| Title |
Closing Date |
Closing Time (DST) |
Tabulations |
| NW-13-033 HOLDING TANKS |
09/27/2012 |
01:00:00 PM CST |
NW-13-033 Tabulation |
| NW-13-026 GARAGE DOORS WITH OPENERS |
09/18/2012 |
02:00:00 PM CST |
NW-13-026 Tabulation |
| NW-13-025 HOLDING TANKS |
09/18/2012 |
01:00:00 PM CST |
No Bids Received. |
| NW-13-027 Duffle Bags |
09/17/2012 |
01:00:00 PM CST |
NW-13-027 Tabulation |
| NW-13-022 Addendum 001 |
09/18/2012 |
01:00:00 PM CST |
|
| NW-13-022 ON-CALL HAULING SERVICE |
09/18/2012 |
01:00:00 PM CST |
NW-13-022 Tabulation |
| NW-13-020 WINTER EQUIPMENT RENTAL WITH OPERATORS |
08/30/12 |
01:00:00 PM CST |
NW-13-020 Tabulation |
| NW-13-014 Spec. 4 Aggregate |
08/09/12 |
01:00:00 PM CST |
NW-13-014 Tabulation |
| NW-13-008 Dowel Bars and Dowel Assemblies |
08/06/12 |
01:00:00 PM CST |
NW-13-008 Tabulation |
| NW-13-007 Cinder Hauling |
07/27/12 |
10:00:00 AM CST |
NW-13-007 Tabulation |
| NW-13-013 Dirty Cinders |
07/10/12 |
01:00:00 PM CST |
NW-13-013 Tabulation |
| NW-12-120 Plant Pickup Aggregate |
06/29/12 |
01:00:00 PM CST |
NW-12- 120 TABULATION |
| NW-12-117 CANVAS DUFFEL BAGS |
CANCELLED |
1:00:00 PM CST |
|
| NW-12-114 4 POST HOIST |
06/19/2012 |
1:00:00 PM CST |
NW-12-114 Tabulation |
| NW-12-111 Propane |
05/25/12 |
10:00:00 AM CST |
NW-12-111 Tabulation |
| NW-12-107 Arch Pipe |
04/27/12 |
10:00:00 AM CST |
NW-12-107 Tabulation |
| NW-12-103 Addendum 002 |
04/25/2012 |
01:00:00 PM CST |
|
| NW-12-103 Addendum 001 |
04/25/2012 |
01:00:00 PM CST |
|
| NW-12-103 WASH BAY MATERIAL- GRANT CITY |
04/25/2012 |
01:00:00 PM CST |
NW-12-103 Tabulation |
| NW-12-101 Flashing Solar Beacon |
04/06/12 |
01:00:00 PM CDT |
NW-12-101 Tabulation |
| NW-12-094 HOT AND COLD MIXES |
03/27/12 |
01:00:00 PM CDT |
NW-12-094 Tabulation |
NW-12-093 Clevis Type Grab Hooks
Addendum 001 |
03/19/12 |
10:00:00 AM CDT |
NW-12-093 Tabulation |
| NW-12-089 Annual Concrete |
02/24/12 |
10:00:00 AM CDT |
NW-12-089 Tabulation |
| NW-12-084 Misc. Aggregate |
01/27/12 |
10:00:00 AM CDT |
NW-12-084 Tabulation |
| NW-12-078 EQUIPMENT RENTALS 2 BID |
02/15/12 |
1:00:00 PM CDT |
NW-12-078 Tabulation
NW-12-078 EQUIPMENT RENTAL PRICING BY COUNTY |
| NW-12-066 Used Oil Disposal |
01/23/12 |
1:00:00 PM CDT |
NW-12-066 Tabulation |
| NW-12-060 EQUIPMENT RENTALS 2011 |
01/31/12 |
1:00:00 PM CDT |
NW-12-060 Tabulation NW-12-060 EQUIPMENT RENTALS PRICING BY COUNTY |
| NW-12-075 Addendum 003 |
02/07/12 |
1:00:00 PM CDT |
|
| NW-12-075 Addendum 002 |
02/07/12 |
1:00:00 PM CDT |
|
| NW-12-075 Addendum 001 |
02/07/12 |
1:00:00 PM CDT |
|
NW-12-075 SELF CONTAINED FUEL TANKS
|
01/18/12 postponed to 02/07/12 |
1:00:00 PM CDT |
NW-12-075 Tabulation |
NW-12-061 Polyethylene Pipe
Addendum 001 |
12/23/11 |
10:00:00 AM CDT |
NW-12-061 Tabulation |
| NW-12-040 GARAGE DOORS AND OPERATORS |
11/07/11 |
1:00:00 PM CST |
NW-12-040 Tabulation |
| NW-12-009 VIDEO DETECTION SYSTEM |
7/27/11 |
1:00:00 PM CST |
NW-12-009 Tabulation |
| NW-12-002 Propane |
7/25/11 |
1:00:00 PM CDT |
NW-12-002 Tabulation |
D1-11-226 Polyethylene Pipe
Addendum 001 |
6/22/11 |
1:00:00 PM CDT |
D1-11-226 Tabulation |
| D1-11-222 RENTAL OF SHEEPS FOOT VIBRATORY COMPACTOR |
05/04/11 |
1:00:00 PM CDT |
D1-11-222 Tabulation |
| D1-11-219 ROTO MIXER-ROAD RECLAIMER RENTAL |
04/28/11 |
1:00:00 PM CDT |
D1-11-219 Tabulation |
D1-11-215
Commerical Hot and Cold Mix |
04/25/11 |
1:00:00 PM CST |
D1-11-215 Tabulation |
D1-11-206 Annual Concrete
ADDENDUM 001
ADDENDUM 002 |
02/22/11 |
1:00:00 PM CST |
D1-11-206 Tabulation |
| D1-11-203 Aggregate |
2/10/11 |
1:00:00 PM CST |
D1-11-203 Tabulation |
| D1-11-202 EQUIPMENT RENTALS 2011 |
01/27/11 |
1:00:00 PM CST |
D1-11-202 EQUIPMENT RENTALS 2011 PRICING (POSTED 03/01/11) |
| D1-11-196 GARAGE DOORS |
12/28/10 |
1:00:00 PM CST |
D1-11-196 Tabulation |
| D1-11-195 Polyethylene Pipe |
12/22/10 |
1:00:00 PM CST |
D1-11-195 Tabulation |
| D1-11-194 Signal Pole Replacement |
12/21/10 |
1:00:00 PM CST |
D1-11-194 Tabulation |
| D1-11-193 SELF LEVELING LOADER |
12/02/10 |
2:00:00 PM CST |
D1-11-193 Tabulation |
| D1-11-192 Addendum 001 |
12/02/10 |
1:00:00 PM CST |
|
| D1-11-192 TIRE CHAINS |
12/02/10 |
1:00:00 PM CST |
D1-11-192 Tabulation |
| D1-11-154 Addendum 002 |
11/10/10 |
2:00:00 PM CST |
|
| D1-11-154 Addendum 001 |
11/10/10 |
2:00:00 PM CST |
|
| D1-11-154 STORAGE TANK INSPECTIONS |
11/10/10 |
2:00:00 PM CST |
D1-11-154 Tabulation Form |
| |
|
|
|
| D1-11-096 Type I Base |
09/09/10 |
1:00:00 PM CDT |
D1-11-096 Tabulation |
| D1-11-094 ROCKPORT MO GARAGE DOORS |
09/16/10 |
10:00:00 AM CDT |
D1-11-094 Tabulation |
| D1-11-091 ROOF REPAIRS |
09/09/10 |
1:00:00 PM CDT |
D1-11-091 Tabulation |
| D1-11-060 WIRELESS IN-PAVEMENT VEHICLE DETECTION SYSTEM |
08/19/10 |
1:00:00 PM CDT |
D1-11-060 Tabulation pdf |
| D1-11-059 Addendum 002 |
08/25/10 |
1:00:00 PM CDT |
|
| D1-11-059 Addendum 001 |
08/25/10 |
1:00:00 PM CDT |
|
| D1-11-059 TUCK POINTING DISTRICT 1 OFFICE |
08/25/10 |
1:00:00 PM CDT |
D1-11-059 Tabulation |
| D1-11-041 PNEUMATIC CORNER DRILL - BRIDGE REAMER |
08/11/10 |
1:00:00 PM CDT |
D1-11-041 Tabulation |
| D1-11-028 WALK BEHIND MOWERS |
07/29/10 |
1:00:00 PM CDT |
D1-11-028 Tabulation |
| D1-11-027 OVERHEAD LIGHT BARS |
07/28/10 |
1:00:00 PM CDT |
D1-11-027 OVERHEAD LIGHT BARS Tabulation |
D1-11-024 Propane
D1-11-024 Addendum |
7/26/10 |
1:00:00 PM CDT |
D1-11-024 Tabulation |
| D1-11-022 4-POST HOIST |
07/26/10 |
2:00:00 PM CDT |
D1-11-022 4-POST HOIST Tabulation |
D1-11-002 Aggregate
D1-11-002 Addendum |
07/14/10 |
1:00:00 PM CDT |
D1-11-002 Tabulation |
| D1-11-001 WALK BEHIND MOWERS |
07/07/10 |
1:30:00 PM CDT |
D1-11-001 Tabulation |
| D1-10-388 Polyethylene Pipe |
06/21/10 |
1:00:00 PM CDT |
D1-10-388 Tabulation |
| D1-10-371 Various Aggregates |
05/21/10 |
10:00:00 AM CDT |
D1-10-371 Tabulation |
| D1-10-344 COMMERICAL HOT AND COLD MIX |
04/21/10 |
1:00:00 PM CDT |
D1-10-344 Tabulation |
| D1-10-337 HYDRAULIC POST DRIVER |
04/14/10 |
1:00:00 PM CST |
D1-10-337 Tabulation |
| D1-10-312 Concrete |
02/11/10 |
1:00:00 PM CDT |
D1-10-312 Tabulation |
| D1-10-254 Boiler Slag |
02/10/10 |
1:00:00 PM CDT |
D1-10-254 Tabulation |
| D1-10-245 Patch Material |
01/25/10 |
|
D1-10-245 Tabulation |
D1-10-225 Aggregate
Addendum 001 |
1/28/10
2/3/10 |
1:00:00 PM CDT |
D1-10-225 Tabulation |
| D1-10-164 Polyethylene Pipe |
12/28/09 |
1:00:00 PM CDT |
D1-10-164 Tabulation |
| D1-10-166 Addendum 001 |
12/23/09 |
2:00:00 PM CDT |
|
D1-10-166 RADAR SPEED TRAILER |
12/23/09 |
2:00:00 PM CDT |
D1-10-166 Tabulation |
| D1-10-163 ROLLER CAB TOOL BOX |
12/15/09 |
2:00:00 PM CDT |
D1-10-163 Tabulation |
| D1-10-162 Boiler Slag |
12/22/09 |
1:00:00 PM CDT |
D1-10-162 Tabulation |
