| Title |
Closing Date |
Closing Time
(DST) |
Tabulations |
| SW-13-024AM Bagged and Bulk Winter Cold Mix |
12/17/12 |
1:00 p.m. local time |
SW-13-024AM Tabulation |
| SW-13-028CS Aerial Bucket Truck Rentals |
12/13/12 |
1:00 p.m. local time |
SW-13-018-A-CS Tire Cables-Bid Tabs |
| SW-13-026CS Husqvarna Concrete Saw |
12/10/12 |
1:00 p.m. local time |
SW-13-028CS Husqvarna FS413 Concrete Saw-Bid Tabs |
SW-13-023CS Emergency Roadside Truck and Equipment Repair Services |
12/10/12 |
1:00 p.m. local time |
SW-13-023CS Emergency Roadside Truck and Equipment Repair Service-Bid Tabs- |
| SW-13-019CS Spreader Chains |
11/8/12 |
1:00 p.m. local time |
SW-13-019-CS Spreader Chains-Bid Tabs |
| SW-13-018-A-CS Tire Cables |
11/6/12 |
1:00 p.m. local time |
SW-13-018-A-CS Tire Cables-Bid Tabs.pdf |
| SW-13-022AM Garmin GPS |
11/1/12 |
1:00 p.m. local time |
SW-13-022AM Tabulation |
| SW-13-021AM Propane |
10/22/12 |
1:00 p.m. local time |
SW-13-021AM Tabulation |
| SW-13-018CS Tire Chains and Cables |
10/22/12 |
1:00 p.m. local time |
TO BE REBID |
| SW-13-020CS Annual Fire Extinguisher Inspections |
10/19/12 |
1:00 p.m. local time |
ALL BIDS REJECTED |
SW-13-017AM Sectional Overhead Doors-Cassville
Addendum 001 SW-13-017AM |
10/11/12 |
1:00 p.m. local time |
SW-12-017AM Tabulation |
SW-13-016AM Concrete Containment Structures
Addendum 001 SW-13-016AM |
10/9/12 |
1:00 p.m. local time |
SW-13-016AM Tabulation |
SW-13-015CS Asphalt Pads for Salt Tents
Annual Wage Order 19-Dallas
Annual Wage Order 19-Stone
Annual Wage Order 19-Webster |
10/11/12 |
1:00 p.m. local time |
SW-13-015CS Aspahlt Pads-Bid Tabs |
SW-13-012AM Signal and Lighting Repair MO 171 Jasper County
Contractor Pre-Qualification Required |
10/9/12 |
1:00 p.m. local time |
SW-13-012AM Tabulation |
| SW-13-014CS Hurley School Flashers |
9/24/12 |
1:00 p.m. local time |
SW-13-014CS Hurley School Flashers-Bid Tabs |
RFQ SW-13-013CS Asphalt Pad for Buffalo Salt Tent
Prevailing Wage Order 19_Dallas County |
9/21/12 |
1:00 p.m. local time |
TO BE REBID |
| SW-13-011CS NEMA Eberle Devices MMU16LEIP |
9/14/12 |
1:00 p.m. local time |
SW-13-011CS NEMA-Eberle Devices MMU 16LE IP-Bid Tabs |
| SW-13-010AM Ready Mix Concrete US 13-Polk County |
9/6/12 |
1:00 p.m. local time |
SW-12-010AM Tabulation |
| SW-13-009AM Hay Harvesting |
9/10/12 |
1:00 p.m. local time |
no award |
| SW-13-008CS Conflict Monitors |
8/24/12 |
1:00 p.m. local time |
SW-13-008CS Conflict Monitors-Bid Tabs |
| SW-13-007CS AXIS Q6032-E PTZ Dome Network Camera |
8/20/12 |
1:00 p.m. local time |
SW-13-007CS Axis Q6032-E PTZ Dome Network Cameras |
SW-13-006AM Spray Foam Insulation-Buffalo
Addendum 001 SW-13-006AM |
8/9/12
8/16/12 |
1:00 p.m. local time |
SW-12-006AM Tabulation |
| SW-13-004AM Sectional Overhead Doors-Buffalo |
8/7/12 |
1:00 p.m. local time |
SW-12-004AM Tabulation |
SW-13-003AM Concrete Slab Reclamation
Addendum 001 SW-13-003AM |
8/15/12 |
1:00 p.m. local time |
SW-13-003AM Tabulation |
| SW-13-002CS Graders and Loaders w-Operators |
8/13/12 |
1:00 p.m. local time |
SW-13-002CS Motor Graders and Loaders w operators-Bid Tabsl |
SW-13-001AM National DDI Striping
Addendum 001 SW-13-001AM |
8/2/12
8/15/12 |
1:00 p.m. local time |
SW-13-001AM Tabulation |
| SW-13-005CS Metal Building Materials |
7/30/12 |
1:00 p.m. local time |
SW-13-005CS Metal Building Materials Bid Tabs |
| SW-12-048CS Utility Air Compressor |
7/9/12 |
1:00 p.m. local time |
SW-12-048CS Utility Air Compressor-Bid Tabs |
| SW-12-047AM Structural Steel Materials |
6/20/12 |
1:00 p.m. local time |
SW-12-047AM Tabulation |
| RFQ SW-12-046CS Floor Saw |
6/11/12 |
1:00 p.m. local time |
SW-12-046CS Floor Saw-husqvarna FS513 or Equivalent-Bid Tabs |
| RFQ SW-12-045CS MTX-Series Rammer-80SD Model |
6/7/12 |
1:00 p.m. local time |
SW-12-045CS MTX-Series Rammer-Model 80 SD-Bid Tabs |
SW Joplin CRS2P and CQS Bid Sheet 7-25 Thru 8-5-2012
Open Enrollment |
6/6/12
6/20/12
7/3/12
7/18/12 |
1:00 p.m. local time |
SW District CRS2P Bid 4 Tabulation 7-23-12 to 8-05-12 |
| SW-12-044 CS Vehicle Computer Mount Desks |
6/1/12 |
1:00 p.m. local time |
SW-12-044CS-Vehicle Computer Mount Desks -Bid Tabs |
| SW-12-043AM Truck Wash Building Erection |
5/21/12 |
1:00 p.m. local time |
SW-12-043AM Tabulation |
| SW-12-041-A-CS Reversible Tailgate Conveyor |
5/16/12 |
1:00 p.m. local time |
SW-12-041-A-CS- Reversible Tailgate Conveyor -Bid Tabs |
| SW-12-042AM Aluminized Corrugated Metal Pipe |
5/14/12 |
1:00 p.m. local time |
SW-12-042AM Tabulation |
| SW-12-037CS Plant Pickup Mix-Aggregate |
5/24/12 |
1:00 p.m. local time |
SW-12-037CS Plant Pick Up Mix-Bid Tabs |
| SW-12-041CS Reversible Tailgate Conveyor |
5/4/12 |
1:00 p.m. local time |
TO BE REBID |
| SW-12-039CS Activated Flashers |
5/3/12 |
1:00 p.m. local time |
SW-12-039CS Activated Flashers - Bid Tabs |
| SW-12-038CB Aggregate for Bituminous Surface_AppletonCity |
4/24/12 |
1:00 p.m. local time |
SW-12-038CB Aggregate for Bituminous Surface_Bid Tab |
SW-12-037AM Pole Barn Erection Services - Clinton MO
Addendum 001 SW-12-037AM
Addendum 002 SW-12-037AM |
4/16/12 |
1:00 p.m. local time |
ALL BIDS REJECTED
TO BE REBID |
| SW-12-036CB Signal Change Services Business US 71 |
4/12/12 |
1:00 p.m. local time |
SW-12-036CB Business US 71_Range Line_ Signal Change Services_BidTab |
SW-12-035AM Lawn Mowing Service
MoDOT SW District Office Mowing Drawings |
4/6/12 |
1:00 p.m. local time |
SW-12-035AM Tabulation |
SW-12-034CS Heavy Equipment Rentals
GS6MasterEquipmentRentalAgreement |
4/23/12 |
1:00 p.m. local time |
SW-12-034CS Bid Tabulations |
| SW-12-32CS Zero Turn Radius Lawn Mower |
3/12/12 |
1:00 p.m. local time |
SW-12-032CS Zero Turn Mower - Bid Tabs |
| SW-12-032AM Black Traffic Marking Paint |
3/8/12 |
1:00 p.m. local time |
SW-12-032AM Tabulation |
| SW-12-031AM Wavetronix Matrix Radar Detection |
3/12/12 |
1:00 p.m. local time |
SW-12-031AM Tabulation |
| SW-12-030AM Alpha FXM 1100 UPS System |
3/12/12
3/29/12 |
1:00 p.m. local time |
SW-12-030AM Tabulation |
| SW-12-026CB Plant Mix Oil Material_Monett |
3/13/12 |
1:00 p.m. local time |
SW-12-026CB BID Tab |
| SW-12-029AM Bagged and Bulk Winter Cold Mix |
3/9/2012 |
1:00 p.m. local time |
SW-12-029AM Tabulation |
| SW-12-028AM Chip Seal Aggregate |
3/6/2012 |
1:00 p.m. local time |
SW-12-028AM Tabulation |
| SW-12-027CS -Vibratory Roller Rentals |
3/5/2012 |
1:00 p.m. local time |
SW-12-027CS Vibratory Rollers Rental - Bid Tabs |
| SW-12-021CS-A Zero Turn Radius Lawn Mower |
3/2/2012 |
1:00 p.m. local time |
BID CANCELLED |
SW-12-023CS-A Concrete Culvert Pipe - Fixed Pricing Agreement
MGS9210 |
2/23/2012 |
1:00 p.m. local time |
RFB SW-12-023CS-Concrete Pipe Tabulations |
| SW-12-024CB Plant Mix Oil Material_Quarry Stockpile |
2/22/12 |
1:00 p.m. local time |
SW-12-024CB BID Tab |
| SW-12-025 Graders and Loaders w-Operators |
2/10/2012 |
1:00 p.m. local time |
SW-12-025CS Motor Graders w operators-Bid Tabsl |
SW-12-021CS Zero Turn Radius Lawn Mower |
2/8/2012 |
1:00 p.m. local time |
TO BE REBID |
| SW-12-022CB Lighting Controller |
2/7/2012 |
1:00 p.m. local time |
|
| SW-12-020CS Lube Skid |
2/6/2012 |
1:00 p.m. local time |
SW-12-020CS Lube Skid - Bid Tabs |
| SW-12-019CB Spec 8 Aggregate |
1/19/2012 |
1:00 p.m. local time |
SW-12-019 Spec 8 Type I Base Aggregate Bid Tab |
| SW-12-018CS-A Quikrete Concrete |
1/9/2012 |
1:00 p.m. local time |
SW-12-018CS-A Quickcrete Bid Tabs |
| SW-12-017AM Bridge Reinforcement Steel Plates |
12/29/2011 |
1:00 p.m. local time |
SW-12-017AM Tabulation |
| SW-12-018CS Quikrete Concrete |
12/27/11 |
1:00 p.m. local time |
TO BE REBID |
| SW-12-016AM Countdown Pedestrian Signals |
12/28/2011 |
1:00 p.m. local time |
SW-12-016AM Tabulation |
SW-12-015CS Corrugated Metal Pipe-Eldorado Springs
MGS-91-11G
Addendum 001-SW-12-015CS |
12/15/2011 |
1:00 p.m. local time |
SW-12-015CS Round and Elliptical Corrugated Metal Pipe-Bid Tabs |
| SW-12-014 Recapped Tires |
11/15/2011 |
1:00 p.m. local time |
|
| SW-12-013AM Safety Harnesses |
11/1/2011 |
1:00 p.m. local time |
SW-12-013AM Tabulation |
SW-12-011AM Stream Bank Stabilization-Polk County
Contractor Pre-Qualification Required |
11/15/2011 |
1:00 p.m. local time |
ALL BIDS REJECTED |
SW-12-012CS Pipe Installation
Addendum 001-Pipe Installation |
11/4/11 |
1:00 p.m. local time |
SW-12-012CS Pipe Installation Bates County-Bid Tabs |
| SW-12-009CS Preventive Pest Control Services |
10/24/11 |
1:00 p.m. local time |
SW-12-009CS Preventive Pest Control Services-Bid Tabs |
| SW-12-010AM Metal Building Material |
10/12/2011 |
1:00 p.m. local time |
SW-12-010AM Tabulation |
| SW-12-008CB Concrete Commercial Mix Fixed Pricing |
10/06/2011 |
1:00 p.m. local time |
SW-12-008CB Commercial Mix Concrete Bid Tab |
| SW-12-004RG Propane |
9/26/2011 |
1:00 p.m. local time |
Tabulation SW-12-004RG Propane |
| SW-12-006CB Traffic Signal Mast and Arm |
9/20/2011 |
1:00 p.m. local time |
SW-12-006CB Traffic Signal Mast and Arm Bid Tab |
| SW-12-007CS Health Fair Catering 2011 |
9/16/11 |
1:00 p.m. local time |
SW-12-007CS Catering Service 2011 Health Fair-Bid Tabs |
SW-12-005CB Diamond Grinding_US 71 Newton Co
SW-12-005CB General Wage Order 54
Contractor Pre-Qualification Required |
8/25/2011 |
1:00 p.m. local time |
SW-12-005CB Diamond Grinding_US 71 Newton Co BID Tab |
SW-12-001CB Streambank Stablization_BigDryWood_Route_54_Vernon Co
SW-12-001CB Attachment A_Special Provisions
SW-12-001CB Attachment B - Special Provisions Construction
SW-12-001CB Exhibit A - Traffic Control
SW-12-001CB Exhibit B - Construction and Material Specifications
SW-12-001CB Exhibit C - Plan Sheets_DSR 217-10-001 EWP Project
SW-12-001CB Exhibit D - General Wage Order 54
Contractor Pre-Qualification Required |
8/17/2011/ |
1:00 p.m. local time |
SW-12-001CB Stream Bank Stablization Big Dry Wood Creek Rte 54 Vernon Co. Bid Tab |
SW-12-003AM Stream Bank Stabilization - Polk County
Contractor Pre-Qualification Required
Addendum 001 SW-12-003AM |
8/1/2011 |
1:00 p.m. local time |
ALL BIDS REJECTED |
SW-12-002AM Signal Hardware
Addendum 001 SW-12-002AM |
7/19/2011 |
1:00 p.m. local time |
SW-12-002AM Tabulation |
SW Joplin CRS2P and CQS Bid Sheet 9-5 thru 9-25
Open Enrollment |
7/06/2011
7/20/2011
8/03/2011
8/17/2011
8/31/2011
|
1:00 p.m. local time |
Asphalt Pricing 9-5 thru 9-25 |
| D8PP-11055 Mini-Lightbar |
5/16/2011 |
1:00 p.m. local time |
Tabulation D8PP-11055 |
| D8PP-11054 Truck Tires |
05/06/2011 |
1:00 p.m. local time |
D8PP-11054 Tabulation |
| D8PP-11053 Pelco Cameras |
05/16/2011 |
1:00 p.m. local time |
D8PP-11053 Tabulation |
| D8PP-11052 General Fabrication Services |
5/10/2011
5/27/2011 |
1:00 p.m. local time |
D8PP-11052 Tabulation |
| D8PP-11051 Corrugated Metal Round Pipe |
5/03/2011 |
1:00 p.m. local time |
D8PP-11051 Tabulation |
| D8PP-11050 Pole Barn Erection Services-Gainesville |
5/05/2011 |
1:00 p.m. local time |
D8PP-11050 Tabulation |
D8PP-11049 Industrial Lighting
Addendum 001 D8PP-11049 |
5/05/2011 |
1:00 p.m. local time |
|
| D8PP-11048 Concrete Ready Mix |
4/19/2011 |
1:00 p.m. local time |
D8PP-11048 Tabulation |
D8PP-11047 Cargo Trailer Equipment - Shelving
Addendum 001 D8PP-11047 |
4/18/2011 |
1:00 p.m. local time |
D8PP-11047 Tabulation |
| D8PP-11046 Black Traffic Marking Paint |
03/31/2011 |
1:00 p.m. local time |
D8PP-11046 Tabulation |
| D8PP-11045 Encom Traffic Signal Radios |
03/30/2011 |
2:00 p.m. local time |
D8PP-11045 Tabulation |
D8PP-11044 Wavetronix Matrix Radar Detection
Addendum 001 D8PP-11044 |
03/30/2011
04/04/2011 |
1:00 p.m. local time |
D8PP-11044 Tabulation |
| D8PP-10043 Roller and Broom Equipment Rental |
03/28/2011 |
1:00 p.m. local time |
D8PP-11043 Tabulation |
| D8PP-11041 Box Culverts |
03/17/2011 |
1:00 p.m. local time |
D8PP-11041 Tabulation |
| D8PP-10039 Annual Aggregate Plant Pickup |
03/29/2011 |
1:00 p.m. local time |
D8PP-11039 tabulation
Updated 7/21/2011 |
| D8PP-11038 Corrugated Metal Round Pipe |
03/17/2011 |
1:00 p.m. local time |
D8PP-11038 Tabulation |
| D8PP-11035 Steel Buildings |
03/24/2011 |
1:00 p.m. local time |
D8PP-11035 Tabulation |
| D8PP-11037 Corrugated Metal Arch and Round Pipe |
03/08/2011 |
1:00 p.m. local time |
D8PP-11037 Tabulation |
D8PP-11033 Pole Barn Erection Services
Addendum 001 D8PP-11033 |
03/10/2011 |
1:00 p.m. local time |
D8PP-11033 Tabulation |
| D8PP-11032 Globug Balloon Lighting System |
03/1/2011 |
1:00 p.m. local time |
D8PP-11032 Tabulation |
| D8PP-11031 Asphalt Recycling Trailer |
02/18/2010 |
1:00 p.m. local time |
D8PP-11031 Tabulation |
D8PP-11029 Corrugated Metal Pipe
Addendum 001 D8PP-11029 |
01/19/2010 |
1:00 p.m. local time |
D8PP-11029 Tabulation |
D8PP-11028 Recap Tires
Addendum 001 D8PP-11028 Recap Tires |
01/28/2010 |
1:00 p.m. local time |
D8PP-11028 Tabulation |
| D8PP-11027 Box Culvert |
12/23/2010 |
1:00 p.m. local time |
D8PP-11027 Tabulation |
| D8PP-11026 Building Material |
12/10/2010 |
1:00 p.m. local time |
D8PP-11026 Tabulation |
| D8PP-11025 Antifreeze |
01/25/2011 |
1:00 p.m. local time |
D8PP-11025 Tabulation |
| D8PP-10024 Bagged and Bulk Winter Cold Mix Material |
11/30/2010 |
1:00 p.m. local time |
D8PP-11024 Tabulation 12-30-2010 |
| D8PP-11023 LD Salt Spreader |
11/23/2010 |
1:00 p.m. local time |
D8PP-11023 Tabulation |
| D8PP-11022 Septic Pumping and Hauling |
01/19/2011 |
1:00 p.m. local time |
|
D8PP-11021 Spreader Stands
D8PP-11021 Drawing |
11/03/2010 |
1:00 p.m. local time |
D8PP-11021 Tabulation |
| D8PP-11020 Tilt Trailer |
11/04/2010 |
1:00 p.m. local time |
D8PP-11020 Tabulation |
| D8PP-11019 Compact Roller |
10/29/2010 |
1:00 p.m. local time |
D8PP-11019 Tabulation |
| D8PP-11017 Recycling Trailer |
10/29/2010 |
1:00 p.m. local time |
D8PP-11017 Tabulation |
| D8PP-11016 Trailer Painting |
11/04/2010 |
1:00 p.m. local time |
D8PP-11016 Tabulation |
