
| D611-073-RW On Call Portland Type I |
December 17, 2010 |
10:00 a.m. |
Tabulation Portland |
D611-068-RW Bridge Rehabilitation Approach Asphalt Wearing Surface
Exhibit A
Exhibit B
Addendum 001 brdgAH |
December 14, 2010 |
10:00 a.m. |
tabulationbrdg |
D611-066-RB Route 40 Guardrail Upgrades
Exhibit B
Exhibit C
Exhibit D
General Wage Order 54
Addendum 001 RFB Guardrail |
December 30, 2010 |
2:00 p.m.. |
Tabulation |
| D611-072-RW Wood Chipper Rentals |
December 9, 2010
December 13, 2010 |
10:00 a.m. |
tabulationwoodchipperrental |
| D611-067-RW Used Oil |
December 7, 2010 |
10:00 a.m. |
Tabulation used oil |
D611-069-RW Cantilever Gate and Fences
Addendum 001 fences |
December 6, 2010 |
10:00. a.m. |
Tabulation-FENCES |
| D611-078-RW Skidsteer Rental |
November 26, 2010 |
10:00 a.m. |
Skid Steer Tabulation |
| D611-070-RW AMS Maintentence |
November 30, 2010 |
10:00 a.m. |
Tabulationams |
D611-071-R7 Tire Chains
Addendum 001
Addendum 002 |
November 24, 2010 |
10:00 a.m. |
WITHDRAWN |
D611-065-RB Eurkea Fence Installation
General Wage Order #54 |
November 16, 2010 |
10:00 a.m. |
Tabulation |
D611-064-RW Reinforcement Pre-Stressed Girders
Sign Details, Tamm-BR27
Addendum 001 fiberwrap |
December 1, 2010 |
10:00 a.m. |
Bridge fiber wrapTabulation |
D611-062-RW Brdg overlay
Exhibit A, Exhibit B, Exhibit C
Addendum 001 |
November 30, 2010 |
10:00 a.m. |
Bridge Overlay Tabulation |
| D611-060-R7 Tire Repair Service |
November 15, 2010 |
10:00 a.m. |
Tabulation |
D611-059-RW Broadway Fence
Exhibit B
Exhibit A |
November 15, 2010 |
10:00 a.m. |
Tabulation |
| D611-058-RW Transformer Bases |
November 9, 2010 |
10:00 a.m. |
Tabulationbases |
D611-057-RW Fence Mealer Lane
Exhibit A Mealer Lane
Addendum 001 MEALER |
November 8, 2010 |
10:00 a.m. |
Tabulation |
| D611-061-R7 Walk-Behind Mower |
November 5, 2010 |
10:00 a.m. |
Tabulation |
D611-055-RW Signal Rewire
Exhibit A |
November 5, 2010 |
10:00 a.m. |
Tabulationsignal |
D611-056-RB Ballwin Curb & Sidewalk Replacement
General Wage Order# 54 |
November 3, 2010 |
10:00 a.m. |
Tabulation |
D611-054-RB Ballas Island Curb Replacement
General Wage Order#54 |
November 2, 2010 |
10:00 a.m. |
Tabulation |
D611-053-RB On Call Hauling Service
Attachment I - Building Lists |
November 1, 2010 |
2:00 p.m. |
Tabulation |
D611-045-RB Title Company Services
Addendum 001 RFP
Addendum 002 RFP
Addendum 003 RFP |
November 18, 2010 |
10:00 a.m. |
List of Offerors |
D611-050-RW Signal Span Repair
Exhibit A,Exhibit B,Exhibit C, Exhibit D
APL-Internet
Addendum 001 signal |
November 5, 2010 |
10:00 a.m. |
Tabulationspan |
| D611-051-RW Variable Refrigerant Flow Equipment |
November 4, 2010 |
10:00 a.m. |
Tabulation |
D611-063-R7 Equipment Rental-Sunset Hills
Addendum 001 |
October 29, 2010 |
10:00 a.m. |
Tabulation |
D611-052-RW Asbestos Removal
Exhibits A,B,C and Asbestos Report
Addendum 001 ASBESTOS REMOVAL
REVISED ASBESTOS REPORT |
October 22, 2010
October 25, 2010 |
10:00 a.m.
1:00 p.m. |
Tabulationasbestos |
| D611-049-RW HVAC Equipment |
October 19, 2010 |
10:00 a.m. |
Tabulation Hvac |
| D611-048-RW HAENNI Load O Meter |
October 12, 2010 |
10:00 a.m. |
Tabulation-scales |
| D611-044-RW Flu Vaccinations |
October 8, 2010 |
10:00 a.m. |
Tabulation-flu |
D611-046-R7 Retroreflective Sheeting for TMA Systems
Addendum 001
Addendum 002
Attachment 1-Picture |
October 5, 2010 |
10:00 a.m. |
WITHDRAWN |
| D611-047-RW Building Propane |
October 4, 2010 |
10:00 a.m. |
Tabulation-propane |
| D611-043-RW Spreader Parts |
October 4, 2010 |
10:00 a.m. |
Tabulation Spreader Parts |
D611-042-R7 Bridge Deck Sealing/Resurfacing
Exhibit A |
October 4, 2010 |
10:00 a.m. |
Tabulation |
| D611-040-R7 Tire Repair Service |
October 15, 2010 |
10:00 a.m. |
WITHDRAWN-To be rebid |
| |
|
|
|
| 7-0611103 Striper Truck Modification |
November 1, 2010 |
November 3, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, that only Molly Bloomberg (MB), the manufacturer of a traffic paint striper truck currently in use by D6, can make the necessary modifications to install a 500 gallon glass bead tank without voiding the original manufacturer's warranty. This modification inclues the mounting of the tank, pressurized, gauges installed, supply hoses attached to bead guns and attached to the current air supply and vacuum system. The cost of this modification is $14,000.00 Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until November 3, 2010. |
| 7-06110812 ACTRA SIGNAL SYSTEM MAINTENANCE |
August 3, 2010 |
August 12, 2010 |
The Missouri Department of Transportation , District 6 has determined that only one source can provide the necessary upgrade operatonal program maintenance agreement for phone on on site support for the D6 ACTRA signal system. To our knowledge, Brown Traffic Products Inc DBA Traffic Systems Solutions., is the only authorized vendor in the St. Louis area approved by Siemens ITS for the ACTRA signal system. This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until August 12, 2010. |
| 7-06110805 Safe Stop Attenuator Parts |
August 3, 2010 |
August 5, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is one company, HCI - The Hoosier Company, Inc., which can provide the Safe Stop Attenuator System. Purchaseof the Safe Stop Attenuator System is estimated to be approximately $24,999.99. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described.
Issue with this purchase may be directed to Athena Nance at (314) 301-1440 or Athena.Nance@modot.mo.gov until August 5, 2010. |
| 7-06110712 Eagle Traffic Control Replacement/Repair |
July 2, 2010 |
July 12, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Brown Traffic Inc. , of Davenport, IA. as the sole authorized distributor that can furnish the department with replacement Eagle Control parts and warranty and service repair compatible with the exisiting Eagle product systems already installed in District 6.
This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until July 12, 2010. |
| 7-06110713 Iteris Replacement/Repair |
July 2, 2010 |
July 12, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Brown Traffic Inc. , of Davenport, IA. as the sole authorized distributor that can furnish the department with replacement Iteris parts and warranty and service repair compatible with the exisiting Iteris camera systems already installed in District 6.
This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until July 12, 2010. |
| 7-06110714 Autoscope Replacement Parts/Repair |
July2, 2010 |
July 13, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Traffic Contro Corporation. as the sole authorized distributor that can furnish the department with replacement Autoscope parts and warranty and service repair compatible with the exisiting Autoscope systems already installed in District 6.
This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until July 13, 2010. |
| 7-0610510 Sensys Arterial Travel Time System |
April 26, 2010 |
May 10, 2010 |
The Missouri Department of Transportation, D6, has determined that only Sensys Networks, Inc., has the sole patented technology that can utilize algorithims proprietary to Sensys Networks, Inc.. The algorithims are used to calculate, measure and report real time travel times obtained from wireless, battery-powered magnetometer Sensys vehicle detectors. Sensys detection devices are part of jobs Special Provisions already installed or in process of installation onthe Commission's noted arterial roadways per previously awarded construction contracts. Applicable patents 7,382,238; 7,382,281;, 7,382,282; 7,388,517; 7,427,931. this notice shall meet the single feasible source posting requirements in association with the needs described for two (2 ) years. Issues with this purchase may be directed to Terri Mount, Procurement Sr. Specialist at 314-301-1431 or teres.mount@modot.mo.gov until May 10, 2010. |
| 7-06100416 REACT 350 Attenuator System |
April 16, 2010 |
April 23, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is one company, HCI - The Hoosier Company, Inc., which can provide the REACT 350 Attenuator System. Purchaseof the REACT 350 Attenuator System is estimated to be approximately $34,999.99. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described.
Issue with this purchase may be directed to Athena Nance at (314) 301-1440 or Athena.Nance@modot.mo.gov until April 23, 2010. |
| 7-06100412 BlueTOAD |
April 7, 2010 |
April 9, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Traffic Control Corporation, of Fenton, Mo.. as the sole authorized distributor for BlueTOAD technology manufactured by TrafficCast. This specific product is undergoing a three month test period to evaluate new traffic monitoring technology that traces anonymous Bluetoth signals to determine travel times and vehicle movement. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until April 9, 2010. |
| 7-06100326 Aldis Video Dectection System |
March 24, 2010 |
March 26, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Traffic Control Corporation, of Fenton, Mo.. as the sole authorized distributor that can furnish the department with Aldis Video Detection System compatible with the exisiting systems already installed in District 6.
This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until March 26, 2010. |
| 7-06100324 Vehicle Detector Repair |
March 22, 2010 |
March 24, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source ISS, Image Sensing Systems Inc, of St. Paul, Mn., . as the sole authorized distributor that can repair existing vehicle dectector EIS units.
This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until March 24, 2010. |
| 7-06100318 Iteris Camera Parts |
March 16, 2010 |
March 24, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Brown Traffic Inc. , of Davenport, IA. as the sole authorized distributor that can furnish the department with replacement Iteris parts compatible with the exisiting Iteris camerasystems already installed in District 6.
This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until March 24, 2010. |
| 7-06100319 Autoscope Terra Cameras |
March 16, 2010 |
March 25, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Traffic Control Corporation, of Fenton, Mo.. as the sole authorized distributor that can furnish the department with replacement Terra parts and cameras compatible with the exisiting Terra Dectection systems already installed in District 6.
This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until March 25, 2010. |
| 7-06100223 Replacement Intelight Parts |
Feb. 18, 2010 |
Feb. 23, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Brown Traffic Inc. , of Davenport, IA. as the sole authorized distributor that can furnish the department with replacement Intelight parts compatible with the exisiting Intelight systems already installed in District 6.
This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until February 23, 2010. |
| 7-06100127 Repair of Media Converters |
Jan. 27, 2010 |
Jan. 29, 2010 |
The Missouri Department of Transportation, District 6, has determined that only GarrettCom Inc, can provide thewarranty repair and repair replacements media converters for existing IS systems.Repair cost of $8,000.00 Issues with this repair may be directed to Athena Nance, athena.nance@ modot. mo. gov, 314.301.1440 until January 29, 2010 |
| 7-06100128 Bridge Replacement Vents |
Jan. 26, 2010 |
Jan. 28, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that only one source can provide the Department withe specific use, replacement bridge vents as manufactured originally by Promaco for the vents in the Creve Coeur Lake Bridge, located in Creve Coeur, Missouri on State Route 364. The specific vents were originally produced by Promaco who retains the only mold with exact dimensions and specifications as required for the fabrication of replacement vents. The approximate value of the product is estimated at a cost of $7,500.00.
Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until January 20, 2009. |
| 7-060100121 Traffic Operations Direct Digital Control |
Jan. 11, 2010 |
Jan. 20, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Dynamic Controls Inc. , of St. Louis , MO. as the sole authorized factory service technical support representative that can furnish the department with Andover Continuum system engieering, equipment , programming ans system support compatible with the exisiting Andover Continuum system already installed in District 6.
This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until January 20, 2009. |
| 7-0610120 Electronic Fueling Equipment Bennett Fuel Dispensers |
Jan. 11, 2010 |
Jan. 20, 2010 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source Graham Equipment, of St. Louis , MO. as the sole authorized factory service technical support representative that can install department provided Bennett Electronic Fueling equipment . Service may include but not limited to provide factory warranty parts, installation and factory start up.Installation of MoDOT provided equipment and related fuel island components may exceed $25, 000 individually and/or cumulatively and may be made throughtout calendar year 2010 and expiring on December 31, 2010. This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until January 20, 2009. |
| 7-06101214 Fiber Termination |
Dec. 02, 2009 |
Dec.14, 2009 |
The Missouri Department of Transportation has determined that only LightCore Company as the selected vendor by Digital Teleport can provide specific fiber termination as allowed by a exisiting contract with the Commission as executed with Digital Teleport in April of 2003. |
| SFS 7-06101123 Wavetronix Replacement Parts |
Nov. 19, 2009 |
Nov. 23, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source that can provide specific use Wavetronix replacement parts, Traffic Control Corporation, of Fenton, MO. as the sole authorized Eastern Missouri distributor for Wavetronic brand parts .This specific product has been documented as fully and absolutely compatible with existing units, estimated to be approximately $ 6000.00. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until November 23, 2009. |
| SFS 7-06101120 ACTRA SIGNAL SYSTEM MAINTENANCE |
Nov. 10, 2009 |
Nov. 20, 2009 |
he Missouri Department of Transportation, District 6, has determined that only one source can provide the annual operational program maintenance agreement for phone and on site support for the District 6 ACTRA signal system. To our knowledge, Traffic Systems Solutions Company a wholly owned subsidiary of Brown Traffic Products, Inc. is the only authorized vendor in the St. Louis are approved by Siemens ITS for the ACTRA signal system. Issues with this purchase may be directed to Terri Mount, Teresa. Mount @modot.mo.gov, 314.301.1431 until November 20, 2009. |
| SFS 7-06101106 Steel Bridge Deck Epoxy |
Nov. 5, 2009 |
Nov. 9, 2009 |
The Missouri Department of Transportation, District 6, has determined that only the CASTEK Materials Division of Transpo Industries, Inc. can provide the Department with a specfic use approved epoxy system for the Mississippi River Bridge the only steel bridge deck in the State of Missouri.
The esitmated amount of these repair material yearly on as if needed basis is $20,000.00. Issues with this purchase may be directed to Terri Mount, Teresa. Mount @modot.mo.gov, 314.301.1431 until November 9, 2009. |
| SFS 7-06101002 Alamo X Frame Square Head Assy |
Sept. 30, 2009 |
October 2, 2009 |
The Missouri Department of Transportation, District 6, has determined that only the Alamo Industrial Sales can provide the Department with an X-Frame Square Head Assmbly
The esitmated amount of these replacements parts is $7784.00. Issues with this purchase may be directed to Terri Mount, Teresa. Mount @modot.mo.gov, 314.301.1431 until October 2, 2009. |
| SFS 7-06100924 Glare Screen Systems |
Sept. 24, 2009 |
Sept. 28, 2009 |
The Missouri Department of Transportation, District 6, has determined that only the Hoosier Company, HCI Inc, can provide the replacement glare screen system parts for Wenztville, Route Z.