| D1-10-156 Addendum 001 |
12/07/09 |
10:00:00 PM CDT |
|
| D1-10-156 PAINT TANK CLEANING |
12/07/09 |
10:00:00 AM CDT |
D1-10-156 Tabulation |
| D1-10-149 PORTABLE RUMBLE STRIPS |
11/30/09 |
2:00:00 PM CDT |
D1-10-149 Tabulation |
| D1-10-132 Base Rock |
11/06/09 |
1:00:00 PM CDT |
D1-10-132 Tabulation |
| D1-10-133 18000 LB 4-POST LIFT |
11/17/09 |
2:00:00 PM CDT |
D1-10-133 Tabulation |
| D1-10-103 LARGE GARAGE DOORS |
10/27/09 |
2:00:00 PM CST |
D1-10-103 Tabulation |
| D1-10-084 Addendum |
10/13/09 |
2:00:00 PM CST |
|
| D1-10-084 GARAGE DOORS |
10/13/09 |
2:00:00 PM CST |
D1-10-084 Tabulation |
| D1-10-076 Type I Base |
09/25/09 |
1:00:00 PM CST |
D1-10-076 Tabulation |
| D1-10-072 PORTABLE RUMBLE STRIPS |
09/21/09 |
2:00:00 PM CST |
CANCELLED |
| D1-10-067 VIDEO DETECTION SYSTEM |
09/16/09 |
2:00:00 PM CST |
D1-10-067 Tabulation |
D1-10-045 Corrugated Metal Pipe (RFB)
Addendum 001 |
09/14/09 |
1:00:00 PM CST |
D1-10-045 Tabulation |
| D1-10-036 Addenddum 001 |
08/18/09 |
1:00:00 PM CST |
|
| D1-10-036 SALT BRINE SPRAYER |
08/18/09 |
1:00:00 PM CST |
D1-10-036 Revised Tabulation |
| D1-10-026 Corrugated Metal Pipe |
07/31/09 |
2:00:00 PM CST |
D1-10-026 Tabulation |
D1-10-002 Polyethylene Pipe
Addendum 001 |
07/28/09 |
1:00:00 PM CST |
|
| D1-10-011 CONCRETE BLOCKS |
07/21/09 |
1:00:00 PM CST |
D1-10-011 Tabulation |
| D1-10-012 Propane |
07/27/09 |
1:00:00 PM CST |
D1-10-012 Tabulation |
| D1-10-001 Addendum |
07/21/09 |
2:00:00 PM CST |
|
| D1-10-001 ASPHALT HOT BOX |
07/21/09 |
2:00:00 PM CST |
D1-10-001 Tabulation |
| D1-09-316 LOADER TIRES |
06/30/09// |
2:00:00 PM CST |
D1-09-316 Tabulation |
| D1-09-306 Addendum 001 |
06/16/09 |
2:15:00 PM CST |
|
| D1-09-306 STEWARTSVIL METAL SIDING |
06/15/09 |
2:15:00 PM CST |
D1-09-306 Tabulation |
| D1-09-305 Addendum 001 |
06/16/09 |
2:00:00 PM CST |
|
| D1-09-305 CAMERON METAL SIDING |
06/15/09 |
2:00:00 PM CST |
D1-09-305 Tabulation |
| D1-09-292 FIREPROOF FILE CABINETS |
06/08/09 |
2:00:00 PM CST |
D1-09-292 Tabulation |
| D1-09-287 Clean Rock |
6/2/09 |
1:00:00 PM CST |
Bid Rejected |
D1-09-278 Materials
D1-09-278 Addendum 001 |
05/28/09 |
10:00:00 AM CST |
D1-09-278 Tabulation |
| D1-09-277 DUST COLLECTOR |
05/27/09 |
2:00:00 PM CST |
D1-09-277 Tabulation |
| D1-09-272 Addendum 002 |
05/18/09 |
10:00:00 AM CST |
|
| D1-09-272 Addendum 001 |
05/18/09 |
10:00:00 AM CST |
|
| D1-09-272 AUTO CRANE |
05/18/09 |
10:00:00 AM CST |
D1-09-272 Tabulation |
| D1-09-271 STANDARD TRAILER |
05/12/09 |
2:00:00 PM CST |
D1-09-271 Tabulation |
| D1-09-270 Addendum 001 |
05/20/09 |
2:00:00 PM CST |
|
| D1-09-270 SALT DOME FLOOR |
05/20/09 |
2:00:00 PM CST |
D1-09-270 Tabulation |
| D1-09-269 Addendum 001 |
05/19/09 |
2:00:00 PM CST |
|
| D1-09-269 REST AREA ROOFS |
05/19/09 |
2:00:00 PM CST |
D1-09-269 Tabulation |
| D1-09-259 Addendum 001 |
04/27/09 |
2:00:00 PM CST |
|
| D1-09-259 TRAILER |
04/27/09 |
2:00:00 PM CST |
D1-09-259 Tabulation |
| D1-09-257 COMMERICAL HOT AND COLD MIX |
04/21/09 |
01:00:00 PM CST |
D1-09-257 Tabulation |
| Addendum 001 Breakroom Materials |
04/06/09 |
2:00:00 PM CST |
|
| D1-09-250 BREAKROOM MATERIALS |
04/06/09 |
2:00:00 PM CST |
D1-09-250 Tabulation |
| D1-09-248 Addendum 001 |
03/18/09 |
2:00:00 PM CST |
|
| D1-09-248 TRAILER |
03/18/09 |
2:00:00 PM CST |
Cancelled |
| D1-09-240 4-POST LIFT |
03/11/09 |
2:00:00 PM CST |
D1-09-240 Tabulation |
| D1-09-241 Diamond Saw Blade Extension |
02/27/09 |
01:00:00 PM CST |
D1-09-241 Tabulation |
| D1-09-238 Concrete |
02/18/09 |
01:00:00 PM CST |
D1-09-238 Tabulation |
| EQUIPMENT RENTAL WITH OPERATORS |
02/18/09 |
2:30:00 PM CST |
D1-09-236 TABULATION |
| D1-09-235 Aggregate |
02/10/09 |
11:59:59 PM CST |
D1-09-235 Tabulation |
| D1-09-229 EQUIPMENT RENTALS 2009 |
02/18/09 |
2:00:00 PM CST |
D1-09-229 Tabulation |
| D1-09-215 CORRUGATED METAL PIPE |
12/10/08 |
2:00:00 PM CST |
D1-09-215 TABULATION |
| SFS D1-09-216 |
12/5/08 |
12/11/08 |
- The Missouri Department of Transportation District 1, St. Joseph, Missouri, has determined that there is only one known source, City of St. Joseph Landfill, St. Joseph, Missouri that can provide the department with the service for the disposal of roadway debris and dirt material for the St. Joseph, District 1 area. This service will not exceed $25,000.00 individually and/or cumulatively with a one-year renewal option.
- Please direct any questions regarding this SFS to Brenda Christie at (816) 387-2430 or via email at Brenda.Christie@modot.mo.gov.
|
| D1-09-198 CONCRETE |
11/24/08 |
11:59:59 PM CST |
D1-09-198 TABULATION |
| D1-09-134 SALT BRINE SYSTEM |
10/08/08 |
2:00:00 PM CST |
D1-09-134 Tabulation |
| D1-09-124 Addendum 001 |
10/07/08 |
2:00:00 PM CST |
|
| D1-09-124 WARNING LIGHT BARS |
10/07/08 |
2:00:00 PM CST |
D1-09-124 Tabulation |
| D1-09-058 Propane |
08/08/08 |
01:00:00 P.M. CST |
D1-09-058 Tabulation |
| D1-09-024 Carbide Tipped Bits |
07/16/08 |
01:00:00 P.M. CST |
D1-09-024 Tabulation |
| D1-09-002 Commercial Mix |
07/08/08 |
01:00:00 P.M. CST |
|
| D1-08-433 Commercial Mix |
06/26/2008 |
01:00:00 P.M.CST |
|
| D1-08-357 SALT DOME ROOF REPLACEMENT |
05/09/08 |
2:00:00PM CST |
D1-08-357 Dome Roof Tabulation |
| D1-08-357 Addendum 001 |
05/09/08 |
2:00:00PM CST |
|
| D1-08-419 TRUCK WASH BAY |
06/12/2008 |
2:00:00PM CST |
CANCELLED |
| D1-09-001 CORRUGATED METAL PIPE |
07/11/2008 |
2:00:00 PM CST |
Tabulation D1-09-001 |
| Addendum 001 Corrugated Metal Pipe |
07/11/08 |
2:00:00 PM CST |
|
| Addendum 002 Corrugated Metal Pipe |
07/11/08 |
2:00:00 PM CST |
|
| D1-09-003 TOOL BOXES |
07/28/08 |
2:00:00 PM CST |
D1-09-003 Tabulation |
| D1-09-028 CONCRETE BLOCKS |
07/30/2008 |
2:00:00 PM CST |
D1-09-028 Tabulation |
| D1-09-062 ASBESTOS ABATEMENT |
08/20/2008 |
2:00:00 PM CST |
D1-09-062 Tabulation |
| D1-09-062 Addendum 001 |
08/20/08 |
2:00:00 PM CST |
|
| D1-09-062 Addendum 002 |
08/20/08 |
2:00:00 PM CST |
|
| D1-09-068 CONFLICT MONITOR TESTER |
08/18/08 |
2:00:00 PM CST |
D1-09-068 Tabulation |
| D1-09-075 SALT DOME ASPHALT PADS |
09/03/08 |
2:00:00 PM CST |
D1-09-075 TABULATION |
| D1-09-075 Addendum 001 |
09/03/08 |
2:00:00 PM CST |
|
| D1-09-113 LABOR FOR PAVING |
09/10/08 |
2:00:00 PM CST |
D1-09-113 Tabulation |
| D1-09-115 Detection System 169-29 |
09/24/08 |
1:00:00 PM CST |
D1-09-115 Tabulation |
| D1-09-116 Detection System 46-1 |
09/24/08 |
2:00:00 PM CST |
D1-09-116 Tabulation |
| D1-08-339 Commercial Mix |
03/24/2008 |
|
D1-08-339 Tabulation |
| D1-08-337 Concrete |
03/28/2008 |
1:00:00PM CST |
D1-08-337 Tabulation |
| D1-08-288 ANNUAL EQUIPMENT RENTAL |
03/21/2008 |
1:30:00PM CST |
D1-08-288 EQUIPMENT RENTAL TABULATION |
| D1-08-328 DISK MOWER |