| D8PP-11015 Dust Collection System |
10/15/2010 |
1:00 p.m. local time |
D8PP-11015 Tabulation |
D8PP-11014 Alpha FXM 1100 UPS System
Addendum 001 D8PP-11014 |
10/15/2010
10/22/2010 |
1:00 p.m. local time |
D8PP-11014 Tabulation |
| D8PP-11013 14000 LB Equipment Trailer |
10/13/2010 |
1:00 p.m. local time |
D8PP-11013 Tabulation |
D8PP-11012 Overhead Doors
Annual Wage Order No. 17 - Greene County |
10/5/2010 |
1:00 p.m. local time |
D8PP-11012 Tabulation |
| D8PP-11011 Cargo Trailer |
9/30/2010 |
1:00 p.m. local time |
D8PP-11011 Tabulation |
D8PP-11010 Insulation
Annual Wage Order No. 17 - Greene County
Addendum 001 D8PP-11010 |
11/15/2010 |
1:00 P.M. LOCAL TIME |
D8PP-11010 Tabulation |
D8PP-11009 Flu Vaccination
Cancelled |
9/24/2010 |
1:00 p.m. local time |
|
| D8PP-11008 Metal Building Material |
9/16/2010 |
1:00 p.m. local time |
D8PP-11008 Tabulation |
D8PP-11007 Concrete Resurfacing
Attachment A - D8PP-11007 JSP_Final
Attachment B - FinalPlansD8PP-11007
Attachment C - General Wage Order No. 54 |
9/24/2010 |
1:00 p.m. local time |
D8PP-11007 Tabulation |
D8PP-11006 Fuel Tank Gauges
Addendum001forPRL |
9/02/2010 |
1:00 p.m. local time |
D8PP-11006 Tabulation |
| D8PP-11005 Car Hauler |
9/01/2010 |
1:00 p.m. local time |
D8PP-11005 Tabulation |
| D8PP-11004 Wavetronix Matrix Radar Detection |
9/01/2010 |
1:00 p.m. local time |
D8PP-11004 Tabulation |
D8PP-11003 Self Propelled Paver with Operator
General Wage Order No. 54 |
9/2/2010 |
1:00 p.m. local time |
D8PP-11003 Tabulation |
| D8PP-11001 Vehicle Computer Mount Desks |
7/12/2010 |
1:00 p.m. local time |
D8PP-11001 Tabulation |
D8PP-10068 AC Recovery Recycling Unit
Addendum 001 D8PP-10068 |
7/08/2010 |
1:00 p.m. local time |
D8PP-10068 Tabulation |
| D8PP-10067 Propane |
07/07/2010 |
1:00 p.m. local time |
Propane Bid Tabulation |
| D8PP-10066 Ethernet Video Transmitter |
6/10/2010 |
10:00 a.m. local time |
D8PP-10066 Tabulation |
D8PP-10065 Bridge Paint
Addendum 001 D8PP-10065 |
06/04/2010
06/09/2010 |
1:00 p.m. local time |
D8PP-10065 Tabulation |
| D8PP-10064 Galvalume Arch Building |
06/04/2010 |
1:00 p.m. local time |
D8PP-10064 Tabulation |
| D8PP-10063 Replacement Signal Pole |
5/5/2010 |
1:00 p.m. local time |
D8PP-10063 Tabulation |
D8PP-10062 Safety Harnesses
Addendum 001 D8PP-10062 |
5/5/2010
5/6/2010 |
1:00 p.m. local time |
D8PP-10062 Tabulation |
D8PP-10052 Fixed Automated Spray Technology
Addendum 001 D8PP-10052 |
5/19/2010
5/28/2010 |
2:00 p.m. local time |
NO AWARD MADE |
D8PP-10061 Structured Telecommunications Cabling System
Annual Wage Order No. 16
District8office FLOORPLAN
Work Hour Restrictions Map
D8PP-10061 Planholder List
Addendum 001 D8PP-10061
Addendum 002 D8PP-10061
Addendum 003 D8PP-10061 |
5/13/2010
5/21/2010 |
1:00 p.m. local time |
D8PP-10061 Tabulation |
| D8PP-10060 Concrete Ready Mix |
3/25/2010 |
1:00 p.m. local time |
D8PP-10060 Tabulation |
| D8PP-10059 Concrete Pipe |
3/12/2010 |
1:00 p.m. local time |
D8PP-10059 Tabulation |
| D8PP-10058 Annual Aggregate Plant Pickup |
3/26/2010 |
1:00 p.m. local time |
D8PP-10058 tabulation |
D8PP-10057 Wastewater Treatment Plant Operator
Addendum 001 D8PP-10057 |
3/25/2010
3/30/2010 |
1:00 p.m. local time |
D8PP-10057 Tabulation |
| D8PP-10056 Chip Seal Equipment Rental |
3/8/2010 |
1:00 p.m. local time |
D8PP-10056 Tabulation |
D8PP-10055 Herbicide Sprayer Parts
Addendum 001 D8PP-10055 |
2/26/2010 |
1:00 p.m. local time |
D8PP-10055 Tabulation |
| D8PP-10054 Tree Removal |
3/5/2010 |
1:00 p.m. local time |
D8PP-10054 Tabulation |
D8PP-10053 Insulation
annual wage order 16
Cancelled |
1/22/2010 |
1:00 p.m. local time |
|
D8PP-10051 Steel Flat-Beds
Addendum 001 D8PP-10051
Addendum 002 D8PP-10051
Addendum 003 D8PP-10051 |
1/25/2010 |
1:00 p.m. local time |
D8PP-10051 Tabulation |
| D8PP-10050 Building Materials - Ava Maintenance |
1/5/2010 |
1:00 p.m. local time |
D8PP-10050 Tabulation |
D8PP-10038 Overhead Crane Installation
Addendum 001 D8PP-10038
Addendum 002 D8PP-10038
Addendum 003 D8PP-10038 |
1/21/2010
1/26/2010
2/4/2010
2/11/2010 |
1:00 p.m. local time |
CANCELLED |
| |
|
|
|
| D8PP-9050 Reversible Tailgate Conveyor |
4/30/2009 |
1:00 p.m. local time |
D8PP-9050 Tabulation |
| D8PP-9049 Knuckle Boom Trucks with Operators |
4/21/2009 |
1:00 p.m. local time |
D8PP-9049 Tabulation |
| D8PP-9048 Truck Mounted Crane |
4/14/2009 |
1:00 p.m. local time |
D8PP-9048 tabulation |
D8PP-9022 Loop Detector Replacements and Additions
General Wage Order No. 52 |
4/16/2009 |
1:00 p.m. local time |
D8PP-9022 Tabulation |
| D8PP-9047 Concrete Ready Mix |
4/15/2009 |
1:00 p.m. local time |
D8PP-9047 Tabulation |
| D8PP-9046 AC Recovery Recycling Unit |
4/01/2009 |
1:00 p.m. local time |
D8PP-9046 tabulation |
D8PP-9045 Corrugated Metal Pipe
FAXED QUOTATIONS WILL BE ACCEPTED - 417-895-6704 |
3/19/2009 |
1:00 p.m. local time |
D8PP-9045 Tabulation |
| D8PP-9044 Corrugated Metal Pipe |
3/18/2009 |
1:00 p.m. local time |
CANCELED - QUOTE WILL BE REISSUED |
| D8PP-9043 Storm Debris Tub Grinding Service |
3/18/2009 |
1:00 p.m. local time |
All QUOTES REJECTED -
MAY BE REBID |
| D8PP-9042 Trucks with Knuckle Boom Loader and Operator |
3/13/2009 |
1:00 p.m. local time |
D8PP-9042 Tabulation |
D8PP-9040 Bulk Oil
Specifications |
4/01/2009 |
1:00 p.m. local time |
D8PP-9040 Tabulation |
| D8PP-9039 Annual Aggregate Plant Pickup |
3/17/2009 |
1:00 p.m. local time |
|
| D8PP-9037 Chip Seal Aggregate |
3/3/2009 |
1:00 p.m. local time |
D8PP-9037 Tabulation |
| D8PP-9038 McMillen Hydraulic Drive Heads |
2/17/2009 |
1:00 p.m. local time |
D8PP-9038 Tabulation |
D8PP-9036 Horizontal Elliptical Leg Tanks
Addendum 001 D8PP-9036 |
02/17/09 |
1:00 p.m. local time |
D8PP-9036 Tabulation |
| D8PP-9035 Rycom Locator |
02/17/09 |
1:00 p.m. local time |
D8PP-9035 tabulation |
D8PP-9028 Class D Wastewater Treatment Plant Operator
Addendum 001 D8PP-9028
Lab Info |
02/24/09 |
1:00 p.m. local time |
D8PP-9028 Tabulation |
| D8PP-9034 Quikrete |
02/02/09 |
1:00 p.m. local time |
D8PP-9034 Tabulation |
D8PP-9033 Horizontal Elliptical Leg Tanks
CANCELLED - WILL BE REBID |
01/27/09 |
1:00 p.m. local time |
BID WILL BE REISSUED BECAUSE OF ADDITIONAL NEEDS THAT HAVE BEEN REQUESTED |
| Autoscope Solo Detection Cameras SFS7-042409 |
4/24/2009 |
05/08/2009 |
|
| SFS 7 - 042109 Superpave Bridge Overlay |
2/21/2009 |
2/23/2009 |
|
| Tasmanian Digger - SFS7-020609 |
2/10/2009 |
2/25/2009 |
|
| SFS 8 - 121808 Maddock Repair |
12/08/08 |
12/23/08 |
|
| D8PP-9032 Metal Building Materials |
1/28/09 |
1:00 p.m. local time |
D8PP-9032 tabulation |
D8PP-9031 Spreader Stands
D8PP-9031 Drawing |
01/27/09 |
1:00 p.m. local time |
D8PP-9031 tabulation |
D8PP-9030 Bagged Concrete Masonry Repair
Qualified Product List |
01/26/09 |
1:00 p.m. local time |
D8PP-9030 Tabulation |
D8PP-9029 Leica Survey Equipment
Photo - Leica SR530 equipment
***Faxed Quotations Will Be
Accepted - 417-895-6704*** |
01/23/2009 |
1:00 p.m. local time |
D8PP-9029 Tabulation |
| D8PP-10049 Hose Reels |
12/23/2009 |
1:00 p.m. local time |
D8PP-10049 Tabulation |
| D8PP-10048 Herbicide Sprayers |
12/30/2009 |
1:00 p.m. local time |
D8PP-10048 Tabulation |
| D8PP-10047 Plastic Septic Tank |
12/23/2009 |
1:00 p.m. local time |
D8PP-10047 Tabulation |
| D8PP-10046 On-Call General Fabrication |
1/6/2010 |
1:00 p.m. local time |
|
| D8PP-10045 Tire Chains |
12/15/2009 |
1:00 p.m. local time |
D8PP-10045 Tabulation |
| D8PP-10044 Welded Steel Wire Fabric |
12/10/2009 |
1:00 p.m. local time |
D8PP-10044 Tabulation |
| D8PP-10043 Quikrete |
12/14/2009 |
1:00 p.m. local time |
D8PP-10043 Tabulation |
D8PP-10042 50 ton Detachable Lowboy Equipment Trailer
Cancelled |
12/11/2009 |
1:00 p.m. local time |
|
D8PP-10041 Custom Built Fiber Optic Splice Trailer
Addendum 001 - D8PP-10041 |
12/11/2009 |
1:00 p.m. local time |
D8PP-10041 Tabulation |
D8PP-10040 Sectional Overhead Doors
Addendum 001 D8PP-10040 |
11/30/2009 |
1:00 p.m. local time |
D8PP-10040 Tabulation |
| D8PP-10039 Crane Service |
11/20/2009 |
1:00 p.m. local time |
D8PP-10039 Tabulation |
| D8PP-10037 Truck Mounted Crane |
11/25/2009 |
1:00 p.m. local time |
D8PP-10037 Tabulation |
| D8PP-10036 Barrier Lift Tongs |
11/19/2009 |
1:00 p.m. local time |
D8PP-10036 Tabulation |
| D8PP-10035 Rubber Skid Steer Tracks |
11/20/09 |
1:00 p.m. local time |
D8PP-10035 Tabulation |
| D8PP-10034 PreMark Pavement Markings |
11/09/09 |
1:00 p.m. local time |
D8PP-10034 Tabulation |
| D8PP-10033 Box Culvert |
11/4/2009 |
1:00 p.m. local time |
D8PP-10033 Tabulation |
| D8PP-10032 Salt Spreader Tanks |
10/30/2009 |
1:00 p.m. local time |
D8PP-10032 Tabulation |
D8PP-10031 Winter Cold Mix Material
Addendum 001 D8PP-10031 |
10/22/2009 |
1:00 p.m. local time |
D8PP-10031 Tabulation |
D8PP-10030 HVAC Materials
Addendum 001 D8PP-10030 |
9/21/2009 |
1:00 p.m. local time |
D8PP-10030 Tabulation |
D8PP-10029 Tank Manway Replacement
Annual Wage Order No 16
Pictures
Example Manway
Manway to replace |
9/24/2009 |
1:00 p.m. local time |
D8PP-10029 Tabulation |
| D8PP-10028 Lighting |
9/30/2009 |
1:00 p.m. local time |
D8PP-10028 Tabulation |
| D8PP-10027 Wabo Flex Expansion Joint |
9/22/2009 |
1:00 p.m. local time |
|
| D8PP-10026 Administration of Flu Shots |
9/15/09 |
1:00 p.m. local time |
D8PP-10026 Tabulation |
| D8PP-10025 Lightweight Aggregate |
10/7/09 |
1:00 p.m. local time |
D8PP-10025 Tabulation
All Bids Rejected for Budgetary Limitations |
D8PP-10024 Chip Seal Aggregate
Addendum 001 D8PP-10024 |
10/7/09 |
1:00 p.m. local time |
D8PP-10024 Award Sheet |
D8PP-10023 Intersection Lighting Installation
General Wage Order No.53
Marshfield Lighting MO 38 and Route W
Gage_St_Lighting updated 9-14-09
Addendum 001 D8PP-10023
Addendum 002 D8PP-10023 |
9/23/09 |
1:00 p.m. local time |
D8PP-10023 Tabulation |
D8PP-10022 Track Loader with Operator
General Wage Order No 53
D8PP-10022 sketches
Bridge Photos:
east end of all bridges showing access area
north profile of outer road bridge
north profile of WB bridge
south profile of twin bridges |
8/19/2009 |
1:00 p.m. local time |
D8PP-10022 Tabulation |
| D8PP-10021 Rip Rap Material |
8/19/2009 |
1:00 p.m. local time |
D8PP-10021 Tabulation |
| D8PP-10020 Ready Mix - Ava Maintenance |
8/17/2009 |
1:00 p.m. local time |
D8PP-10020 Tabulation |
D8PP-10019 Poly Heads and Signal Hardware
Addendum 001 |
8/21/2009 |
1:00 p.m. local time |
D8PP-10019 Tabulation |
| D8PP-10018 Limestone Boulder |
8/20/2009 |
1:00 p.m. local time |
D8PP-10018 Tabulation |
| D8PP-10017 PreMark Pavement Markings |
8/14/2009 |
1:00 p.m. local time |
D8PP-10017 Tabulation |
| D8PP-10016 Industrial Lighting |
8/18/2009 |
1:00 p.m. local time |
D8PP-10016 Tabulation |
D8PP-10015 Traficon Video Detector Parts |
8/13/2009 |
1:00 p.m. local time |
D8PP-10015 Tabulation |
| D8PP-10014 Metal Siding Material |
8/12/2009 |
1:00 p.m. local time |
D8PP-10014 Tabulation |
D8PP-10013 Building Materials - Ava Maintenance
D8PP-10013 Truss Drawings |
8/11/2009 |
3:00 p.m. local time |
D8PP-10013 Tabulation |
| D8PP-10012 A36 Flat Steel |
7/21/2009 |
3:00 p.m. local time |
D8PP-10012 Tabulation |
| D8PP-10011 Spill Containment Equipment |
7/30/2009 |
1:00 p.m. local time |
D8PP-10011Tabulation |
D8PP-10010 Bridge Overlay
General Wage Order No. 52 |
8/10/2009 |
1:00 p.m. local time |
D8PP-10010 Tabulation |
| D8PP-10009 Traficon Video Detector Parts |
7/29/2009 |
1:00 p.m. local time |
CANCELED - WILL BE REBID |
| D8PP-10008 Trackhoe Rental |
7/28/2009 |
1:00 p.m. local time |
|
| D8PP-10007 Commercial Grade Zero Turn Mower |
7/30/2009 |
1:00 p.m. local time |
D8PP-10007 Tabulation |
| D8PP-10006 Commercial Grade Zero Turn Mower |
7/30/2009 |
1:00 p.m. local time |
Cancelled |
D8PP-10005 Limestone Boulders
Addendum 001 D8PP-10005 |
7/28/2009 |
1:00 p.m. local time |
D8PP-10005 Tabulation |
| D8PP-10004 Compact Tractor with Mower |
7/27/2009 |
1:00 p.m. local time |
D8PP-10004 Tabulation |
| D8PP-10003 Commercial Grade Zero Turn Mower |
7/02/2009 |
1:00 p.m. local time |
D8PP-10003 Tabulation |
| D8PP-10002 Crusher and Pug Mill Service |
7/09/2009 |
1:00 p.m. local time |
D8PP-10002 Tabulation |
| D8PP-9056 Hydraulic Post Driver |
6/12/2009 |
10:00 a.m. local time |
D8PP-9056 tabulation |
| D8PP-9055 Propane |
6/18/2009 |
1:00 p.m. local time |
D8PP-9055 Propane Tabulation |
| D8PP-9054 36 Inch Concrete Saw |
5/28/2009 |
1:00 p.m. local time |
D8PP-9054 Tabulation |
| D8PP-9053 LED Mini Light Bar |
5/20/2009 |
1:00 p.m. local time |
D8PP-9053 tabulation |
| D8PP-9052 Compact Tractor with Mower |
5/6/09 |
1:00 p.m. local time |
D8PP-9052 Tabulation |
D8PP-9041 Slide Repair
General Wage Order No. 52
SLIDE_J8P0787
Rte 14 Slide Repair_0
Rte 14 Slide Repair_1
Rte 14 Slide Repair_2
Rte 14 Slide Repair_3
Rte 14 Slide Repair_4
Rte 14 Slide Repair_5 |
05/14/2009 |
1:00 p.m. local time |
D8PP-9041 Tabulation
|
| D8PP-9051 Truck Mounted Changeable Message Sign |
05/12/2009 |
1:00 p.m. local time |
D8PP-9051Tabulation |
| D8PP-9027 Paint and Bead Gun Parts |
01/06/2008 |
1:00 p.m. local time |
D8PP-9027 tabulation |
| D8PP-9026 LED Mini Light Bar |
12/30/2008 |
1:00 p.m. local time |
D8PP-9026 tabulation |
| D8PP-9025 Motor Grader |
12/30/2008 |
10:30 a.m. local time |
|
| D8PP-9024 Storage Container |
12/12/2008 |
1:00 p.m. local time |
D8PP-9024 tabulation |
| D8PP-9011 Used Oil Disposal |
12/9/2008 |
1:00 p.m. local time |
D8PP-9011 Tabulation |
| D8PP-9023 Industrial Lighting |
12/04/2008 |
1:00 p.m. local time |
D8PP-9023 Tabulation |
| SFS 8 - 110508 MODIS System |
11/05/08 |
11/10/08 |
|
| D8PP-9021 Overhead Door Repair |
11/12/2008 |
1:00 p.m. local time |
D8PP-9021 Tabulation |
| D8PP-9019 Crane Service |
11/3/2008 |
1:00 P.M. local time |
D8PP-9019 Tabulation |
D8PP-9020 14000 LB Tandem Axle Trailer
Addendum 001 D8PP-9020 |
10/31/2008 |
1:00 P.M. local time |