The esitmated amount of these replacements parts is $10,000.00. Issues with this purchase may be directed to Athena Nance, athena.nance@ modot. mo. gov, 314.301.1440 until September 28, 2009. |
| SFS 7-06100923 SDIC Training |
Sept. 21, 2009 |
Sept. 23, 2009 |
The Missouri Department of Transportation, District 6, has determined that only the Institute for Participatory Management and Planning, can provide the Department with specific training services for SDIC ( Systematic Development of Informed Consent) as used in the public sector to develop public involvement, problem solving and decision making. The SDIC process utilizes the Bleiker's Consent-Building Methodology; this specific course has been utilized previosly by MoDOT districts. The esitmated amount of this service is $13,000.00 and is a one time, three day course to be utilized specifically by D6 transportation professionals to better serve the public interest. Issues with this purchase may be directed to Terri Mount, Procurement Sr. Specialist at 314- 301-1431 or Teresa.Mount@modot.mo.gov, until September 23, 2009. |
| 7-06100909 Sound Wall Replacement Panels |
Sept. 4, 2009 |
Sept. 10, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that only one source, McCann Concrete, Dorsey, IL.,can provide the Department with specific use, replacement parts as the original manufacturer of the original soundwall panels to match type, fuctionality, color and texture. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. Estimated purchase price $6,800. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until September 10, 2009. |
| 7-06100914 Siemens Eagle Products |
Sept. 2, 2009 |
Sept. 14, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that only one source, Brown Traffic Products, Inc. of Davenport, Iowa is the only distributor in the United States who can sell Eagle traffic control products in the State of Missouri. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. Estimated purchase price $30,000. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until September 14, 2009. |
| 7-06100727 Vertical Heated Storage Tanks |
July 15, 2009 |
July 24, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that only one source, Crafco Inc., can provide the department with 10,000 gallon capacity heated storage tank for emulsified asphalt with 3 phase 208 volt power. No other firm supplies this equipment with a 10 guage steel secondary containment shell with installation on up to 8' legs. Includes safety upgrades including high decibel audible alarm and high visibility stack for alarm modes which will alert as high oil level alarm, low oil level alarm, and high oil temperature and power outage. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. Estimated purchase price $80,000. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until July 24, 2009. |
| SFS 7-06100706 DCMS.2 Video Detection System |
June 25, 2009 |
July 6, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source that can provide a specific use, DCMS.2 Video Detection Central System, Traffic Control Corporation, of Fenton, MO. as the sole authorized Missouri distributor for Econolite Inc., and Autoscope detection cameras. .This specific product has been documented as fully and absolutely compatible to provide graphical interface with the Autoscope brand of video detection processors currently utilized in District 6. A one time purchase is estimated to be approximately $ 107,000.00. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until July 6, 2009 |
| sfs 7-06100701 |
June 24, 2009 |
June 26, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is one company, HCI - The Hoosier Company, Inc., which can provide parts to texisting Safe Stop Sttenuator Parts. Purchases to repair Safe Stop Attenuators through July 1, 2010 are estimated to be approximately, $24,999.99. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described.
Issue with this purchase may be directed to Athena Nance at (314) 301-1440 or Athena.Nance@modot.mo.gov until June 26, 2009. |
| D611-039-RW Fabric Structure |
September 28, 2010 |
10:00 a.m. |
Tabulation |
D611-038-RB Mill Rental Normandy
Addendum 001 Rental |
September 20, 2010
September 22, 2010 |
10:00 a.m. |
Tabulation |
| D611-041-RW Crack Repair Epoxy |
September 16, 2010 |
1:00 p.m. |
Tabulation |
| D611-037-RB Tree Service Lindbergh |
September 15, 2010 |
10:00 a.m. |
Tabulation |
| D611-036-RW UPS Systems |
September 30, 2010 |
10:00 a.m. |
|
| D611-035-RW Fabric Salt Structure |
September 15, 2010 |
10:00 a.m. |
WITHDRAWN-Central Office Facilties will re-bid |
D611-034-RW Culvert Pipe Extension
Exhibits A,B,C,D,E
Addendum 001 |
September 21, 2010 |
10:00 a.m. |
Tabulation |
D611-033-RB Sand
Attachment D611-033-RB |
September 14, 2010 |
10:00 a.m. |
Tabulation |
| D611-030-RB Containment System |
September 10, 2010 |
10:00 a.m. |
Tabulation |
D611-028-RW High Mast Tower Cable Repair
Exhibit 1 Location
Picture 1, Picture 2
Addendum 001
Addendum 002 |
September 10, 2010 |
10:00 a.m. |
Tabulation |
| D611-031-R7 Roll-Up Signs |
September 8, 2010 |
10:00 a.m. |
Tabulation |
| D611-027-RW Used Scissors Lift |
September 7, 2010 |
10:00 a.m. |
Tabulation |
D611-023-RW Watering Service
Exhibit A Plans |
September 8, 2010 |
10:00 a.m |
Withdrawn |
| D611-026-RB Crafco Equipment |
August 30, 2010 |
10:00 a.m. |
Tabulation |
| D611-024-RW Vehicle External Oil By Pass Filtration System |
August 31, 2010 |
10:00 a.m. |
Tabulation |
D611-025-RB Crafco Machine |
August 26, 2010 |
10:00 a.m. |
Withdrawn |
D611-022-RW Demolition I-70
Exhibit A Plans,Exhibit B Standard Specifications, Exhibit C Additional Provisions,Exhibit D Asbestos Survey and HeavyMetals Report, Exhibit E Required Documentation Checklist
General Wage Order # 54
Addendum 001 |
September 14, 2010 |
10:00 a.m. |
Tabulation |
| D611-017-RW Enclosed Cargo Trailer |
August 31, 2010 |
10:00 |
CANCELLED |
| D611-021-RB SkiDril Post Driver |
August 12, 2010 |
10:00 a.m. |
Tabulation |
| D611-018-RW Holophane Fixtures |
August 11, 2010 |
10:00 a.m. |
Holophane Tabulation |
| D611-16-RB Skidsteer Rental |
August 2, 2010 |
10:00 a.m. |
Tabulation |
| D611-015-RB On Call Sweeping |
August 16, 2010 |
10:00 a.m. |
Tabulation |
D611-012-RW Modular Office Unit
Addendum 001
Addendum 002
Addendum 003
Addendum 004
Addendum 005
Addendum 006 |
August 30, 2010 |
10:00 a.m. |
|
| D611-014-RW MRE (Meals Ready to Eat), Water |
August 10, 2010 |
10:00 a.m |
Tabulation |
D611-013-RW Fence Repair
Exhibit A-Plans, Exhibit B- Misc. Requirements and Specifications, Exhibit C-MoDOT Std. Specifications,Exhibit D- MoDOT Std. Plans
Annual Wage Order 53
Addendum 001 |
August 9, 2010 August 16, 2010
|
10:00 a.m. |
Tabulation |
| D611-010-RB Retractable Changeable Message Board |
July 26, 2010 |
10:00 a.m. |
Tabulation |
D611-009-RB Tree Removal Lemay
Inspection of Job-site recommended |
July 22, 2010 |
10:00 a.m. |
Tabulation |
D611-008-RW Rte1 85 Garage
Exhibit A- Plan, Exhibit B-Standard Specification,Exhibit C-Additional Provisions, Exhibit D-Asbestos Survey Heavy Metals Report, Exhibit E-Document Requirements
Addendum 001 |
July 28, 2010 |
10:00 a.m. |
Tabulation |
| D611-011-R7 Temporary Portable Chain Link Fencing |
July 16, 2010 |
10:00 a.m. |
Tabulation |
D611-006-RW Concrete Pipe Replacement
Exhibit A- Location, Exhibit B- As Built Plans, Exhibit C-Culvert Section Drawings
Addendum 001
Addendum 002
Addendum 003 |
July 16, 2010
July 19, 2010 |
10:00 a.m. |
Tabulation |
| D611-007-RW Concrete Blocks |
July 15, 2010 |
10:00 a.m. |
Tabulation |
D611-004-RW Demolition Weigh Scale Building Rte I-55
Exhibit A Plans, Exhibit B-Standard Specification, Exhibit C Additional Provisions, Exhibit D Asbestos Survey , Heavy Metals Report,Exhibit E Document Checklist
ADDENDUM 001 |
July 14, 2010
July 15, 2010 |
10:00 a.m |
Tabulation |
D611-001-RW I-55 Guard Cable
Exhibit A,Exhibit B, Exhibit C, Exhibit D |
July 7, 2010 |
1:00 p.m. |
Tabulation |
| D611-005-R7 Marking Paint |
July 1, 2010 |
10:00 a.m. |
Tabulation |
| D611-003-RW Dump-Lok Steel Braces |
July 1, 2010 |
10:00 a.m. |
Tabulation |
| D611-002-R7 Super Heavy Duty Flail Mower |
June 21, 2010 |
10:00 a.m. |
Tabulation |
| D610-153-R7 Drain Cleaning Service |
June 15, 2010 |
10:00 a.m. |
Tabulation |
| D610-158-R7 Utility Trailer |
June 14, 2010 |
10:00 a.m. |
Tabulation |
D610-160-RB Mulching Service
Addendum 001, Mulching Service |
June 10, 2010 |
2:00 p.m. |
Tabulation |
| D610-157-R7 Walk-Behind Mower w/Trade In |
June 9, 2010 |
10:00 a.m. |
Tabulation |
D610-148-RB Janitorial Services - District Office and Barrett Station Operations Complex
Addendum 001
Addendum 002 |
June 7, 2010 |
1:00 p.m. |
Tabulation |
D610-156-R7 Mid Mount Zero Turn Riding Mower
Addendum 001 |
June 7, 2010 |
10:00 a.m. |
Tabulation |
| D610-155-RW Portable Breath Testers |
May 28, 2010 |
10:00 a.m. |
Tabulation |
| D610-154-RW Equipment Rental |
May 27, 2010 |
2:00 p.m. |
Tabulation |
D610-151-RW St. Clair Fencing
General Fencing Specification
Exhibit 1 Fence
Exhibit 2
Exhibit 3
ADDENDUM 001, ADDENDUM 001 DRAWING |
May 26, 2010 |
10:00 a.m. |
Tabulation |
| D610-150-R7 Hydro Drive Walk-Behind Mower |
May 18, 2010 |
10:00 a.m. |
Tabulation |
| D610-152-RW Locator Units |
May 14, 2010 |
10:00 a.m. |
Tabulation |
D610-146-RW Demolition Salt Dome
Exhibit A Location, Exhibit B Speciifications
Exhibit C Broadway Specifications
Exhibit D Asbestos Report
Exhibit E Document Check List
ADDENDUM 001
ADDENDUM 002 |
May 18, 2010 |
10:00 a.m. |
tabulation |
| D610-149-RW Bridge Rehabilitation Rte E |
May 14, 2010 |
10:00 a.m. |
Tabulation |
| D610-147-RW Bridge Approach Paving |
May 6, 2010 |
12:00 p.m. |
Tabulation |
| D610-145-R7 Vehicle Mounted "Area" Work Lighting Units |
May 3, 2010 |
10:00 a.m. |
Tabulation |
D610-144-RB Pavement Grinder
Addendum 001 |
May 11, 2010 |
10:00 a.m. |
|
| D610-135-RW Preformed Silicone Joint Sealing Material |
April 30, 2010 |
10:00 a.m. |
Tabulation |
D610-140-RW Security Fences
Plan Sheets Reference Only 1,Plan Sheets Reference Only 2, Plan Sheets Reference Only 3, Plan sheets Reference Only 4, Plan Sheets Reference Only 5. Plan Sheets Reference Only 6. Plan Sheets Reference Only 7
Addendum 001 4/23/10
Attachment 1 4/23/10
Attachment 2 4/23/10
ADDENDUM 002 |
April 29, 2010
May 5, 2010 |
10:00 a.m. |
Tabulation |
| D610-143-RW Basket Truck Rental |
April 22, 2010 |
10:00 a.m. |
Tabulation |
| D610-142-R7 Pelco Parts |
April 21, 2010 |
10:00 a.m. |
Tabulation |
D610-141-R7 Mineral Spirits and Linseed Oil
Addendum 001 |
April 20, 2010
April 23, 2010 |
10:00 a.m. |
Tabulation |
| D610-138-RB Utility Trailer |
April 19, 2010 |
10:00 a.m. |
Tabulation |
| D610-137-RB Zero Turn Mower |
April 16, 2010 |
10:00 a.m. |
Tabulation |
| D610-139-RW Paver, roller w Operators |
April 16, 2010 |
10:00 a.m. |
Tabulation |
| D610-134-RW Holophane Mongoose Parts |
April 14, 2010 |
10:00 a.m. |
Tabulation |
| D610-136-RW High Tension Cable Barrier Hardware |
April 13, 2010 |
10:00 a.m. |
TABULATION |
| D610-133-R7 Pelco Parts |
April 12, 2010 |
10:00 a.m. |
Tabulation |
D610-131-RW Guardrail Fencing Repair with Signage
Photos ,photo 2, photo 3 |
April 8, 2010 |
10:00 a.m. |
Tabulation |
D610-132-RW Equipment Trailer
Addendum 001
Addendum 002
ADDENDUM 003 |
April 8, 2010
April 13, 2010 |
10:00 a.m.