03/24/2008 |
1:30:00PM CST |
D1-08-328 DISK MOWER TABULATION |
| D1-08-338 SEWER MONITORING |
04/03/2008 |
1:30:00PM CST |
D1-08-338 Tabulation |
| D1-08-255 CONCRETE SAW |
February 21, 2008 1:00:00 PM CST |
|
D1-08-255 Tabulation |
| D1-08-255 Addendum 001 |
|
|
|
| D1-08-255 Addendum 002 |
|
|
|
| D1-08-245 SALT BRINE TANKS |
February 1, 2008 1:00:00 PM CST |
|
Bid Cancelled 1/30/08 |
D1-08-235 ASBESTOS ABATEMENT
|
January 29, 2008 10:00:00 AM CST |
|
Bid Cancelled 2/04/08 |
| SFS 7-D1-08-151 |
December 7, 2007 |
December 20, 2007 |
The Missouri Department of Transportation, District 1, St. Joseph, has determined that there is only one known source that can supply MoDOT, D1, with Black Cat Joma 6000 System. Purchases relating to these items may or maynot exceed $60,000 individually and/or cumulatively and may be made throughout calendar year 2008. If you have any questions regarding this information, please contact Brenda Christie at 816-387-2430 or via email at Brenda.Christie@modot.mo.gov |
| D1-08-123 Propane |
November 26, 2007 |
10:00:00 A.M. CST |
D1-08-123 Tabulation |
D1-08-116 Hydraulic Post Driver
D1-08-116 Addendum 001
D1-08-116 Addendum 002 |
11/19/2007 |
10:00:00 A.M. CST |
D1-08-116 Tabulation Form |
D1-08-117 Salt Brine System
D1-08-117 Addendum 001 |
11/05/2007 |
11:00:00 A.M. CST |
D1-08-117 Tabulation Form |
| SFS 7-D1-08-111
|
October 18, 2007 |
October 23, 2007 |
The Missouri Department of Transportation, District 1, St. Joseph, has determined that there is only one known source that can supply MoDOT, D1, with GEOMELT 55 Anti-Icing/Deicing Fluid. The approximate value of this product cannot exceed $24,999.99 during the contract period. If you have any questions regarding this information, please contact Brenda Christie at 816-387-2430 or via email at
Brenda.Christie@modot.mo.gov |
| D1-08-092 Transmission Jack |
October 9, 2007 |
01:00:00 P.M. CST |
D1-08-092 Tabulation |
| D1-08-087 Dowel Pin Drill |
October 2, 2007 |
01:00:00 P.M. CST |
D1-08-087 Tabulation |
| D1-08-063 Self Propelled Paver |
September 13, 2007 |
10:00:00 A.M. CST |
D1-08-063 Tabulation |
D1-08-045 Remove and Install Garage Door
D1-08-045 Addendum 001 |
September 21, 2007 |
10:00:00 A.M. CST |
D1-08-045 Tabulation |
| D1-08-044 Walk Behind Lawn Mowers |
September 10,2007 |
10:00:00 A.M. CST |
D1-08-044 Tabulation |
| D1-08-055 Concrete Blocks |
August 28, 2007 |
01:00:00 P.M. CST |
No responses received |
| D1-08-056 Mobile Screen Machine Rental |
August 27, 2007 |
10:00:00 A.M. CST |
D1-08-056 Tabulation |
D1-08-035 Enclosed Walk Way
PreBid
D1-08-035 Addendum 001 |
August 31, 2007 |
10:00:00 A.M. CST |
D1-08-035 Tabulation |
| D1-08-036 RADAR GUNS |
August 29, 2007 |
01:00:00 P.M. CST |
D1-08-036 Tabulation |
| D1-08-040 CMP |
August 17, 2007 |
01:00:00 P.M. CST |
D1-08-040 Tabulation |
| D1-08-029 Mobile Screen Machine |
August 13, 2007 |
10:00:00 A.M. CST |
Canceled |
| D1-08-019 20-TON TRAILERS |
August 14, 2007 |
10:00:00 A.M. CST |
Bid canceled. |
D1-08-006 Electrical Wiring of Offices
D1-08-006 Addendum 001
D1-08-006 Addendum 002 |
August 8, 2007 |
10:00:00 A.M. CST |
D1-08-006 Tabulation |
| D1-07-243 CPU BOARDS AND MANAGER |
July 19, 2007 |
10:00:00 A.M. CST |
D1-07-243 Tabulation |
| D1-07-202 Install Guardrail |
July 16, 2007 |
01:00:00 P.M. CST |
D1-07-202 Tabulation |
| SFS D1-07-236 Disposal Roadway Debris and Dirt |
July 2, 2007 |
July 17, 2007 |
- The Missouri Department of Transportation has determined that only one source, City of St. Joseph Landfill, St. Joseph, Missouri can provide the department with the service for the disposal of roadway debris and dirt material for the St. Joseph, District 1 area. This service may exceed $25,000 individually and/or cumulatively and may be made throughout calendar year 2007 and expiring on December 31, 2007, with a one-year renewal option. A contract to purchase the above-described services may be executed with the City of St. Joseph Landfill, 6431 50th Road, St. Joseph, Missouri on July 18, 2007. To our knowledge, this service for the disposal of roadway debris and dirt material cannot be purchased from any other provider. Issues with this contractual agreement may be directed to Brenda Christie, 816-387-2430, email Brenda.Christie@modot.mo.gov. The closing date for this service bid is July 17, 2007 at 10:00:00 a.m. CST time.
|
D1-07-211 Rip Rap
D1-07-211 Addendum 001 |
June 14, 2007 |
10:00:00 A.M. CST |
D1-07-211 Tabulation |
| D1-07-209 Concrete Bunker Blocks |
June 8, 2007 |
10:00:00 A.M. CST |
Canceled |
D1-07-199 Sheridan Roof
D1-07-199 Addendum 001
Replacement Worth County |
June 7, 2007 |
01:00:00 P.M. CST |
|
D1-07-198 Roof Replacement
D1-07-198 Addendum 001
Buchanan County |
June 6, 2007 |
01:00:00 P.M. CST |
|
D1-07-173 Remove and Install Garage Door
D1-07-173 Addendum 001 |
May 16, 2007 |
10:00:00 A.M. CST |
D1-07-173 Tabulation |
D1-07-172 Garage Floor Repair
D1-07-172 Addendum 001 |
May 17, 2007 |
10:00:00 A.M. CST |
D1-07-172 Tabulation |
D1-07-166 Weigh Scale Window Replacement
D1-07-166 Addendum 001
D1-07-166 Addendum 002 |
May 10, 2007 |
10:00:00 A.M. CST |
Pending |
| D1-07-164 Salt Shelters and End Walls |
May 7, 2007 |
01:00:00 P.M. CST |
Canceled |
D1-07-160 Rental Power Screen
D1-07-160 Addendum 001 |
May 2, 2007 |
10:00:00 A.M. CST |
D1-07-160 Tabulation |
| D1-07-167 ANNUAL HOT AND COLD MIX |
April 24, 2007 |
10:00:00 A.M. CST |
D1-07-167 Tabulation |
| D1-07-146 Annual Concrete |
April 13, 2007 |
10:00:00 A.M. CST |
D1-7-146 Tabulation |
| D1-07-124 Disk Mowers |
April 11, 2007 |
10:00:00 A.M. CST |
D1-07-124 Tabulation |
| D1-07-144 Light Fixtures |
April 10, 2007 |
10:00:00 A.M. CST |
Revised
D1-07-144 Tabulation |
D1-07-011 Directional Underground Boring Servcies
D1-07-011 Addendum 001
D1-07-011 Addendum 002
D1-07-011 Addendum 003 |
April 11, 2007 |
02:00:00 P.M. CST |
D1-07-011 Tabulation |
| D1-07-131 Fiberglass Insulation |
March 16, 2007 |
10:00:00 A.M. CST |
D1-07-131 Tabulation |
D1-07-108 SPEC 8
D1-07-108 Addendum 001 |
March 2, 2007 |
10:00:00 A.M. CST |
D1-07-108 Tabulation |
| D1-07-103 Equipment Rental |
March 2, 2007 |
02:00:00 P.M. CST |
D1-07-103 Tabulation |
D1-07-104 Slag
D1-07-104 Addendum 001 |
February 16, 2007 |
10:00:00 A.M. CST |
D1-07-104 Tabulation |
| D1-07-099 PRESENTATIONS |
February 6, 2007 |
February 8, 2007 |
The Missouri Department of Transportation located in St. Joseph, Missouri is seeking a firm to give a presentation encouraging high school seniors and college students to consider the impact of making the decision to drink and drive. This presentation is sponsored by the Blueprint for Safety Coalition.