D8PP-9020 Tabulation |
| D8PP-9018 Winter Cold Mix Material |
10/10/08 |
1:00 P.M. local time |
D8PP-9018 Tabulation |
| D8PP-9017 Tire Chains |
10/9/08 |
1:00 P.M. local time |
D8PP-9017 Tabulation |
D8PP-9015 Welded Steel Wire Fabric
MGS9215 Welded Steel Wire Fabric Spec
Addendum 001 D8PP-9015 |
9/23/08
9/26/08 |
1:00 p.m. local time |
D8PP-9015 Tabulation |
| D8PP-9016 Flu Vaccinations |
9/23/08 |
1:00 P.M. local time |
D8PP-9016 Tabulation |
| D8PP-9014 Bobcat 250 Welder |
9/22/08 |
1:00 p.m. local time |
D8PP-9014 Tabulation |
D8PP-9013 LD Salt Spreader
Addendum 001 D8PP-9013 |
9/22/08 |
1:00 p.m. local time |
D8PP-9013 Tabulation |
D8X2-9012 Spreader Stands
D8x2-9012 Drawing |
9/17/08 |
1:00 p.m. local time |
D8PP-9012 tabulation |
D8PP-9010 Pre-Cast Box Culvert
Addendum 001 - D8X2-9010 |
8/21/08 |
1:00 p.m. local time |
|
| D8PP-9009 Window Tint |
8/11/08 |
1:00 p.m. local time |
D8PP-9009 Tabulation |
| D8PP-9008 Corrugated Metal Pipe |
7/28/08 |
1:00 p.m. local time |
D8PP-9008 Tabulation |
| D8PP-9007 RT WW-T Seal Chips |
7/22/08 |
10:00 a.m. local time |
D8PP-9007 Tabulation |
| D8PP-9006 A36 Steel Plates |
7/8/08 |
3:00 p.m. local time |
D8PP-9006 Tabulation |
D8PP-9005 Gasboy Fuel System
Addendum 001 |
7/9/08
7/10/08 |
1:00 p.m. local time |
D8PP-9005 Tabulation |
| D8PP-9004 25 ft. Equipment Trailer |
7/10/08 |
1:00 p.m. local time |
D8PP-9004 Tabulation |
| D8PP-9003 Aerial Truck Inspections |
7/7/08 |
1:00 p.m. local time |
D8PP-9003 Tabulation |
| D8PP-9002 Residential Grade Zero Turn Mower |
7/08/08 |
1:00 p.m. local time |
D8PP-9002 Tabulation |
| D8PP-9001 Commercial Grade Zero Turn Mower |
7/08/08 |
1:00 p.m. local time |
D8PP-9001 Tabulation |
| D8X2-8056 Grass Seed |
5/30/08 |
1:00 p.m. local time |
D8X2-8056 tabulation |
D8X2-8055 Propane
D8X2-8055 Addendum 001 |
6/06/08 |
1:00 p.m. local time |
D8X2-8055 Tabulation |
| D8X2-8054 Cargo Trailers |
5/30/08 |
1:00 p.m. local time |
D8X2-8054 tabulation |
| D8X2-8053 Transportation of Incarcerated Personnel |
5/30/08 |
1:00 p.m. local time |
D8X2-8053 Tabulation |
| D8X2-8052 Pre-Cast Box Culvert |
5/11/08 |
1:00 p.m. local time |
D8X2-8052 tabulation |
| D8X2-8051 Summer Aggregate Bid |
5/15/08 |
1:00 p.m. local time |
D8X2-8051 Tabulation |
D8X2-8050 Bagged Concrete Masonry Repair
Qualified Product List |
4/18/08 |
1:00 P.M. local time |
D8X2-8050 Tabulation |
D8X2-8049 Erosion Control and Native Seeding
Project Plan Sheets 465-76 |
4/18/08 |
1:00 p.m. local time |
D8X2-8049 Tabulation |
| D8X2-8048 Pile Driving |
4/1/08 |
1:00 p.m. local time |
D8X2-8048 Tabulation |
D8X2-8045 Asphalt Overlay
Strafford Weight Station
D8X2-8045 elevation drawing |
4/8/08 |
1:00 p.m. local time |
D8X2-8045 Tabulation |
| D8X2-8046 Video Transmission Equipment |
4/4/08 |
1:00 p.m. local time |
D8X2-8046 Tabulation |
| D8X2-8047 Plant Pickup |
4/9/08 |
1:00 p.m. local time |
D8X2-8047 Tabulation |
| D8X2-8044 Planetary Auger Drive |
3/28/08 |
1:00 p.m. local time |
D8X2-8044 Tabulation |
D8X2-8043 Concrete Ready Mix
Addendum 001 Concrete Ready Mix D8x2-8043 |
3/21/08 |
1:00 p.m. local time |
D8X2-8043 tabulation 1 |
| D8X2-8042 Shaft Guard |
3/14/2008 |
1:00 p.m. local time |
D8X2-8042 Tabulation |
| D8X2-8041 Mowing Services |
3/13/2008 |
1:00 p.m. local time |
D8X2-8041 Tabulation |
D8X2-8040 LED SIGN
D8X2-8040 Specification and Drawing |
3/10/08 |
1:00 P.M. local time |
D8X2-8040 Tabulation |
| D8X2-8039 Engine Replacement |
2/26/08 |
10:00 a.m. local time |
D8X2-8039 Tabulation |
| D8X2-8038 Hydraulic Pump and Motor Assembly |
2/21/08 |
1:00 p.m. local time |
D8X2-8038 Tabulation |
| D8X2-8037 Shindaiwa Trimmer |
2/13/08 |
1:00 p.m. local time |
D8X2-8037 Tabulation |
D8X2-8036 Industrial Lighting
Addendum 001 D8X2-8036 |
1/24/08 |
1:00 p.m. local time |
D8X2-8036 Tabulation |
| D8X2-8035 Equipment Rental |
1/24/08 |
2:00 p.m. local time |
|
| SFS7 - 121007 Geomelt |
12/17/07 |
4:00 p.m. local time |
The Missouri Department of Transportation has determined that there is only one known source for GEOMELT 55 Anti-Icing/Deicing fluid in the Springfield, District 8 Areas. |
| D8X2-8034 Signal Controller Cabinet |
12/14/07 |
1:00 p.m. local time |
D8X2-8035 Tabulation |
| D8X2-8033 Tires-Recap |
12/20/07 |
1:00 p.m. local time |
D8X2-8033 Tabulation |
| D8X2-8032 Auger drive and Auger |
11/07/07 |
1:00 p.m. local time |
D8X2-8032 Tabulation |
| D8X2-8031 Signal Hardware |
11/06/07 |
1:00 p.m. local time |
D8X2-8031 Tabulation |
| D8X2-8030 Building Relocation |
10/23/07 |
1:00 p.m. local time |
D8X2-8030 Tabulation |
| SFS7-100907 Guardrail Mower
|
9/25/07 |
10/09/07 |
The Missouri Department of Transportation has determined that only one source, US Ditcher, Inc., can provide a hydraulic-drive guardrail mower with capabilities of being front or rear mounted on either the right or left side of a tractor. Questions may be directed to Richard Gardner at (417) 895-7811 or
richard.gardner@modot.mo.gov |
| D8X2-8029 Asphalt Overlay |
10/15/07 |
1:00 p.m. local time |
D8X2-8029 Tabulation |
| D8X2-8024 Used Trencher |
10/10/07 |
1:00 p.m. local time |
D8X2-8024 Tabulation |
| D8X2-8026 Flu Shots |
9/25/07 |
1:00 p.m. local time |
D8X2-8026 Tabulation |
| D8X2-8025 Office Chairs |
9/26/07 |
1:00 p.m. local time |
D8X2-8025 Tabulation |
| D8X2-8027 V-bed spreader stands |
9/20/07 |
1:00 p.m. local time |
D8X2-8027 Tabulation |
| D8X2-8022 Over the road tractor |
9/13/07 |
1:00 p.m. local time |
D8X2-8022 Tabulation |
| D8X2-8023 Pressure washers |
9/11/07 |
1:00 p.m. local time |
D8X2-8023 Tabulation |
| D8X2-8021 Cargo Trailer |
9/11/07 |
1:00 p.m. local time |
D8X2-8021 Tabulation |
| D8X2-8015 Heavy-duty winch straps |
9/07/07 |
1:00 p.m. local time |
D8X2-8015 Tabulation |
| D8X2-8020 Backhoe thumb attachment |
9/05/07 |
1:00 p.m. local time |
D8X2-8020 Tabulation |
| D8X2-8019 Hydraulic rock drill |
8/29/07 |
1:00 p.m. local time |
D8X2-8019 Tabulation |
| D8X2-8018 Ballasts and bulbs |
8/23/07 |
1:00 p.m. local time |
D8X2-8018 Tabulation |
| D8X2-8017 Tow-Type Hydraulic 8-Foot Rotary Road Broom |
8/22/07 |
1:00 p.m. local time |
D8X2-8017 Tabulation |
| D8X2-8016 Cargo Trailer |
8/22/07 |
2:00 p.m. local time |
Cancelled |
| D8X2-8012 Aggregate Material |
8/08/07 |
1:00 p.m. local time |
D8X2-8012 Tabulation |
D8X2-8007 Installation of Interactive Flasher
D8X2-8007 Drawing
Picture 1
Picture 2
Picture 3
Picture 4
Picture 5
Picture 6
Picture 7
Picture 8 |
8/08/07 |
1:00 p.m. local time |
D8X2-8007 Tabulation |
| D8X2-8010 Metal Building Materials |
8/03/07 |
1:00 p.m. local time |
D8X2-8010 Tabulation |
D8X2-8013 Winter Cold Mix
Addendum 001 |
8/02/07 |
1:00 p.m. local time |
D8X2-8013 Tabulation |
| D8X2-8011 Reversible Tailgate Conveyor |
8/02/07 |
1:00 p.m. local time |
D8X2-8011 Tabulation |
| D8X2-8009 Front Mount Broom |
7/31/07 |
1:00 p.m. local time |
D8X2-8009 Tabulation |
D8X2-8006 Storage containers
Addendum 001 |
7/31/07 |
1:00 p.m. local time |
D8X2-8006 Tabulation |
| D8X2-8003 Compact Tractor |
7/24/07 |
1:00 p.m. local time |
D8X2-8003 Tabulation |
| D8X2-8002 PROPANE |
7/24/07 |
1:00 p.m. local time |
D8X2-8002 Tabulation |
| D8X2-8008 Lumber |
7/23/07 |
1:00 p.m. local time |
D8X2-8008 Tabulation |
| D8X2-8005 Automatic standby generator system |
7/19/07 |
1:00 p.m. local time |
D8X2-8005 Tabulation |
| D8X2-8004 Concrete Saw |
7/16/07 |
1:00 p.m. local time |
D8X2-8004 Tabulation |
| D8X2-8001 Snow Plows |
7/13/07 |
1:00 p.m. local time |
D8X2-8001 Tabulation |
| D8X2-7061 Zero Turn Mower |
7/12/07 |
1:00 p.m. local time |
D8X2-7061 Tabulation |
| D8X2-7060 Concrete Saw |
7/11/07 |
1:00 p.m. local time |
Cancelled |
D8X2-7058 Installation of Permanent Lighting
D8X2-7058 Addendum 001
D8X2-7058 Addendum 002 |
6/29/07 |
1:00 p.m. local time |
|
| D8X2-7057 Drive unit and bits |
6/26/07 |
1:00 p.m. local time |
D8X2-7057 Tabulation |
D8X2-7056 Installation of Interactive Flasher
D8X2-7056 Addendum 001
Drawing of RT H and Z
existing picture 1
existing picture 2
existing picture 3
existing picture 4
existing picture 5
existing picture 6
existing picture 7
existing picture 8 |
6/28/07 |
1:00 p.m. local time |
Cancelled |
| SFS7 - 072707 Tasmanian Digger |
7/27/07 |
7/31/07 |
The Missouri Department of Transportation has determined that there is only one known source for the Tasmanian Digger, which is a one-man truck mounted hydraulic post-hole drilling machine. Accent Sales & Service Company is the sole manufacturer of the Tasmanian Digger and does not sell through dealers at this point. |
| D8X2-7055 Chain link fence materials |
6/5/07 |
1:00 p.m. local time |
D8X2-7055 Tabulation |
| D8X2-7054 Lumber and materials |
5/31/07 |
1:00 p.m. local time |
D8X2-7054 Tabulation |
D8X2-7053 Automatic standby generator system
Addendum 001 |
5/29/07 |
1:00 p.m. local time |
D8X2-7053 Tabulation |
D8X2-7051 Installation of Interactive Flasher
Addendum 001 D8X2-7051
Drawing of RT H and Z
existing picture 1
existing picture 2
existing picture 3
existing picture 4
existing picture 5
existing picture 6
existing picture 7
existing picture 8 |
5/29/07 |
1:00 p.m. local time |
NO BIDS RECEIVED. WILL BE RE-BID AT A LATER DATE. |
| D8X2-7052 Concrete sidewalk forming, pouring, and finishing |
5/23/07 |
1:00 p.m. local time |
D8X2-7052 Tabulation |
| D8X2-7050 Electrical Supplies |
5/14/07 |
1:00 p.m. local time |
D8X2-7050 Tabulation |
| D8X2-7049 Trucks with Knuckle Boom Loader and Operator |
4/30/07 |
1:00 p.m. local time |
D8X2-7049 Tabulation |
| D8X2-7048 Metal Building Materials |
4/27/07 |
1:00 p.m. local time |
D8X2-7048 Tabulation |
| D8X2-7047 Directional Fault Finder |
4/13/07 |
1:00 p.m. local time |
D8X2-7047 Tabulation |
| D8X2-7045 Metal Building Materials |
4/11/07 |
1:00 p.m. local time |
cancelled |
| D8X2-7039 Aggregate Material |
4/11/07 |
1:00 p.m. local time |
D8X2-7039 Tabulation |
| D8X2-7044 Paint Drain and Separator Cleaning |
4/10/07 |
1:00 p.m. local time |
D8X2-7044 Tabulation |
| D8X2-7043 Portable Toilets |
4/05/07 |
1:00 p.m. local time |
D8X2-7043 Tabulation |
| D8X2-7041 Cargo Trailer |
3/29/07 |
1:00 p.m. local time |
D8X2-7041 Tabulation |
| D8X2-7037 Plant Pickup Aggregate |
03/14/07 |
1:00 p.m. local time |
D8X2-7037 Tabulation |
| D8X2-7027 Concrete Ready-Mix |
03/13/07 |
1:00 p.m. local time |
D8X2-7027 Tabulation |
| D8X2-7036 Cargo Trailer |
03/07/07 |
2:00 p.m. local time |
D8X2-7036 Tabulation |
| D8X2-7035 Dimas 8700 conversion parts |
03/02/07 |
2:00 p.m. local time |
D8X2-7035 Tabulation |
| D8X2-7038 Engine Replacement |
03/01/07 |
10:00 a.m. local time |
D8X2-7038 Tabulation |
D8X2-7034 25 ft. Equipment Trailer
Addendum 001 |
02/26/07 |
2:00 p.m. local time |
D8X2-7034 Tabulation |
D8X2-7029 Educational Tools to Promote Roadway Safety
Addendum 001 |
02/26/07 |
10:00 a.m. local time |
|
| D8X2-7033 Backhoe Mechanical Thumb Attachment |
01/30/07 |
1:00 p.m. local time |
D8X2-7033 Tabulation Sheet |
| D8X2-7028 40 ft High Cube Storage Containers |
01/19/07 |
1:00 p.m local time |
D8X2-7028 Tabulation |
| D8X2-7032 Power Box Tractor Rake |
01/29/07 |
2:00 p.m. local time |
D8X2-7032 Tabulation |
| D8X2-7030 Self-propelled aerial lift rental |
01/17/07 |
1:00 p.m. local time |
D8X2-7030 Tabulation |
D8X2-7023 Native Seeding and Erosion Control
Plan sheets |
01/09/07 |
2:00 p.m. local time |
D8X2-7023 Tabulation |
| D8X2-7024 Grass and forb seed |
01/05/07 |
1:00 p.m. local time |
D8X2-7024 Tabulation |
| D8X2-7025 Tire Chains |
12/22/06 |
1:00 p.m. local time |
D8X2-7025 Tabulation |
| D8X2-7022 Diamond saw blades |
12/08/06 |
1:00 p.m. local time |
D8X2-7022 Tabulation |
D8X2-7020 Wood Fence Material
Addendum 001 |
11/17/06 |
1:00 p.m local time |
D8X2-7020 Tabulation |
| D8X2-7016 Reinforced Concrete Pipe |
11/15/06 |
1:00 p.m. local time |
D8X2-7016 Tabulation |
| D8X2-7021 Tailgate Spreader |
11/14/06 |
1:00 p.m. local time |
D8x2-7021 Tabulation |
| D8X2-7018 Winter Cold Patching Material |
11/08/06 |
1:00 p.m. local time |
D8X2-7018 Tabulation |
| D8X2-7019 Propane |
11/01/06 |
1:00 p.m. local time |
D8X2-7019 Tabulation |
| D8X2-7017 Canopy Cutter |
10/25/06 |
1:00 p.m. local time |
D8X2-7017 Tabulation Sheet |
| D8X2-7015 Snow Plow |
09/28/06 |
1:00 p.m. local time |
D8X2-7015 Tabulation Sheet |
| D8X2-7012 Unit Heaters |
09/28/06 |
1:00 p.m. local time |
D8X2-7012 Tabulation Sheet |
| D8X2-7013 RFQ Precast Box Culvert |
09/26/06 |
1:00 p.m |
D8X2-7013 Tabulation Sheet |
| D8X2-7014 RFQ Office Chairs |
09/19/06 |
1:00 p.m. |
D8X2-7014 Tabulation Sheet |
| D8X2-7010 D8 Window Replacement |
09/12/06 |
1:00 p.m. |
D8X2-7010 Tabulation Sheet |
| D8X2-7009 School Flasher |
09/13/16 |
1:00 p.m. |
D8X2-7009 Tabulation Sheet |
| D8X2-7008 Precast Box Culvert |
09/08/06 |
1:00 p.m. |
Cancelled |
D8X2-7004 Rotary Mowers
Addendum 001 |
09/06/06 |
1:00 p.m. |
D8X2-7004 Tabulation Sheet |
| D8X2-7007 Zero Turn Residential |
08/31/06 |
1:00 p.m. |
D8X2-7007 Tabulation Sheet |
| D8X2-7006 Commercial Grade Zero Turn Mower |
08/21/06 |
2:00 p.m. |
D8X2-7006 Tabulation Sheet |
D8X2-7003 Aluminum Box Culvert
Addendum 001
Addendum 002 |
08/17/06 |
1:00 p.m. |
D8X2-7003 Tabulation Sheet |
| D8X2-7002 ADIEM Replacement Modules |
08/01/06 |
1:00 p.m. |
D8X2-7002 Tabulation Sheet |
D8X2-7001 Labor & Materials to Install Overhead Door in Concrete Wall
D8X2-7001 Addendum 001
D8X2-7001 Addendum 002 |
07/28/06 |
1:00 p.m. |
|
RFB 6-060706G D08 District Uniform Bid
RFB 6-060706G Addendum 001 |
July 6, 2006 |
2:00 p.m. |
|
| D8X2-6067 36" Reinforced Concrete Pipe & End Sections |
07/06/06 |
2 p.m. CDT |
D8X2-6067 Tabulation Sheet |
| D8X2-6066 20' Flex Wing Rotary Cutter |
07/05/06 |
1 p.m. CDT |
D8X2-6066 Tabulation Sheet |
| D8X2-6063 RXQ ProLine, High Performance Polymer Modified Cold Asphalt |
05/26/06 |
06/02/06 |