12:00 p.m. |
Tabulation |
D610-130-RW Soundwall Panel Installation
EXHIBIT A.EXHIBIT B, EXHIBIT C
EXHIBIT D, EXHIBIT E. EXHIBIT F |
April 8, 2010 |
10:00 a.m. |
Tabulation |
D610-120-RB Brickwork Columns
Attachment Drawing 001
Attachment Drawing 002
Attachment Drawing 003
Attachment Drawing 004
Attachment Drawing 005
Attachment Drawing 006
Attachment Drawing 007
Addendum 001 March 31, 2010
Addendum 002 April 5, 2010 |
April 7, 2010 |
10:00 a.m. |
Tabulation |
| D610-128-RW Pull Cylinders |
April 1, 2010 |
10:00 a.m. |
Tabulation |
| D610-129-RB Loader Rental |
March 26, 2010 |
12:00 p.m. |
Tabulation |
| D610-127-RB Dozer Rental |
March 22, 2010 |
10:00 a.m. |
Tabulation |
| D610-126-RW Paver/ roller with Operator |
March 22, 2010 |
10:00 a.m. |
Tabulation |
| D610-125-RW Alpha Replacement Parts |
March 24, 2010 |
10:00 a.m. |
Tabulation |
RFQ D610-124-RB Bore Pipe
Attachment - Plan Sheet Exhibit A |
March 19, 2010 |
10:00 a.m. |
Tabulation |
RFB D610-122-RW Demolition I-44
Exhibit A Location, Exhibit B Specification
Exhibit C Demolition Specifications
Exhibit D Asbestos Survey
ADDENDUM 001
Addendum 002 |
March 31, 2010 |
10:00 a.m. |
Tabulation |
RFB D610-121-RW Demolition Rte I-64
Exhibit A Location,Exhibit B Specifications
Exhibit C Demolition Specifications
Exhibit D Asbestos Report |
March 31, 2010 |
10:00 a.m. |
Tabulation |
| D610-118-RB Scrap Metal Service |
March 16, 2010 |
10:00 a.m. |
Tabulation |
| D610-119-RB Surface Mount Slip Bases |
March 10, 2010 |
10:00 a.m. |
Tabulation |
RFB D610-114-RW Audible Signals
Sealed Bid |
March 10, 2010 |
10:00 a.m. |
Tabulation |
D610-117-RW Trackhoe Rental
Addendum 001 |
March 9, 2010 |
10:00 a.m. |
Tabulation |
| D610-116-RW Bagged Portland Cement |
March 3, 2010 |
10:00 a.m. |
Tabulation |
| D610-113-RW ON CALL ROCK |
March 2, 2010 |
10:00 a.m. |
TABULATION |
D610-112-RW Shouldering Machine
Addendum 001 |
February 25, 2010 |
10:00 a.m. |
Tabulation |
| D610-111-RW Walk Behind/Riding Mowers |
February 17, 2010 |
10:00 a.m. |
Tabulation |
D610-109-RW Sweeper Parts
Addendum 001 |
February 16,2010 |
10:00 a.m. |
tabulation |
| D610-104-RW Commercial Mix |
February 9, 2010 |
1:00 p.m. |
Tabulation |
D610-107-R7 Heavy Duty Anti-Freeze Summer Coolant and Heavy Duty Predilute 50-50
Addendum 001 |
February 1, 2010
February 3, 2010 |
10:00 a.m. |
Tabulation |
| D610-108-RW Black Magnum M1240 |
February 2, 2010 |
10:00 a.m. |
Tabulation |
| D610-090-RW Bridge Rehabilitation |
February 1, 2010 |
10:00 a.m. |
Tabulation |
D610-103-RB Landscape Sponsor Signs
Attachment 001
Addendum 001 D610-103-RB
Addendum 002 D610-103-RB |
January 19, 2010 |
2:00 p.m. |
Tabulation |
| D610-106-RB SweepPro Rental |
January 19, 2010 |
2:00 p.m. |
Tabulation |
D610-093-RW Demolition Rte 364
Exhibit A- Plans
Exhibit B MoDOT Standard Specifications
Exhibit C Additional Demolition and Removal Provisions
Exhibit D Asbestos Survey Report
sealed bid
ADDENDUM 001 |
January 13, 2010 |
10:00 a.m. |
Tabulation |
D610-091-RW Vehicle Video Dectection Installation
APL
Addendum 001
Exhibit 1
Addendum 002
Addendum 003
Exhibit 2- Plans
sealed bid |
January 12, 2010
January 19, 2010 |
10:00 a.m. |
Tabulation |
| D610-101-RW On Call Rapid Set |
December 30, 2009 |
10:00 a.m. |
Tabulation |
| D610-100-RW On Call Portland Type I |
December 30, 2009 |
10:00 A.M. |
Tabulation |
D610-086-RB Supply and Install IPM
Attachment A |
December 30, 2009 |
2:00 p.m. |
Tabulation |
D610-102-R7 Bush-Whacker Mower Parts
Sealed Bid |
December 29, 2009 |
10:00 a.m. |
Tabulation |
| D610-097-RW On Call Wood Chipper Rental |
December 29, 2009 |
10:00 a.m. |
Tabulation |
| D610-098-R7 Various Filters |
December 28, 2009 |
2:00 p.m. |
Tabulation |
D610-094-RB St. Louis Wayfinding Signs
Attachment A-Design Intent
Attachment B-Wording (Sign Location Plan)
Attachment C-Quantities per Sign |
December 22, 2009 |
10:00 a.m. |
Tabulation |
D610-074-RW Used Oil- reissued
Exhibit One- Locations
Addendum 001 |
December 18, 2009
December 21, 2009 |
10:00 a.m. |
Tabulation |
D610-083-RW Demolition Rte 141
Exhibit A- Plan, Exhibit B Specifications
Exhibit C- Demolition and Removal Provisions
Exhibit D Asbestos Survey
Addendum 001
Addendum 002
Sealed Bid |
December 17, 2009 |
10:00 a.m. |
Tabulation |
| D610-095-R7 Heavy Hex Bolts |
December 15, 2009 |
10:00 a.m. |
Tabulation |
| D610-092-RB Festus Project Office Weekly Trash Service |
December 15, 2009 |
10:00 a.m. |
Tabulation |
D610-087-R7 Bush-Whacker Mower Parts
Addendum 001
|
December 15, 2009 |
10:00 a.m. |
WITHDRAWN-To be rebid |
D610-088-R7 Triumph Switchblade Mower Parts
Addendum 001 |
December 15, 2009 |
10:00 a.m. |
Tabulation |
D610-089-R7 Mott-Alamo Mower Parts
Addendum 001
Addendum 002 |
December 15, 2009 |
10:00 a.m. |
Tabulation |
| D610-084-RW Tank Cleaning |
December 11, 2009 |
10:00 a.m. |
Tabulation |
D610-080-RW Transverse Grooving
Exhibit A
Exhibit B
sealed bid
Addendum 001 |
December 7, 2009 |
10:00 a.m. |
Tabulation |
D610-079-RB Container and Weekly Trash Receptacle
Addendum 001 -Weekly Trash Service |
December 4, 2009 |
10:00 a.m. |
Tabulation |
| D610-078-RB Roll Off Trash Container Service |
December 4, 2009 |
10:00 a.m. |
Tabulation |
| D610-085-RW Wing Plow Guidance Laser |
December 3, 2009 |
10:.00 a.m. |
Tabulation |
RFB D610-074-RW Used Oil Pick Up
sealed bid
Exhibit One |
November 30, 2009 |
10:00 a.m. |
To be re-bid |
| D610-082-RB Tree Removal Eureka Area |
November 25, 2009 |
10:00 a.m. |
Tabulation |
| D610-081-RW Bullnose GuardRail Repair |
November 23, 2009 |
10:00 a.m. |
Tabulation |
| D610-069-RW Mobile Home Roof Over System |
November 12, 2009 |
10:00 a.m. |
All quotes rejected |
| D610-077-RW Elevator Upgrade |
November 9, 2009 |
10:00 a.m. |
Tabulation |
| D610-076-RW Paver |
November 4, 2009 |
10:00 a.m. |
Tabulation |
D610-075-RB Bronze Highway Plaques
Attachment 001- Workforce Advisory Committee
Attachment 002- MoDOT Team
Attachment 003- Overall Project 'High Priority'
Quote may be faxed to 314.301.1437 |
October 27, 2009 |
10:00 a.m. |
Tabulation |
| D610-073-RW Bridge Rehabilitation |
November 13, 2009 |
10:00 a.m. |
Tabulation |
| D610-072-RW Holophane Fixtures |
October 29, 2009 |
10:00 a.m. |
Tabulation |
| D610-071-RW Pelco Parts |
October 26, 2009 |
10:00 a.m. |
Tabulation |
| D610-067-RW Hose Crimper |
October 26, 2009 |
10:00 a.m. |
Tabulation |
D610-070-RW Padlocks
Addendum 001 |
October 22, 2009
October 26, 2009 |
10:00 a.m. |
Tabulation |
D610-062-RW Demolition Storage Building
Exhibit A, Exhibit B, Exhibit C, Exhibit D
Addendum 001
Addendum 002 |
October 22, 2009 |
10:00 a.m. |
Tabulation |
| D610-065-RB Premix Window Washing Fluid |
October 21, 2009 |
10:00 a.m. |
Tabulation |
| D610-068-RW Tandem Truck Bed Liners |
October 19, 2009 |
10:00 a.m. |
Tabulation |
D610-063-RB Antifreeze Service
Attachment I - Antifreeze Service |
October 19, 2009 |
1:00 p.m. |
Tabulation |
D610-066-RW Seed /Straw Repair Areas
Addendum 001
Addedum 002 |
October 13, 2009 |
10:00 a.m. |
Tabulation |
| D610-064-RW Bridge Approach Paving |
October 13, 2009 |
10:00a.m. |
Tabulation |
| D610-061-RW Crane-rebid |
September 28, 2009 |
10:00 a.m. |
Tabulation |
D610-060-RB IPM Supply and Installation
Attachment A |
October 5, 2009 |
2:00 p.m. |
WITHDRAWN |
| D610-059-RW Building Propane |
September 28,2009 |
10:00 a.m. |
Tabulation |
D610-058-RW Lubricant Storage System
ADDENDUM 001 |
October 5, 2009
October 7, 2009 |
10:00 a.m. |
Tabulation |
D610-057-RW UPS Sys and Parts
sealed bid
Addendum 001 |
October 6, 2009 |
10:00 a.m. |
Tabulation |
D610-056-RW Bridge Abutment Bearings Rehabiliatation
Information Only Drawing 1,Information Only Drawing 2, Information Only Drawing 3,
Information Only Drawing 4
sealed bid |
September 30, 2009 |
10:00 a.m. |
WITHDRAWN |
D610-055-RW Demolition
Exhibit A, Exhibit B, Exhibit C, Exhibit D
Addendum 001 |
September 29, 2009 |
10:00 a.m. |
Tabulation |
D610-046-RB On Call Hauling Service
Attachment I-Building Location
Attachment II-MoDOT Map
Attachment III- Maint Building Addresses |
September 30, 2009 |
10:00 a.m. |
Tabulation |
D610-054-RW Crane/operator
Addendum 001 |
September 21, 2009 |
10:00 a.m. |
Rejected |
D610-053-RB Sand
Attachment I |
September 14, 2009 |
10:00 a.m. |
Tabulation |
| D610-052-RB Mortar |
September 10, 2009 |
10:00 a.m. |
Tabulation |
| D610-051-RW Bridge Deck and Approach Resurfacing |
September 3, 2009 |
10:00 a.m. |
Tabulation |
D610-044-RW UPS INSTALLATION
EXHIBIT I
ADDENDUM 001 |
September 1, 2009 |
10:00 a.m. |
tabulation |
D610-050-RB Janitorial Service 3 PO
Attachment I - Floor Plan, Festus
Attachment II - Floor Plan, Maryland Heights
Attachment III- Floor Plan, St. Clair
Addendum 001 |
September 1, 2009 |
10:00 a.m. |
Tabulation |
| D610-045-RB Roadeo Catering |
August 31, 2009 |
2:00 p.m. |
Tabulation |
610- 049- RW Mobile Screen Plant
sealed bid |
August 28, 2009 |
10:00 a.m. |
Tabulation |
RFP D610-023-RW Arterial Dynamic Message Sign Assembly
Addendum 001
Addendum 002
Addedum 003 |
August 27, 2009 |
10:00 a.m. |
|
D610-048-RW Combo Power Supply
Exhibit 1 |
August 17, 2009
August 19, 2009 |
10:00 a.m. |
Tabulation |
| D610-047-RW Pelco Parts |
August, 13, 2009 |
10:00 a.m. |
Tabulation |
D610-040-RW FLAIL MOWER
Addendum 001 |
August 5, 2009 |
10:00 a.m. |
tabulation |
D610-043-RW BACKHOE RENTAL
Addendum 001 |
August 5, 2009 |
10:00 a.m. |
tabulation |
RFP D609-007-RW CCTV ASSEMBLIES
ADDENDUM 001 |
August 5, 2009 |
10:00 a.m. |
|
| D610-041-RW Charging Station |
August 3, 2009 |
10:00 a.m. |
Tabulation |
RFB D610-028-RW Bridge Rehabilitation-Franklin County
ADDENDUM 001 |
July 30, 2009 |
10:00 a.m. |
Tabulation |
| RFB D610-027-RW Bridge Rehabilitation- Warren County |
July 30, 2009 |
10:00 a.m. |
Tabulation |
RFQ D610-038-RB On Call Sweeping
Quote may be faxed |
July 29, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D610-035-R6 Gas-Powered Jackhammer |
July 27, 2009 |
10:00 a.m. |
Tabulation |
| D610-036-RW Brake Cleaner Charging Station |
July 27, 2009 |
10:00 a.m. |
All quotes Rejected |
| RFQ D610-039-RW LED Sign |
July 24, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D610-034-R6 Heavy Duty Anti-Freeze Summer Coolant and Heavy Duty Predilute 50-50 |
July 23, 2009 |
10:00 a.m. |
Tabulation D610-034-R6 |
| D610-037RB Front Mount Riding Mower BF |
July 21, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D610-031-R6 Directional Indicator Barriers-Type II SHRP |
July 21, 2009 |
10:00 a.m. |
Tabulation |
| D610-033-RW Sweeper Hydraulic Fluid |
July 21, 2009 |
10:00 a.m |
WITHDRAWN |
| D610-032-RW Traffic Hardware |
July 21, 2009 |
10:00 a.m |
Tabulation |
RFQ D610-030-R6 Spreaders
Addendum 001 D610-021-R6 and D610-030-R6 |
July 17, 2009 |
10:00 a.m. |
Tabulation RFQ D610-030-R6 |
RFQ D610-021-R6 Plows For 2009 Chevy 1-Tons
Addendum 001 D610-021-R6 and D610-030-R6 |
July 17, 2009 |
10:00 a.m. |
Tabulation D610-021-R6 |
D610-020-RW Alpha FXM UPS Systems
Sealed Bid |
July 16, 2009 |
10:00 a.m. |
Tabulation |
D610-024-RB Backhoe/Excavator Rock Breaker
Rental |
July 15, 2009 |
10:00 a.m. |
Tabulation |
| D610-029-RW Tideland Replacement Parts |
July 14, 2009 |
10:00 a.m. |
TABULATION |
D610-026-RB Tree Removal Garden Ave
Addendum 001 |
July 13, 2009 |
10:00 a.m. |
Tabulation |
D610-025-RW Tower Parts
ADDENDUM 001
ADDENDUM 002 |
July 13, 2009
July 16, 2009 |
10:00 a.m. |
Tabulation |
D610-016-RB Temporary Personnel Services
Sealed bids |
July 8, 2009 |
2:00 p.m. |
Tabulation |
D610-018-RW Fluid Storage System
Addedum 001
Addendum 002 |
July 7, 2009
July 9, 2009 |
10:00 a.m. |
Tabulation |
D610-022-RB ZT Riding Mower
Addendum 001
|
July 7, 2009 |
10:00 a.m. |
Withdrawn |
| D610-013-RW Pavement Breaker |
July 7, 2009 |
10:00 a.m. |
Tabulation |
D610-017-RB Zero Turns Riding Mower |
July 2, 2009 |
10:00 a.m. |
Withdrawn - incorrect model |
| D610-015-RW Vehicle Trumpet Horns |
June 26, 2009 |
10:00 a.m. |
TABULATION |
| RFQ D610-019-R6 Surface Mount Slip Base Bottoms |
June 26, 2009 |
10:00 a.m. |
Tabulation D610-019-R6 |
RFB D610-002-RW Bridge Rehabilitation Jefferson County, MO. |
June 26, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D610-014-R6 Various Filters |
June 25, 2009 |
2:00 p.m. |
Tabulation D610-014-R6 |
RFQ D610-012-R6 Marking Paint
Fax number 314-301-1437 is experiencing problems. Please fax bids to 314-301-1425. |
June 23, 2009 |
10:00 a.m. |
Tabulation D610-012-R6 |
| RFQ D609-133-RB Crawler Camera System |
June 16, 2009 |
10:00 a.m. |
Tabulation |
| RFB D610-005-RB Temporary Personnel Service |
June 16, 2009 |
10:00 a.m. |
ALL BIDS REJECTED |
| RFQ D610-004-RB Drain Cleaning |
June 15, 2009 |
10:00 a.m. |
Tabulation |
| D610-011-RW Sweeper Parts |
June 12, 2009 |
10:00 a.m. |
Tabulation |
RFB D610-009- RW Bridge Hydrodemolition
Addendum 001 |
June 11, 2009 |
10:00 a.m. |
Tabulation |
RFP D609-127-RB Digitizing Microfilm Service
Addendum I
Attachment to Addendum I |
June 10, 2009 |
10:00 a.m. |
|
| RFQ D610-010-R6 Crawler Loader Rental |
June 5, 2009 |
2:00 p.m. |
Tabulation D610-010-R6 |
| D610-008-RW Ice Machines |
June 3, 2009 |
10:00 a.m. |
tabulation |
RFQ D609-131-RB Paver with Operator
This quote may be faxed to 314-301-1437 |
June 3, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-132-RW Type II Pipe Liner |
June 1, 2009 |
10:00 a.m. |
TABULATION |
| RFQ D610-003-R6 Bulldozer with Operator |
May 28, 2009 |
10:00 a.m. |
Tabulation D610-003-R6 |
| RFQ D610-001-R6 Excavator Rental |
May 21, 2009 |
10:00 a.m. |
Tabulation D610-001-R6 |
RFQ D609-128-R6 Riding Mower For Grover
Addendum 001 D609-128-R6 |
May 21, 2009 |
10:00 a.m. |
ALL BIDS REJECTED |
D609-125-RW Demolition 3
Exhibit A
Exhibit B
Exhibit C (Note: Responses may be faxed)
Addendum 001 |