The Department of Transportation has identified Campuspeak, Aurora, CO as the only available firm meeting the general requirements as outlined and intend to clarify the use of that firm as a single feasible source to meet those needs. |
| D1-07-091 Vantage Plus Processor Unit Panel |
January 25, 2007 |
10:00:00 A.M. CST |
D1-07-091 Tabulation |
| D1-07-076 PROPANE |
December 19, 2006 |
10:00:00 A.M. CST |
D1-07-076 Tabulation |
| D1-07-075 Digital Color Copier |
December 14, 2006 |
10:00:00 A.M. CST |
D1-07-075 Tabulation |
| D1-07-073 SLOPE ENDS |
December 13, 2006 |
10:00:00 A.M. CST |
D1-07-073 Tabulation |
| D1-07-049 TRAILER MOVE BID |
November 29, 2006 |
10:00:00 A.M. CST |
D1-07-049 Tabulation |
D1-07-036 SALT SHELTERS
D1-07-036 ADDENDUM 001 |
October 31, 2006 |
02:00:00 P.M. CST |
CANCELED |
D1-07-048 FOUR POST HOIST LIFT
D1-07-048 ADDENDUM 001 FOUR POST HOIST LEFT |
October 31, 2006 |
10:00:00 A.M. CST |
D1-07-048 TAB - FOUR POST HOIST LIFT |
D1-07-025 Janitorial Services
ADDENDUM 001 D1-07-025 |
October 25, 2006 |
2:00:00 P.M. CST |
|
| D1-07-040 CONCRETE DRILL |
October 17, 2006 |
10:00:00 A.M. CST |
D1-07-040 Tabulation |
| D1-07-029 MARYVILLE DISC MOWER |
September 27, 2006 |
10:00:00 A.M. CST |
D1-07-029 TABULATION |
| D1-07-027 WALK BEHIND MOWER |
August 30, 2006 |
10:00:00 A.M. CST |
D1-07-027 Tabulation |
RFB 6-060706 D01 District Uniform Bid
RFB 6-060706 Addendum 001 |
July 6, 2006 |
2:00 p.m. |
|
| D1-07-001 Flatbed Trailer |
July 13, 2006 |
10:00:00 A.M. |
D1-07-001 Trailer Tabulation |
| D1-07-002 Concrete Saw |
July 12, 2006 |
10:00:00 A.M. |
D1-07-002 Concrete Saw Tabulation |
| D1-07-003 CUTTING TEETH |
July 10, 2006 |
10:00:00 A.M. |
D1-07-003 TABULATION |
| D1-07-008 HOT MIX |
July 18, 2006 |
10:00:00 A.M. |
D1-07-008 Tabulation |
| D1-07-016 CMP |
July 31, 2006 |
10:00:00 A.M. |
D1-07-016 Tabulation |
| |
|
|
|
| Title |
Closing Date |
Closing Time
(DST) |
Tabulations |
| D211-072-RO Annual Propane RFB |
June 20, 2011 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D211-071-R2 Cinder Hauling RFB |
June 6, 2011 |
1:00 PM |
Cinder Hauling Tabulation Sheet |
D211-070-RO Truck Wash Doors RFQ and Prevailing Wage Order 17 - Schuyler County and Addendum 001 |
May 13, 2011 |
1:00 PM |
Truck Wash Doors Tabulation Sheet |
| D211-068-R2 Grade E Concrete Rock and Concrete Sand RFQ |
May 2, 2011 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
| D211-067-R2 Spec 8 Aggregate RFQ |
April 29, 2011 |
1:00 PM |
Spec 8 Aggregate Tabulation Sheet |
| D211-066-R2 Tree Removal RFQ |
April 28, 2011 |
1:00 PM |
Tree Removal Tabulation Sheet |
| D211-064-RN Lease Rollers RFQ |
April 19, 2011 |
10:00 AM |
Lease Rollers Tabulation Sheet |
| D211-063-R2 Aggregate - Rip-Rap RFQ |
April 14, 2011 |
1:00 PM |
Aggregate - Rip-Rap Tabulation Sheet |
| D211-060-RN Roofing - Brookfield Concrete Crew RFQ and Prevailing Wage Order 17 - Linn County |
April 14, 2011 |
1:00 PM |
Roofing - Brookfield Concrete Crew Tabulation Sheet |
| D211-062-R2 Bush Hog 2715L Cutters RFB |
April 13, 2011 |
1:00 PM |
Bush Hog 2715L Cutters Tabulation Sheet |
| D211-061-R2 Lumber For Bridge Crew RFQ |
April 7, 2011 |
1:00 PM |
Lumber For Bridge Crew Tabulation Sheet |
| D211-056-RO Annual Hot Mix RFB |
March 31, 2011 |
1:00 PM |
Annual Hot Mix Tab Sheet |
| D211-058-R2 Type S Poly Culvert Pipe RFQ |
March 29, 2011 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D211-057-R2 Metal For Bridge Crew RFQ |
March 28, 2011 |
1:00 PM |
Metal For Bridge Crew Tabulation Sheet |
| D211-055-R2 Epoxy Coated Rebar RFQ |
March 25, 2011 |
1:00 PM |
Epoxy Coated Rebar Tabulation Sheet |
| D211-054-R2 Flexible Delineators RFQ |
March 23, 2011 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D211-053-R2 Metal Grates RFQ |
March 21, 2011 |
1:00 PM |
Metal Grates Tabulation Sheet |
D211-049-RO Car Wash RFB
Wage Order No. 17 |
March 11, 2011 |
1:00 PM |
Car Wash Tabulation Sheet |
| D211-051-RO Annual Concrete RFB |
March 10, 2011 |
1:00 PM |
2011 Annual Concrete Tab Sheet |
D209-062-R2-B Contract Mowing (Additional Areas) RFQ |
March 8, 2011 |
1:00 PM |
Contract Mowing (Additional Areas) Tabulation Sheet |
| D211-052-R2 Plywood RFQ |
March 7, 2011 |
1:00 PM |
Plywood Tabulation Sheet |
| D211-047-R2 Rubber Tired Excavator Lease RFB and Addendum 001 and Addendum 002 |
February 10, 2011 |
1:00 PM |
Rubber Tired Excavator Lease Tabulation Sheet |
| D211-046-R2 Cinder Hauling RFB |
February 8, 2011 |
1:00 PM |
Cinder Hauling Tabulation Sheet |
| D211-045-R2 Haydite VS. Trap Rock RFB |
February 4, 2011 |
1:00 PM |
Haydite VS. Trap Rock Tabulation Sheet |
| D211-043-R2 Type S Poly Culvert Pipe RFQ |
January 31, 2011 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D211-048-R2 Sand RFQ |
January 27, 2011 |
2:30 PM |
Sand Tabulation Sheet |
| D211-042-R2 Type 2 Rock Blanket RFQ |
January 27, 2011 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-041-R2 Aggregate - Rip-Rap RFQ |
January 25, 2011 |
1:00 PM |
Aggregate - Rip-Rap Tabulation Sheet |
| D211-039-R2 Type 2 Rock Blanket RFB |
January 21, 2011 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-036-RO Paint Tank Cleaning RFQ |
January 19, 2011 |
1:00 PM |
Paint Tank Cleaning Tabulation Sheet |
| D211-037-R2 Aggregate - 1.5 Inch Rock RFQ |
January 12, 2011 |
1:00 PM |
Aggregate - 1.5 Inch Rock Tabulation Sheet |
D211-028-R2 Pull Pavers RFB
and Addendum 001 |
January 5, 2011 |
1:00 PM |
Pull Pavers Tabulation Sheet |
| D211-035-R2 Solar Powered Street Light RFQ |
January 3, 2011 |
1:00 PM |
Solar Powered Street Light Tabulation Sheet |
| D211-034-R2 Light Fixtures and Bulbs RFQ |
December 28, 2010 |
1:00 PM |
Light Fixtures and Bulbs Tabulation Sheet |
| D211-031-RN Recap Tire Program RFB |
December 28, 2010 |
1:00 PM |
Recap Tire Program Tabulation Sheet |
| D211-033-R2 Type 2 Rock Blanket RFQ |
December 27, 2010 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-032-R2 Gabion Stone RFQ |
December 22, 2010 |
1:00 PM |
Gabion Stone Tabulation Sheet |
| D211-026-R2 Trackhoe Excavator Rental RFQ |
November 30, 2010 |
1:00 PM |
Trackhoe Excavator Rental Tabulation Sheet |
| D211-025-R2 Treated Wood Posts RFQ |
November 4, 2010 |
1:00 PM |
Treated Wood Posts Tabulation Sheet |
| D211-024-R2 Hauling Cinders RFB |
October 29, 2010 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
| D211-023-R2 Type 2 Rock Blanket RFQ |
October 25, 2010 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-022-R2 3-Inch and Type 5 Base Rock RFQ |
October 15, 2010 |
1:00 PM |
3-Inch and Type 5 Base Rock Tabulation Sheet |
| D211-020-R2 Crane and Pile Hammer Work RFQ |
October 5, 2010 |
1:00 PM |
Crane and Pile Hammer Work Tabulation Sheet |
| D211-019-R2 Type 2 Rock Blanket RFQ |
October 4, 2010 |
2:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-018-R2 Spec 8 Aggregate RFQ |
October 4, 2010 |
1:00 PM |
Spec 8 Aggregate Tabulation Sheet |
| D211-007-RN Diesel Fuel Tank Cleaning RFB and Addendum 001 |
September 27, 2010 |
1:00 PM |
RFB NOT AWARDED
DUE TO BUDGET CONSTRAINTS |
| D211-017-RN PVC Caps for Pipe Bollards RFQ |
September 22, 2010 |
1:00 PM |
PVC Caps for Pipe Bollards Tabulation Sheet |
| D211-016-RO Used Oil Disposal RFB |
September 16, 2010 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D211-015-R2 Chicago Pneumatic Jackhammers RFQ |
September 9, 2010 |
1:00 PM |
Chicago Pneumatic Jackhammers Tabulation Sheet |
| D211-014-RN Steel Pipe for Bollards RFB and Addendum 001 |
September 8, 2010
September 9, 2010 |
1:00 PM |
Steel Pipe for Bollards RFB Tabulation Sheet |
| D211-013-R2 Various Aggregates RFQ |
August 30, 2010 |
1:00 PM |
Various Aggregates Tabulation Sheet |
| D211-009-RN Stump Grinding Services RFQ |
August 19, 2010 |
1:00 PM |
Stump Grinding Service RFQ Tabulation Sheet |
| D211-011-R2 Emergency Premix RFQ |
August 19, 2010 |
10:00 AM |
Emergency Premix Tabulation Sheet |
| D211-010-RN Emergency Lease - Vibratory Rollers RFQ |
August 18, 2010 |
10:00 AM |
Emergency Lease - Vibratory Rollers RFQ Tabulation Sheet |
| D211-002-RN Collection & Disposal of Scrap Metal RFB and Addendum 001 |
August 6, 2010
August 12, 2010 |
1:00 PM |
RFB NOT AWARDED |
D211-008-R2 Sand RFQ |
August 4, 2010 |
9:00 AM |
Sand Tabulation Sheet |
| D211-006-R2 Two-Inch Rock (Wetlands Road) RFQ |
August 3, 2010 |
1:00 PM |
Two-Inch Rock (Wetlands Road) Tabulation Sheet |
| D211-003-R2 9-Foot Diameter Metal Pipe RFB and Addendum 001 |
August 2, 2010
August 3, 2010 |
1:00 PM |
9-Foot Diameter Metal Pipe Tabulation Sheet |
D211-005-R2 Rock Blanket and Gabion Stone RFQ |
July 27, 2010 |
1:00 PM |
Rock Blanket and Gabion Stone Tabulation Sheet |
| D211-001-RO Flexible Delineators RFQ |