The Missouri Department of Transportation has determined that there is only one known source for ProLine, High Performance Polymer Modified Cold Asphalt, that is supplied in a proprietary blend |
| D8X2-6061 RXQ Modified Aggregate Quick Set Surfacing System Installed |
05/12/06 |
05/18/06 |
The Missouri Department of Transportation has determined that there is only one known source for Modified Aggregate Quick Set Surfacing System installed. |
| D8X2-6064 7-12 Ton Dual Drum Vibratory Roller - 5 Month Lease |
06/20/06 |
1 p.m. CDT |
D8X2-6064 Tabulation Sheet |
| D8X2-6065 Truck Mounted Electric Crane - 3200 lb |
06/08/06 |
1 p.m. CDT |
D8X2-6065 Tabulation Sheet |
| D8X2-6062 New 4 Wheel Pneumatic Diesel Forklift – 6,000 LB. capacity |
06/01/06 |
1 p.m. CDT |
D8X2-6062 Tabulation Sheet |
| D8X2-6060 Flink HD6 Tail-Gate Replacement Spreader or equivalent |
05/23/06 |
1 p.m. CDT |
D8X2-6060 Tabulation Sheet |
| D8X2-6059 Sokkia model# SET1130R3 Long-Range Reflectorless Total Station surveying instrument or equivalent |
05/22/06 |
1 p.m. CDT |
D8X2-6059 Tabulation Sheet |
| D8X2-6058 Safety Slope End Sections for 15" pipe |
05/12/06 |
1 p.m. CDT |
D8X2-6058 Tabulation Sheet |
| D8X2-6057 Precast Box Culvert and Tapered End Sections |
05/04/06 |
1 p.m. CDT |
D8X2-6057 Tabulation Sheet |
| Single Feasible Source Bidding Opportunities: |
| Item |
Date Posted |
Response Date |
Vendor/Bid Information |
| SFS 7-12072012 Double Bladed Concrete Walk Behind Saw with Operator |
12/07/12 |
12/10/12 |
The Missouri Department of Transportation has determined that there is only one known source, Chester Bross Construction Company with Equipment and Operator for a double bladed walk-behind concrete saw capable of sawing 4-1/2” depth and sawing 3 slots per joint with1” slot spacing. This includes mobilization for all equipment to Benton County. |
| SFS 7-110912 Compact Skid Steer with 72 in Brush Hog -Bobcat |
11/9/12 |
11/13/12 |
The Missouri Department of Transportation has determined that there is only one known source of a 80 HP Compact Skid Steer with a 72” Brush Hog, Bobcat of Springfield has this equipment for $2800 per month and $1800 per month for the brush hog. |
| SFS 7-121105 Fastrac -Western Material and Design LLC |
11/05/12 |
11/09/12 |
The Missouri Department of Transportation has determined that there is only one known source of MoDOT Rapid Cement Premix (RPC) for pavement repair now referred to as “Fastrac”, Western Material & Design, LLC. Rapid Cement Premix (RPC) / Fastrac is one-component shrinkage compensated proprietary blend of cement, aggregates and performance enhancing chemical additives in 50lbs, 60lbs and 70lbs bags. This is used for horizontal concrete repairs that require high-early strength gain. Rapid Cement Premix (RPC) / Fastrac is a patent pending formulation that was developed exclusively for the DOT market. Included is the Bulk Fastrac Products not blended with aggregates at time of delivery. |
| SFS 7-102612 Best-Cormax Key System |
10/26/12 |
11/6/12 |
The Missouri Department of Transportation has determined that only one source, Stanley Security Systems., can provide BEST-Cormax door lock systems to provide consistent access through the Southwest District. Stanley Security Systems is the exclusive manufacturer and distributor for the BEST-Cormax door lock system. Purchases for BEST-Cormax door lock systems may exceed $25,000.00, initially or during the next year. A purchase order will be issued to Stanley Security Systems, on November 6, 2012 for the above-described material. |
| SFS 7-102912 Quick Change Oil Adapters |
10/29/12 |
10/31/12 |
Description: The Missouri Department of Transportation has determined that there is only one known source, Unique Truck Equipment has the following Quick Change Oil Drain Adapters, 25mm x 1.5 at $40.50 each, 18mm x 1.5 at $34.98 each, 1” x 18 UNF at $40.50 each, Small Adapter Drain Hoses at $14.63 and Large Adapter Hoses at $16.85 each, delivered. |
| SFS 7-102512 Leica Equipment Calibration |
10/25/12 |
10/29/12 |
The Missouri Department of Transportation has determined that only one source, Leica Geosystems, Inc., can provide calibration services for MoDOT owned Leica Model HDS4050 survey instrument. Leica Geosystems, Inc., is the sole manufacturer and distributor for Leica service and re-calibration. A purchase order for the approximate amount of $4400.00 may be issue to Leica Geosystems, Inc. on October 29, 2012 for the above-described material. |
| SFS 7-101012 PreMark Contrast Markings |
10/10/12 |
10/12/12 |
The Missouri Department of Transportation has determined that only one source, Flint Trading, Inc.., can supply PreMark® Contrast Markings. Flint Trading, Inc., is the sole manufacturer and distributor for PreMark® Contrast Markings. A purchase order for the approximate amount of $3500.00 may be issue to Flint Trading, Inc. on August 16, 2012 for the above-described material. |
| SFS 7-081612CS Rapid Installation Barrier System -RIBS- for Earth Stabilization |
8/16/12 |
8/20/12 |
The Missouri Department of Transportation has determined that there is only one known source for rapid installation Barrier System (RIBS) for earth stabilization that shall include Concrete fill in 2’ polypropylene bags with Technical Support and application of product by Certified Construction Co of Kentucky. MoDOT to supply labor and concrete pump and backfill equipment. 900 bags of concrete at $30.50 each, technical support at 16 hours at $145.00 per hour and mobilization to Southwest District $1,500.00, totaling $ 31,270.00. |
| SFS 7-081412 Etnyre Chipspreader Parts |
8/14/12 |
8/16/12 |
The Missouri Department of Transportation has determined that only one source, G.W. Van Keppel Co., can furnish repair parts for Etnyre Chipspreaders. G. W. Van Keppel Co., is the regional distributor of Etnyre Chipspreader Equipment. A purchase order for the approximate amount of $3800.00 may be issue to G. W. Van Keppel Co. on August 16, 2012 for the above-described equipment. |
| SFS 7-061412SW Lura Lightning Screed |
6/14/12 |
6/18/12 |
The Missouri Department of Transportation has determined that only one source, Lura Enterprises, Inc., can provide the Department with a Lura Lightning Screed. Lura Enterprises is the sole source for sales, parts and services for Lura Lightning Screeds in the Missouri region. A purchase order for the approximate amount of $8800.00 may be issued to Lura Enterprises, Inc., for the above-described equipment. |
| SFS 7-051112SW Ultralyte 100LR with DBC |
5/11/12 |
5/15/12 |
The Missouri Department of Transportation has determined that only one source, Laser Technology, Inc., can provide the Department with a Ultralyte 100 LR w/DBC radar speed gun. Laser Technology, Inc., is the sole distributor of Ultralyte 100LR w/DBC radar guns in the United States. This equipment will be purchased as part of the Blueprint for Safer Roadways Program and the purchase price will not exceed $4000.00. |
| SFS 7-050212SW Pro-Tainer Pro-Tilt Recycling Trailer |
5/2/12 |
5/4/12 |
The Missouri Department of Transportation has determined that only one source, Pro-Tainer, Inc., can provide the Department with a Pro-Tainer, Pro-Tilt Recycling Trailer. Pro-Tainer, Inc. is the sole manufacturer of Pro-Tainer Pro-Tilt Recycling trailers. A purchase order for the approximate amount of $11,000.00 may be issued to Pro-Tainer, Inc., for the above-described equipment. |
| SFS 7-050112SW Haenni Load O Meter |
5/1/12 |
5/3/12 |
The Missouri Department of Transportation has determined that only one source, Loadometer Corporation, can provide the Department with Haenni Model WL101 wheel load weighers. Loadometer is the sole source for sales, parts and services for Haenni and Cie.AG’s in the United States. A purchase order for the approximate amount of $19,5800.00 may be issued to Loadometer Corporation, for the above-described equipment. |
| SFS 7-040212 Easy Cover Housing |
4/2/12 |
4/4/12 |
The Missouri Department of Transportation has determined that there is only one known source, Aero Industries, for Easy Cover Housing, P/N: ECK450UH25V5 at $1495.00 each. |
| SFS 7-031512 Pave Patch 3000 |
3/15/12 |
3/18/12 |
The Missouri Department of Transportation has determined that there is only one known source, Construction Anchor, for Conspec Pave Patch 3000 rapid set concrete patching material used for bridge repairs. The Pave Patch 3000 is supplied in 50 lb bags at $16.25 per bag and is an approved material. |
| SFS 7-031212 ATSI Conflict Monitor |
3/12/2012 |
3/14/2012 |
The Missouri Department of Transportation has determined that there is only one known source for the ATSI Conflict Monitors and Testing Equipment. Pinkley Sales Company is the sole Distributor for the state of Missouri, for the ATSI conflict monitors and testing equipment. |
| SFS7 - 030612 NSC Training Literature |
3/6/2012 |
3/8/2012 |
The Missouri Department of Transportation has determined that there is only one known source, Safety Council of the Ozarks, as the regional distributor for National Safety Council CPR/AED/First Aid training literature. A purchase order for the approximate amount of $4700.00 may be issued to the Safety Council of the Ozarks, on March 8, 2012. |
| SFS 7-111121SW Elgin Parts |
11/17/2011 |
11/21/2011 |
The Missouri Department of Transportation has determined that only one source, Key Equipment & Supply Co., can furnish OEM repair parts for Elgin Street Sweepers. Key Equipment & Supply Co. is the regional distributor of Elgin Street Sweeper Equipment. A purchase order for the approximate amount of $3500.00 may be issue to Key Equipment & Supply Co.,for the above-described equipment. |
| SFS 7-111011 Hot Mix Asphalt |
11/08/2011 |
11/10/2011 |
The Missouri Department of Transportation – Southwest District, has determined that only one source, C. B. Asphalt, Inc., can provide BP-1 hot mix asphalt for plant pickup from a quarry in the Warsaw, Benton County area. C. B. Asphalt has a portable asphalt plant in use in Benton County for producing material for an overlay project and has provided MoDOT with material from this temporary plant. Material from this plant is close to the jobsite and represents a freight savings as opposed to traveling large distances to pick up material. |
| SFS 7-111020 GL400 Parts |
10/20/2011 |
10/31/2011 |
The Missouri Department of Transportation Southwest District has determined that only one source, Certified Power/Component Technology, of Bridgeton, MO can provide the department with proprietary parts for GL400 systems. The approximate value of this purchase is estimated at an approximate cost of between $25,000 to $30,000. Issues with this purchase may be directed to Cathy Bay @ 417-621-6354 or Cathy.Bay@modot.mo.gov. |
| SFS - 7-SW110927 On Line Interactive Oil Analyses with Oil Kits |
9/27/11 |
9/28/11 |
The Missouri Department of Transportation has determined that there is only one known source of Oil Analyses with On-Line Interactive Reporting capabilities. Staveley Services out of Kansas City KS is the only supplier for the On-Line Interactive Oil Analyses process used by our Oil Suppliers in the past two years, supplying us with oil sample kits monthly at $115.20 per 10 packs |
| SFS7 - 110830 Gibraltar Cable Barrier Parts |
08/18/2011 |
08/30/2011 |
|
| SFS 7-100727 Geomelt C |
8/3/11 |
8/5/11 |
|
| SFS 7-071111 Lubra Seal |
07/11/2011 |
07/13/2011 |
|
| SFS SW-110708 SealTekkT Asphalt |
07/08/2011 |
07/12/2011 |
|
| SFS 7-063011 M-B Striper Repair Parts |
06/30/2011 |
07/7/2011 |
|
| SFS 7-062811 Miovision Automated Traffic Counting Systems |
06/28/2011 |
07/11/2011 |
|
| SFS 7-051111 CTS Low P Cement |
05/11/2011 |
05/13/2011 |
|
| SFS 7 - 040611 Quick Stand |
04/06/2011 |
04/08/2011 |
|
| SFS7-032911 Western Material |
3/29/2011 |
4/8/2011 |
|
| SFS7-032511 Industrial Hydraulic Technology Class |
3/25/2011 |
3/30/2011 |
|
| SFS7-010711 RWIS Weather Station Repair |
1/7/2011 |
1/17/2011 |
|
| |
|
|
|
| |
|
|
|
| ATSI 2600 - T Monitor Tester SFS7-110310 |
11/03/2010 |
11/08/2010 |
|
| SFS7-100510 Microline 1000 |
10/5/2010 |
10/8/2010 |
|
| SFS 7 - 0090910 Silspec 900 |
9/9/2010 |
9/13/2010 |
|
| Audible Pedestrian Signal - SFS7-090110 |
9/01/2010 |
9/07/2010 |
|
| SFS 7 - 082010 Parts for GL 400 System |
8/20/2010 |
8/30/2010 |
|
| SFS 7 - 081910 Repair Parts for Daimond Boom Mower |
8/19/2010 |
8/24/2010 |
|
| SFS7 - 070610 Kimco Salt Conveyor Parts |
7/6/2010 |
7/9/2010 |
|
| SFS7 - 052610 Bridge-Mate |
5/26/2010 |
6/7/2010 |
|
| Tasmanian Digger - SFS9-011110 |
1/25/2010 |
02/05/2010 |
|
| SFS Quote -9-011110 Tasmanian Digger |
01/12/2010 |
01/20/2010 |
|
| SFS 7-110509 Striper Rebuild |
10/23/2009 |
11/5/2009 |
|
| SFS7 - 101309 Dredging |
9/29/2009 |
10/13/2009 |
|
| SFS7 - 100109 Toilet Paper |
9/25/2009 |
10/01/2009 |
|
| SFS 7 - 081209 Quixote Surface Patrol System |
8/12/2009 |
8/14/2009 |
|
| SFS 7 - 081109 John Deere Industrial Engine repair |
8/11/2009 |
8/13/2009 |
|
| SFS 7-071409 Western Material |
7/14/2009 |
7/26/2009 |
|
| SFS 7 - 0600209 Elgin Street Sweeper Parts |
6/2/2009 |
6/5/2009 |
|
| SFS 7 - 050109 Forney Material Testing Equipment |
5/1/2009 |
5/5/2009 |
|
| SFS7 - 082208 Gibraltar Cable Barrier System |
8/22/08 |
9/4/08 |
The Missouri Department of Transportation has determined that there is only one known source for median guard cable replacement parts for the Gibraltar Cable Barrier System that is installed on MODOT maintained roadways in the Springfield – District 8 Area. Multiple purchases shall be made during the contract period. Total expenditures during the contract period, in whole or in part, may exceed $25,000. |
| SFS7-062608 Modified Aggregate Quick Set |
6/26/08 |
7/7/08 |