May 20, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-124-R6 Bridge Jack |
May 19, 2009 |
10:00 a.m. |
Tabulation D609-124-R6 |
| RFQ D609-126-R6 Vehicle Mounted Area Work Lighting Units |
May 18, 2009 |
2:00 p.m. |
Tabulation D609-126-R6 |
| RFQ D609-122-R6 Oil Absorbing Compound |
May 14, 2009 |
10:00 a.m. |
Tabulation D609-122-R6 |
| D609-120-RW Bullnose Guardrail Repair |
May 13, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-123-R6 Vehicle Mounted Balloon Lighting System |
May 12, 2009 |
2:00 p.m. |
REJECTED - BEING RE-ISSUED |
| D609-121-RW MVP810 |
May 7, 2009 |
10:00 a.m. |
Tabulation |
D609-119-RW light Pole Installation
Addendum 001 |
May 7, 2009 |
10:00 a.m. |
Tabulation |
D609-118-RW Seal Parking Lots
Addendum 001 |
May 6, 2009 |
10:00 a.m. |
Tabulation |
D609-117-RW Wash Bay Equipment
Wash Bay Layout |
May 5, 2009 |
10:00 a.m. |
Tabulation |
RFQ D609-111-R6 Hydraulic Drop-Deck Trailer
Addendum 001 D609-111-R6
Addendum 002 D609-111-R6 |
April 23, 2009
April 30, 2009 |
10:00 a.m. |
Tabulation D609-111-R6 |
D609-115-RW Lindbergh Tunnel Pole, Light Replacement |
April 30, 2009 |
10:00 a.m. |
Withdrawn- insufficient data |
| D609-108-RW Fuel Dispensers |
April 28, 2009
April 30, 2009 |
10:00 a.m. |
Tabulation |
D609-105-RW Lighting Supplies
Addendum 001 |
April 22, 2009
April 29, 2009 |
10:00 a.m. |
Tabulation |
RFQ D609-114-RB Hydrodemolotion Rte. A &
Rte. Y, Warren County |
April 28, 2009 |
10:00 a.m. |
All bids Rejected |
| RFQ D609-113-RB Hydrodemolotion Rte. PP, Pike County |
April 28, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-112-RB Hydrodemolition Rte. Z, Lincoln County |
April 28, 2009 |
10:00 a.m. |
All bids Rejected |
RFQ D609-106-R6 Bridge Jack
Addendum 001 D609-106-R6 |
April 28, 2009 |
10:00 a.m. |
REJECTED - BEING RE-ISSUED |
| RFQ D609-116-RB Rollup Signs with Stands and Brackets |
April 27, 2009 |
2:00 p.m. |
Tabulation |
D609-099-RW CTAD Installation
Scope of Work
Plan Sheet |
April 27, 2009 |
10:00 a.m. |
Tabulation |
D609-098-RW Demolition 2
Exhibit A, Exhibit B, Exhibit C, Exhibit D |
April 27, 2009 |
10:00 a.m. |
Tabulation |
D609-109-RW Ice Machines
Addendum 001
Addendum 002 |
April 24, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-107-R7 Water Coolers |
April 23, 2009 |
10:00 a.m. |
Tabulation |
| D609-104-RW Holophane Parts |
April 22, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-101-R6 Bridge Drain Cleaning I-55 Meramec Bridge |
April 21, 2009 |
10:00 a.m. |
Tabulation D609-101-R6 |
D609-096-RW Gate Maintenance
Gate Locations |
April 17, 2009 |
10:00 a.m. |
tabulation |
| D609-103-RW Bridge Paving Lincoln County |
April 16, 2009 |
10:00 a.m. |
Withdrawn |
| D609-102-RW Bridge Paving- Warren County |
April 16, 2009 |
10:00 a.m. |
Tabulation |
| D609-097-RW Light Pole/Pull Box Installation |
April 15, 2009 |
10:00 a.m |
All bids Rejected |
D609-093-RW Pipe Liner
Addendum 001
RFB D609-093-RW Pipe Liner |
April 2, 2009
April 14, 2009 |
10:00 a.m.
1:00 p.m. |
Tabulation |
| D609-095-RW CCTV Cameras |
April 13, 2009 |
10:00 a.m. |
Tabulation |
D609-094-RB Rollup Signs MA
Attachment |
April 6, 2009 |
10:00 a.m. |
Tabulation |
D609-092-RW CMP
Specifications |
April 1, 2009 |
10:00 a.m. |
Tabulation |
| D609-091-RW On Call Portland Type I Concrete |
March 25, 2009 |
10:00 a.m. |
tabulation |
| D609-090-RW On Call Rapid Set Concrete |
March 25, 2009 |
10:00 a.m. |
tabulation |
RFB D609-085-RW Demolition with Friable Asbestos Abatement
Exhibit A Plans
Exhibit B Specifications
Exhibit C Additional Demolition Specifications
Exhibit D Asbestos Surveys |
March 18, 2009 |
10:00 a.m. |
Tabulation |
| D609-089-RW Bag Portland Cement |
March 17, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-088-RW Concrete Blocks |
March 17, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-087-R6 Hydrostatic Stand-On Mower |
March 12, 2009 |
10:00 a.m. |
Tabulation D609-087-R6 |
| D609-083-RW Sweeper Parts |
March 11, 2009 |
10:00 a.m. |
Tabualtion |
D609-082-RW Conveyor with Hopper
Exhibit A Conveyor Specifications
Exhibit B Hopper Specifications |
March 9, 2009 |
10:00 a.m. |
Tabulation |
D609-084-RW Crane Project
Sketch 1
Sketch 2
Photo 1
Photo 2
Photo 3 |
March 4, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-080-R6 Manual Bandsaws |
March 3, 2009 |
10:00 a.m. |
Tabulation RFQ D609-080-R6 |
| D609-081-RW Trackhoe Rental |
March 3, 2009 |
10:00 a.m. |
Tabulation |
| D609-078-RW On Call Rock |
March 2, 2009 |
10:00 a.m. |
Tabulation |
D609-077-Joint Sealing - RW
Addendum 001
Specification 711 |
February 20, 2009
February 25, 2009 |
10:00 a.m. |
Tabulation |
D609-079-RW Crane Rental w Operator
Addendum 001
Addendum 002
Addendum 003 |
February 11, 2009
February 18, 2009 |
1:00 p.m.
10:00 a.m. |
Rejected, to be re-issued |
| sfs 7-06090515 Root Pruned Trees |
May 12, 2009 |
May 14, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source that can provide Root Pruned Trees, achieved by a patented process.A one time purchase is estimated to be approximately $5000.00. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until May 14, 2009. |
| sfs 7-06090202 Marketing Advertising |
February 2, 2009 |
February 6, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determind the only one source can provide the marketing and advertising in print for the Missouri Department of Transportation, District 6, St. Louis. This market is through the St. Louis American. To our knowledge, the St. Louis American is the only medium that can rpovide the scale of advertisement to the intended target marekt wtih the expected advertisement. Advertising related to this mareting campaign will exceed $5000 cummulatively. A contract to purchase the above advertising packet may be executed with the St. Louis American after February 6, 2009.
Issue with this purchase may be directed to Athena Nance at (314) 301-1440 or Athena.Nance@modot.mo.gov |
D609-075-RW Post Driver
ADDENDUM 001 |
January 23, 2009 |
10:00 a.m. |
tab sheet |
| D609-075-RB Crawler Loader Rental |
January 22, 2009 |
10:00 a.m. |
All Bids Rejected |
| D609-074-RW On Call Commercial Mix |
February 9, 2009 |
1:00 p.m. |
Tabulation |
| D609-073-RW Fault Locator |
January 20, 2009 |
10:00 a.m. |
tabulation |
| D609-071-RW Tower Parts |
January 5, 2009 |
10:00 a.m |
Tabulation |
| D609-069-RW Simulated Impaired Driving Vehicle |
January 9, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-068-R6 Various Filters |
December 31, 2008 |
2:00 p.m. |
Tabulation RFQ D609-068-R6 |
| RFQ D609-065-RB Camera System |
December 31, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-067-R6 Triumph Switchblade Mower Parts |
December 31, 2008 |
10:00 a.m. |
Tabulation D609-067-R6 |
RFQ D609-066-R6 Bush-Whacker Mower Parts
Addendum 001 D609-066-R6 |
December 31, 2008 |
10:00 a.m. |
Tabulation D609-066-R6 |
| D609-070-RW Trackhoe Rental |
December 30, 2008 |
10:00 a.m. |
All Bids Rejected |
RFQ D609-063-R6 LED Retractable Arrow Boards
Side View Picture
RearView Up Picture
RearView Down Picture |
December 30, 2008 |
10:00 a.m. |
D609-063-R6 Tabulation |
| D609-064-RW Blank Out Signs |
December 30, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-062-R6 Fence Windscreen
Addendum 001 D609-062-R6 |
December 30, 2008 |
10:00 a.m. |
D609-062-R6 Tabulation |
| D609-061-RB Rock Pile St. Charles/Wentzville |
December 30, 2008 |
10:00 a.m. |
All Bids Rejected |
D609-060-RW Type A Base Replacement
Addendum 001 |
December 15, 2008 |
10:00 a.m. |
Tabulation |
D609-047-RB DBE Supportive Services and Business Consultation Program
Addendum 001
Addendum 002
Attachment I |
December 19, 2008 |
10:00 a.m. |
|
| D609-059-RW On Call Wood Chipper Rental |
December 16, 2008 |
10:00 a.m. |
Tabulation |
| D609-055-RW Jotto Desk Bases |
December 9, 2008 |
10:00 a.m. |
Tabulation |
D609-052-RW Fence Enclosures
Addendum 001
Specification
Addendum 002
Addendum 003 |
December 9, 2008 |
10:00 a.m. |
Tabulation |
D609-0057-RW On Call Rapid Set Cement
Addendum 001 Rapid Set |
December 8, 2008 |
10:00 a.m. |
Tabulation |
| D609-058-RW Fence Glare Slats |
December 3, 2008 |
10:00 a.m. |
Tabulation |
D609-056-RW On Call Portland Cement
Addendum 001 |
December 8, 2008 |
10:00 a.m. |
Tabulation |
| D609-053-RW Silspec Polymer Nosing System |
December 2, 2008 |
10:00 a.m. |
Tabulation |
| 7-06090130 Original Software Coding for Lindbergh Tunnel |
January 26, 2009 |
February 5, 2009 |
The Missouri Department of Transportation, District 6 has determined that one company, Finavon Design, of Forest, VA. can furnish the department with knowledge of the original un-compiled code used for the Lindbergh Tunnel cusotm software.
Purchases for Finvron Design Inc., services may exceed $25,000, individually and/or cumulatively and may be made throughout the calendar year 2009, This authorization may be extended for an additional one year unless additional suppliers are identified upon the expiration of any single feasible source authorization.
.This notice shall meet the single feasible source posting requirements for one year and in association with the needs described.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until February 5, 2009.. |
| 7-06090126 Quad Gaurd Attenuator Parts |
January 21, 2009 |
January 26, 2009 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is one company, HCI – The Hoosier Company, Incorporated, which can provide parts to existing Quad Guard Attenuators. Purchases to repair Quad Guard Attenuators through January 26, 2010 are estimated to be approximately $24,999.99. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described.
Issues with this purchase may be addressed to Kristi Coppinger @ 314-301-1439 or Kristina.Coppinger@modot.mo.gov until January 26, 2009. |
| 7-06090126 Electronic Fueling Equipment |
January 14, 2009 |
January 26, 2009 |
The Missouri Department of Transportation, District 6 has determined that one company,Graham Equipment Company of St. Louis, MO. ( area distributor for Bennett equipment) can furnish and install Bennett fueling equipment that includes but is not limited to pumps,remote dispensers, and future assoiciated installations and supplies that are compatible with the TRAK Sentry GOLD Compact.
Purchases for Bennett equipment and services may exceed $25,000, individually and/or cumulatively and may be made throughout the calendar year 2009, Tis auorization may be extended for an additional one year unless additional suppliers are identified upon the expiration of any single feasible source authorization.
.This notice shall meet the single feasible source posting requirements for one year and in association with the needs described.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until January 26, 2009.. |
| 7-06091201 Wolverine Cold Weather Paint |
November 20, 2008 |
December 1, 2008 |
The Missouri Department of Transportation, District 6 has determined that one company, Ennis Paint can provide specific brand Wolverine Cold Weather Traffic Striping Paint for testing in the St. Louis metro District area . Due to construction projects in District that may have to be striped in cold weather months. This specific brand is currently in the evaluation phase and this is a one time order to test material under actual contitions..This notice shall meet the single feasible source posting requirements for one year and in association with the needs described.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until December 1, 2008. |
| 7-06091125 Intelight Replacement Parts |
November 20,2008 |
November 25, 2008 |
The Missouri Department of Transportation, District has determined that only Brown Traffic, can provide the Department with replacement or extra parts as used in the Intelight SignalSystem.This notice shall meet the single feasible source posting requirements for one year and in association with the needs described. The approximate value of the product is estimated at a cost of $ 10,000year.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until November 25, 2008. |
| 7-06091124 Replacement Parts for TraVis Camera Systems |
November 18, 2008 |
November 24, 2008 |
The Missouri Department of Transportation, District has determined that only Rhythm Engineering, ( formerly Professional Engineering)can provide the Department with replacement or extra parts as used in the TraVis Camera System .This notice shall meet the single feasible source posting requirements for one year and in association with the needs described. The approximate value of the product is estimated at a cost of $ 13,000year.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until November 24, 2008. |
| 7-06091105 DTN Meteorologist Services |
November 3, 2008 |
November 5, 2008 |
The Missouri Department of Transportation, District has determined that only DTN Meteorlogix can provide the Department with DTN Meterorological Services for Weather Sentry On Line Pro .This notice shall meet the single feasible source posting requirements for one year and in association with the needs described. The approximate value of the product is estimated at a cost of $ 5,750/year.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until November 5, 2008. |
| 7-06091027 Repair and Upgrade of RWIS System |
October 15, 2008 |
October 27, 2008 |
The Missouri Department of Transportation, District has determined that only HCI can provide the Department with specific use, repair and upgrade of District 6 RWIS System.. This specific product has been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one year and in association with the needs described. The approximate value of the product is estimated at a cost of $ 94,000 for 2 (two) locations..