July 20, 2010 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D210-075-R2 Hydrodemolition - Bridge A1970 RFB |
June 24, 2010 |
1:00 PM |
Hydrodemolition Tabulation Sheet |
| D210-073-R2 Type 2 Rock Blanket RFB |
June 23, 2010 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D210-072-R2 Aggregates - Rip-Rap RFB |
June 22, 2010 |
1:00 PM |
Aggregates - Rip-Rap Tabulation Sheet |
| D210-074-R2 Plate Steel RFQ |
June 15, 2010 |
1:00 PM |
Plate Steel Tabulation Sheet |
| D210-068-RN Tree Removal Services |
June 8, 2010 |
1:00 PM |
Tree Removal Service Tabulation Sheet |
| D210-071-R2 Trackhoe Rental RFQ |
June 2, 2010 |
1:00 PM |
Trackhoe Rental Tabulation Sheet |
| D210-069-R2 Trailer RFQ |
May 28, 2010 |
1:00 PM |
Trailer Tabulation Sheet |
| D210-066-RO Annual Propane RFB |
May 27, 2010 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D210-067-R2 Diamond Grinding RFQ and Addendum 001 |
May 18, 2010 |
1:00 PM |
Diamond Grinding Tabulation Sheet |
| D210-065-R2 Rock Blanket and Rip-Rap RFQ |
April 27, 2010 |
1:00 PM |
Rock Blanket and Rip-Rap Tabulation Sheet |
| D210-062-R2 Hauling Cinders RFB |
April 22, 2010 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
| D210-061-R2 Grade E Concrete Rock and Concrete Sand RFQ |
April 13, 2010 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
| D210-060-R2 Coal Slag Abrasive RFQ |
April 9, 2010 |
1:00 PM |
RFQ NOT AWARDED
DUE TO BUDGET CONSTRAINTS |
| D210-049-RO Annual Hot Mix RFB |
March 25, 2010 |
1:00 PM |
Annual Hot Mix Tabulation Sheet |
D210-048-R2 Lubricant Storage and Dispensing Apparatus RFQ and Addendum 001 |
March 18, 2010 |
1:00 PM |
Lubricant Storage and Dispensing Apparatus Tabulation Sheet |
| D210-058-R2 Hydraulic Breaker Rental RFQ |
March 17, 2010 |
1:00 PM |
Hydraulic Breaker Rental Tabulation Sheet |
| D209-062-R2-A Contract Mowing (Additional Areas) RFQ |
March 16, 2010 |
1:00 PM |
RFQ CANCELLED
DUE TO BUDGET CUTBACKS |
D210-053-RO Vehicle Maintenance RFB and Sample list of vehicles |
March 9, 2010 |
1:00 PM |
Vehicle Maintenance Tabulation Sheet |
| D210-057-R2 Solar Flashing Beacons RFQ |
March 4, 2010 |
1:00 PM |
Solar Flashing Beacons Tabulation Sheet |
| D210-054-RO Annual Concrete RFB |
February 25, 2010 |
1:00 PM |
Annual Concrete Tabulation Sheet |
| D210-056-R2 Trailers RFQ |
February 22, 2010 |
1:00 PM |
Trailers Tabulation Sheet |
| D210-055-R2 Timber For Bridge Backwall RFQ |
February 18, 2010 |
1:00 PM |
Timber for Bridge Backwall Tabulation Sheet |
| D210-052-RN 9' Pickup Material Spreaders RFQ |
February 10, 2010 |
1:00 PM |
9' Pickup Material Spreaders Tabulation Sheet |
D210-047-RN Lease - Wheeled Excavator RFB and Addendum 001 |
February 1, 2010 |
1:00 PM |
Lease - Wheeled Excavator Tabulation Sheet |
| D210-051-R2 Hauling Cinders RFB |
January 27, 2010 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
| D210-050-R2 Carpentry and Plumbing Supplies RFQ |
January 22, 2010 |
1:00 PM |
Carpentry and Plumbing Tabulation Sheet |
D210-044-RN Filters (Air, Fuel, Oil, Etc.) RFB and 2010 Filter Pricing Sheet and Addendum 001 - Informational Only and MoDOT D2 Equipment Counts |
January 20, 2010 |
1:00 PM |
Filters (Air, Oil, Fuel, etc.) Tabulation Sheet |
| D210-046-R2 Spill Containment Pallets RFQ |
January 12, 2009 |
1:00 PM |
Spill Containment Pallets Tabulation Sheet |
| D210-040-RN Undercarriage For Bulldozer RFB and Addendum 001 and Addendum 002 |
December 23, 2009
December 29, 2009 |
1:00 PM |
Undercarriage for Bulldozer Tabulation Sheet |
| D210-039-R2 Elliptical Leg Tank RFQ |
December 16, 2009 |
1:00 PM |
Elliptical Leg Tank Tabulation Sheet |
| D210-042-R2 Various Aggregates RFQ |
December 16, 2009 |
10:00 AM |
Various Aggregates Tabulation Sheet |
| D210-043-R2 Trackhoe With Operator RFQ |
December 16, 2009 |
9:00 AM |
RFQ NOT AWARDED - Trackhoe With Operator Tabulation Sheet |
| D210-038-R2 Haydite VS. Trap Rock RFB |
December 15, 2009 |
1:00 PM |
Haydite VS. Trap Rock Tabulation Sheet |
| D210-041-R2 Plant Pick-Up Rip-Rap RFQ |
December 15, 2009 |
10:00 AM |
Plant Pick-Up Rip-Rap Tabulation Sheet |
| D210-037-RN Pressure Washers RFQ |
December 11, 2009 |
1:00 PM |
Pressure Washer Tabulation Sheet |
| D210-033-R2 Diamond Saw Blades RFQ |
December 11, 2009 |
1:00 PM |
Diamond Saw Blades Tabulation Sheet |
| D210-032-R2 Rip-Rap RFB |
December 10, 2009 |
1:00 PM |
Rip-Rap Tabulation Sheet |
| D210-031-R2 Type S Poly Culvert Pipe RFQ |
December 9, 2009 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D210-030-R2 Culvert Pipe Liner RFQ |
December 8, 2009 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D210-029-R2 Type 2 Rock Blanket RFQ |
December 7, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D210-034-R2 On-Call Hauling Service RFQ |
December 3, 2009 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet |
| D210-027-RM Solar Flashing Amber Beacon RFQ |
November 12, 2009 |
1:00 PM |
Solar Flashing Amber Beacon Tabulation Sheet |
D210-008-RM Tree Removal Services RFB and Addendum 001 |
November 10, 2009 |
1:00 PM |
Tree Removal Services Tabulation Sheet |
D210-026-RN Motorgrader Tires RFB and Addendum 001 |
October 28, 2009 |
1:00 PM |
Motorgrader Tires Tabulation Sheet |
| D210-025-RO Used Oil Disposal RFB |
October 23, 2009 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D210-023-R2 Underground Boring RFB |
October 16, 2009 |
1:00 PM |
Underground Boring Tabulation Sheet |
D210-017-RO Janitorial Services RFB and Building Floor Plans and Addendum 001 |
October 6, 2009 |
1:00 PM |
Janitorial Services Tabulation Sheet |
D210-018-RM One-Month Trackhoe Lease RFQ and 902 North Missouri Street (Map) |
September 21, 2009 |
1:00 PM |
One-Month Trackhoe Lease Tabulation Sheet |
| D210-022-R2 Type 2 Rock Blanket RFQ |
September 18, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D210-021-R2 Metal Pipe RFQ |
September 17, 2009 |
1:00 PM |
Metal Pipe Tabulation Sheet |
| D210-016-RN Shoulder Recycler RFQ |
September 17, 2009 |
1:00 PM |
Shoulder Recycler Tabulation Sheet |
D210-020-R2 Steel Piling RFQ
and Addendum 001 |
September 16, 2009 |
1:00 PM |
Steel Piling Tabulation Sheet |
| D210-015-R2 Dozer Rental RFQ |
August 24, 2009 |
1:00 PM |
Dozer Rental Tabulation Sheet |
| D210-014-R2 Trailers RFQ |
August 21, 2009 |
1:00 PM |
Trailers RFQ Tabulation Sheet |
| D210-013-R2 Hauling Cinders RFB |
August 20, 2009 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
D210-005-RM Guardrail Repair Randolph County RFB and General Wage Order and Map of Randolph Co. Guardrail Projects and Plan Sheet - Proposed Guardrail at the Norfolk and Southern Railroad Overpass and Plan Sheet - Proposed Guardrail at McKinsey St. Overpass and Missouri Standard Specification for Highway Construction 2004 Edition and Typical Work Zone Applicaitons |
August 20, 2009 |
1:00 PM |
Guardrail Repair Randolph County Tabulation Sheet |
| D210-012-R2 Aluminum Box Culvert RFQ and Addendum 001 |
August 19, 2009 |
1:00 PM |
Aluminum Box Culvert Tabulation Sheet |
| D210-011-R2 Coal Slag Abrasive RFQ |
August 18, 2009 |
1:00 PM |
Coal Slag Abrasive Tabulation Sheet |
| D210-007-R2 Dust Control RFQ |
August 10, 2009 |
1:00 PM |
Dust Control Tabulation Sheet |
| D210-006-R2 Spec 8 Aggregate RFQ |
August 7, 2009 |
1:00 PM |
Spec 8 Aggregate Tabulation Sheet |
D210-004-RM Concrete Pad RFQ
and Addendum 001 |
August 3, 2009 |
1:00 PM |
Concrete Pad Tabulation Sheet |
| D210-002-R2 Arched Metal Pipe RFQ and Addendum 001 |
July 17, 2009 |
1:00 PM |
Arched Metal Pipe Tabulation Sheet |
| D210-001-R2 Metal Pipe RFQ |
July 16, 2009 |
1:00 PM |
RFQ CANCELLED (NOT AWARDED) |
| D209-097-R2 Rip-Rap RFB |
July 15, 2009 |
1:00 PM |
Rip-Rap Tabulation Sheet |
D209-100-RM Electrical Components RFQ and Addendum 001 |
July 8, 2009 |
1:00 PM |
Electrical Components Tabulation Sheet |
| D209-096-R2 Poly Pipe RFB |
July 8, 2009 |
1:00 PM |
Poly Pipe Tabulation Sheet |
| D209-095-R2 Metal Pipe RFB |
July 7, 2009 |
1:00 PM |
Metal Pipe Tabulation Sheet |
| D209-094-R2 Western Snowplows RFQ |
July 6, 2009 |
1:00 PM |
Western Snowplows Tabulation Sheet |
| D209-093-R2 Bush Hog 2715 Cutter RFQ |
July 2, 2009 |
2:00 PM |
Bush Hog 2715 Cutter Tabulation Sheet |
| D209-092-R2 Pipe Liner RFQ |
July 1, 2009 |
1:00 PM |
Pipe Liner Tabulation Sheet |
| D209-099-R2 Plate Arch Pipe RFQ and Addendum 001 |
July 1, 2009 |
10:00 AM |
RFQ CANCELLED (NOT AWARDED) |
| D209-091-R2 Tire Chains RFQ |
June 30, 2009 |
1:00 PM |
Tire Chains Tabulation Sheet |
| D209-090-R2 Flexible Delineators RFQ |
June 29, 2009 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D209-089-R2 18-Foot Trailer RFQ |
June 29, 2009 |
10:00 AM |
18-Foot Trailer Tabulation Sheet |
