7-NW-17-075 Clean - Dirty Cinders |
01/31/2017 |
02/10/2017 |
Headwaters Resources, LLC. |
7-NW-17-060 Haydite Aggregate Material |
01/03/2017 |
01/17/2017 |
Buildex, Inc. |
7-NW-17-059 Preformed Pavement Marking Tape |
01/03/2017 |
01/10/2017 |
Ennis-Flint |
7-NW-16-126 Radar Detection System |
04/26/2016 |
05/12/2016 |
Mid American Signal |
7-NW-16-118 PULL TYPE PRO-PAVER |
04/25/2016 |
05/06/2016 |
JMG Equipment Company |
7-NW-16-123 Iteris Pegasus 5.8GHz Broadband Radios |
04/25/2016 |
05/06/2016 |
Mobotrex |
7-NW-16-117 SECURITY CONTROL SYSTEM UPGRADE |
04/25/2016 |
05/06/2016 |
C & C Group |
7-NW-16-077 Haydite Aggregate Material |
12/3/15 |
12/8/15 |
Buildex |
7-NW-16-069 Preformed Pavement Marking Tape |
11/4/15 |
11/6/15 |
Ennis-Flint Traffic Safety |
7-NW-15-058 Asphalt Millings |
10/26/15 |
10/18/15 |
Herzog Construction |
7-NW-16-050 SFS SB600 Salt Brine System |
09/23/2015 |
09/28/2015 |
Varitech Industries, Inc. |
7-NW-16-011 SFS Salt Dome Tarp Repairs |
07/22/2015 |
07/24/2015 |
Misc. Salt Dome Tarp Repairs by Midstate Construction & Roofing...estimated repair cost is $8.000.00. |
NW-15-130 SLS Clean - Dirty Cinders |
05/29/15 |
06/12/2015 |
Harsco Minerals controls the distribution of coal slag materials (cinders) that are a by-product of electrical generation activities at the Thomas Hill Power Plant. These materials come in two forms: clean and washed cinders and dirty cinders. MoDOT will use materials from this supplier, as needed during the contract period for various projects. The supplier will submit individual pricing proposals for materials when requested. MoDOT will have the right to accept or reject any pricing proposals received |
7-NW-15-088 Haydite Aggregate Material |
12/23/14 |
12/31/14 |
Buildex, Inc. |
SFS 7-NW-15-065 |
09/29/2014 |
10/01/2014 |
The Missouri Department of Transportation, Northwest District, has determined asphalt millings can be provided by Herzog from a current project in Atchison county at a cost of $8.00/ton with MoDOT hauling away. The approximate amount of millings is expected to be 1,200 tons. The work will be taking place the weeks of September 29 – October 12, 2014. These millings are only available immediately on site during the current repair period. Estimated purchase cost is $10,000. |
7-NW-15-064 HYDRAULICS SYSTEM UPGRADE |
09/29/2014 |
10/01/2014 |
The Missouri Department of Transportation has determined due to the extent of
hydraulics involved on this unique 6X6 plow truck with tow plow capabilities
that Viking Cives is the only dealer in close proximity to supply the Certified
Power hydraulic system upgrades. The system upgrade to cost approximately
$14,200.00. |
7-NW-15-007 Iteris Camera System |
6/17/14 |
7/2/14 |
The Missouri Department of Transportation, Northwest District, has determined that only one source; Brown Traffic Products can provide the department with VRACK-TS2-SYS2 Video Detection System. This product is compatible with our existing system. Estimated Purchase $9,000.00. |
7-NW-14-145 Video Detection System |
05/29/14 |
06/02/14 |
The Missouri Department of Transportation has determined that only one source; Pinkley Sales Company of Oklahoma City, OK can furnish the department with Peek Video Trak IQ-ITS Video Detection System. Pinkley the distributor is territorial for this region.The expenditure is anticipated to be less than $25,000. |
7-NW-14-137 MOTORGRADER RETRIEVERS |
04/30/2014 |
05/13/2014 |
|
7-NW-14-132 SLS Clean - Dirty Cinders |
04/21/2014 |
04/29/14 |
Harsco Minerals controls the distribution of coal slag materials (cinders) that are a by-product of electrical generation activities at the Thomas Hill Power Plant. These materials come in two forms: clean and washed cinders and dirty cinders. MoDOT will use materials from this supplier, as needed during the contract period for various projects. The supplier will submit individual pricing proposals for materials when requested. MoDOT will have the right to accept or reject any pricing proposals received |
7-NW-14-108
Haydite |
03/19/2014 |
04/15/2014 |
MoDOT has determined that Buildex, Inc., is the single feasible
source for the Northwest District to obtain Haydite aggregate
materials.
MoDOT will use these materials as needed during the contract period for the Northwest district. Purchase orders are anticipated to exceed $25,000 annually. |
7-NW-14-096 MOTORGRADER RETRIEVER |
01/28/2014 |
01/31/2014 |
|
7-NW-14-053 Iteris V4Plus TS1 Rack System |
9/27/13 |
10/1/13 |
|
7-NW-14-020 Discounted Aggregate |
07/31/13 |
08/08/13 |
APAC-Missouri |
7-NW-14-023 SFS SPAN WIRE CAMERAS
|
07/25/2013 |
07/30/2013 |
ITERIS |