The Missouri Department of Transportation has determined that only one source, Donelson Construction Company, LLC, can provide the department with Modified Aggregate Quick Set (MAQS) Surfacing System®. Modified Aggregate Quick Set (MAQS) Surfacing System®, is an asphalt resurfacing material that is produced and installed on the job site, often in ¼” thickness. |
| SFS 8 - 042808 Quick Stand |
4/28/08 |
5/06/08 |
The Missouri Department of Transportation has determined that there is only once source who can provide the the producted listed below. Quick Stand is a NCHRP 350 compliant temporary ground mount sign support. It is specifically used as a sign support for rollup work zone signs. Sierra Safety is the sole manufacturer and sole distributor of Quick Stand. |
| SFS7 - 032907 ENCOM Wireless Data Solutions |
03/29/07 |
4/10/07 |
The Missouri Department of Transportation has determined that there is only one authorized dealer for ENCOM Wireless Data Solutions products in the state of Missouri. ENCOM radio systems are the only systems available that provide full support for the capabilities of existing BiTRAN signal firmware. Estimated expenditures for ENCOM products are expected to exceed $25,000 for a one year period. |
| SFS 7-011007 Interstate Grade Curb System |
01/10/07 |
01/18/07 |
The Missouri Department of Transportation has determined that there is only one known source for FG 300 Interstate Grade Curb System to fit current "Flexi-Guide, 300 Series FG336 UR and FG318 UR" Island Tubular Delineators. |
| SFS 7 - 010907 Rapid Cement |
01/09/07 |
01/17/07 |
The Missouri Department of Transportation has determined that only one source, Western Material & Design, LLC, can provide the department with Rapid Cement-Rapid Pavement Repair Cement. Rapid Cement is a one-component shrinkage compensated proprietary blend of cements and performance enhancing chemical additives. |
| SFS7 - 102506 Geomelt 55 Deicing Fluid |
10/25/06 |
10/31/06 |
The Missouri Department of Transportation has determined that there is only one known source for GEOMELT 55 Anti-Icing / deicing fluid in the Springfield, District 8 areas. |
Title |
Closing Date |
Closing Time
(DST) |
Tabulations |
RFQ D7-11-047 Asphalt Pad for Joplin Airport
Addendum 001
Annual Wage Order 18_WO049 |
May 23, 2011 |
1:00 PM Local Time |
RFQ D7-11-047 Asphalt Pad Joplin Airport-Quote Tabs |
| D7-11-048 RFQ Traffic Signal Mast and Arm |
May 19, 2011 |
1:00 PM Local Time |
|
| D7-11-046 RFQ Elevator Maintenance Services |
May 11, 2011 |
1:00 PM Local Time |
D7-11-046 Elevator Maintenance Service Agreement Bid Tab |
D7-11-037 RFB Streambank Stablization_BigDryWood_Route_54_Vernon Co
D7-11-037 Attachment A_Special Provisions
D7-11-037 Attachment B - Special Provisions Construction
D7-11-037 Exhibit A - Traffic Control
D7-11-037 Exhibit B - Construction and Material Specifications
D7-11-037 Exhibit C - Plan Sheets_DSR 217-10-001 EWP Project
D7-11-037 Exhibit D - General Wage Order 54
Contractor Pre-Qualification Required |
April 26, 2011 |
1:00 p.m. Local Time |
All Bids Rejected. |
| RFB D7-11-044 Salt Conveyor and Hopper |
April 25, 2011 |
1:00 p.m. Local Time |
Bid Cancelled |
D7-11-045 RFB Traffic Signal Battery Backup Systems_Cabinets
D7-11-045 Addendum 001 |
April 20, 2011 |
1:00 p.m. Local Time |
D7-11-045 Traffic Signal Battery Backup Systems_Cabinets Bid Tab |
| D7-11-039 RFB Special Gradation Spec 4C Aggregate |
April 19, 2011 |
1:00 p.m. Local Time |
D7-11-039 Spec 4C Special Gradation Aggregate Bid Tab |
| RFB D7-11-042 Cement Silo 200 Barrel Low-Profile |
April 18, 2011 |
1:00 p.m. Local Time |
RFB D7-11-042 Cement Silo- Bid Tabs |
| D7-11-043 RFB Aluminum Sign Stands |
April 13, 2011 |
1:00 p.m. Local Time |
D7-11-043 TwinFlex Sign Stands TF60-RUB Bid Tab |
D7-11-033 RFB ADA Compliance_WB and EB Rest Area_Rte I-44 Lawrence Co
D7-11-033 ATTACHMENT A Special Provisions
D7-11-033 Exhibit A Plan Sheets for D7-11-033 Project
D7-11-033 Exhibit B - General Wage Order 54
Contractor Pre-Qualification Required |
April 13, 2011 |
1:00 p.m. Local Time |
D7-11-033 ADA Compliance_WB and EB Rest Area_Rte I-44_Lawrence Co_Bid Tab |
D7-11-030 RFB Driveway Improvements_RteFF_Jasper_County
D7-11-030 Exhibit A_Plan_Sheets
D7-11-030 Exhibit B General Wage Order 54
Contractor Pre-Qualification Required |
April 6, 2011 |
1:00 p.m. Local Time |
D7-11-030 Driveway Improvements_RteFF_JasperCo_Bid Tab |
| RFQ D7-11-041 Parking Lot Seal Coating |
April 5, 2011 |
1:00 p.m. Local Time |
BID CANCELLED |
| D7-11-038 RFB Commercial Hot or Cold Mix Price Agreement |
March 31, 2011 |
1:00 p.m. Local Time |
|
D7-11-031 RFB Stream Bank Stablization_Seligman Branch_Route DD_Barry County
D7-11-031 Attachment A Special Provisions
D7-11-031 Attachment B Special Provisions Construction
D7-11-031 Exhibit A Traffic Control
D7-11-031 Exhibit B Construction and Material Specifications
D7-11-031 Exhibit C Plan Sheets DSR_009-10-003
D7-11-031 Exhibit D General Wage Order 54
Contractor Pre-Qualification Required |
March 30, 2011 |
1:00 p.m. Local Time |
D7-11-031 Stream Bank Stablization Route DD Barry Co. Bid Tab |
| RFB D7-11-035 Chip Seal Lease Equipment |
March 28, 2011 |
1:00 p.m. Local Time |
RFB D7-11-035 Chip Seal Rental Equipment- Bid Tabs |
D7-11-029 RFB ADA Compliance_Welcome Center Route I-44_Newton County
D7-11-029 Attachment A - Special Provisions
D7-11-029 Exhibit A - Plan Sheets for ADA Compliance_Welcome Center I44_Newton Co
D7-11-029 Exhibit B - General Wage Order 54
Contractor Pre-Qualification Required |
March 23, 2011 |
1:00 p.m. Local Time |
D7-11-029 ADA Compliance_Welcome Center_I-44 Newton Co Bid Tab |
D7-11-024 RFB Plant Mix Oil Material_ El Dorado Springs
D7-11-024 Addendum 001 |
March 17, 2011 |
1:00 p.m. Local Time |
D7-11-024 Plant Mix Oil Material Bid Tab |
D7-11-023 RFB Streambank Stablization _Trent Creek_Route 90_McDonald County
D7-11-023 Attachment A
D7-11-023 Attachment B
D7-11-023 Exhibit A Traffic Control
D7-11-023 Exhibit B Construction and Material Specifications
D7-11-023 Exhibit C Plan Sheets DSR 119-10-001 EWP Project
D7-11-023 Exhibit D General Wage Order 54
D7-11-023 Addendum 001 |
Feb 23, 2011
March 16, 2011 |
1:00 p.m. Local Time |
D7-11-023 Stream Bank Stablization Route 90 McDonald Co. Bid Tab |
| RFB D7-11-034 -Vibratory Roller Rentals |
March 11, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-034 Vibratory Steel Wheel Rollers- Bid Tabs |
| RFQ -D7-11-036 Galvanized Guardrail Supplies |
March 10, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-036 Galvanized Guard Rail Supplies. Bid Tabulations |
RFQ D7-11-032 Well Drilling at Anderson MoDOT
Annual Wage Order 17_WO060 |
Feb 28, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-032 Well Drilling Services. Bid Tabs |
| RFQ D7-11-027-A Preventive Maintenance Sectional Bay Doors |
Feb 24, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-027-A Preventive Maintenance Sectional Bay Doors- Bid Tabs |
| RFQ D7-11-027 Preventive Maintenance Sectional Overhead Doors |
Feb 10, 2011 |
1:00 p.m. Local Time |
To Be Rebid |
| RFQ -D7-11-025 Under Tail Gate Spreaders |
Feb 8, 2011 |
1:00 p.m. Local Time |
|
| RFQ -D7-11-026 Stump Grinder Rental |
Feb 3, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-026 Stump Grinder Bid Tabs |
| RFB D7-11-018 Recapped tires |
Jan 26, 2011 |
1:00 p.m. Local Time |
RFB D7-11-018 Recapped Tire-Bid Tabs |
| RFQ -D7-11-022 Elliptical Metal Pipe |
Jan 6, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-022 Elliptical Metal Pipe-Quote Tabs |
| RFQ -D7-11-019 Battery Consignment Services |
Dec 27, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-019 Battery Consignment Program- Bid Tabulations |
RFB D7-11-020 Trash Collection and Disposal Services Bid
Page 8-Pricing Sheet |
Dec 17, 2010 |
1:00 p.m. Local Time |
RFB D7-11-020 Trash Collection and Disposal-Bid Tabs |
RFQ D7-11-021 HDPE Pipe
MGS9213
Sec1047 |
Dec 16, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-021-HDPE Pipe-Tabulations |
| |
|
|
|
D7-11-016 RFQ Fire Extinguisher Inspections |
Oct 18, 2010 |
1:00 p.m. Local Time |
|
RFQ D7-11-017 REBAR |
Oct 15, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-017 Number 4 Rebar-Quote Tabs.xlsx |
RFQ D7-11-013 Right of Entry Preparation Work |
Oct 13,2010 |
1:00 p.m. Local Time |
RFQ D7-11-013 Right of Entry Preparation Work-Quote Tabs |
D7-11-012 RFB Concrete Commercial Mix Fixed Pricing
D7-11-012 RFB Exhibit 1 B-2 Mix Design |
Oct 6, 2010 |
1:00 p.m. Local Time |
D7-11-012 Commercial Mix Concrete Bid Tab |
RFQ D7-11-015 Precast 3 x 6 Wash Bay Pits |
Sept 30, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-015 Precast 3 x 6 Wash Bay Pits-Quote Tabs |
RFQ -D7-11-014 Concrete Separator Tanks
Separator Tank |
Sept 28, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-014 Concrete Separtor Tanks -Quote Tabs |
RFQ D7-11-011 Concrete Blocks for Lamar Fabric Building |
Sept 9, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-011 Concrete Blocks Lamar Fabric Building-Quote Tabs |
RFQ D7-11-010 Asphalt Pad for Lamar Fabric Building |
Sept 8, 2010 |
1:00 p.m. Local Time |
Quote Cancelled |
RFQ -D7-11-006 Catering Meals-2010 Health Fair |
August 17, 2010 |
1:00 p.m. Local Time |
D7-11-006 Catering Meals 2010 Health Fair-Bid Tabs |
RFQ -D7-11-009 Materials for Weigh Station Scale Repairs |
August 13, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-009 Various Steel Materials Weigh Station Scale Repair-Quote Tabs |
D7-11-007 RFQ Vending Machine Canopy |
August 12, 2010 |
1:00 p.m. Local Time |
CANCELED - TO BE REBID |
RFQ -D7-11-008 Portable Water Coolers -Evaporative |
August 10, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-008 Portable Water Coolers-Evaporative-Quote Tabs |
RFB D7-11-002 Heavy Equipment with Operators
Addendum 001
Annual Wage Order 18_WO049 |
July 19, 2010 |
1:00 p.m. local time |
Blanket Bid |
RFB D7-11-001 Bulk Oil-Semi-Annual-2011 |
July 15, 2010 |
1:00 p.m. Local Time |
D7-11-001 Bulk Oil Bid Tabulation |
D7-11-004 RFQ Cleaning Service for Rags_Mops |
July 14, 2010 |
1:00 p.m. Local Time |
D7-11-004 Cleaning Services for Rags_Mops Bid Tab |
D7-11-005 Diamond Product Saw Blades
MGS9001 |
July 12, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-005 Diamond Saw Blades-Quote Tabs |
D7-11-003 RFQ TwinFlex Sign Stands |
July 8, 2010 |
1:00 p.m. Local Time |
D7-11-003 RFQ TwinFlex Sign Stands Bid Tab |
D7-10-064 Schulte Mower Parts |
June 23, 2010 |
1:00 p.m. Local Time |
Quote Canceled |
RFQ D7-10-062 Tree Removal-Bates and St. Clair Counties |
June 9, 2010 |
1:00 p.m. Local Time |
To be Rebid |
RFQ D7-10-063 Computer Mount Desk for Automobiles |
June 6, 2010 |
1:00 p.m. Local Time |
RFQ D7-10-063 Computer Mount Desks-Quote Tabs |
RFQ D7-10-061 Truck Shells - Caps |
May 25, 2010 |
1:00 p.m. Local Time |
RFQ D7-10-061 Truck Shells-Caps-Quote Tabs |
RFQ D7-10-060 Culvert Pipe Installation Bates County |
May 10, 2010 |
1:00 p.m. Local Time |
D7-10-060 Bid Tabs- Pipe Installation-Bates County |
D7-10-058 RFQ Remove Tile_ Repair and Overlay Bathroom Floors Main Office |
May 6, 2010 |
1:00 p.m. Local Time |
|
D7-10-057 RFB Traffic Signal Battery Backup Systems_Cabinets |
May 5, 2010 |
1:00 p.m. Local Time |
D7-10-057 Bid Tab Traffic Signal Battery Backup Systems_Cabinets |
RFQ D7-10-059 Oil Tanks |
April 29, 2010 |
1:00 p.m. Local Time |
RFQ D7-10-059 Oil Tanks -Quote Tabs |
RFQ D7-10-056 Concrete Blocks for Neosho Fabric Building |
April 21, 2010 |
1:00 p.m. Local Time |
RFQ D7-10-056 Concrete Blocks Neosho Fabric Building-Quote Tabs |
D7-10-014 RFQ Elevator Maintenance Services |
April 21, 2010 |
1:00 p.m. Local Time |
No Responses |
RFB D7-10-053 Guardrail Installation Route 71 Bates County
D7-10-053 Addendum 001-Guardrail Installation Bates County |
April 20, 2010 |
1:00 p.m. Local Time |
RFB D7-10-053 Bid Tab Guardrail Installation Rte 71 Bates County |
RFQ D7-10-055 Asphalt Pad for Neosho Fabric Building
D7-10-055 Addendum 001-Asphalt Pad for Neosho Fabric Building
D7-10-055 Addendum 002-Asphalt Pad for Neosho Fabric Building |
Apirl 15, 2010 |
1:00 p.m. Local Time |
RFQ D7-10-055 Asphalt Pad Neosho Fabric Building-Quote Tabs |
D7-10-27 Oil tank bid form
Bid Canceled |
April 15, 2010 |
1:00 p.m. Local Time |
Bid Canceled |
D7-10-054 RFQ Aggregate Price Agreement_Plant Pickup |
April 14, 2010 |
1:00 p.m. Local Time |
|
D7-10-051 RFQ Fuel Island Electrical Upgrade Anderson
D7-10-051 Attachment A_NEC Article 514 |
April 8, 2010 |
2:00 p.m. Local Time |
D7-10-051 RFQ Fuel Island Electrical Upgrade Anderson Bid Tab |
D7-10-050 RFQ Fuel Island Electrical Upgrade Neosho
D7-10-050 Attachment A_NEC Article 514 |
April 8, 2010 |
1:30 p.m. Local Time |
D7-10-050 RFQ Fuel Island Electrical Upgrade Neosho Facility Bid Tab |
D7-10-049 RFQ Fuel Island Electrical Upgrade Joplin General Services
D7-10-049 Attachment A_NEC Article 514 |
April 8, 2010 |
1:00 p.m. Local Time |
D7-10-049 RFQ Fuel Island Electrical Upgrade Joplin GS Facility Bid Tab |
D7-10-048 RFQ Fuel Island Electrical Upgrade Monett
D7-10-048 Attachment A_NEC Article 514 |
April 7, 2010 |
2:00 p.m. Local Time |
D7-10-048 RFQ Fuel Island Electrical Upgrade Monett Facility Bid Tab |
D7-10-047 RFQ Fuel Island Electrical Upgrade Sarcoxie
D7-10-047 Attachment A_NEC Article 514 |
April 7, 2010 |
1:30 p.m. Local Time |
D7-10-047 RFQ Fuel Island Electrical Upgrade Sarcoxie Facility Bid Tab |
D7-10-046 RFQ Fuel Island Electrical Upgrade Mt. Vernon
D7-10-046 Attachment A_NEC Article 514 |
April 7, 2010 |
1:00 p.m. Local Time |
D7-10-046 RFQ Fuel Island Electrical Upgrade Mt. Vernon Facility Bid Tab |
D7-10-041 RFB Commercial Hot or Cold Mix Price Agreement |
March 30, 2010 |
1:00 p.m. Local Time |
D7-10-041 Hot Mix_Cold Mix Bid Tabulation |
D7-10-052 Shot Rock for Rte 90_McDonald Co |
March 29. 2010 |
10:00 a.m.