| D209-087-RM Loader Tires RFQ |
June 8, 2009 |
10:00 AM |
Loader Tire Tabulation Sheet |
| D209-086-R2 Walk-Behind Mower RFQ |
June 4, 2009 |
1:00 PM |
Walk-Behind Mower Tabulation Sheet |
| D209-085-R2 Corrugated Metal Pipe RFQ |
June 3, 2009 |
10:00 AM |
Corrugated Metal Pipe Tabulation Sheet |
D209-084-R2 Digitizing Microfiche RFQ and Addendum 001 |
May 28, 2009 |
1:00 PM |
Digitizing Microfiche Tabulation Sheet |
| D209-083-RM 2009-2010 Annual Propane RFB |
May 28, 2009 |
1:00 PM |
2009-2010 Annual Propane Tabulation Sheet |
| D209-081-RM Retaining Wall Knob Style Concrete Interlocking Blocks RFQ |
May 18, 2009 |
1:00 PM |
Retaining Wall Knob Style Concrete Interlocking Blocks Tabulation Sheet |
| D209-054-RM Hot Water Pressure Washer RFQ |
May 4, 2009 |
1:00 PM |
Hot Water Pressure Washer Tabulation Sheet |
| D209-080-RM Concrete Slab Unionville Salt Bldg. RFQ |
April 30, 2009 |
1:00 PM |
Concrete Slab Tabulation Sheet |
D209-074-RM Courier Service RFB and Addendum 001 |
April 15, 2009
April 21, 2009 |
1:00 PM |
NO AWARD - Utilized In-house Services
Courier Service Tabulation Sheet |
| D209-079-R2 Plywood and Lumber RFQ |
April 17, 2009 |
1:00 PM |
Plywood and Lumber Tabulation Sheet |
| D209-078-R2 Culvert Pipe Liner RFQ |
April 16, 2009 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D209-077-R2 Corrugated Metal Pipe RFQ |
April 15, 2009 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-076-R2 Steel RFQ |
April 14, 2009 |
10:00 AM |
Steel Tabulation Sheet |
| D209-067-RN Chassis Removal and Installation RFQ |
April 8, 2009 |
1:00 PM |
Chassis Removal and Installation Tabulation Sheet |
| D209-075-R2 Grade E Concrete Rock and Concrete Sand RFQ |
March 30, 2009 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
| D209-073-RM Annual Hot Mix RFB |
March 25, 2009 |
1:00 PM |
Annual Hot Mix Price Agreements |
| D209-059-RM Fuel Pump Dispensers RFB |
March 16, 2009 |
1:00 PM |
Fuel Pump Dispensers Tabulation Sheet |
D209-072-R2 Crushed Porphyry Rock RFB
and Addendum 001 |
March 13, 2009 |
10:00 AM |
Crushed Porphyry Rock Tabulation Sheet |
| D209-066-RN Motorgrader Shoulder Conditioning Attachment RFQ |
March 12, 2009 |
1:00 PM |
Motorgrader Shoulder Conditioning Attachment Tabulation Sheet |
| D209-071-R2 Truck Conspicuity D.O.T. Tape RFQ |
March 12, 2009 |
10:00 AM |
Truck Conspicuity D.O.T. Tape Tabulation Sheet |
| D209-070-R2 Bush Hog 2715 Cutter RFQ |
March 11, 2009 |
2:00 PM |
NOT AWARDED due to budget constraints
Bush Hog 2715 Cutter Tabulation Sheet |
| D209-069-R2 Pull Broom RFQ |
March 11, 2009 |
12:00 PM (Noon) |
Pull Broom Tabulation Sheet |
| D209-068-R2 Steel RFQ |
March 10, 2009 |
1:00 PM |
Steel Tabulation Sheet |
| D209-064-R2 Plate Steel RFQ |
March 10, 2009 |
10:00 AM |
Plate Steel Tabulation Sheet |
D209-065-R2 Hauling Cinders RFQ |
March 4, 2009 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
D209-062-R2 Contract Mowing RFQ |
February 24, 2009 |
1:00 PM |
Contract Mowing Tabulation Sheet |
| D209-063-R2 Corrugated Metal Pipe RFQ |
February 18, 2009 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-053-RE Annual Concrete RFB |
February 17, 2009 |
1:00 PM |
Annual Concrete Tabulation Sheet |
| D209-061-R2 Corrugated Metal Pipe RFQ |
February 11, 2009 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-058-R2 Type 2 Rock Blanket RFQ |
January 30, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D209-082-R2 Uretek Pavement Leveling SFS Posting |
May 12, 2009 |
1:00 PM |
Uretek USA, Inc. |
| D209-060-R2 Video Detection System Parts RFQ |
February 5, 2009 |
1:00 PM |
Delta Technologies, Inc.
Video Detection System Parts Tabulation Sheet |
D209-047-RM One-Month Lease Trackhoe RFQ
and Addendum 001 |
January 29, 2009 |
1:00 PM |
One-Month Lease Trackhoe Tabulation Sheet |
D209-050-R2 Type 2 Rock Blanket RFB and Addendum 001 |
January 7, 2009
January 5, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D209-052-R2 Aggregates - Sand RFQ |
January 2, 2009 |
1:00 PM |
Aggregates - Sand Tabulation Sheet |
| D209-049-R2 Corrugated Metal Pipe RFQ |
December 17, 2008 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-044-R2 Crushed Porphyry Rock RFB |
December 16, 2008 |
1:00 PM |
Crushed Porphyry Rock Tabulation Sheet |
| D209-048-R2 4X4 Utility Vehicle RFQ |
December 15, 2008 |
1:00 PM |
4X4 Utility Vehicle Tabulation Sheet |
| D209-043-R2 Aggregates - Shot Rock RFB |
December 12, 2008 |
1:00 PM |
Aggregates - Shot Rock Tabulation Sheet |
D209-042-R2 Aggregates - Rip-Rap RFB and
Addendum 001 |
December 11, 2008 |
1:00 PM |
Aggregates - Rip-Rap Tabulation Sheet |
| D209-035-RE Repair Fencing RFQ |
December 11, 2008 |
1:00 PM |
Repair Fencing Tabulation Sheet |
| D209-046-R2 Aggregates - 1.5 Inch Rock RFQ |
December 9, 2008 |
1:00 PM |
Aggregates - 1.5 Inch Rock Tabulation Sheet |
| D209-041-R2 Diamond Saw Blades RFQ |
December 8, 2008 |
1:00 PM |
Diamond Saw Blades Tabulation Sheet |
| D209-045-R2 Corrugated Metal Pipe RFQ |
December 5, 2008 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-039-R2 Lockout Tagout Kits RFQ |
December 2, 2008 |
1:00 PM |
Lockout Tagout Kits Tabulation Sheet |
| D209-040-R2 Protect-a-Rail and Mounting Kit RFQ |
November 26, 2008 |
1:00 PM |
Protect-a-Rail and Mounting Kit Tabulation Sheet |
| D209-038-R2 Corrugated Metal Pipe RFQ |
November 26, 2008 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-037-R2 Type S Poly Culvert Pipe RFQ |
November 25, 2008 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
D209-030-R2 Crushed Porphyry Rock RFB and
Addendum 001 |
November 20, 2008 |
1:00 PM |
Crushed Porphyry Rock Tabulation Sheet |
| D209-031-R2 Coal Slag Abrasive RFQ |
November 18, 2008 |
1:00 PM |
Coal Slag Abrasive Tabulation Sheet |
| SFS 7 - D209-028-RM Screened, Washed & Cleaned Cinders |
November 17, 2008 |
1:00 PM |
Reed Minerals, Inc. - Screened Washed and Cleaned Cinders Tabulation Sheet |
| D209-029-RM Loader Tires RFQ |
November 10, 2008 |
1:00 PM |
Loader Tire Tabulation Sheet |
| D209-025-R2 On-Call Hauling Service RFQ |
October 30, 2008 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet
Haul Rate Chart:
1) Haul Rate Chart - Effective 11-01-08
2) Haul Rate Chart - Effective 12-01-08
3) Haul Rate Chart - Effective 02-01-09
4) Haul Rate Chart - Effective 03-01-09 |
| D209-015-RM ProLaser III Laser Radar Gun RFQ |
October 29, 2008 |
1:00 PM |
ProLaser III Laser Radar Gun Tabulation Sheet |
D209-024-R2 Recap Tire Program RFB
and Addendum 001 |
October 28, 2008 |
1:00 PM |
Recap Tire Program Tabulation Sheet |
| D209-027-RM Knob Style Interlocking Concrete Blocks RFQ |
October 16, 2008 |
2:00 PM |
Knob Style Interlocking Concrete Blocks Tabulation Sheet |
| D209-026-RM Video Detection Equipment RFB |
October 9, 2008 |
1:00 PM |
Video Detection Equipment Tabulation Sheet |
| D209-023-RE Light Strips and Bulbs RFB |
October 8, 2008 |
1:00 PM |
Light Strips and Bulbs Tabulation Sheet |
| D209-022-R2 Flexible Delineators RFQ |
October 3, 2008 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D209-021-R2 Plate Steel and Pipe RFQ |
October 1, 2008 |
1:00 PM |
Plate Steel and Pipe Tabulation Sheet |
| D209-020-R2 Used Oil Disposal RFB |
September 29, 2008 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D209-019-R2 Culvert Pipe Liner RFQ |
September 25, 2008 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D209-018-R2 Type S Poly Culvert Pipe RFB |
September 23, 2008 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D209-014-R2 GPS Survey Equipment RFB |
September 18, 2008 |
1:00 PM |
GPS Survey Equipment Tabulation Sheet |
| D209-017-R2 Type 2 Rock Blanket RFQ |
September 15, 2008 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D209-008-RE Crane and Pile Hammer RFB |
September 10, 2008 |
1:00 PM |
Crane and Pile Hammer Tabulation Sheet |
| D209-012-R2 Premium Hardwood Mulch RFQ |
August 29, 2008 |
1:00 PM |
Premium Hardwood Mulch Tabulation Sheet |
| D209-013-RM One-Month Lease Trackhoe RFQ |
August 28, 2008 |
1:00 PM |
One-Month Lease Trackhoe Tabulation Sheet |
| D209-011-R2 Western Snowplow RFQ |
August 26, 2008 |
1:00 PM |
Western Snowplow Tabulation Sheet |
| D209-010-R2 Type 2 Rock Blanket RFQ |
August 19, 2008 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
D209-007-RE Bridge Repair RFQ Attachments:
|
August 7, 2008 |
1:00 PM |
Bridge Repair Tabulation Sheet |
| D209-006-R2 Tire Chains and Crosslinks RFQ |
August 6, 2008 |
1:00 PM |
Tire Chains and Crosslinks Tabulation Sheet |
| D209-005-R2 Waste Aggregate Scalpings RFQ |
August 5, 2008 |
1:00 PM |
Waste Aggregate Scalpings Tabulation Sheet |
| D209-003-RN Whelen LED Lights SFS |
July 21. 2008 |
1:00 PM |
Whelen Engineering Co.