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until October 27, 2008. |
| 7-06090929 |
Sept. 18, 2008 |
Sept. 29, 2008 |
The Missouri Department of Transportation, District has determined that only Raytheon Corporation can provide the Department with specific use, ACU1000 units. This specific product has been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one month and in association with the needs described. The approximate value of the product is estimated at a cost of $ 45,000 for 2 (two) units.
Issues with this purchase may be directed to Athena Nance, Senior Procurement Agent, at 314-301-1440 or Athena.nance@modot.mo.gov until September 29, 2008. |
| D609-049-RB Weekly Trash Service |
November 19, 2008 |
10:00 a.m. |
Tabulation |
D609-046-RB MRCC Database Evaluation and Updating
Addendum 001 |
November 13, 2008 |
10:00 a.m. |
Tabulation |
| D609-051-RW Equipment Trailer |
November 12, 2008 |
10:00 a.m. |
Tabulation |
| D609-050-RW Transmission Fluid |
November 6, 2008 |
10:00 a.m. |
Tabulation |
| D609-045-RW TRAILER DOORS REPLACEMENT |
October 23, 2008 |
10:00 a.m. |
Tabulation |
D609-044-RW Pull Box Install
Addendum 001
Addendum 002 |
October 15, 2008 |
10:00 a.m. |
Tabulation |
| D609-043-RW Mobile Mix Unit |
October 9, 2008 |
10:00 a.m. |
Tabulation |
| D609-042-RW Hydrodemolition |
October 9, 2008 |
10:00 a.m. |
tabulation |
| D609-041-RB Tree Removal I44 & S. Forest |
October 8, 2008 |
10:00 a.m. |
Tabulation |
| D609-040-RB Tree Removal Valley Park |
September 30, 2008 |
2:00 p.m. |
Tabulation |
D609-020-RW Beam Clamp Repair
Structure Photo A Sign Overview
Structure photo B Beam Clamp photo1
Beam clamp Photo2 Beam Clamp Detail
Beam clamp Photo4 Sign shop Drawings
Sign Plan Sheets E1
Steel Truss Detail |
October 17, 2008 |
10:00 a.m. |
Under review |
| D609-39-RW On Call Bridge Washing |
October 6, 2008 |
10:00 a.m. |
All bids rejected |
D609-038-RW CMP
CMP SPECIFICATIONS |
October 1, 2008 |
10:00 a.m. |
Tabulation |
D609-037-RW Brdg Joint Sealing NB
Addendum 001
Addendum 002 |
October 3, 2008 |
10:00 a.m. |
Tabulation |
| D609-036-RW Brdg Joint Sealing SB |
October 3, 2008 |
10:00 a.m. |
tabulation |
D605-035-RW Bullnose Repair |
October 1, 2008 |
10:00 a.m. |
Tabulation |
| D609-034-RB Tree Removal Service Lemay |
September 26, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-032-R6 Truck Inspections |
September 24, 2008 |
10:00 a.m. |
Tabulation RFQ D609-032-R6 |
| D609-031-RW Bldg Propane |
September 17, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-029-R6 Plows For Chevy Dump and Flatbed |
September 16, 2008 |
10:00 a.m. |
Tabulation RFQ D609-029-R6 |
| D609-027-RW On Call Bridge Washing |
September 16, 2008 |
10:00 a.m. |
All bids rejected |
D609-030-RW Mobile Mix Unit w Operator
ADDENDUM 001 |
September 15, 2008
September 16, 2008 |
10:00 a.m. |
All bids rejected |
D609-028-RW Mill w Conveyor |
September 15, 2008 |
10:00 a.m. |
Tabulation |
D609-026-RB Sand
Attachment I |
September 15, 2008 |
10:00 a.m. |
Tabulation |
D609-025-RW HYDRO DEMOLITION
ADDENDUM 001 |
September 15, 2008
September 16, 2008 |
10:00 a.m |
All bids rejected |
D609-023-RB Entry Monuments
Attachment I
Addendum 001 |
August 26, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-005-R6 Food Service For Roadeo Event
Addendum 001 D609-005-R6
Addendum 002 D609-005-R6 |
Bid Closing Extended Until August 22, 2008 |
2:00 p.m. |
Tabulation RFQ D609-005-R6 |
| D609-022-RW Bridge Seal Coating Service |
August 21, 2008 |
10:00 a.m. |
Tabulation |
| D609-021-RB Lease 36month Color Copier |
August 18, 2008 |
10:00 a.m. |
Tabulation |
| D609-018-RB Floor Mat Service |
August 18, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-016-R6 CMP For Desoto
CMP Specifications MGS-91-11G
Addendum 001 D609-016-R6 |
August 12, 2008 |
10:00 a.m. |
Tabulation RFQ D609-016-R6 |
| D609-015-RW Shot Rock |
August 8, 2008 |
10:00 a.m. |
Tabulation |
| D609-017-RW Dozer Rental |
August 8, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-013-R6 Rubber Track Hoe Pads
D609-013-R6 Specifications For Kobelco SK115SRDZ
Addendum 001 D609-013-R6
Addendum 002 D609-013-R6 |
August 7, 2008 |
10:00 a.m. |
Tabulation RFQ D609-013-R6 |
| RFQ D609-014-RB Welder Generator |
August 6, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-010-RB Entry Monuments
Attachments I, II, III |
July 29, 2008 |
10:00 a.m. |
Withdrawn due to Plan Redesign |
| D609-012-RW MILBANK METER SERVICE PEDESTALS |
July 29,2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-009-RW ON CALL RAPID SET CONCRETE |
July 23, 2008 |
10:00 a.m. |
D609-009-RW Tabulation |
| D609-011-RW CONCRETE BLOCKS |
July 23, 2008 |
10:00 a.m. |
Tabulation |
| RFB D609-008-RB On Call Sweeping |
July 23, 2008 |
10:00 a.m. |
Tabulation |
RFB D609-007-RB Trailer Pump
Addendum 001 |
July 21, 2008 |
10:00 a.m. |
Tabulation |
RFB D609-003-RW BULK OIL
ATTACHMENT A
ATTACHMENT B |
July 1,2008 |
10:00 a.m. |
Tabulation |
D609-006-RW Tower Cable Replacement
Sketch 2.10 Transition Assbly Parts
Sketch 2.21 Luminaire Ring Parts
Sketch Additional
Addendum 001 |
June 27, 2008 |
10:00 a.m. |
Tabulation |
| RFB D608-133-R6 Truck Painting |
June 17, 2008 |
2:00 p.m. |
Tabulation RFQ D608-133-R6 |
| D609-001-RB On Call Drain Cleaning |
June 6, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-135-R6 Directional Indicator Barriers Type II SHRP |
May 27, 2008 |
10:00 a.m. |
Tabulation |
| 7-06090918 |
Sept.12,2008 |
Sept. 17, 2008 |
The Missouri Department of Transportation,District 6, has determined that only Traffic Systems Solutions a subsidary of Brown Inc., Davenport, IA, can provide the Department with specific service upgrade to expand remote ACTRAservice to 16 additional users.
These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $15,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by September 17, 2008 |
| 7-06090624 Iteris Replacement Parts |
June 24, 2008 |
June 27, 2008 |
The Missouri Department of Transportation,District 6, has determined that only Brown Inc., Davenport, IA, can provide the Department with specific use iteris camera mounted processors and or replacement parts.
These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $15,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 27, 2008. |
| 7-06090718 Top Loading Non-commercial Animal Incinerator |
July 9, 2008 |
July 18, 2009 |
The Missouri Department of Transportation,District 6, has determined that only Lewis Repair & Mfg. of Cedar, Iowa, can provide the Department with specific use large animal non-commercial top loading animal incinerator as previously approved by the University of Missouri Extension Service.
These specific products have been documented as fully and absolutely suitable for all current requirements. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $26,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 27, 2008. |
| 7-06090717 Autoscope Solo Detection Cameras |
July 8, 2008 |
July 17, 2008 |
The Missouri Department of Transportation,District 6, has determined that onlyTraffic Control Corporation, Fenton, Mo., can provide the Department with specific use Econolite Autoscope Solo Detection Cameras.
These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $40,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 27, 2008. |
| 7-06090721 Portable Stop Signs Complete |
July 18, 2008 |
July 21, 2008 |
The State of Missouri, Department of Transportation District 6, has a need portable stop signs for the use of traffic stoppage in the St. Louis County, MO Areas. All signs associated with must be fully and absolutely compatible with all current materials - no exceptions. The Department of Transportation has identified Impact Recovery Systems, Eldon, MO., as the only available vendor capable of providing the specific materials as outlined and intend to clarify the use of that vendor as a single feasible source to meet those needs. The approximate value of the service is estimated at a cost of $6500. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. Issues with this process and/or acquisition may be directed Athena Nance, Senior Procurement Agent, at 314-301-1440 or Athena.nance@modot.mo.gov until July 21, 2004 at 10:00 a.m. local time.
|
| SFS7-06090728 Rapid Set Cement |
July 18, 2008 |
July 28, 2008 |
The Missouri Department of Transportation,District 6, has determined that onlyCTS Mf., of Mexico, MO, can provide the Department with specific use Rapid Set Cement in bulk form as blended to perform a specific use patching material for dense overlays with the ability to reach high strengths in one to two hours and controlled cracking.
These specific products have been documented as fully and absolutely compatible for use with the desired results for patching operations. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $10,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 28, 2008. |
| SFS 7-06090808 Vehicle Arresting Barrier Repair |
July 30,2008 |
August 8, 2008 |
The Missouri Department of Transportation,District 6, has determined that only the Entwistle Company, of Hudson, MA, can provide the Department with specific repair, training, and/or maintnenance as required on D6 reversible lane equipment, specifically the vehicle arresting barrier as manufactured by the vendor indicated above.
This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $20,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 28, 2008 |
| 7-0608325 Jet/Vac Sewer Cleaner |
March 25, 2008 |
April 7, 2008 |
The Missouri Department of Transportation District 6, St. Louis has determined that only one source can provide the design build for a roll –off jet/vac sewer cleaner Ecosystems Sewer Drainage Truck parts and labor for the Missouri Department of Transportation District 6, St. Louis. To our knowledge, the Ecosystems Company is the only business that can provide the scale of design build on this antiquated truck. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $120,000.
Issues with this purchase may be directed to Athena Nance at
(314) 301-1440 or athena.nance@modot.mo.gov by April 7, 2008
|
| 7-06080319 Impact Attenuator |
March 17, 2008 |
March 19, 2008 |
The Missouri Department of Transportation, Shreve Maintenance, District 6, has determined that only Trinity Industries, Dallas, TX can provide the Department with specific use of impact attenuator sections. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of this product has an estimated cost of $12,000 and associated costs. Issues with this purchase may be directed to Athena Nance, Senior Procurement Agent at 314-301-1440 or Athena.Nance@modot.mo.gov, until March 19, 2008.
|
| 7-06080319 Star MacroDeck |
March 4, 2008 |
March 19, 2008 |
The Missouri Department of Transportation, General Services, to the best of their knowledge, has determined that there is only one known source, McConnell & Associates, Pevely, MO., that can furnish the department with Star Macro Deck Bridge Deck and Crack Sealer. Material is an OR MoDOT approved penetrating clear product which will waterproof and not discolor bridge deck. the material allows the elimination of blotter material to absorb excess material and may be utilized by traffic as soon as dried without exhibiting residual tracking. Purchase for this item is anticipated to be approximately $18,000 individually and/or cumulatively may be made throughout the calendar year 2008 and expiring on December 31, 2008.
Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo.gov until March 19, 2008. |
| D608-136-RW Holophane Fixtures |
May 27, 2008 |
10:00 a.m. |
Tabulations |
| D609-002-RB Excavator Rental |
May 21, 2008 |
10:00 a.m. |
Tabulation |
| D608-137-RW Asphalt Paver and Roller |
May 21, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-134-R7 Holophane Lights |
May 15, 2008 |
10:00 a.m. |
WITHDRAWN - TO BE RE-ISSUED |
| RFQ D608-130-R6 Various Filters |
April 24, 2008 |
2:00 p.m. |
RFQ D608-130-R6 Tabulation |
| D608-126-RW Microsurfacing Highway Repair |
April 23, 2008 |
10:00 a.m. |
Tabulation |
RFQ D608-129-R6 CMP For Gray Summit
CMP Specifications MGS-91-11G
D608-129-R6 Addendum 001 |
April 22, 2008 |
10:00 a.m. |
RFQ D608-129-R6 Tabulation |
D608-128-RW Waterproof Bridge Piling
Picture1
Picture 2 |
April 18, 2008 |
10:00 a.m. |
Tabulation |
| D608-127-RW Bridge Drain Trough Cleaning |
April 18, 2008 |
10:00 a.m. |
Tabulation |
| D608-125-RW Equipment Trailer |
April 15, 2008 |
10:00 a.m. |
Tabulation |
| D608-123-RW Portable Line Striping System |
April 14, 2008 |
10:00 a.m. |
Tabulation |
| D608-117-RW Installed Automatic Car Wash and Modifications , SEALED BID |
April 14, 2008
Extended April 18, 2008 |
10:00 a.m. |
Tabulation |
| D608-118-RW Epoxy Wall Coating System Installed |
April 10, 2008 |
10:00 a.m. |
Tabulation |
| D608-122-RW Baler |
April 8, 2008 |
10:00 a.m. |
Tabulation |
| D608-121-RW Rubber Flooring |
March 31, 2008 |
10:00 a.m. |
Tabulation |
| D608-120-RW Oak Timbers |
March 31, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-112-R6 Hydraulic System and Spreader For 3 qutr ton Chevy |
March 31, 2008 |
10:00 a.m. |
RFQ D608-112-R6 Tabulation |
| D608-116-RW Rubber Tile |
March 27, 2008 |
10:00 a.m. |
Withdrawn- to be re-issued |
D608-115-RW BRIDGE MIX
ADDENDUM 001 |
March 26, 2008 |
10:00 a.m. |
Tabulation |
D608-114-RW Paver with Operator
Addendum 001 |
March 26, 2008 |
10:00 a.m. |
Tabulation |
D608-113-RW Rotomill Job
Addendum 001 |
March 26, 2008 |
10:00 a.m. |
Tabulation |
| D608-111-RW Bridge Joint Sealing Extraction,Jefferson County,MO |
|
|
Withdrawn- duplicate to RFQ D608-108-RW |
| D608-110-RW Removal and Reseal Bridge Compression Seal Joints Rock Creek Rd |
March 27, 2008 |
10:00 a.m. |
Tabulation |
| D608-109-RW Removal and Reseal Bridge Compression Seal Joints |
March 28,2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-097-R6 Plow and Spreader For Chevy Flatbeds |
March 25, 2008 |
10:00 a.m. |
RFQ D608-097-R6 Tabulation |
| D608-108-RW Bridge Joint Seal |
March 19, 2008 |
10:00 a.m |
Tabulation |
| D608-107-RW Bridge Drain Trough System Cleaning-Vandenventer |
March 14, 2008 |
10:00 a.m. |
Tabulation |
| D608-106-RW- Bridge Drain Trough System cCeaning |
March 14, 2008 |
10:00 am |
Tabulation |
| D608-105-RW Line Bore, Rte 67 and Schuetz |
March 17, 2008 |
10:00 a.m. |
Tabulation |
| D608-104-RW Lighting Repair |
March 17, 2008 |
10:00 a.m. |
tabulation |
| D608-103-RW Bridge Flushing |
March 14, 2008 |
10:00 a.m. |
Tabulation |
RFQ D608-093-R6 Plow and Spreader For Chevy 1-Ton Dump
RFQ D608-093-R6 Addendum 001 |
February 28, 2008 |
10:00 a.m. |
RFQ D608-093-R6 Tabulation |
| D608-100-RB Design 6 Ballas Sign Shop |
February 29, 2008 |
10:00 a.m. |
Tabulation |
| D608-099-RW Moblile Home Roof Over System-extended |
March 21, 2008 |
10:00 a.m. |
Tabulation |
d608-096-RW Riding and Walk Behind Mowers
Specifications Riding Mower
Specifications Walk Behind Mower |
March 6, 2008 |
10:00 a.m. |
tabulation |
| D608-095-RW Line Bore Job Olive and Tempo |
March 4, 2008 |
10:00 a.m. |
WITHDRAWN |
| D608-094-RB Tile St Peters PO |
March 3, 2008 |
10:00 a.m. |
Tabulation |
| D608-101-RW Lego Cement Blocks |
February 28, 2008 |
10:00 a.m. |
Tabulation |
RFQ D608-093-R6 Plows and Spreaders
RFQ D608-093-R6 Addendum 001 |
February 28, 2008 |
10:00 a.m. |
|
| D608-092-RW Truck BedSlides |
February 27, 2008 |
10:00 a.m. |
Tabulation |
| D608-091-RW Landfill |
February 19, 2008 |
10:00 a.m |
tabulation |
| 7-06080225 Direct Digital Control System Monitoring |
February 14, 2008 |
February 25, 2008 |
District 6, of the Missouri Department of Transportation has determined only one known source can furnish the district with a Andover Continuum system to interface with an existing system at District Office.To our knowledge, Eagle Energy of maryland Heights, Mo., is the only experienced vendor in the St. Louis area with pre-existing familiarity with the Andover Continuum system to provide installation, interface and monitoring of new and existing systems. Purchase for items and installation may exceed $25,000 individually or comulatively and may be made throughout the claendar year 2008 and expiring on December 31, 2008. This osting may be extended for up to two (2) additional one(1) year periods unless additional suppliers are identified upon the expirationof any single feasible source authorization period. Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo.gov until February 25, 2008. |
| 7-6080219 REACT Cylinder 6 |
February 19, 2008 |
February 28, 2008 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is a sole distributorship, HCI- Hoosier Company Incorporated, which can supply MoDOT District 6 with the REACT 55 MPH 6 Cylinder TMA product. The approximate value of this product cannot exceed $40,000 during the contract period. |
| D608-090-RW Street Sweeper Replacement Brooms and Parts |
February 14, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-061-R6 Mott-Alamo Mower Parts |
February 4, 2008 |
2:00 p.m. |
RFQ D608-061-R6 Tabulation |
| D608-081-RW Commercial Mix |
January 30, 2008 |
1:00 p.m. |
Tabulation |
| RFQ D608-063-R6 Triumph Switchblade Mower Parts |
January 29, 2008 |
10:00 a.m. |
RFQ D608-063-R6 Tabulation |
| RFQ D608-087-R6 Pavement Markers |
January 23, 2008 |
10:00 a.m. |
RFQ D608-087-R6 Tabulation |
RFQ D608-085-R6 Type II SHRP Barricades
RFQ D608-085-R6 Addendum 001 |
January 22, 2008 |
10:00 a.m. |
RFQ D608-085-R6 Tabulation |
D608-084-RW CMP
Addendum 001 CMP Measurement |
January 17,2008 |
10:00 a.m. |
tabulation |
| RFQ D608-062-R6 Bush-Whacker Mower Parts |
January 15, 2008 |
2:00 p.m. |
RFQ D608-062-R6 Tabulation |
| D608-086-RW Black Beauty |
January 11,2008 |
1:00 p.m. |
Tabulation |
| D608-082-RW Fault Locator |
January 11, 2008 |
10:00 a.m. |
Tabulation |
| D608-083-RW Light Tower Rental |
January 10, 2008 |
10:00 a.m |
Tabulation |
| 7-6080111 REACT 55 MPH 6 Cylinder Product |
January 11, 2008 |
January 25,2008 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is a sole distributorhip, HCI-Hoosier Compnay Incorporated of Indianapolis, IN. whcih can supply MoDOT, District 6 with the REACT 55 MPH 6 Cylinder, 36" wide with Steel Backup product. The approximate value of this product cannot exceet $30,000.00 durning the contract period. |
| 7-6080107-R6 Tape Assemblies |
January 7, 2008 |
January 9, 2008 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is only one known source that can supply MoDOT, D6, with 75’ Tape Assemblies for a Vehicle Arresting Barrier System. The approximate value of this product cannot exceed $24,999.99 during the contract period. |
| 7-06080107 Terra Video Detection Cameras |
December 26, 2007 |
January 7, 2008 |
The Missouri Department of Transportation, District 6, St. Louis has determined that only one source can provide specific use parts and Terra Video Detection Cameras in use in the St. Louis Metro Distric-all parts are fully and completely compatible with existing equipment. To our knowledge, Traffic Control Corporation, of Fenton, Missouri, is the sole authorized distributor to provide compatible parts and cameras. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $68,000.00. Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo. gov until January 7, 2008. |
| 7-06080108 PolyFiber Type III |
January 4, 2008 |
January 9, 2008 |
The Missouri Department of Transportation, District 6, St. Louis has determined that only one source can provide specific use Polyfiber Type III material for use in the St. Louis Metro District manufactured by Crafco, Co. To our knowledge, Clayco Midwest, of Granite City, IL. is the sole authorized distributor to provide this material. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $24,000.00. Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo. gov until January 9, 2008. |
| 7-06081210 Video Conferencing Modification |
December 10, 2007 |
December 12, 2007 |
The Missouri Department of Trasportation District 6, St. Louis had determined that only one source can provide the modifications to the existing video conferencing equipment located at the Traffic management Center in Chesterfield, MO. To our knowledge, Antech Labs, is the only authorized vendor in the St. Louis area approved to provide the necessary equipment and repairs to this equipment. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $15,000.00 |
| 7-06080103 Daktronic Replacement Parts |
December 21, 2007 |
January 2, 2008 |
The Missouri Department of Transportation, District 6, St. Louis has determined that only one source can provide specific replacement parts for Daktronic DMS Boards in use in the St. Louis Metro Distric-all parts are fully and completely compatible with existing Boards. To our knowledge, Daktronics, is the only authorized vendor to provide compatible OEM replacement parts. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $30,000.00. Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo. gov until January 2, 2008. |
| D608-080-RW Bag Portland Cement Type I |
December 20, 2007 |
10:00 a.m. |
Tabulation |
D608-079-RW Hole Drilling
ADDENDUM 001 |
December 20, 2007 |
10:00 a.m. |
Tabulation |
| RFQ D608-078-R6 Plow and Spreader for Festus |
December 19, 2007 |
10:00 a.m. |
Withdrawal Letter |
| D608-077-RW UTILITY TRUCK TOPS |
December 11, 2007 |
10:00 a.m. |
Tabulation |
| D608-074-RW Installed Truck Lift |
December 7, 2007 |
10:00 a.m. |
Tabulation |
D608-069-RW CMP REPLACEMENT
Addendum 001
Addendum 002 |
December 7, 2007 |
10:00 a.m. |
Rejected |
D608-075-RW Lego Concrete Blocks
Site Drawing |
December 5, 2007 |
10:00 a.m. |
Tabulation |
| D608-072-RW Wood Chipper Rentals |
December 4,2007 |
10:00 a.m. |
Tabulation |
D608-076-RB Excavator Rental
Addendum 001 |
December 3, 2007 |
10:00 a.m. |
Tabulation |
D608-073-RB Sand
Attachment I |
December 3, 2007 |
2:00 p.m. |
Tabulation |
| D608-071-RW Weatherguard Saddle Box |
November 27, 2007 |
10:00 a.m. |
Tabulation |
| RFQ D608-068-RB 20 Yard Roll Off Containers |
November 16, 2007 |
10:00 a.m. |
Tabulation |
RFQ D608-064-R6 Break-Out Post Hardware
RFQ D608-064-R6 Addendum 001 |
November 15, 2007 |
10:00 a.m. |
RFQ D608-064-R6 Tabulation |
RFQ D608-065-R6 Perforated Square Tubing Post Hardware
RFQ D608-065-R6 Addendum 001 |
November 13, 2007 |
10:00 a.m. |
RFQ D608-065-R6 Tabulation |
| D608-060-RW Replacement Type A Base |
November 8, 2007 |
10:00 a.m. |
Tabulation |
| D608-058-RW Multiple Switch Tester |
November 2, 2007 |
10:00 a.m |
Tabulation |
| D608-057-RW BackRacks |
November 2, 2007 |
10:00 a.m. |
Tabulation |
| D608-059-RW Mini Light Bars |
November 1, 2007 |
10:00 a.m. |
Tabulation |
| D608-056-RW Black Magnum |
November 1, 2007 |
10:00 a.m. |
no bid |
| RFB D608-037-RW On Call Painting |
October 30, 2007 |
10:00 a.m. |
Tabulation |
RFQ D608-055-R6 Guardrail Repair-Hwy. 21 Picture 1
Picture 2
Picture 3
Picture 4 |
October 23, 2007 |
10:00 a.m. |
RFQ D608-055-R6 Tabulation |
RFP D608-043-RW Video Wall
Addendum 001
Addendum 002
Addendum 003 |
October 17, 2007 |
12:00 p.m. |
|
RFQ D608-054-R6 E85 Fuel
RFQ D608-054-R6 Addendum 001 |
October 16, 2007 |
10:00 a.m. |
REJECTED |
D608-053-RW Bullnose Guard Rail Repair
photo 1 photo 3 photo 5
photo 2 photo 4 photo 6 |
October 16, 2007 |
10:00 a.m. |
Tabulation |
D608-047-RW Fence, Jefferson Avenue, St. Louis
Addendum 001 |
October 9, 2007 |
10:00 a.m. |
Tabulation |
| RFQ D608-052-R6 Epoxy Bridge Seal |
October 4, 2007 |
2:00 p.m. |
RFQ D608-052-R6 Tabulation |
| D608-050-RB Tree Removal |
October 1, 2007 |
10:00 a.m. |
Tabulation |
RFB D608-020-RW Project Office Weekly Janitorial
Floor Plan St. Peters Office
Floor Plan Chesterfield Office
Floor Plan Fenton Office
Floor Plan Festus Office
Floor Plan Hampton Office
Floor Plan Maryland Hts. Office
Floor Plan Melville Office
Floor Plan St. Clair Office
Floor Plan Bellfontaine Office |
September 27, 2007 |
10:00 a.m. |
Tabulation |
| D608-045-RW Airless Gas Powered Sprayer |
September 24, 2007 |
10:00 a.m. |
Tabulation |
D608-049-RW Bridge Seal Coat
Addendum 001 |
September 24, 2007 |
10:00 a.m. |
Tabulation |
| D608-048-RW Bridge Mix |
September 20, 2007 |
10:00 am. |
No bids, will be re-issued |
D608-042-RB Scrap Metal Container Service
RFB D608-042-RB Addendum 001 |
September 18, 2007 |
10:00 a.m. |
Tabulation |
| 7-06081101 Surface Patrol Sensor |
November 1, 2007 |
November 5, 2007 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is a sole distributorship, HCI- Hoosier Company Incorporated, which can supply MoDOT District 6 with the Surface Patrol Pavement Sensor product. The approximate value of this product cannot exceed $24,999.99 during the contract period. |
| 7-06081123 Police Motorcycle Radar Units |
November 9, 2007 |
November 13, 2007 |
The Missouri Department of Transportation, District 6, has determined that only Stalker, Inc., can provide the Blueprint for Safety Program with specific use of police waterproof motorcycle radar units as units already in use by the St. Louis Police Department. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year in association with the needs described. The approximate value of this product has an estimated cost of $20,000.00 |
| 7-06081019 ACTRA Maintenance Program |
October 10, 2007 |
October 19, 2007 |
The Missouri Department of Transportation District 6, St. Louis has determined that only one source can provide the annual operational program maintenenace agreement for phone and on site support for the District 6 ACTRA signal system. To our knowledge, Traffic Systems Solutions Company, a wholly owned subsidiary of Brown Traffic products, Inc., is the only authorized vendor in the St. Louis area approved by Siemens ITS for the ACTRA signal system. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $40,000. Issues with this purchase may be directed to Terea (Terri) Mount at (314)301-1431 or teresa.mount@modot.mo.gov by October 19, 2007. |
| 7-06081005 Pump Repair |
October 3, 2007 |
October 5, 2007 |
The Missouri Department of Transportation District 6, St. Louis has determined that only one source can provide the replacement parts and repair of the Ecosystems Sewer Drainage Truck containing porcelain pistols parts for the Missouri Department of Transportation District 6, St. Louis. To our knowledge, the Missouri Machinery and Engineering Company is the only business that can provide the scale of repair on this antiquated design built truck. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $6,000. Issues with this purchase may be directed to Athena Nance at (314) 301-1440 or athena.nance@modot.mo.gov by October 5, 2007. |
7-06081003 STLPost advertising |
September 20, 2007 |
October 3, 2007 |
The Missouri Department of Transportation, District 6, has determined that only the St. Louis Post-Dispatch Newspaper can provide the Department with advertising to a specific intended market.
To our knowledge the St. Louis Post-Dispatch is the only medium that can provide this scale of expected advertisement to a specific intended market. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described.
The approximate value of this product, service, and other associated costs has an estimated cost of $25,000.