Local Time |
D7-10-052 RFQ Shot Rock to Rte 90 McDonald Co bid tab |
D7-10-045 RFQ Fuel Island Electrical Upgrade Carthage
D7-10-045 Attachment A_NEC Article 514 |
March 25, 2010 |
2:30 p.m. Local Time |
D7-10-045 RFQ Fuel Island Electrical Upgrade Carthage Facility Bid Tab |
D7-10-044 RFQ Fuel Island Electrical Upgrade Lamar
D7-10-044 Attachment A_NEC Article 514 |
March 25, 2010 |
2:00 p.m. Local Time |
D7-10-044 RFQ Fuel Island Electrical Upgrade Lamar Facility Bid Tab |
D7-10-043 RFQ Fuel Island Electrical Upgrade Greenfield
D7-10-043 Attachment A_NEC Article 514 |
March 25, 2010 |
1:30 p.m. Local Time |
D7-10-043 RFQ Fuel Island Electrical Upgrade Greenfield Facility Bid Tab |
D7-10-042 RFQ Fuel Island Electrical Upgrade Stockton
D7-10-042 Attachment A_NEC Article 514 |
March 25, 2010 |
1:00 p.m. Local Time |
D7-10-042 RFQ Fuel Island Electrical Upgrade Stockton Facility Bid Tab |
D7-10-040 RFQ Fuel Island Electrical Upgrade Collins
D7-10-040 Attachment A_NEC Article 514 |
March 24, 2010 |
2:30 p.m. Local Time |
D7-10-040 RFQ Fuel Island Electrical Upgrade Collins Facility Bid Tab |
D7-10-039 RFQ Fuel Island Electrical Upgrade El Dorado Springs
D7-10-039 Attachment A_NEC Article 514 |
March 24, 2010 |
2:00 p.m. Local Time |
D7-10-039 RFQ Fuel Island Electrical Upgrade ElDorado Springs Facility Bid Tab |
D7-10-038 RFQ Fuel Island Electrical Upgrade Nevada
D7-10-038Attachment A_NEC Article 514 |
March 24, 2010 |
1:30 p.m. Local Time |
D7-10-038 RFQ Fuel Island Electrical Upgrade Nevada Facility Bid Tab |
D7-10-037 RFQ Fuel Island Electrical Upgrade Butler Facility
D7-10-037 Attachment A_NEC Article 514 |
March 24, 2010 |
1:00 p.m. Local Time |
D7-10-037 RFQ Fuel Island Electrical Upgrade Butler Facility Bid Tab |
RFQ D7-10-036 Culvert Pipe Installation Vernon County |
March 23, |
1:00 p.m. Local Time |
D7-10-036 Bid Tabs- Pipe Removal and Installation-Vernon County |
RFB D7-10-034 Tree Removal Services |
March 22, 2010 |
1:00 p.m. Local Time |
|
RFB D7-10-035- Pumping Sewage Holding Tanks |
March 16, 2010 |
1:00 p.m. Local Time |
RFQ D7-10-035 Pumping Holding Tanks Bid Tabs |
RFB D7-10-029 Fabrication of Spreader Stands
Sander Stand Drawing
D7-10-029 Addendum 001
10 ft spreader stands Drawings.tif
10 foot Stand P1010367
10 foot Stand P1010371 |
March 2 , 2010 |
1:00 p.m. Local Time |
D7-10-029 Sander Stand Fabrication-Bid Tabs |
RFB-D7-10-032 Heavy Equipment Rental-Lease
D7 Location of Buildings |
Feb 18, 2010 |
1:00 p.m. Local Time |
D7-10-032 Heavy Equip Rental-Bid Tabs-protected |
D7-10-033 RFQ Signal Change Services_College and Coler |
Feb 17, 2010 |
1:00 p.m. Local Time |
D7-10-033 BidTab Signal Change Services |
D7-10-013R RFB Solar_Cell Phone School Flashers |
Jan 20, 2010 |
1:00 p.m. Local Time |
D7-10-013R Bid Tab Solar School Flashers |
RFQ D7-10-027 Pumping Out Separator Tank-Monett MO |
Jan 15, 2010 |
1:00 p.m. Local Time |
D7-10-027 Pumping Out Separator Tank- Quote Tabulations |
D7-10-030 RFQ Rental of Aerial Bucket Truck |
Jan 14, 2010 |
1:00 p.m. Local Time |
D7-10-030 RFQ Rental of Aerial Bucket Truck Bid Tab |
RFQ D7-10-028 Zero Turn Radius Mower |
Jan 14, 2010 |
1:00 p.m. Local Time |
RFQ D7-10-028 Zero Turn Radius Mower-Quote Tabs |
RFQ D7-10-031 Reconditioned Oil Containers |
Jan 11, 2010 |
1:00 p.m. Local Time |
D7-10-031 Reconditioned Oil Containers-bid tabs |
d7-10-018-a bulk oil bid
MGS9212
Addendum 001-D7-10-018-A Bulk Oil Bid |
Jan 12, 2010 |
1:00 p.m. Local Time |
D7-10-018-A-Bulk Oil Bid Tabulations |
RFQ D7-10-026 Auger Bucket Truck Rentals |
Dec 31, 2009 |
1:00 p.m. Local Time |
RFQ D7-10-026 Auger Bucket Truck Rentals-Quote Tabs |
RFQ D7-10-025 Auger Bucket Truck Rental |
Dec 23, 2009 |
1:00 p.m. Local Time |
To be Rebid |
D7-10-017 RFB Harvest Timber |
Dec 22, 2009 |
1:00 p.m. Local Time |
No Responses |
RFQ D7-10-023 Purchase and Installation Tower Lighting System
Addendum 001-D7-10-023 Tower Lighting System with Alarm |
Dec 18, 2009 |
1:00 p.m. Local Time |
Quote Tabs D7-10-023 -Purchase Installation of Tower Lighting System |
RFQ D7-10-022 Purchase and Installation Wireless lighting Alarm
Addendum 001-D7-10-022 Wireless Lighting Alarm
Addendum 002-D7-10-022 Wireless Lighting Alarm |
Dec 18, 2009 |
1:00 p.m. Local Time |
Quote Tabs D7-10-022 -Purchase Installation of Alarm System |
RFB D7-10-018 Bulk Oil Bid-Semi-Annual-2010
MGS9212 |
Dec 16, 2009 |
1:00 p.m. Local Time |
To be Rebid |
RFQ D7-10-024 Aerial Bucket Truck Rental |
Dec 10, 2009 |
1:00 p.m. Local Time |
D7-10-024 Aerial Bucket Truck Rental-Quote Tabs |
RFQ D7-10-021 Corrugated Metal Pipe
MGS9111
Sec0725
Sec1020
Sec1022 |
Dec 10, 2009 |
1:00 p.m. Local Time |
D7-10-021 Corrugated Metal Pipe-Quote Tabulations |
D7-10-019 RFQ Type 4 Rock Ditch Liner |
Dec 3, 2009 |
1:00 p.m. Local Time |
D7-10-019 RFQ Type 4 Rock Ditch Liner Bid Tab |
D7-10-007 Streambank Stablization Route DD Barry County
D7-10-007 Attachments A and B_NRCS_BigSugarCreek
D7-10-007 Exhibit A Construction Specifications
D7-10-007 Exhibit B DSR 009_09_002 EWP Plan Sheets_Sealed
D7-10-007 Exhibit C Traffic Control
D7-10-007 Exhibit D and E Worker Eligibility Affidavits |
Dec 2, 2009 |
1:00 p.m. Local Time |
D7-10-007 Streambank Stablization Route DD Barry County Bid Tab |
D7-10-020 Bark Oil Blue LT |
Nov 18, 2009 |
1:00 p.m. local Time |
D7-10-020 Bark Oil Blue LT and Herbicides-Bid Tabulations |
D7-10-015 RFB Guardrail Installation Route 86 Barry County
D7-10-015 Addendum 001 |
Nov 10, 2009
Nov 17, 2009 |
1:00 p.m. Local Time |
D7-10-015 Bid Tab Guardrail Installation Rte 86 Barry County |
D7-10-012-A Rug cleaning |
Nov 6, 2009 |
1:00 p.m. Local Time |
D7-10-012-A Rug Rental-Cleaning Tabulations |
D7-10-013 RFB Solar_Cell Phone School Flashers |
Nov 3, 2009 |
1:00 p.m. Local Time |
To be rebid |
D7-10-016 Corrugated Metal Pipe-48 Inch |
Oct 29, 2009 |
1:00 p.m. Local Time |
RFQ D7-10-016 Corrugated Metal Pipe - Tabulations |
D7-10-011 RFB On-Call Detector Loop Installation Fixed Pricing |
Oct 14, 2009 |
1:00 p.m. Local Time |
D7-10-011 Installation of Inductance Loops Bid Tab |
D7-10-012 RFQ Rug Cleaning |
Oct 6, 2009 |
1:00 p.m. Local Time |
No responses/to be rebid |
D7-10-010 RFQ Fire Extinguisher Inspections |
Oct 6, 2009 |
1:00 p.m. Local Time |
D7-10-010 Annual Fire Extinguisher Inspection Bid Tab |
RFQ D7-10-009 Telescopic Pole Trailer |
Sept 30, 2009 |
1:00 p.m. Local Time |
Bid Cancelled |
D7-10-006 Preventive Pest Control Services
D7-10-006 ADDENDUM 001 |
Sept 15, 2009 |
1:00 p.m. Local Time |
D7-10-006 Pest Control Bid Tabulations |
RFQ D7-10-002-A Underbelly Plow Installation |
Sept 8, 2009 |
1:00 p.m. Local Time |
Bid Cancelled |
RFQ -D7-10-008 Catering Service 2009 Snow Academy |
Sept 4, 2009 |
1:00 p.m. Local Time |
Quote Tabs D7-10-008 -Catering Service 2009-10 Snow Academy |
RFQ D7-10-005 Fifth Wheel Converter Dolly |
Sept 2, 2009 |
1:00 p.m. Local Time |
Bid Tab-D7-10-005 Fifth Wheel Converter Dolly |
D7-10-004 RFB Concrete Fixed Pricing |
August 20, 2009 |
1:00 p.m. Local Time |
D7-10-004 Commercial Mix Concrete Bid Tab |
RFQ D7-10-002 Underbelly Plow Installation |
August 8, 2009 |
1:00 p.m. Local Time |
To be rebid |
RFQ D7-10-005 Fifth Wheel Converter Dolly |
July 28, 2009 |
1:00 p.m. Local Time |
No Responses |
RFQ D7-10-001 Culvert Pipe Installation Vernon County |
July 28, 2009 |
1:00 p.m. Local Time |
D7-10-001 Bid Tabs- Pipe Removal and Installation-Vernon County |
D7-10-003 RFQ Lateral Rock |
July 27, 2009 |
1:00 p.m. Local Time |
D7-10-003 RFQ Lateral Rock Bid Tab |
D7-09-070 Sidewalk and Curb Construction_Rte Y Barry County
D7-09-070 Addendum 001
D7-09-070 Addendum 002 |
July 16, 2009 |
1:00 p.m. Local Time |
D7-09-070 Sidewalk and Curb Construction_ Rte Y Barry County Bid Tab |
RFQ D7-09-071 Parking Lot Seal Coating
Addendum-001-D7-09-071 Parking Lot Seal Coating |
July 10, 2009 |
1:00 p.m. Local Time |
D7-09-071 Tabulations-Parking Lot Seal Coating |
D7-09-065 RFB Demolition Project 7th Street_Duquesne to Rte 249 |
July 1, 2009 |
1:00 p.m. Local Time |
D7-09-065 Demoltion and Improvement Services Bid Tab |
RFB-D7-09-068-Heavy Equipment with Operators |
June 30, 2009 |
1:00 p.m. Local Time |
RFB D7-09-068 Heavy Equipment-Operator Services-Tabulations |
RFB D7-09-069 Bulk Oil-Semi-Annual-2009
MGS9212 |
June 26, 2009 |
1:00 p.m. Local Time |
D7-09-069-Bulk Oil Bid Tabulations |
RFQ D7-09-064 Culvert Pipe Installation Barton-Vernon Cty |
June 17, 2009 |
1:00 p.m. Local Time |
D7-09-064 Bid Tabulations- Pipe Installation Projects |
D7-09-067 RFQ Bridge Crane |
June 16, 2009 |
1:00 p.m. Local Time |
D7-09-067 BidTab |
RFB-D7-09-063 Janitorial Services- MoDOT District Office |
June 10 , 2009 |
1:00 p.m. Local Time |
Bid Cancelled |
D7-09-057 RFQ Spec 4 Grade C Seal Rock |
June 8, 2009 |
1:00 p.m. Local Time |
D7-09-057 BidTab |
D7-09-058A RFB Lightweight Aggregate for Chip Seal |
May 21, 2009 |
1:00 p.m. Local Time |
D7-09-058A BID Tab |
RFB D7-09-060A Concrete Pipe and Curb Inlets
MGS9210; Sec1026 |
May 14, 2009 |
1:00 p.m. Local Time |
D7-09-060A-Concrete Pipe and Curb Inlets-Bid Tabulations |
SFS 7-101207 Trimble GPS Equipment |
Dec 7, 2010 |
Dec 17, 2010 |
The Missouri Department of Transportation has determined that only Seiler Instrument can provide MoDOT with proprietary upgrades and compatible GPS equipment. District 7 is currently needing to replace aging and outdated parts of the Trimble GPS systems that MoDOT Distruct 7 is using. Seiler Instrument is the regional distributor for Trimble equipment in the District 7 area. Seiler Instrument is also allowing trade-in discounts when purchaseing new equipment. Purchases relating to this Trimble GPS equipment are estimated to be $63,408.00
Please direct questions regarding this SFS to Cathy Bay at (417) 621-6354 or via email at Cathy.Bay@modot.mo.gov |
SFS-100825-Coreslab Structures-Bridge Panels |
Aug 25, 2010 |
Sept 7, 2010 |
The Missouri Department of Transportation has determined that there is only one known source for manufacturing concrete bridge slabs/panels to a specific size of 17’. Coreslab Structures, Kansas City MO will manufacturer (14) each 6” Precast Concrete Bridge Panels to 17’ long for $3,012.50 a panel. Delivery is included in this price. |
SFS 7-100811 Pave Patch 3000 |
Aug 11, 2010 |
Aug 13, 2010 |
The Missouri Department of Transportation has determined that there is only one known source, Construction Anchor, for Conspec Pave Patch 3000 rapid set concrete patching material use for bridge repairs. The Pave Patch 3000 is supplied in 50 lb bags at $15.75 per bag and is an approved material. |
SFS 7-100727 Geomelt C |
July 27, 2010 |
Aug 9, 2010 |
The Missouri Department of Transportation has determined that only one source, Smith Fertilizer & Grain, Knoxville, Iowa can furnish the Department with Geomelt C (Beet Juice and Calcium Chloride mixed) at $1.20 per gallon. MoDOT plans to use a couple of loads of this product to compare against straight Calcium Chloride and Straight Geomelt 55 and record the differences between products. |
SFS 7-100727 Geomelt C |
July 27, 2010 |
Aug 8, 2010 |
The Missouri Department of Transportation has determined that only one source, Smith Fertilizer & Grain, Knoxville, Iowa can furnish the Department with Geomelt C (Beet Juice and Calcium Chloride mixed) at $1.20 per gallon. MoDOT plans to use a couple of loads of this product to compare against straight Calcium Chloride and Straight Geomelt 55 and record the differences between products. |
SFS 7-100721 SealTekk |
July 21, 2010 |
July 23, 2010 |
The Missouri Department of Transportation (Distrct 7) has determined that only one known source can provide the department with SealTekk asphalt. SealTekk is a polymerized cationic emulsified asphalt product utilized as a high performance emulsion for use in chip seal applications. It shall be capable of allowing a faster break and superior adhesion to aggregate than conventional chip seal emulsions such as CRS-2P. The emulsion shall be engineered to the specific aggregate on the project to ensure maximum compatibility and highest performance. Performance of the end product will be validated using the ASTM D-7000 sweep testing procedure. Application rate shall vary according to the demands of the pavement but shall typically be in the range of 0.30-0.40 gal/sq yard for use with MoDOT Spec 4 chip seal aggregate limestone. Purchases relating to this product are not expected to exceed $25,000.00 individually and/or cumulatively during the MoDOT pilot project. This pilot project is needed for additional testing.
Please direct questions regarding this SFS to Mary Teel at (417) 621-6356 or via email at Mary.Teel@modot.mo.gov |
SFS 7-100714 Rapid Crete-Fastrac Cement |
July 14, 2010 |
July 19, 2010 |
The Missouri Department of Transportation has determined that there is only one known source of MoDOT Rapid Cement Premix (RPC) for pavement repair now referred to as “Fastrac”, Western Material & Design, LLC. Rapid Cement Premix (RPC) / Fastrac is one-component shrinkage compensated proprietary blend of cement, aggregates and performance enhancing chemical additives in 50lbs, 60lbs and 70lbs bags. This is used for horizontal concrete repairs that require high-early strength gain. Rapid Cement Premix (RPC) / Fastrac is a patent pending formulation that was developed exclusively for the DOT market. Included is the Bulk Fastrac Products not blended with aggregates at time of delivery. |
SFS 7-100630 SealTekk |
June 30, 2010 |
July 6, 2010 |
The Missouri Department of Transportation (Distrct 7) has determined that only one known source can provide the department with SealTekk asphalt. SealTekk is a polymerized cationic emulsified asphalt product utilized as a high performance emulsion for use in chip seal applications. It shall be capable of allowing a faster break and superior adhesion to aggregate than conventional chip seal emulsions such as CRS-2P. The emulsion shall be engineered to the specific aggregate on the project to ensure maximum compatibility and highest performance. Performance of the end product will be validated using the ASTM D-7000 sweep testing procedure. Application rate shall vary according to the demands of the pavement but shall typically be in the range of 0.30-0.40 gal/sq yard for use with MoDOT Spec 4 chip seal aggregate. Purchases relating to this product will not exceed $25,000.00 individually and/or cumulatively during the MoDOT pilot project.
Please direct questions regarding this SFS to Mary Teel at (417) 621-6356 or via email at Mary.Teel@modot.mo.gov |
SFS 7-100517-Snap Tite Pipe Liner |
May 17, 2010 |
May 19, 2010 |
The Missouri Department of Transportation has determined that there is only one known source, ISCO for Snap-Tite Culver Lining system that allows snap together pieces using solid wall high density polyethylene pipe meeting ASTM D3212 requirements. The snap-tite pipe is then filled with a low density cellular grout, which fills any voids between roadway and cuvert, delivering a rehabbed culvert. ISCO can offer this product at $21.27 a foot for 14” which will include 32.5 m/f of snap tite pipe, HDPE 3408, 50’ lay length, 3 pieces of 50’. |
SFS 7-100401 Tra Vis Traffic Vision with InSync Traffic Adaptive System |
04/01/10 |
04/13/10 |
The Missouri Department of Transportation has determined that there is only one known source for purchasing Tra Vis Traffic Vision with InSync Traffic Adaptive System. This system is an adaptive traffic signal control system, which detects and collects vehicle data by processing video images and automatically optimizes the changing of traffic signals in response to real-time traffic demands. Unlike other traffic control systems that use common cycle lengths, this system uses principles of robotics and artificial intelligence to optimize traffic flow. Purchases relating to this system are estimated @$450,000 over a 2 year period.