Whelen LED Lights Tabulation Sheet |
D208-057-RE Fuel Tank Installation RFB
and Addendum 001 |
July 10, 2008 |
1:00 PM |
Fuel Tank Installation Tabulation Sheet |
| D209-002-R2 Aggregates - Rip-Rap RFQ |
July 9, 2008 |
10:00 AM |
Aggregates - Rip-Rap Tabulation Sheet |
| D208-055-RE Fayette Force Main RFB |
July 3, 2008 |
1:00 PM |
Fayette Force Main Tabulation Sheet |
| D208-058-R2 Oils, Lubricants & Fluids RFQ |
July 1, 2008 |
1:00 PM |
Initial Award Sheet:
Oils, Lubricants & Fluids Tabulation Sheet
Revised Award Sheets:
1) Pricing Sheet - Effective 08-01-08
2) Pricing Sheet - Effective 10-01-08
3) Pricing Sheet - Effective 11-01-08
4) Pricing Sheet - Effective 12-01-08 |
D208-050-RE Fuel Tank Removal RFQ and Addendum 001 |
June 4, 2008
June 12, 2008 |
1:00 PM |
Fuel Tank Removal Tabulation Sheet |
D208-054-R2 Contract Mowing RFQ and Addendum 001 - Informational Only |
June 11, 2008 |
1:00 PM |
Contract Mowing Tabulation Sheet |
D208-051-RE Fuel Tank Installation RFB and
Addendum 001 |
May 29, 2008
June 5, 2008 |
1:00 PM |
RFB CANCELLED (NOT AWARDED) |
D208-052-RN 36 Inch Steel Pipe RFQ |
June 3, 2008 |
1:00 PM |
36 Inch Steel Pipe Tabulation Sheet |
| D208-059-R2 Video Detection Equipment SFS RFQ |
June 18, 2008 |
1:00 PM |
Delta Technologies, Inc. - Video Detection Equipment Tabulation Sheet |
| D208-056-RN Portable Tank Cleaning Unit SFS RFQ |
June 10, 2008 |
1:00 PM |
RCI Technologies - Portable Tank Cleaning Unit Tabulation Sheet |
| D208-046-RE Annual Propane RFB |
May 29, 2008 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D208-053-R2 Materials Lab Equipment SFS RFQ |
May 28, 2008 |
1:00 PM |
Gilson Company, Inc. - Materials Lab Equipment Tabulation Sheet |
| D208-048-RN Concrete Screed SFS RFQ |
May 23, 2008 |
1:00 PM |
Lura Enterprises, LLC. -
Concrete Screed Tabulation Sheet |
| D208-049-RE Kirksville Project Office Addition RFQ |
May 20, 2008 |
1:00 PM |
Kirksville Project Office Addition Tabulation Sheet |
| D208-047-RE Heavy Duty 10 Foot Rear Mount Blade RFQ |
May 7, 2008 |
1:00 PM |
Heavy Duty 10 Foot Rear Mount Blade Tabulation Sheet |
| D208-044-RE Annual Hot Mix RFB |
April 15, 2008 |
1:00 PM |
Annual Hot Mix Tabulation Sheet |
| D208-042-RE 2nd Quarter Oil Lube and Fluids RFQ |
April 4, 2008 |
1:00 PM |
2nd Quarter Oil Lube and Fluids Tabulation Sheet |
| D208-043-R2 Plant Pick Up Sand SFS RFQ |
March 31, 2008 |
1:00 PM |
Missouri Contractors, LLC. -
Plant Pick Up Sand Tabulation Sheet |
D208-040-RE Fabric Door RFB and Addendum 001 |
March 20, 2008 |
1:00 PM |
Fabric Door Tabulation Sheet |
| D208-039-R2 Grade E Concrete Rock and Concrete Sand RFQ |
March 6, 2008 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
D208-038-R2 Poly Tanks RFQ and Poly Tank Pictures - For Example Only |
March 4, 2008 |
1:00 PM |
Poly Tank Tabulation Sheet |
| D208-037-R2 Pull Broom RFQ |
March 3, 2008 |
1:00 PM |
Pull Broom Tabulation Sheet |
| D208-036-R2 Black Cat Joma Blades SFS RFQ |
February 27, 2008 |
1:00 PM |
Winter Equipment Co. -
Black Cat Joma Blades Tabulation Sheet |
| D208-033-RE Annual Concrete RFB |
February 14, 2008 |
1:00 PM |
Annual Concrete Tabulation Sheet |
| D208-034-R2 Wireless Interconnect SFS RFQ |
February 13, 2008 |
1:00 PM |
Brown Traffic Products -
Wireless Interconnect Tabulation Sheet |
D208-032-R2 Employee Recognition Shirts RFQ
and Addendum 001 and Addendum 002 |
January 22, 2008
January 24, 2008 |
1:00 PM |
Employee Recognition Shirts Tabulation Sheet |
| D208-029-R2 Culvert Pipe Liner RFQ |
January 16, 2008 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D208-028-R2 Type S Poly Culvert Pipe RFB |
January 15, 2008 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
D208-027-R2 Diamond Saw Blades RFQ
and Addendum 001 - Informational Only |
January 10, 2008 |
1:00 PM |
Diamond Saw Blades Tabulation Sheet |
D208-026-R2 Aggregates - 1 Inch Driveway Rock - RFQ and Addendum 001 and Addendum 002 |
January 9, 2008 |
1:00 PM |
Aggregates - 1 Inch Driveway Rock - Tabulation Sheet |
D208-025-R2 Aggregates - Rip-Rap - RFB
and Addendum 001 |
January 8, 2008 |
1:00 PM |
Aggregates - Rip-Rap - Tabulation Sheet |
D208-031-RE 1st Quarter Oil Lube and Fluids RFQ and Addendum 001 |
December 27, 2007
January 2, 2008 |
1:00 PM |
1st Quarter Oil Lube and Fluids Tabulation Sheet (Vendor withdrew their quote) 1st Quarter Oil Lube and Fluids Tabulation Sheet - Revised 02-04-08
|
| D208-030-R2 Video System SFS RFQ |
January 17, 2008 |
1:00 PM |
Enforcement Video, LP
(DBA: WatchGuard Video) -
Video System SFS Tabulation Sheet |
| D208-024-R2 Haydite - Fine Grade - SFS RFB |
January 3, 2008 |
1:00 PM |
Buildex, Inc. -
Haydite - Fine Grade - SFS Tabulation Sheet |
| D208-003-R2 Floor Mat and Shop Towel Service RFQ |
December 20, 2007 |
1:00 PM |
Floor Mat and Shop Towel Service Tabulation Sheet |
| D208-022-RN Geomelt RFQ |
November 14, 2007 |
1:00 PM |
Smith Fertilizer & Grain, Inc. |
| D208-017-RN Motorgrader Shouldering Tool RFQ |
October 29, 2007 |
1:00 PM |
Motorgrader Shouldering Tool Tabulation Sheet |
| D208-020-R2 Used Oil Disposal RFB |
October 26, 2007 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D208-015-R2 4th Quarter Oil Lube and Fluids RFQ |
October 2, 2007 |
1:00 PM |
Oil Lube and Fluids Tabulation Sheet |
D208-014-R2 Rally Towels RFQ and Addendum 001 |
October 1, 2007 |
1:00 PM |
Rally Towels Tabulation Sheet |
D208-012-RN Diesel Tank Cleaning RFB and
Addendum 001 |
September 18, 2007 |
1:00 PM |
Diesel Tank Tabulation Sheet |
| D208-013-R2 Poly Pipe RFQ |
September 11, 2007 |
1:00 PM |
Poly Pipe Tabulation Sheet |
| D208-006-RE Fabric Doors RFB (Cancelled) |
August 30, 2007 |
1:00 PM |
RFB CANCELLED (NOT AWARDED) |
| D208-010-RE Paint Tank Cleaning RFQ |
August 28, 2007 |
1:00 PM |
Paint Tank Cleaning Tabulation Sheet |
| D208-009-RN Material Spreaders RFQ |
August 22, 2007 |
1:00 PM |
Spreader RFB Tabulation Sheet |
| D208-011-R2 Child Car Seats RFQ |
August 21, 2007 |
1:00 PM |
Child Car Seats Tabulation Sheet |
| D208-008-R2 Aluminum Backing Bars RFQ (Cancelled) |
August 9, 2007 |
1:00 PM |
RFQ CANCELLED (NOT AWARDED) |
| D208-007-R2 Posts - Slip Bases RFQ |
August 8, 2007 |
1:00 PM |
Posts - Slip Bases Tabulation Sheet |
D208-004-R2 Pavement Leveling RFB
and General Wage Order No. 50 and D208-004-R2 Addendum 001 |
August 3, 2007 |
1:00 PM |
Pavement Leveling Tabulation Sheet |
| D208-002-R2 Transportation Options RFI (Request For Information Only) |
July 6, 2007 |
1:00 PM |
The following were the responses received to the RFI:
RFI Response - Hornblower Marine Services
RFI Response - OATS Inc
RFI Response - Sunset Tours Inc
RFI Response - White Knight Coaches Inc |
| D208-001-RN Pressure Washer RFQ |
June 27, 2007 |
1:00 PM |
Pressure Washer Tabulation Sheet |
| D207-082-R2 Aggregates - Rip-Rap - RFQ |
June 21, 2007 |
1:00 PM |
Aggregates - Rip-Rap - Tabulation Sheet |
| D207-081-R2 Trackhoe With Operator RFQ |
June 15, 2007 |
1:00 PM |
RFQ CANCELLED (NOT AWARDED ) |
D207-052-RN Lease Trackhoe RFB and Addendum 001 |
June 14, 2007 |
1:00 PM |
Lease Trackhoe Bid Tabulation Sheet |
D207-078-R2 Contract Mowing - Saline County - RFQ and D207-078-R2 Addendum 001 |
June 6, 2007 |
1:00 PM |
Contract Mowing - Saline County - Tabulation Sheet |
| D207-073-RE Annual Propane RFB |
May 30, 2007 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D207-076-R2 Haydite - Fine Grade - SFS RFB |
May 18, 2007 |
1:00 PM |
Buildex, Inc. - Haydite SFS Tabulation Sheet |
| D207-075-RN Walk-Behind Mower RFQ |
May 15, 2007 |
1:00 PM |
Walk-Behind Mower Tabulation Sheet |
D207-072-RE Refurbish and Repair Salt Buildings RFQ and Addendum 001 and Addendum 002 |
May 9, 2007 |
1:00 PM |
Refurbish and Repair Salt Buildings Tabulation Sheet |
| D207-070-RN Leased Aggregate Screen RFQ |
May 9, 2007 |
1:00 PM |
Leased Aggregate Screen Tabulation Sheet |
| D207-074-R2 Child Car Seats RFQ |
May 3, 2007 |
1:00 PM |
Child Car Seats Tabulation Sheet |
| D207-071-RN Zero-Turn Radius Mower RFQ |
May 3, 2007 |
1:00 PM |
Zero-Turn Radius Mower Tabulation Sheet |
| D207-069-R2 Flowable Backfill RFQ |
April 30, 2007 |
1:00 PM |
Flowable Backfill Tabulation Sheet |
| D207-067-R2 Topcon GPS Survey Equipment RFB |
April 24, 2007 |
1:00 PM |
Topcon GPS Survey Equipment Tabulation Sheet |
D207-065-RE Milan Furnace RFQ and Addendum 001 |
April 24, 2007 |
1:00 PM |
Milan Furnace Tabulation Sheet |
| D207-064-RE Oil Separator for Princeton and Keytesville RFQ |
April 19, 2007 |
1:00 PM |
Oil Separator for Princeton and Keytesville Tabulation Sheet |
D207-062-RE Seal Coating - D2 HQ Complex - RFQ and Addendum 001 |
April 17, 2007 |
1:00 PM |
Seal Coating - D2 HQ Complex - Tabulation Sheet |
| D207-057-RE Annual Hot Mix RFB |
April 19, 2007 |
1:00 PM |
Annual Hot Mix Tabulation Sheet |
D207-058-R2 Corrugated Metal Pipe RFB
and D207-058-R2 Addendum 001 |
April 11, 2007 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D207-055-RN Mobile Lab RFQ |
April 10, 2007 |
1:00 PM |
Mobile Lab RFQ Tabulation Sheet |
D207-061-R2 Haydite - Grade B - SFS RFB
SFS RFB Cancelled (Not Awarded) |
April 3, 2007 |
1:00 PM |
Buildex, Inc.