Issues with this purchase may be directed to Athena Nance, General Services Procurement Suprevisor at 314-301-1440 or Athena.Nance@modot.mo.gov until October 3, 2007. |
| 7-06080924 GEOMELT |
September 21, 2007 |
September 24, 2007 |
The Missouri Department of Transportation, District 6, St. Louis, has determined that there is only one known source that can supply MoDOT, D6, with GEOMELT 55 Anti-Icing/Deicing Fluid. The approimate value of this prouct cannot exceed $24,999.99 during the contract period. Questions may be directed to Kristi Coppinger at (314) 301-1439 or
Kristina.Coppinger@modot.mo.gov
|
| D608-041-RW Rotomill Job- Fairgrounds Rd. |
September 11, 2007 |
10:00 a.m. |
Tabulation |
| D608-040-RW Rotomill Job Holly Hills and Delor |
September 11, 2007 |
10:00 a.m. |
Tabulation |
RFB D608-029-R6 DMS Boards
RFB D608-029-R6 Addendum 001
RFB D608-029-R6 Addendum 002
RFB D608-029-R6 Addendum 003
RFB D608-029-R6 Addendum 004 |
September 11, 2007 |
2:00 p.m. |
RFB D608-029-R6 Tabulation |
| D608-038-RW Tideland Navigation Fixtures |
September 10, 2007 |
10:00 a.m. |
Rejected |
D608-039-RB Roadeo
RFB D608-039-RB Addendum 001 |
September 5, 2007 |
2:00 p.m. |
Tabulation |
| RFQ D608-036-R6 Signal Control Stations |
August 30, 2007 |
10:00 a.m. |
WITHDRAWN |
D608-028-RW Rapid Concrete Repair Material
Addendum 1 |
August 16, 2007 |
10:00 a.m. |
Tabulation |
D608-032-RW Guard Rail Repair
Photo 1 photo 3
Photo 2 Photo 4 |
August 14, 2007 |
10:00 a.m |
Tabulation |
D608-024-RW Commuter Lot Fence
Site plan
Site plan 2
Site plan signs |
August 14, 2007 |
10:00 a.m |
Tabulation |
| D608-033-RW Rotomill with Operator |
August 8, 2007 |
10:00 am. |
Tabulation |
| D608-031-RW Epoxy |
August 8, 2007 |
10:00 a.m. |
Tabulation |
| D608-030-RW Shotblast Job |
August 8, 2007 |
10:00 a.m. |
REJECTED |
| D608-023-RW Transformer Base |
August 8, 2007 |
10:00 a.m. |
D608-023-RW Tabulation |
RFP D608-003-RW Traffic Management Center Janitorial Services
First floor Buiilding Plan TMC
Second Floor Building Plan TMC
D608-003-RW Addendum 001- |
August 7, 2007 |
10:00 a.m. |
|
RFP D608-002-RW Janitorial Services District Office Operations Complex
First Floor Building Plan District Office
Second Floor Building Plan District Office
Third Floor Building Plan District Office
D608-002-RW Addendum 001- |
August 7, 2007 |
10:00 a.m. |
|
| RFQ D608-022-R6 Pavement Markers |
August 7, 2007 |
10:00 a.m. |
RFQ D608-022-R6 Tabulation |
RFQ D608-025-R6 Slotted Drain
Corrugated Metal Pipe Specifications MSG-91-11G |
August 6, 2007 |
10:00 a.m. |
RFQ D608-025-R6 Tabulation |
| D608-027-RW CMS Boards |
August 3, 2007 |
10:00 a.m. |
Tabulation |
| D608-021-RW CMS Board |
August 3, 2007 |
10:00 a.m. |
Withdrawn;Will Be Re-issued |
| RFQ D608-026-R6 Aggregate For Antire Hill Lot |
August 1, 2007 |
10:00 a.m. |
RFQ D608-026-R6 Tabulation |
| RFQ D608-009-R6 Tent Purchase |
August 1, 2007 |
10:00 a.m. |
RFQ D608-009-R6 Tabulation |
| D608-019-RW On Call Sweeping |
July 31, 2007 |
10:00 a.m. |
Tabulation |
| D608-017-RW Replacement Vehicle Dectector Part |
July 25,2007 |
10:00 a.m. |
Tabulation |
RFQ D608-018-R6 Walk Behind Mower with Sulky for St. Charles Mt. Building
RFQ D608-018-R6 Attached Mower Specifications |
July 23, 2007 |
10:00 a.m. |
RFQ D608-018-R6 Tabulation |
RFQ D608-008-R6 Tent Rental
RFQ D608-008-R6 Addendum 001
RFQ D608-008-R6 Addendum 002 |
July 16, 2007 |
10:00 a.m. |
RFQ D608-008-R6 Tabulation |
| RFQ D608-016-R6 Push Bumpers |
July 12, 2007 |
2:00 p.m. |
RFQ D608-016-R6 Tabulation |
RFQ D608-015-R6 LED Arrowboards
Picture 1
Picture 2
Picture 3 |
July 12, 2007 |
2:00 p.m. |
RFQ D608-015-R6 Tabulation |
| RFQ D608-014-RW Mill Attachment for Skidsteer |
July 12, 2007 |
10:00 a.m. |
tab sheet |
| RFB D608-008-RB Surplus Steel & Aluminum |
July 12, 2007 |
10:00 a.m. |
Tabulation Revised |
| RFB D608-007-RW Preformed Thermo Plastic Striping Material |
July 10, 2007 |
1:00 p.m. |
Tabulation |
| RFQ D608-012-R6 Crane With Power Rotation RFQ D608-012-R6 Addendum 001 |
July 10, 2007 |
10:00 a.m. |
RFQ D608-012-R6 Tabulation |
| D608-011-RW Asphalt Paverwith Operators |
July 3, 2007 |
10:00 a.m. |
Tabulation |
RFP D607-083-RW ITS Maintenance
Addendum 001
Addedum 002
Addendum 003- Pre-Proprosal Meeting
Addendum 003- Device Models
Addendum 004 |
June 22, 2007 |
2:00 p.m. |
|
| RFQ D608-005-R6 Wireless Remote Control Spot Lights |
June 14, 2007 |
10:00 a.m. |
RFQ D608-005-R6 Tabulation |
| D607-151-RW Epoxy, Lo Mod |
June 7, 2007 |
10:00 a.m. |
D607-151-RW Tabulation |
| D607-150-RW On Call Quickset Concrete |
June 7, 2007 |
10:00 a.m. |
D607-150-RW Tabulation |
RFQ D608-004-R6 Culvert Pipe Liner
Addendum 001 |
June 7, 2007 |
10:00 a.m. |
RFQ D608-004-R6 Tabulation |
| D608-001-RW As Needed Drain Cleaning Service |
June 4, 2007 |
1:00 p.m. |
D608-001-RW Tabulation |
| SFS 7-06070606 Marketing/Advertising Cardinals Sports |
June 6,2007 |
June 18, 2007 |
The Missouri Department of Transportation District 6, St. Louis has determined that only one source can provide the marketing and advertising through sporting events for the Missouri Department of Transportation District 6, St. Louis for its intended market. This market is through the St. Louis Cardinals LLC and its radio and television coverage of sporting events. To our knowledge, the St. Louis Cardinals LLC is the only medium that can provide the scale of advertisement to the intended target market with the expected advertisement. Advertising related to this marketing campaign will exceed $25,000 cumulatively. A contract to purchase the above advertising packet may be executed with the St. Louis Cardinals LLC on or before July 1, 2007.
Marketing/Advertising to include, but not limited to the following:
In-Stadium Messaging Text Messaging
Pre-Game Video On-Site “The Convincer”
Broadcast Opportunity Branding “MoDOT” Safety
Issues with this purchase may be directed to Athena Nance at
(314) 301-1440 or athena.nance@modot.mo.gov by June 18, 2007
|
| D607-149-RB Loops |
May 29, 2007 |
10:00 a.m. |
D607-149-RB Tabulation |
| D607-148-RW Bridge Surface Finishing |
May 23, 2007 |
10:00 a.m. |
D607-148-RW Tabulation |
D607-146-RW Double Wall Tank
Exhibit A- Drawing |
May 15, 2007 |
10:00 a.m. |
D607-146-RW Tabulation |
| D607-145-RW Radar Speed Message Trailer |
May 11, 2007 |
10:00 a.m. |
D607-145-RW Tabulation |
| D607-143-RW Traffic Radar Speed Sign |
May 9, 2007 |
10:00 a.m. |
D607-143-RW Tabulation |
| D607-144-RW Silica Fume Wearing Surface |
May 9, 2007 |
10:00 a.m. |
D607-144-RW Tabulation |
| RFB D607-124-RW Temporary Personnel Services |
May 9,2007 |
1:00 p.m. |
D607-124-RW Tabulation |
D607-142-RW Bridge Cap Sealing
Addendum 001 |
May 7, 2007 |
10:00 a.m. |
All Quotes Rejected |
D607-140-RW Installation Door Jambs and Hardware
Exhibits: Magna Lock,Card Reader.Crash Bar,
Receptacles,Site Plan
Addendum I, Additional Exhibit |
May 2, 2007 |
10:00 a.m. |
D607-140-RW Tabulation |
| SFS7-06070515 Star Macrodeck Deck Sealer |
5/11/07 |
5/15/07 |
The Missouri Department of Tranportation, District 6, to the best of their knowledge, has determined that there is only one known source, McConnell & Associates, Pevely, MO, that can furnish the department with Star Macro Deck Sealer. Material is an OR MoDOT approved penetrating clear product which will waterproof and not discolor Bridge deck. The material allows the elimination of blotter material and may be used by traffic immediately after drying without exhibiting residual tracking. Purchases for this item is anticipated to be approximately $18,000.
Issues with this purchase may be directed to Terri Mount, General Services, D6, at 314-301-1431 or Teresa.Mount@modot.mo.gov until May 15, 2007. |
| SFS 7-060705525 Electronic Fueling Equipment |
5/14/07 |
5/25/07 |
The Missouri Department of Transportation, District 6 has determined that only one source, Graham Equipment Co. of St. Louis MO. (area distributor for Bennett equipment, and a PEI member) can furnish and install the department with aBennett Electronic Fueling Equipment that includes but may not be limited to pumps, remote dispensers, and associated installations, supplies that are compatible with the TRAK SENTRYGOLD COMPACT at eleven sites in the St. Louis Area District counties of Franklin, St. Charles, Jefferson, and St. Louis. This project shall consist of supplying Bennett Electronic fuel equipment, installing it, replacing lines, fittings, accessories and tank part. Purchases for Bennett equipment and its installation may exceed $25,000 individuallyand/or cumulatively and may be made throughout calendar year 2007 and expiring on December 31, 2007. This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization.
Issues with this purchase may be directed to Terri Mount, General Services Procurement Specialist at 314-301-1431 or Teresa.Mount@modot.mo. gov, until May 25, 2007. |
| SFS 7-060705522 Ingersol-Rand Replacement Parts |
5/18/07 |
5/22/07 |
The Missouri Department of Transportation , D6, has determined that only one source, Farrar Pump , of St. Louis, Mo. (the area distributor of Ingersol-Rand) can furnish and install specific replacement parts as installed for specific use pumps as installed on D6 Striper vehicles.purchaes for IR replacement parts is $10,000 individualy and/or cumulatively and may be made throughout the calendar year 2007 and expiring on December 31, 2007. This authrization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization.
Issues with this purchase may be directed to Terri mount, General Services Procurement specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov, until May 22, 2007 |
| sfs 7-06070723 Trailer TMA |
5/21/07 |
5/23/07 |
The Missouri Department of Transportation, D6, has determined that only Safety Trailers, Inc. can provide the Department with an apparently proprietary truck mounted trailer TMA. This specific product is unique in that it is considered suitable for use with small sedan and light truck vechicles which may be attached to the support truck using a standard pintle hook. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of this product and service has an estimated cost of $15,000.
Issues with this purchase may be directed to Terri Mount, General Services Intermediate Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov, until may 23, 2007. |
| D607-138-RW Hydrodemolition |
April 30, 2007 |
10:00 a.m. |
D607-138-RW Tabulation |
| D607-137-RW Rotomill Rental w Operator |
April 30, 2007 |
10:00 a.m. |
D607-137RW Tabulation |
| D607-136-RW Concrete Wearing Surface |
April 30, 2007 |
10:00 a.m. |
rejected |
| D607-135-RW Formed Concrete Repair |
April 30, 2007 |
10:00 a.m. |
D607-135-RW Tabulation |
| D607-139-RW Broom Parts |
April 27, 2007 |
10:00 a.m. |
D607-139-RWTabulation |
D607-134-RW Gate Operators
Site Plan |
April 25, 2007 |
10:00 a.m. |
D607-134-RW Tabulation |
| D607-133-RW Polyurea Application |
April 25, 2007 |
10:00 a.m. |
D607-133-RW Tabulation |
RFP D607-120-RW Vehicle Tracking Service
Addendum I
EXHIBIT CHANGEABLE MESSAGE BOARD |
April 25, 2007 |
1:00 p.m. |
|
| D607-130-RW Unformed Concrete Repair and Sealing |
April 23,2007 |
10:00 a.m. |
Withdrawn-No Award |
| D607-131-RW Concrete Wearing Surface |
April 18, 2007 |
10:00 a.m. |
D607-131-RW Tabulation |
| D607-129-RW Hydrodemolition |
April 18, 2007 |
10:00 a.m. |
D607-129-RW Tabulation |
| D607-115-RW Seal Parking Lot Seal |
April 18,2007 |
10:00 a.m. |
D607-115-RW Tabulation |
| D607-123-RW Trailer Mounted Diesel Generator |
April 17,2007 |
10:00 a.m. |
D607-127-RW Tabulation |
| D607-128-RW Rotomill Rental with Operator |
April 17, 2007 |
10:00 a.m. |
D607-124-RW Tabulation |
| D607-123-RW Zero Turn Riding Commercial Mower |
April 17, 2007 |
10:00 a.m. |
D607-123-RW Tabulation |
RFQ D607-125-R6 Plows for Broadway
D607-125-R6 Snow Plow Specifications
D607-125-R6 Addendum 001
D607-125-R6 Addendum 002 |
April 16, 2007 |
10:00 a.m. |
RFQ D607-125-R6 Tabulation |
| D607-122-RW Acrylic Polymer Deck Sealer |
April 11, 2007 |
10:00 a.m. |
D607-122-RW Tabulation |
D607-121-RW Concrete Beam Cap Sealing Material
MoDOT Approved Products List |
April 10, 2007 |
10:00 a.m. |
D607-121-RW Tabulation |
D607-119-RW Truck LED Arrowboard
Picture 1, Picture 2,Picture 3 |
April 10, 2007 |
10:00 a.m. |
D607-119-RW Tabulation |
| D607-118-RW Polymer Mortar Expansion Dam |
April 6, 2007 |
10:00 a.m. |
D607-118-RW Tabulation |
RFB D607-114-RW Inertial Profiling System
ADDENDUM 1 |
April 4, 2007 |
1:00 p.m. |
D607-114-RW Tabulation |
RFP-COVER PAGE-PORTABLE TRAFFIC MANAGMENT SERVICE
RFP D607-106-RW Portable Traffic Management Services |
March 30, 2007 |
2:00 p.m. |
D607-106-RW Tabulation |
| sfs 7-06070425 Security,Fire Protection Hardware and Monitoring Services |
April 11, 2007 |
April 25, 2007 |
The Missouri Department of Transportation, General Services, to the best of their knowledge, has determined that there is only one known source, Sonitrol of jefferson City, MO. that can furnish the department with maglocks, prox readers, exit devices, fire protection devices that provide access control and is compatible with the existing access, fire and security systems currently in use at the Missouri Department of Transportation facilities located in District 6, Metro St. Louis Area and is currently provided by Sonitrol of Jefferson City, Missouri. No other manufacturer's detection system provides the necessary operational and characteristics that are compatible with the existing monitoring services currently being provided. Purchases for various items may exceed $25,000 individually and/or cumulatively may be made throughtout the calender year 2007 and expiring on December 31, 2007. This authorization may be extended for five additional 1-year priods unless additional suppliers are identified upon the expiration of any single feasible source authorization period.