Please direct questions regarding this SFS to Cathy Bay at (417) 621-6354 or via email at Cathy.Bay@modot.mo.gov |
SFS 7-100326 Precision Daylighting Inc-UPRHD Drilling |
03/26/10 |
03/30/10 |
The Missouri Department of Transportation has determined that there is only one known source for drilling through solid rock in minutes using a Mission Sandvic Drill Hammer, with a 875 Sullair Compressor, while maintaining a 125PSI. Precision Daylighting Inc. will perform drilling through solid rock and cleaning out culvert pipe with a 3000 PSI Tornado Hydro Vac Truck. MoDOT Plans to have Precision Daylighting perform these tasks for a one day period each at $2700 per day for rock drilling and $2800 per day for Hydro Vacuuming Culverts. If (2) days is required, the cost will drop $100 per day for each task. |
SFS - 7-100226 On Line Interactive Oil Analyses and sample kits |
02/26/10 |
03/02/10 |
The Missouri Department of Transportation has determined that there is only one known source of Oil Analyses with On-Line Interactive Reporting capabilities. Staveley Services out of Kansas City KS is the only supplier for the On-Line Interactive Oil Analyses process used by our Oil Suppliers in the past two years, supplying us with oil sample kits monthly at $105.00 per 10 packs |
SFS 7-100205 Wash Bay Pits |
02/05/10 |
02/09/10 |
The Missouri Department of Transportation has determined that there is only one known source, Scurlock Industries that can supply the Department with Precast 3 X 6 wash bay pits, 6” walls and Neenah R-4990 mx Trench drain with frame for $2091.00 each. |
SFS 7-091022 Concrete Screed |
10/22/09 |
10/26/09 |
The Missouri Department of Transportation has determined that Lura Enterprises, LLC is the only one known source for a Gas Powered, Lightweight, adjustable to different lengths Concrete Screed. The Luralightning Strike Power Screed comes complete with Contractor Package: 50 cc Gas Motor, 20ft tube, 12 ft tube, 6 ft tube, 4 ft tube, tripod stands (3 ea), metal handle, Motor Side Riser Wheel, 6 in wall plug and 18 in wall plug for $7, 645.26 with shipping. This is being offered as 30 demo with option to purchase. |
SFS 7-090702-All Steel Weed Wiper |
07/02/09 |
07/05/09 |
The Missouri Department of Transportation has determined that there is only one known source, Glassworks Weed Wiper in Strafford MO for an All Steel Construction including roller and frame weed wiper including a 3-point tractor hitch and 60 gallon tank. |
SFS 7-090605 Pave Patch 3000 |
06/05/09 |
06/09/09 |
The Missouri Department of Transportation has determined that there is only one known source, Construction Anchor, for Conspec Pave Patch 3000 rapid set concrete patching material used for bridge repairs. The Pave Patch 3000 is supplied in 50 lb bags and is an approved material |
D7-09-059 RFQ Relocation of Traffic Signal and Pull Box M66 and Maiden Lane |
May 12, 2009 |
1:00 p.m. Local Time |
D7-09-059 BidTab |
RFQ-D7-09-060 Concrete Pipe and Curb Inlets
MGS9210
Sec1026 |
May 7, 2009 |
1:00 p.m. Local Time |
Cancelled-To Be Rebid. |
D7-09-058 RFB Lightweight Aggregate for Chip Seal |
April 30, 2009 |
1:00 p.m. Local Time |
Rejected; Being Re-Issued |
D7-09-056 RFQ Crushed Porphyry Trap Rock |
April 21, 2009 |
1:00 p.m. Local Time |
D7-09-056 Bid Tabulation |
RFQ D7-09-054 Force Fed Tail Gate Conveyers |
April 9, 2009 |
1:00 p.m. Local Time |
D7-09-054 Force Fed Tail Gate Conveyer-Bid Tabs |
D7-09-051 Demolition Project Route 66 Jasper County J7S0594B2
D7-09-051 Addendum 001 |
April 7, 2009
April 16, 2009 |
1:00 p.m. Local Time |
D7-09-051 Demoltion and Improvement Services Bid Tab |
D7-09-052 RFQ B-2 Commercial Mix Concrete for Bridge Deck Repair
D7-09-052 Exhibit 1 |
March 27, 2009 |
1:00 p.m. Local Time |
D7-09-052 Bid Tabulation |
RFB D7-09-053 - Schulte 20 Foot Mowers-FX520 Rotary Mower |
March 26, 2009 |
1:00 p.m. |
D7-09-053 Tabulations - Schulte 20 Foot Mowers |
RFB D7-09-050 -Vibratory Roller Rentals |
March 23, 2009 |
1:00 p.m. Local Time |
D7-09-050 Vibratory Roller Rental Tabulations-2009 |
D7F-09-003 FM06 Signal roof re-coat
Scope of Work for Signal roof re-coat
Terms and Conditions Standard |
March 27, 2009 |
1:00 p.m. Local Time |
D7F-09-003 Bid Tab |
D7-09-048 RFB Hot and Cold Mix Price Agreement |
March 18, 2009 |
1:00 p.m. Local Time |
D7-09-048 Hot Mix_Cold Mix Bid Tabulation |
D7-09-049 RFQ Service to install Interactive Flasher System and Street Lighting at Intersection of M37 and RteB_C_Barry Co |
March 16, 2009 |
1:00 p.m. Local Time |
|
D7-09-045 RFQ AMP Electrical Components
D7-09-045 Addendum 001 |
March 13, 2009
Changed to
March 16, 2009
same time |
1:00 p.m. Local Time |
D7-09-045 Bid Tabulation |
RFB D7-09-046 - Chip Seal Lease Equipment |
March 12, 2009 |
1:00 p.m. Local Time |
D7-09-046 Chip Seal Equipment-Bid Tabs |
D7-09-042RFB Route 60 and 60B Signal Change |
March 6, 2009 |
1:00 p.m. Local Time |
D7-09-042 BidTab Signal Change Services on Rt 60 and 60B |
D7-09-047 RFQ Service to install Interactive Flasher System and Street Lighting at Intersection of M96 and M43_Jaspser Co |
March 3, 2009 |
1:00 p.m. Local Time |
D7-09-047 Bid Tab |
D7-09-043 RFQ Self Propelled Airless Striper |
Feb 17, 2009 |
1:00 p.m. Local Time |
D7-09-043 Self-Propelled Airless Striper Bid Tab |
RFQ D7-09-044 Auger Bucket Truck Rental |
Feb 17, 2009 |
1:00 p.m. Local Time |
D7-09-044 Auger Bucket Truck Rental-Bid Tabs |
RFB D7-09-038 Bulk Oil Bid
MGS9212
D7-09-038-ADDENDUM 001 |
Feb 11, 2009 |
1:00 p.m. Local Time |
D7-09-038-Bulk Oil Bid Tabulations |
D7-09-041 RFQ Advance Wireless Flashers |
Feb 4, 2009 |
1:00 p.m. Local Time |
D7-09-041 Bid Tab Advance Wireless Flashers |
D7-09-040 RFQ Truck Mounted Full Matrix Changeable Message Sign |
Feb 3, 2009 |
1:00 p.m. Local Time |
D7-09-040 RFQ Bid Tab Truck Mounted Full Matrix Changeable Message Sign |
D7-09-032 Consignment Supplies
Stock Inventory Turns Information
D7-09-032 addendum001 |
Feb 3, 2009
Addendum Changed to
Feb 14 2009 |
1:00 p.m. Local Time |
Canceled |
SFS 7-090414-Hydro-Static Culvert Pipe Cleaner |
04/14/09 |
04/24/09 |
The Missouri Department of Transportation has determined that there is only one known source CIMCOR-Fort Worth, Texas can supply a Rota-JETTER - Hydro-Static Self Propelled Power Culvert Pipe Cleaner with dual hydro-static pump system (21cc & 10cc), 16 HP, 435 gallon water tank, PTO & w/powered wheel drive, 21” x 11”-6” Tubeless Mud Tires, controls and 9”, 11”, 13”, 16”, 18”, 22” and 28” augers. Boring Pilot Bit: 3-1/2” bit, dirt/soft rock, carbide teeth, and safety control tool/aiming device, with 12 each 10’ long cleaning rods. Included is 7,000GVWR Heavy Duty Dual Axle trailer. Includes in-field training. $28,650 |
SFS 7-090407 Vertical Drill |
04/07/09 |
04/09/09 |
The Missouri Department of Transportation has determined that there is only one known source, Logan Contractors that can supply a vertical EZ Drill, Model 20UTL for $7,385.00 |
SFS 7-090402 TTMA-Folding Arrowboard-Assembled |
04/02/09 |
04/06/09 |
The Missouri Department of Transportation has determined that there is only one known source for a TMA-100 Trailer Mounted Attenuator and FLF 4X8 Folding Arrowboard frame (installed) for $17,275.00 |
SFS 7-090209 GL400 Parts |
02/09/09 |
02/20/09 |
The Missouri Department of Transportation District 7 has determined that only one source, Certified Power/Component Technology, of Bridgeton, MO can provide the department with proprietary parts for GL400 systems. The approximate value of this purchase is estimated at a cost of $26,673.93. Issues with this purhase may be directed to Cathy Bay @ 417-629-3223 or Cathy.Bay@modot.mo.gov. |
D7-09-037 RFB Interactive Flasher Equipment |
Jan 30, 2009 |
1:00 p.m. Local Time |
D7-09-037 Bid Tab Interactive Flasher Equipment |
D7-09-030 Demolition and Improvement Services Route 66 Jasper County
D7-09-030 RFB Addendum 001 |
Jan 27, 2009 |
1:00 p.m. Local Time |
D7-09-030 Demoltion and Improvement Services Bid Tab |
RFB-D7-09-031 Janitorial Services-Construction Offices
ADDENDUM 001- D7-09-031 |
Jan 23, 2009 |
1:00 p.m. Local Time |
RFB D7-09-031 Tabulations-Janitorial Services |
D7-09-039 RFQ GL400 Parts |
Jan 20, 2009 |
1:00 p.m. Local Time |
ALL BIDS REJECTED
WILL REBID |
RFQ D7-09-036 High Pressure Hot Water Washer |
Jan 13, 2009 |
1:00 p.m. Local Time |
ALL BIDS REJECTED
WILL REBID
SPECIFICATION CHANGE AND CLARIFICATIONS |
RFQ D7-09-035 Aerial Bucket Truck Rental
D7-09-035 ADDENDUM 001 |
Jan 9, 2009 |
1:00 p.m. Local Time |
D7-09-035 Aerial Bucket Truck Rental-Tabulations |
RFQ - D7-09-034 Cargo Trailer |
Jan 9, 2009 |
1:00 p.m. Local Time |
RFQ D7-09-034 Cargo Trailer-Bid Tabulations |
D7-09-033 RFQ Service to install Interactive Flasher System and Street Lighting at Intersection of M66_Black Cat Rd |
Dec 31, 2008 |
1:00 p.m. Local Time |
D7-09-033 Install Interactive Flasher and Street Lighting Bid Tab |
RFB-D7-09-029 -Concrete Culvert Pipe
MGS9210 |
Dec 30, 2008 |
1:00 P.M. Local Time |
RFB D7-09-029-Concrete Pipe Tabs |
D7-09-028 RFQ HDPE Pipe
MGS9213 |
Dec 18, 2008 |
1:00 P.M. Local Time |
D7-09-028 HDPE Pipe- Bid Tabulations |
D7-09-027 RFQ Traffic Signal Mast and Arm |
Dec 17, 2008 |
1:00 P.M. Local Time |
D7-09-027 Bid Tab Signal Mast and Arm |
D7-09-026 QuickCrete Concrete |
Dec 03, 2008 |
1:00 P.M. Local Time |
D7-09-026 Quickcrete Bid Tabs |
SFS 7-090113 Mastr III_SXHMCX VHF Repeater |
01/13/09 |
01/15/09 |
The Missouri Department of Transportation District 7 has determined that only A&W Communications Inc. can provide the Department with a proprietary radio VHF Repeater (Mastr III-SXHMCX). The approximate value of this purchase is estimated at a cost of $8,100.83. issues with this purchase may be directed to Cathy Bay @ 417-629-3223 or Cathy.Bay@modot.mo.gov. |
SFS 7-081219 Herbicide Blend |
12/19/08 |
12/22/08 |
The Missouri Department of Transportation has determined that there is only one known source, UAP, that can supply the Department with a herbicide blend of 20% Garlon, 3% Stalker and 77% Bark Oil Blue for $42.25 per gallon. |
SFS 7-091125 Portable Traffic Control System |
12/3/08 |
12/13/08 |
The Missouri Department of Transportation has determined that only one source, Horizon Signal Technologies Inc., Malvern, PA can provide the Department with at least one Portable Traffic Control System ( PTCS) with enclosed transportation trailer with lock downs. The PTCS shall consist of four self-contained, portable signal carts. Each cart shall provide a vertical telescoping upright with one signal head, radio communication system, controller, 12-volt battery system to provide minimum 72 hours of continuous operation and a 110-volt battery charger. The signal head shall consist of three (red, amber and green) 12-inch diameter LED signal indications and visors. The System shall include a wireless radio communication package, micro-terminal, work zone indicator light, wireless remote, unlimited technical support and training on the system. The PTCS shall be able to operate in a fix-time, traffic-actuated or manual-control mode. Design and operations of the units shall comply with the Federal Highways Administration’s (FHWA) Manual on Uniform Traffic Control Devices and must meet NCHRP 350 Test Level 3. |
D7-09-020 Demolition and Improvement Services Route FF Newton_Jasper Counties. |
Nov 26, 2008 |
1:00 P.M. Local Time |
D7-09-020 Demoltion and Improvement Services Bid Tab |
D7-09-025 Henke Underbelly Plow Installation |
Nov 25, 2008 |
1:00 P.M. Local Time |
D7-09-025 Henke Underbelly Plow Installation Bid Tabs |
D7-09-024 Tilt-Equipment Trailer
Addendum-1 D7-09-024 |
Nov 21, 2008 |
1:00 P.M. Local Time |
D7-09-024 Tilt Equipment Trailer-Tabulations |
D7-09-022 RFQ LED Radar Speed Display Sign Rebid |
Nov 18, 2008 |
10:00 A.M. Local Time |
D7-09-022 BidTab |
RFB D7-08-021 Trash Collection and Disposal Services Bid |
Nov 18, 2008 |
1:00 P.M. Local Time |
D7-09-021Trash Collection and Disposal - Bid Tabs |
D7-09-022 RFQ LED Radar Speed Display Sign |
Nov 3, 2008 |
1:00 P.M. Local Time |
No Award - All bids rejected
Will be re-bid. |
D7-09-019 RFQ Cleaning of Paint Separators |
Oct 28, 2008 |
1:00 P.M. Local Time |
D7-09-019BidTab |
D7-09-018 RFQ Propane Tank Rental for Joplin Welcome Center |
Oct 15, 2008 |
1:00 P.M. Local Time |
|
D7-09-013 RFB Boulder Removal and Ditch Clearing Services_Rte 54 St.Clair County |
Oct 8, 2008 |
1:00 P.M. Local Time |
D7-09-013 Bid Tab Boulder Removal Rte 54 St. Clair Co. |
SFS 7-081001 Sasco Macro Deck |
10/01/08 |
10/11/08 |
The Missouri Department of Transportation has determined that only one source, Sasco Pavement Coatings, Inc., Springfield MO can furnish District 7’s Bridge Department with Star Macro Deck Bridge Deck and Crack Sealer. This material is an OR MoDOT approved penetrating clear product, which will waterproof and not discolor bridge deck. The material allows the elimination of blotter material to absorb excess material and may be utilized by traffic as soon as dried without exhibiting residual tracking. |
SFS - 7-080930 Rapid Crete |
09/30/08 |
10/10/08 |
The Missouri Department of Transportation has determined that there is only one known source of MoDOT Rapid Cement Premix (RPC) for pavement repair, Western Material & Design, LLC. Rapid Cement Premix (RPC) is one-component shrinkage compensated proprietary blend of cement, aggregates and performance enhancing chemical additives in 70lbs bags. This is used for horizontal concrete repairs that require high-early strength gain. Rapid Cement Premix (RPC) is a patent pending formulation that was developed exclusively for the DOT market. |
SFS 7-080925 Trimble GPS |
09/25/2008 |
10/06/2008 |
The Missouri Department of Transportation (District 7) has determined that only Seiler Instrument can provide the Department with proprietary upgrades and compatible GPS equipment. District 7 is currently using Trimble GPS systems in our Survey and Construction Departments. MoDOT District 7 has determined the need to have compatibility of using the same brand of GPS equipment to integrate crews, without having to acquire additional training because of purchasing different types of equipment. This will reduce training time and allow more opportunities to share resources. If equipment problems develop and the system doesn’t work properly then pieces can be replaced a piece at a time to identify the source of the problem. The Trimble office software is compatible with District 7’s existing GPS systems. Seiler Instrument is the regional distributor for Trimble equipment in the District 7 area. Seiler Instrument is also offering the previous Missouri contract price on this purchase and allowing a trade-in offer for a limited time on specific pieces. Purchases relating to this product are estimated to be $68,508. Questions relating to this single feasible source posting may be directed to Cathy Bay at 417-629-3223 or via email at cathy.bay@modot.mo.gov. |
SFS 7-080916 Save a life Tour |
09/10/2008 |
09/16/2008 |
- We are providing the Save a Life tour to three high schools in the area. They are East Newton, Miller, and Webb City. It costs about $5400 for each school.
The save a life tour multi-million dollar drinking and driving simulators are the only simulators in the nation that give participants a completely realistic, sober perspective on the effects of driving while intoxicated. With massive tour posters on display, high intensity videos rolling on huge monitors, and our charismatic show presenters engaging both participants and onlookers alike, no one that experiences the Save a Life Tour will leave unaffected. Just call us and ask why we're considered the "shock jocks of anti-drunk driving."
Please direct any questions regarding this SFS to Janet Doty at (417) 629-3227 or via email at janet.doty@modot.mo.gov |
D7-09-017 RFQ Commercial Mix Concrete for Partial Depth Bridge Deck Repair |
Sept 29, 2008 |
1:00 P.M. Local Time |
|
RFQ - D7-09-016-A 6- Ton Static or Vibratory Roller |
Sept 18, 2008 |
1:00 P.M. Local Time |
Bid Tabs-D7-09-016-A - Six -6-Ton Static Rollers |
RFQ D7-09-016 One-Ton Static Rollers |
Sept 12, 2008 |
1:00 P.M. Local Time |
Bid Tabs-D7-09-016 - One-Ton Static Rollers |
RFQ D7-09-015 Box Culvert Pipe- St. Clair County |
Sept 11, 2008 |
1:00 P.M. Local Time |
D7-09-015 Tabulations - Box Culvert Pipe |
D7-09-014 Crane with Operator-McDonald CO Pipe |
Sept 11, 2008 |
1:00 P.M. Local Time |
Bid Tabs-D7-09-014 Crane w Operator-Box Culvert McDonald CO |
RFQ -D7-09-011- Catering Service 2008 Rodeo |
Sept 3, 2008 |
1:00 P.M. Local Time |
D7-09-011-Bid Tabs -Catering Service 2008 Rodeo |
SFS 7-080811 ProLine TM |
08/11/2008 |
08/21/2008 |
The Missouri Department of Transportation (District 7) has determined that only one known source, Logan County Asphalt Co. located in Guthrie, Oklahoma, can produce ProLine TM. ProLine TM is a proprietary design of a polymer modified high performance cold asphalt pothole patching material. Multiple purchases shall be made during the contract period ( August 21, 2008 - December 31, 2009). Total expenditures during the contract period, in whole or in part, may exceed $25,000.00.