Product not available in the required timeframe |
| D207-060-R2 Tire Chains and Cross Links RFQ |
April 3, 2007 |
1:00 PM |
Tire Chains and Cross Links Tabulation Sheet |
| D207-059-R2 Grade E Concrete Rock and Concrete Sand RFQ |
April 2, 2007 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
D207-056-RE 2nd and 3rd Quarter Oil Lube and Fluids and Addendum 001 |
March 29, 2007 |
1:00 PM |
2nd and 3rd Quarter Oil Lube and Fluids Tabulation Sheet |
| D207-053-RN Walk-Behind Mower RFQ |
March 29, 2007 |
1:00 PM |
Walk-Behind Mower Tabulation Sheet |
| D207-051-RN Guardrail RFQ |
March 28, 2007 |
1:00 PM |
Guardrail RFQ Tabulation Sheet |
| D207-050-RN Lumber RFQ |
March 22, 2007 |
1:00 PM |
Lumber RFQ Tabulation Sheet |
| D207-049-R2 Arrive Alive T-Shirts RFQ |
March 6, 2007 |
1:00 PM |
Arrive Alive T-Shirts Tabulation Sheet |
| D207-048-R2 Promotional Items RFQ |
March 1, 2007 |
1:00 PM |
Promotional Items Tabulation Sheet |
| D207-022-RN Weed Control Matting RFQ |
February 8, 2007 |
1:00 PM |
Weed Control Matting Tabulation Sheet |
| D207-046-RN Pull Broom RFQ |
February 22, 2007 |
1:00 PM |
Pull Broom Tabulation Sheet |
D207-045-RN Guardrail Repairs RFQ - Randolph County Prevailing Wage Information General Wage Order No. 50 |
February 14, 2007 |
1:00 PM |
Guardrail Repairs Tabulation Sheet - Randolph County |
D207-044-RN Guardrail Repairs RFQ - Macon County Prevailing Wage Information General Wage Order No. 50 |
February 14, 2007 |
1:00 PM |
Guardrail Repairs Tabulation Sheet - Macon County |
| D207-042-RN Surplus Asphalt Millings RFB |
February 21, 2007 |
1:00 PM |
Surplus Asphalt Millings Tabulation Sheet |
| D207-041-RE Annual Concrete RFB |
February 15, 2007 |
1:00 PM |
D207-041-RE Annual Concrete Tabulation Sheet |
| D207-039-RN Lease Roller RFB |
February 15, 2007 |
1:00 PM |
Lease Roller Bid Tabulation Sheet |
| D207-035-RE Grease and Oil Trap Tank RFQ |
January 31, 2007 |
1:00 PM |
D207-035-RE Grease and Oil Trap Tank Tabulation Sheet |
D207-034-RE 2 Inch Back Flow Preventor RFQ |
January 30, 2007 |
1:00 PM |
RFQ CANCELLED
(NOT AWARDED) |
| D207-020-RN Truck Body RFQ |
January 25, 2007 |
1:00 PM |
Truck Body RFQ Tabulation Sheet |
| D207-038-R2 Iron Mountain Chips - Trap Rock RFQ |
January 24, 2007 |
1:00 PM |
Iron Mountain Chips - Trap Rock Tabulation Sheet |
D207-030-RE Fabric Door RFB and D207-030-RE Addendum 001 |
January 9, 2007 |
1:00 PM |
D207-030-RE Fabric Door Tabulation Sheet |
| D207-037-RN Gabion Stone RFQ |
January 18, 2007 |
1:00 PM |
Gabion Stone Tabulation Sheet |
| D207-019-R2 Culvert Pipe Liner RFB |
January 17, 2007 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D207-032-RN PVC Coated Gabion Baskets RFQ |
January 12, 2007 |
1:00 PM |
Gabion Baskets Tabulation Sheet |
| D207-033-RE 1st Qtr Oil Lube and Fluids |
December 28, 2006 |
1:00 PM |
Oil Lube and Fluids Tabulation Sheet |
| D207-031-RE Replacing Existing Car Wash Equipment RFB |
December 28, 2006 |
1:00 PM |
Replacing Existing Car Wash Equipment Tabulation Sheet |
| D207-029-RE Atlanta Overhead Door Installation RFQ |
December 14, 2006 |
1:00 PM |
Atlanta Overhead Door Installation Tabulation Sheet |
| D207-027-RN Polyethylene Tank RFQ |
November 30, 2006 |
1:00 PM |
Polyethylene Tank Tabulation Sheet |
| D207-028-RE Furnace for Kirksville Truck Wash Bay RFQ |
November 29, 2006 |
1:00 PM |
Furnace for Kirksville Truck Wash Bay Tabulation Sheet |
| D207-026-R2 Child Car and Booster Seats RFQ |
November 20, 2006 |
1:00 PM |
Child Car and Booster Seats Tabulation Sheet |
| D207-024-R2 Arrive Alive T-Shirts RFQ |
November 14, 2006 |
1:00 PM |
Arrive Alive T-Shirts Tabulation Sheet |
| D207-023-RE Concrete Forms for Atlanta Bosworth and New Cambria RFQ |
November 13, 2006 |
1:00 PM |
Concrete Walls for Atlanta Bosworth and New Cambria Tabulation Sheet |
| D207-021-RN Pull Broom RFQ |
October 31, 2006 |
1:00 PM |
Pull Broom Tabulation Sheet |
| D207-018-R2 Type S Poly Culvert Pipe RFB |
October 24, 2006 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D207-015-RN Riding Lawn Mower RFB |
October 24, 2006 |
1:00 PM |
Riding Lawn Mower Bid Tabulation Sheet |
| D207-017-RO Used Oil Disposal RFB |
October 19, 2006 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D207-016-RO Tree Removal - Sullivan County - RFQ |
October 18, 2006 |
1:00 PM |
Tree Removal Tabulation Sheet |
D207-012-RN Guardrail Repair RFQ and General Wage Order No. 50 |
October 10, 2006 |
1:00 PM |
Guardrail Repair Tabulation Sheet |
D207-008-RO Nine Wheel Pneumatic Roller RFB
and D207-008-RO Addendum |
October 3, 2006 |
1:00 PM |
Nine Wheel Pneumatic Roller Tabulation Sheet |
| D207-014-RN Electric Jackhammer RFQ |
September 27, 2006 |
1:00 PM |
Electric Jackhammer Tabulation Sheet |
| D207-011-RE 4th Quarter Oil Lube Fluids RFQ |
September 27, 2006 |
1:00 PM |
4th Quarter Oil Lube Fluids Tabulation Sheet |
| D207-013-RE Concrete Piers for Liquid Storage Tanks RFQ |
September 21, 2006 |
1:00 PM |
Concrete Piers for Liquid Storage Tanks Tabulation Sheet |
| D207-010-R2 Coal Slag Sand RFQ - Rebid |
September 8, 2006 |
1:00 PM |
Coal Slag Sand Tabulation Sheet |
| D207-009-R2 Coal Slag Sand RFQ (Not awarded) |
August 31, 2006 |
1:00 PM |
RFQ NOT AWARDED
(REBID # D207-010-R2) |
| D207-007-R2 Slip Bases For Telespar Posts RFQ |
August 29, 2006 |
2:00 PM |
Slip Bases For Telespar Posts Tabulation Sheet |
D207-006-R2 Omni Anchors For Telespar Posts RFB and D207-006-R2 Addendum 001 |
August 29, 2006 |
1:30 PM |
Omni Anchors For Telespar Posts Tabulation Sheet |
| D207-005-R2 Aluminum Backing Bars RFQ |
August 29, 2006 |
1:00 PM |
Aluminum Backing Bars Tabulation Sheet |
| D207-003-RE Man Doors and Paint RFQ |
August 23, 2006 |
1:00 PM |
Man Doors and Paint Tabulation Sheet |
| D207-002-RN Front-Mount Snow Plow RFQ |
August 15, 2006 |
1:00 PM |
Snow Plow Wing Tabulation Sheet |
| D207-004-RM Cinder Coal Slag - Pick up at Plant - RFB |
August 4, 2006 |
1:00 PM |
Cinder Coal Slag Tabulation Sheet |
RFB 6-060803 D2 Janitorial Bid
RFB 6-060803 Addendum 001 |
August 3, 2006 |
1:00 PM |
RFB 6-060803 D2 Janitorial Services Tabulation |
| D206-072-RN Winter Snow Fence RFB |
July 12, 2006 |
1:00 PM |
Winter Snow Fence Tabulation Sheet |
RFB 6-060706A D02 District Uniform Bid
RFB 6-060706A Addendum 001 |
July 6, 2006 |
1:00 PM |
Contact MoDOT's Central Office Procurement Section For Information |
| D206-074-RE Tree Removal Services RFQ |
July 6, 2006 |
1:00 PM |
Tree Removal Services Tabulation Sheet |
| D206-076-RN Ice Machines RFQ |
July 17, 2006 |
1:00 PM |
Ice Machines Tabulation Sheet |
| D206-078-RN Asphalt Paver RFQ |
June 30, 2006 |
1:00 PM |
Asphalt Paver Tabulation Sheet |
| D206-075-R2 Oil Lubricants and Fluids - 3rd Qtr - RFQ |
June 27, 2006 |
1:00 PM |
Oil Lubricants and Fluids - 3rd Qtr - Tabulation Sheet |
| D206-077-R2 Spec 1 Rock - Brookfield - RFQ |
June 22, 2006 |
1:00 PM |
RFQ CANCELLED
(NOT AWARDED)
|
| D206-071-RN Walk-Behind Mower RFQ |
June 15, 2006 |
1:00 PM |
RFQ CANCELLED
(NOT AWARDED) |
| D206-070-R2 Car and Booster Seats RFQ |
June 8, 2006 |
1:00 PM |
Seats Tabulation Sheet |
| RFB 2-060524 District 2 Aggregate |
May 24, 2006 |
2:00 p.m. |
Aggregate Tabulation |
| RFB 2-060519 Plant Mix Oil Mat Material - Special |
May 19, 2006 |
10:00 a.m. |
Plant Mix - Tabulation |
| RFB D206-047-RM Wet Bottom Boiler Slag - Cinders |
May 2, 2006 |
1:00 p.m. |
2006 Wet Bottom Boiler Slag Tabulation Sheet |