Issues with the contractural agreement may be directed to Terri Mount, General Services Specialist at 314-301-1431 or Teresa.MOunt@modot.mo. gov until April 25, 2007 |
D607-116-RW Equipment Trailer
Addendum 1 |
March 26, 2007 |
10:00 a.m. |
D607-116-RW Tabulation |
| D607-101-RW Truck Painting |
March 23, 2007 |
1:00 p.m. |
D607-101-RW Tabulation |
| D607-113-RW Padlocks |
March 20, 2007 |
10:00 a.m. |
D607-113-RW Tabulation |
D607-112-RW Conduit
ADDENDUM 1- CORRECTION |
March 21, 2007 |
10:00 a.m. |
D607-112-RW Tabulation |
| D607-105-TW Used Portable Metal Storage Containers |
March 19, 2007 |
1:00 p.m. |
D607-105-RW Tabulation |
D607-111-RW Platform Truck Rental
ADDENDUM 1 |
March 16, 2007 |
10:00 a.m. |
D607-111-RW Tabulation |
D607-110-RW Fence Repair
Exhibit 1 |
March 13, 2007 |
10:00 a.m. |
D607-110-RW Tabulation |
| D607-109-RW Dunn Rd Line Bore |
March 13, 2007 |
10:00 a.m. |
D607-109-RW Tabulation |
D607-108-RW Mast Arm Job
Addendum 1 |
March 13, 2007 |
10:00 a.m. |
D607-108-RW Tabulation |
D607-100-RW Demolition -St. Charles County
Exhibit A Location Plans
Exhibit B ACM Report
Exhibit C MODOT Demolition Specifications
Exhibit D Additional Required Demolition Specifications |
March 6, 2007 |
1:00 p.m. |
D607-100-RW Tabulation |
SFS 7-0670223 Impact Attenuator Sections |
2/21/07
|
2/23/07 |
The Missouri Department of Transportation, Weldon Springs Maintenance, District 6,,
has determined that only Trinity Industries, Dallas, TX can providethe Department with specific use of concrete foam sections for a damaged impact attentuator. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet thesingle feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of this product and service has an estimated cost of $10,000 and associated costs. Issues with this purchase may be directed to Athena Nance, General Services Procurement Suprevisor at 314-301-1440 or Athena.Nance@modot.mo. gov until February 23, 2007.
|
| SFS 70670107 Safe Stop System |
1/12/07 |
1/29/07 |
The Missouri Department of Transportation, District 6,
has determined that only HCI, The Hoosier Company, Indianapolis, IN.,
can provide the Department with Safe Stop System and parts, and as
the only available vendor capable of providing the general requirements as
outlined and intend to clarify the use of this vendor as a single feasible source
to meet those needs. The approximate value of the product is estimated at a
cost of $62,000.00 Issues with this agreement may be directed to Terri Mount,
Procurement Int.Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov
until January 29, 2007 .
|
| D607-103-RW Lumber- Signal Bldg |
February 28, 2007 |
10:00 a.m. |
D607-103-RW Tabulation |
| D607-102-RW Tree Removal |
February 20, 2007 |
10:00 a.m. |
D607-102-RW Tabulation |
| D607-098-RW Bore Job Lackland |
February 14, 2007 |
10:00 a.m. |
D607-098-RW Tabulation |
| D607-099-RW Bore Job Halls Ferry |
February 14, 2007 |
10:00 a.m. |
Withdrawn |
| RFQ D607-097-R6 Perforated Square Tubing PST - Post Hardware |
February 13, 2007 |
10:00 a.m. |
RFQ D607-097-R6 Tabulation |
RFQ D607-096-R6 Break-Out Post Hardware
D607-096-R6 Addendum 001
E15 Form for D607-096-R6 |
February 8, 2007 |
10:00 a.m. |
RFQ D607-096-R6 Tabulation |
RFQ D607-087-R6 Bushwhacker Mower Parts
RFQ D607-087-R6 Addendum 001
D607-087-R6 Addendum 002
E15 Form for D607-087-R6 |
February 7, 2007 |
2:00 p.m. |
RFQ D607-087-R6 Tabulation |
| D607-094-RW InvisiConnect Units |
February 5, 2007 |
10:00 a.m. |
D607-094-RW Tabulation |
D607-095-RW GC2 Batteries
Addendum 001 |
February 5, 2007 |
10:00 a.m. |
D607-095-RW Tabulation |
| D607-091-R6 Fluid Handling System for Eureka and Grover |
February 5, 2007 |
10:00 a.m. |
RFQ D607-091-R6 Tabulation |
| RFQ D607-088-R6 Triumph Switchblade Mower Parts |
January 31, 2007 |
10:00 a.m. |
RFQ D607-088-R6 Tabulation |
| D607-093-RW Displacement Pump Part |
January 30, 2007 |
10:00 a.m. |
D607-093-RW Tabulation |
| D607-090-RW Portland Cement Type I Bagged |
January 30,2007 |
10:00 a.m. |
D607-090-RW Tabulation |
| RFQ D607-086-R6 Mott-Alamo Mower Parts |
January 29, 2007 |
10:00 a.m. |
RFQ D607-086-R6 Tabulation |
| D607-084-RW Tire Changer |
January 27, 2007 |
10:00 a.m. |
D607-084-RW Tabulation |
RFB D607-077-RW Commercial Mix
Addendum 001 |
January 25, 2007 |
1:00 p.m. |
D606-077-RW Tabulation |
RFB D607-082-RW-Dynamic Message Sign (DMS) Post Spools
Exhibit 1- Drawing 1 of 2
Exhibit 2- Drawing 2 of 2 |
January 24, 2007 |
1:00 p.m. |
D607-082-RW Tabulation |
| D607-089-RW Patcher Equipment Rental |
January 22, 2007 |
10:00 a.m. |
D607-089-RW Tabulation |
| D607-085-RW Trackhoe Rental |
January 19, 2007 |
10:00 a.m. |
D607-085-RW Tabulation |
| D607-080-RW Push Bumpers |
January 12, 2007 |
10:00 a.m. |
D607-080-RW Tabulation |
D607-075-RW Rest Area Doors
Drawing
Addendum 001 |
January 3, 2007 |
10:00 a.m. |
D607-075-RW Tabulation |
RFB D607-071-RW RTMS Replacement
Exhibit 1 Drawings,Exhibit 1a Drawings,Exhibit 1b Drawings
Exhibit 2 Quantities, Location
Exhibit 3 TCP Shoulder Closure
Exhibit 4 TCP Lane Closure
Exhibit 5 Detector Pole,Foundation Detail
Exhibit 6 Pull Box Detail
Exhibit 7 Type 7 Detail
Exhibit 8 Detector Wiring Diagram
Addendum 001 |
January 2 , 2006 |
1:00 p.m. |
Tabulation |
| D607--076-RW Ice machine |
December 20,2006 |
10:00 a.m. |
D607-076-RW Tabulation |
| D607-078-RW Tree Removal |
December 20, 2006 |
10;00 a.m. |
D607-078-RW Tabulation |
| D607-073-RW Bulk Tank |
December 12, 2006 |
10:00 a.m. |
D607-073-RW Tabulation |
| D607-069-RW LED Vehicle Beacon Arrow Lights |
December 8, 2006 |
10:00 a.m. |
D607-069-RW Tabulation |
| RFB D607-068-RW Used Oil Pick Up |
December 8, 2006 |
1:00 p.m. |
D607-068-RW Tabulation |
| D607-072-RW Sand |
December 6, 2006 |
10:00 a.m. |
D607-072-RW Tabulation |
| RFB D607-066-RW Rapid Concrete Repair Material |
December 1, 2006 |
10:00 a.m. |
D607-066-RW Tabulation |
| RFQ D607-070-R6 Post Driver-Breaker for New Haven |
November 27, 2006 |
10:00 a.m. |
REVISED D607-070-R6 Tabulation |
| D607-052-RW Roll OffTrash Bid |
November 22, 2006 |
10:00 a.m. |
D607-052-RW Tabulation |
| D607-052-RW Trash Pick Up Service Bid |
November 22, 2006 |
10:00 a.m. |
D607-053-RW Tabulation |
D607-067-RW Wood Materials
Addendum I
Addendum 2 |
November 17, 2006 |
10:00 a.m. |
D607-067-RW Tabulation
D607-067-RW Tabulation page 2 |
| sfs 7-0671120 DOT Negotiation Training Seminar |
November 16, 2006 |
November 20, 2006 |
The Missouri Department of Transportation, District 6, has determined that only KARRASS can provide the Department with specific training on DOT Negotiations. The approximate value of this seminar has an estimated cost of $24,880 for the training and associated costs.
Issues with this purchase may be directed to Kristi Coppinger,
General Services Technician at 314-301-1439 or Kristina.Coppinger@modot.mo.gov, until November 20, 2006.
|
sfs 7-067117 Updates and Installation to Lindbergh System |
November 15, 2006
|
November 17, 2006 |
The Missouri Department of Transportation, Traffic Management Center District 6, has determined that only Sonitrol can provide the Department with specific use of parts and service to our current system that controls access to the Lindbergh Tunnel. This specific product has been documented as fully and absolutely compatible with all current systems. The approximate value of this update and service has an estimated cost of $12,000 for the changes to the system and associated costs.
Issues with this purchase may be directed to Kristi Coppinger,
General Services Technician at 314-301-1439 or Kristina.Coppinger@modot.mo.gov, until November 17, 2006.
|
| D607-064-RW On Call Wood Chipper Rentals |
November 15, 2006 |
10:00 a.m. |
D607-064-RW Tabulation |
D607-065-RW Insulation Materials
Exhibit A Pricing page |
November 15, 2006 |
10:00 a.m. |
D607-065-RW Tabulation |
| D607-061-RW Message Board Batteries |
November 6, 2006 |
10:00 a.m |
WITHDRAWN |
D607-059-RW Steel Doors
Attachment A
Attachment B
ADDENDUM 1 |
November 02, 2006 |
10:00 a.m. |
D607-059-RW Tabulation |
| D607-058-RW Exterior Doors |
October 31, 2006 |
10:00 a.m. |
D607-058-RW Tabulation |
| RFQ D607-060-RG Windshield Fluid |
October 30, 2006 |
10:00 a.m. |
D607-060-RG Tabulation |
| RFQ D607-057-R6 Rear Mott Mowers for Sunset Hills |
October 30, 2006 |
10:00 a.m. |
D607-057-R6 Tabulation |
| RFQ D607-056-R6 Flail Mower for Broadway |
October 20, 2006 |
10:00 a.m. |
D607-056-R6 Tabulation |
| RFQ D607-054-R6 Scissor Lift for Buildings and Grounds |
October 13, 2006 |
10:00 a.m. |
D607-054-R6 Tabulation |
D607-046-RW Retaining Wall
P9120009Attachment 1
P9120010Attachment 2
P9120011Attachement 3 |
October 10, 2006 |
10:00 a.m. |
D607-046-RW Tabulation |
| D607-050-RW Flag pole |
October 6, 2006 |
10:00 a.m. |
D607-050-RW Tabulation |
| D607-051-RW Insulation |
October 5, 2006 |
10:00 a.m. |
CANCELLED |
| RFQ D607-049-R6 Equipment Mover Trailer |
October 5, 2006 |
10:00 a.m. |
D607-049-R6 Tabulation |
| RFQ D607-048-R6 Plow and Spreader for Weldon Spring |
October 4, 2006 |
10:00 a.m. |
RFQ D607-048-R6 Plow and Spreader for Weldon Spring |
| D607-047-RW Bridge Mix |
September 21, 2006 |
10:00 a.m. |
D607-047-RW Tabulation |
| D607-045-RW Bridge Seal CoatR |
September 21, 2006 |
10:00 a.m. |
D607-045-RW Tabulation |
| D607-044-RW Asphalt Paver with Operators |
September 21, 2006 |
10:00 a.m. |
D607-044-RW Tabulation |
RFQ D607-039-RW Hydro demolition |
September 14, 2006 |
10:00 a.m. |
CANCELLED |
RFQ D607-041-RW Silica Fume Concrete |
September 13, 2006 |
10:00 a.m. |
CANCELLED |
| RFQ D607-040-RW TechCrete |
September 13, 2006 |
10:00 a.m. |
D607-040-RW Tabulation |
RFQ D607-029-RW Tree Removal
Exhibit A |
September 8, 2006 |
10:00 a.m. |
D607-029-RW Tabulation |
RFQ D607-036-RW Rotomill Job |
September 6, 2006 |
10:00 a.m. |
D607-036-RW Tabulation |
RFQ D607-037-R6 Walk Behind Mower with Stand On Sulky for Weldon Spring
D607-037-R6 Mower Specifications |
September 1, 2006 |
10:00 a.m. |
D607-037-R6 Tabulation |
| RFQ D607-035-RW Portable Message Board |
August 25, 2006 |
10:00 a.m. |
D607-035-RW Tabulation |
D607-030-R6 Walk Behind Mower for Lemay Mt. Building
D607-030-R6 Addendum 001 |
August 24, 2006 |
10:00 a.m. |
D607-030-R6 Tabulation |
| D607-034-R6 Weigh Station Portable Toilet Units |
August 22, 2006 |
10:00 a.m. |
WITHDRAWN |
D607-028-R6 Fluid Handling System for Sign Shop
D607-028-R6 Addendum 001 |
August 21, 2006 |
10:00 a.m. |
D607-028-R6 Tabulation |
| D607-027-R6 Fluid Handling System for Sign Shop |
August 21, 2006 |
10:00 a.m. |
WITHDRAWN |
| RFQ D607-032-RW Metal Roofing Material |
August 18, 2006 |
10:00 a.m. |
D607-032-RW Tabulation |
RFQ D607-031-RW Signal Modification
Exhibit A |
August 18, 2006 |
10:00 a.m. |
D607-031-RW Tabulation |
| RFQ D607-022-RW Weldon Spring Fence Job |
August 15, 2006 |
10:00 a.m. |
D607-022-RW Tabulation |
| RFQ D607-026-RW Fault Locator |
August 14, 2006 |
10:00 a.m. |
D607-026 Tabulation |
| RFQ D607-023-RW Deck Sealing Material |
August 11, 2006 |
10:00 a.m. |
D607-023-RW Tabulation |
| RFQ D607-025-RW Latex Modified Concrete |
August 9, 2006 |
10:00 a.m. |
D607-025-RW Tabulation |
| RFQ D607-024-RW Hydro Demolition |
August 8, 2006 |
10:00 a.m. |
D607-024-RW Tabulation |
RFQ D607-021-RW Signal Change and Modification
Exhibit 1 |
August 8, 2006 |
10:00 a.m. |
Withdrawn |
RFQ D607-019-RW Tree and Brush Removal
Exhibit A Site Map |
August 8, 2006 |
10:00 a.m. |
Withdrawn- to be re-issued |
RFQ D607-020-RW Fiber Optic Repairs
Exhibit I Drawings |
August 4, 2006 |
10:00 a.m. |
D607-020-RW Tabulation |
| RFQ D607-013-RW Rapid Concrete Repair Material |
July 24, 2006 |
10:00 a.m. |
D607-013-RW Tabulation |
RFB 6-060706E D06 Uniform Bid
RFB 6-060706E Addendum 001 |
July 6, 2006 |
2:00 p.m. |
|
| RFB D607-008-RW Bulk Oil |
July 20, 2006 |
10:00 CDT |
D607-008-RW Tabulation |
| RFB D607-006-RW Techcrete |
June 30, 2006 |
10.00 CDT |
D607-006-RW Tabulation |
RFP D606-108-RB Traffic Data Collection Services
Addendum I Traffic Data Collection Services |
May 24,2006 |
3:00 CDT |
District 6, Ballwin, MO. |