Please direct any questions regarding this SFS to Cathy Bay at (417) 629-3223 or via email at Cathy.Bay@modot.mo.gov |
D7-09-010 RFQ Rental of Aerial Bucket Truck |
Sept 3, 2008 |
1:00 P.M Local Time |
D7-09-010 RFQ Bid Tab Rental of Aerial Bucket Truck |
RFQ -D7-09-009 Tree Cutting and Removal Service |
August 14, 2008 |
1:00 P.M. Local Time |
D7-09-009-Quote Tabulations-Tree Removal Halltown |
D7-09-007 RFB Cabinet-Type Fuel Pumps |
August 13, 2008 |
1:00 P.M. Local Time |
D7-09-007 RFB Bid Tab Cabinet-Type Fuel Pumps |
Concrete Fixed Pricing RFB D7-09-005 |
August 6, 2008 |
1:00 P.M. Local Time |
D7-09-005 RFB Bid Tab Concrete Fixed Pricing |
RFB-D7-08-077-B Janitorial Services- Nevada Const. Office |
August 4, 2008 |
1:00 P.M. Local Time |
D7-08-077-B Tab - Nevada Construction Office Janitorial Services-B |
RFQ -D7-09-008 Box Culvert Pipe-Dade County |
July 28, 2008 |
1:00 P.M. Local Time |
D7-09-008 Tabulations - Box Culvert Pipe |
RFQ - D7-09-006 Cargo Trailer for Signals Dept |
July 27, 2008 |
1:00 P.M. Local Time |
D7-09-006 -Tabs- Cargo Trailer for Signals Dept |
RFQ - D7-09-004 Wacker Vibratory Roller |
July 25, 2008 |
1:00 P.M. Local Time |
D7-09-004 Tabulations- Vibratory Roller |
RFB-D7-09-001 -Heavy Equipment with Operators Rental |
July 21, 2008 |
1:00 P.M. Local Time |
RFB D7-09-001-Heavy Equipment-Operator Services-Bid Tabs-Final |
D7-08-088- Equipment Parts
addendum 001 d7-08-088
Equipment Parts Price Page Addendum |
July 17, 2008 |
1:00 P.M. Local Time |
|
D7-09-003 RFQ Construction Harnesses |
July 16, 2008 |
1:00 P.M. Local Time |
D7-09-003 RFQ Bid Tabulation Construction Harnesses |
D7-08-084 RFB Hot Asphalt Underseal |
June 20, 2008 |
1:00 P.M. Local Time |
D7-08-084 RFB BID Tab |
D7-08-076 RFQ Establish Operator of Lawrence Co. I-44 Rest Area Sand Filter Sewage Treatment System |
June 19, 2008 |
1:00 P.M. Local Time |
D7-08-076 Bid Tab Operator for Sand Filter Sewage System |
RFQ - D7-09-002 Concrete Barrier Lift |
June 18, 2008 |
4:00 P.M. Local Time |
RFQ D7-09-002 Tabulations- Concrete Barrier Lift |
RFB-D7-08-087 Janitorial Services- MoDOT District Office |
June 17, 2008 |
1:00 P.M. Local Time |
D7-08-087 Tabulations -D7 Office Janitorial Services |
RFB-D7-08-077-A Janitorial Services- Nevada Const. Office |
June 16, 2008 |
1:00 P.M. Local Time |
D7-08-077-A Tab - Nevada Construction Office Janitorial Services |
SFS 7-080514 Datalux Computer |
May 14, 2008 |
May 16, 2007 |
The Missouri Department of Transportation (District 7) has determined that only one known source, M-B Companies, Inc., can provide the department with a Datalux computer loaded with Paint Master Pro sorftware. This is a proprietary purchase to operate the monitoring system of G8868, and MB Striper. |
SFS 7-080421 CQS-1F Asphalt |
April 21, 2008 |
April 24, 2008 |
The Missouri Department of Transportation (District 7) has determined that only one known source, SemMaterials, can provide the department with CQS-1F asphalt. CQS-1F is a cationic emulsified asphalt product for use as a fast breaking, fast curing emulsion for use in fog seal applications. It shall be capable of allowing return to traffic faster than conventional fog seal emulsions such as SS-1 or CSS-1. It shall be delivered to the jobsite in a ready-to-apply dilution not to exceed water to residual asphalt ratio of 60:40. Application rate shall vary according to the demands of the pavement but shall typically be in the range of 0.08-0.10 gal/sq yd for use on chip seals, and 0.05-0.10 gal/sq yd over bituminous mixtures. Purchases relating to this product will not exceed $25,000 individually and /or cumulatively during the MoDOT pilot project. |
SFS 7-080320 Proprietary Repair Parts For CMS |
March 20, 2008 |
March 25, 2008 |
The Missosuri Department of Transportation District 7 Joplin location has determined that only one source, American Signal Company, Inc., can provide the department with proprietary repair parts for their changeable message signs. |
RFQ D7-08-083-14000 lb Capacity Low Profile Trailers
EquipmentTrailer Specs |
May 16, 2008 |
1:00 P.M. Local Time |
D7-08-083-tabs 14000 lb capacity low profile trailer |
D7-08-081 RFQ Equipment to Install InSync Traffic Adaptive Coordination System |
May 7, 2008 |
1:00 P.M. Local Time |
D7-08-081 RFQ Bid Tabulation |
D7-08-078 - 3000-4000 Lb Capacity Forklift
Spec Forklift Electric 3000-4000 lb |
May 2, 2008 |
1:00 P.M. Local Time |
D7-08-078 Forklifts Bid Tabulations |
D7-08-080 RFQ 6V-AGM Gell Cell Batteries |
April 30, 2008 |
10:00 A.M. Local Time |
D7-08-080 RFQ Bid Tab 6V-AGM Gell Cell Batteries |
D7-080-075 Round Culvert Pipe-54-60 Inch |
April 16, 2008 |
1:00 P.M. Local Time |
RFQ D7-08-075 Tabulations 54-60 Inch Concrete Pipe |
D7-080-074 Box Culvert Pipe-McDonald CO |
April 15, 2008 |
1:00 P.M. Local Time |
NO RESPONSES |
D7- 08-061A Gas tank and supply bid |
April 15, 2008 |
2:00 P.M. Local Time |
D7-08-061A tabulation |
RFQ - D7-08-073-10 Foot schulte mowers |
April 11, 2008 |
1:00 P.M. Local Time |
D7-08-073 Tabulations - Schulte 10 Foot Mowers |
D7-08-072 RFQ Crushed Porphyry Trap Rock |
April 8, 2008 |
1:00 P.M. Local Time |
D7-08-072 RFQ Bid Tab Crushed Porphyry |
D7-08-071 RFQ Gas Powered Hammer Drill |
April 3, 2008 |
1:00 P.M. Local Time |
D7-08-071 RFQ Bid Tab Hammer Drill |
FM06 RFQ 031408 flooring GS Main
031408 GS floor scope
D7F-08-002 STANDARD SOLICITATION PROVISION |
April 3, 2008 |
1:00 P.M. Local Time |
D7F002 contractor bid tab |
D7F-08-001 Roofing Project
D7F-08-001 Scope of Work
D7F-08-001 Terms and Conditions |
March 28,2008 |
1:00 P.M. Local Time |
|
RFB-D7-08-063 Janitorial Services- Construction Offices |
March 26, 2008 |
1:00 P.M. Local Time |
D7-08-063 Tabs - Neosho - Janitorial Services
D7-08-063 Tabs -Carthage - Janitorial Services |
RFB-D7-08-069 Mowing Service District Offices |
March 25, 2008 |
1:00 P.M. Local Time |
D7-08-069 Mowing Bid Tabulations |
RFB D7-08-057-A - Pumping Sewage Holding Tanks |
March 20, 2008 |
1:00 P.M. Local Time |
D7-08-057-A Bid Tabulations- Pumping Sewage Holding Tanks |
D7 08 061 Gas tank and supply bid |
March 18, 2008 |
2:00 P.M. Local Time |
|
D7-08-065 RFB Adaptive Traffic Signal Control System |
March 18, 2008 |
1:00 P.M. Local Time |
D7-08-065 RFB Bid Tabulation |
RFB D7-08-067 - Lease Equipment-Chip Seal Process |
March 12, 2008 |
1:00 P.M. Local Time |
D7-08-067-Tabulations-Chip Seal Equipment Rental |
D7-08-066 RFQ Wireless Communication Equipment |
February 27, 2008 |
1:00 P.M. Local Time |
D7-08-066 RFQ BID Tabulation |
D7-08-062 RFB Hot and Cold Mix |
February 26, 2008 |
1:00 P.M. Local Time |
D7-08-062 Hot Mix and Cold Mix Bid Tabulation |
D7-08-064 Culvert pipe removal and installation |
February 25, 2008 |
1:00 P.M. Local Time |
Tabulations-D7-08-064 Culvert Pipe Removal and Installation |
D7-08-057 - Pumping Waste Pits |
February 20, 2008 |
1:00 P.M. Local Time |
No Bids-To Be Re-Bid |
D7-08-052 - Detachable Gooseneck Trailer
Detachable Gooseneck Trailer Specs
Addendum 001 |
February 7, 2008 |
1:00 P.M. Local Time |
Bid Tabulation- 35 Ton Gooseneck Trailer |
D7-08-060-A Crane with Operator |
February 7, 2008 |
1:00 P.M. Local Time |
Bid Tabs-D7-08-060-A Crane w Operator-Box Culvert Unloading |
D7-08-059 Preformed Thermoplastic Pavement Marking Tape |
February 4, 2008 |
10:00 A.M.
Local Time |
D7-08-059 RFQ BID Tabulation |
D7-08-058 Pre-assembled 8 inch Redi-torque Slipbases |
January 30, 2008 |
10:00 A.M.
Local Time |
D7-08-058 RFQ BID Tabulation |
D7-08-053 RFQ Fiber Optic Training |
January 29, 2008 |
1:00 P.M. Local Time |
D7-08-053 RFQ Bid Tabulation |
D7-08-056 RFQ Video Detection Systems |
January 29, 2008 |
10:00 A.M.
Local Time |
D7-08-056 RFQ BID Tabulation |
RFB D7-08-048 Bulk Oil-Year 2008
MGS9212J-Spec |
January 22, 2008 |
1:00 P.M. Local Time |
D7-08-048-Bulk Oil Bid Tabulations |
D7-08-054 Crane and Clam bucket w-Operator |
January 18, 2008 |
1:00 P.M. Local Time |
Quote Tabulations-D7-08-054 Crane-Clam Bucket-Operator |
RFQ-D7-08-050 -Heavy Equipment Rental-Lease |
January 18, 2008 |
1:00 P.M. Local Time |
D7-08-050 Heavy Equipment Bid Tabulation |
SFS 7-080322 NCAA campaign |
01/18/08 |
01/22/08 |
The Missouri Department of Transportation, District 7 Public Information, has determined CBS is the only network that can provide an advertising service for our primary target markets of non seat belt wearing teenage boys that watch NCAA Basketball Tournaments. KOAM-TV, Channel 7 is the CBS affiliate for our district that is carrying these games |
D7-08-051 RFQ Fiber Optic Cable Test Set - Kit |
January 17, 2008 |
1:00 P.M. Local Time |
D7-08-051 RFQ BID Tabulation |
D7-08-046- High Performance Motor Oil |
January 9, 2008 |
1:00 P.M. Local Time |
Bid Cancelled |
D7-08-045 RFB Generator
D7-08-045 Emergency Power Generator and Scope of Work
D7-08-045 T and C
D7-08-045 Office_Plans Generator Electrical
D7-08-045 addendum 001 |
December 21, 2007 |
1:00 P.M. Local Time |
|
D7-08-044 Roofing projects
D7-08-044 Roof Coating Spec
STANDARD SOLICITATION PROVISION |
December 17,2007 |
1:00 P.M. Local Time |
|
D7-08-042 RFQ Mt. Vernon Building insulation project |
December 7, 2007 |
1:00 P.M. Local Time |
RFQ D7-08-042 Bid Tabs Mt. Vernon |
RFB D7-08-028-A Trash Collection and Disposal Services Bid |
December 10, 2007 |
1:00 P.M. Local Time |
Trash Collection and Disposal-A- Bid Tabulations |
SFS 7-021207 Joplin Globe Blueprint |
11/29/07 |
12/02/07 |
The Missouri Department of Transportation has determined that only one source The Joplin Globe can provide an Arrive Alive print advertising campaign targeting the Joplin metropolitan population. |
SFS 7-071129 Screening Bucket |
11/29/07 |
12/13/07 |
The Missouri Department of Transportation has determined that only one source; National Attachments that can provide a screening bucket with aerating blades, equivalent or better than the REMU Screening bucket. |
D7-08-037 Recapped tires |
November 16, 2007 |
1:00 P.M. Local Time |
|
D7-08-036 Neosho Bathroom Remodel
D7-08-036 Addendum 001
D7-08-036 Addendum 002 |
November 16, 2007 |
1:00 P.M. Local Time |
|
D7-08-022 RFQ Sheldon Bathroom Remodel |
November 16, 2007 |
1:00 P.M. Local Time |
Canceled |
D7-08-035 RFQ Mt. Vernon Building insulation project |
November 6, 2007 |
1:00 P.M. Local Time |
|
D7-08-030 RFQ Fire Extinguisher Inspections |
October 31, 2007 |
1:00 P.M. CST |
D7-08-030 Bid Tab |
D7-08-032 RFQ Flu Shot Vaccines |
October 15, 2007 |
2:00 P.M. Local Time |
D7-08-032 BID Tabulation |
D7-08-031 RFB Asphalt Repair Projects
RFB D7-08-031-Addendum 001 |
October 18, 2007 |
2:00 P.M. Local Time |
BID TABULATION RFB D7-08-031 Asphalt Repair Services |
RFQ -D7-08-034 Concrete pipe removal and installation-A001
RFQ D7-08-034-Addendum 001 |
October 19, 2007 |
1:00 P.M. Local Time |
RFQ D7-08-034 Concrete Pipe Removal-Installation-Tabulations |
RFB D7-08-028 Trash Collection and Disposal Services Bid |
November 1, 2007 |
1:00 P.M. Local Time |
D7-08-028 Bid Tabulations - Trash Collection and Disposal |
SFS 7-070921 Trimble R8 GNSS Rover Kit and Accessories for GPS Unit |
Sept 21, 2007 |
Sept 26, 2007 |
The Missouri Department of Transportation has determined that Seiler Instrument is the only authorized dealer to provide proprietary replacement parts and accessories in the State of Missouri for a Trimble GPS unit. |
D7-08-021 RFQ Replace Well House Mt Vernon
D7-08-021 Scope of Work
D7-08-021 T and C |
Sept. 20, 2007 |
1:00 P.M. Local Time |
|
D7-08-20 RFQ Replace Well House Nevada
D7-08-020 Scope of work
D7-08-020 T and C |
Sept. 20, 2007 |
1:00 P.M. Local Time |
|
RFP- D7-08-012 Recap tires
D7-08-012 Addendum 001 |
Sept 19, 2007 |
4:00 P.M Local Time |
Canceled Rebid |
SFS-7-070914-Star Macro Deck |
Sept 14, 2007 |
Sept 18, 2007 |
The Missouri Department of Transportation has determined that only one source, Sasco Pavement Coatings, Inc., Springfield MO can furnish District 7’s Bridge Department with Star Macro Deck Bridge Deck and Crack Sealer. This material is an OR MoDOT approved penetrating clear product, which will waterproof and not discolor bridge deck. The material allow the elimination of blotter material to absorb excess material and may be utilized by traffic as soon as dried without exhibiting residual tracking. Pricing will be $16.50 per gallon. |
RFQ D7-08-027- Corrugated Metal Pipe |
Sept 11, 2007 |
1:00 P.M. Local Time |
RFQ D7-08-027 Tabulations - Corrugated Metal Pipe |
D7-08-026 RFQ Shot Rock Rte 13 Stream Mitigation Project |
August 23, 2007 |
2:00 P.M. Local Time |
D7-08-026BidTab |
D7-08-018 RFQ Trac-hoe with Operator for Rte 13 Stream Mitigation |
August 23, 2007 |
1:00 P.M. Local Time |
D7-08-018 BID Tabulation |
D7-08-019 RFQ Concrete Compression Testing Machine |
August 17, 2007 |
10:00 A.M. Local Time |
D7-08-019 Bid Tab |
SFS 7-070908 Tween Safety Initiative |
August 7,2007 |
August 9,2007 |
MoDOT is partnering with the Alliance of SW Missouri in the Tween Safety Initiative - Fall Semester 2007 and Spring Semester 2008 at a cost of $6,500 per semester total cost of $13,000.00. This joint project includes school visits, safety incentives and a safety presentation including reinforcement with a take home parent magazine. |
RFQ -D7-08-017 Trac-hoe and Dozer with Operator |
August 7, 2007 |
1:00 P.M. Local Time |
Quote Tab-D7-08-13 Trac-hoe-Dozer-Operator |
RFQ -D7-08-016A- Catering Service |
August 7, 2007 |
1:00 P.M. Local Time |
Quote Tabulations D7-08-016A -Catering Service |
Concrete bid D7-08-005 |
July 30, 2007 |
1:00 P.M. Local Time |
Concrete Bid Tab D7-08-005 |
RFQ -D7-08-013 Bridge Concrete Breakup Project |
July 27, 2007 |
1:00 P.M. Local Time |
Withdrawn - Will be re-issued. |
RFQ - D7-08-014 Interactive Sign-No Right Turn |
July 25, 2007 |
4:00 P.M. Local Time |
Quote Tabulations - Signs-Interactive with Traffic Signal |
RFQ - D7-08-008 Sign-Interactive with Traffic Signal |
July 20, 2007 |
1:00 P.M Local Time |
Quote Tabulations - Signs-Interactive with Traffic Signal |
RFQ D7-08-006 Used-Oil Polyethylene Tank |
July 19, 2007 |
1:00 P.M Local Time |
Quote Tabulations - Used-Oil Polyethylene Tank |
SFS 7-071507 Fox ad campaign |
July 11,2007 |
July 16,2007 |
The Missouri Department of Transportation, District 7 Public Information, has determined FOX 14 as a sole source media provider for a 52 week safety campaign called “Think About it” that will include messages airing the day of the sponsorship, logo included as a sponsor, segments production of messages encouraging the use of seat belts. |
SFS 7-070710 Truck beds |
July 10,2007 |
July 18,2007 |
The Missouri Department of Transportation has determined that there is only one known source for truck beds that is supplied in a proprietary design for trucks owned by MoDOT. |
SFS 7-070703 Crushed Porphyry Rock |
July 3, 2007 |
July 18, 2007 |
The Missouri Department of Transportation has determined that only one source within the State of Missouri, Iron Mountain Trap Rock Company of Maryland Heights, MO can produce and supply to District 7, Crushed Porphyry/Igneous Rock. |
D7-07-072 RFQ Proline High Performance Cold Asphalt Pothole Patching Material |
May 18, 2007 |
1:00 PM |
|
D7-07-052 Filter Bid Form 2007 |
April 20, 2007 |
1:00 PM |
D7-07-052 Bid Tab |
D7-07-51 Used oil pick-up |
March 14, 2007 |
2:00 PM |
BID Tabulation D7-07-051 |
D7-07-042 MO 66 at Florida Signal Change |
March 29, 2007 |
1:00 PM |
|
SFS 7-070323 Rapid Pavement Repair |
March 9,2007 |
March 23,2007 |
The Missouri Department of Transportation has determined that there is only one known source for MoDOT Rapid Cement Premix (RPC) for pavement repair, Western Material & Design, LLC. Rapid Cement Premix (RPC) is a one-component shrinkage compensated proprietary blend of cement, aggregates and performance enhancing chemical additives in 70 lb bags. This is used for horizontal concrete repairs that require high-early strength gain. Rapid Cement Premix (RPC) is a patent pending formulation that was developed exclusively for the DOT market. |
SFS 7-070319 Sensys Vehicle Detection Sensor |
March 19, 2007 |
March 22, 2007 |
The Missosuri Department of Transportation has determined that only one source, Brown Traffic Products, can provide the department with a vehicle detection sensor that has the ability to communicate and interface wireless to traffic signal equipment located at a central point. |
D7-07-043-Mowing Bid |
March 5, 2007 |
1:00 PM |
Mowing Bid Tabulation |
RFB D7-07-039 Bulk Oil
MGS9212J-Spec |
February 9, 2007 |
1:00PM |
D7-07-039-Bulk Oil Bid Tabulations |
D7-07-040 Hot and Cold Mix |
February 15, 2007 |
1:00 PM |
D7-07-040 Hot Mix and Cold Mix Bid Tabulation |
RFQ D7-07-017 Asphalt Roof Halltown
D7-07-017 Scope of Work |
11/17/2006 |
2:00 PM |
Bid Cancelled |
RFQ D7-07-021 Remodel District Office Breakroom |
11/02/2006 |
1:00PM |
Bid Tabulation D7-07-021 |
D7-07-030 Bid Request for Flu Shot Vaccines |
11/02/2006 |
1:00 PM |
|
D7-07-029 Bid Request for Hydroseeding |
11/01/2006 |
10:00 AM |
|
RFQ D7-07-028 Polytite N |
10/30/2006 |
4:00 PM |
Polytite Bid Tabulation D7 |
D7-07-031 Annual Inspection Services of Fire Extinguishers |
11/15/2006 |
1:00 PM |
|
D7-06-037 pest control RFQ |
April 19th 2006 |
1:00 PM |
|