| NE17-40B-R2 Bridge A6396 Repairs and Bonding Documents and 1 - Plans for Job K16B1833 and 2 - Job Special Provisions for K16B1833 and 3 - Existing Plans and Shop Drawings Bridge A6396 and General Wage Order No. 60 |
May 11, 2017
Addendum 001
June 15, 2017 |
1:00 PM |
Bridge A6396 Repair Tabulation Sheet |
| NE17-39B-R2 Powerbox P1648 Plus Asphalt Paver |
April 11, 2017 |
1:00 PM |
Powerbox P1648 Plus Asphalt Paver Tabulation Sheet |
| NE17-38Q-R2 Fire Extinguisher Servicing |
April 5, 2017 |
1:00 PM |
Fire Extinguisher Servicing Tabulation Sheet |
| NE17-36B-R2 Clean Cinders and Addendum 001 |
March 30, 2017
March 31, 2017 |
1:00 PM |
Clean Cinders Tabulation Sheet |
| NE17-35Q-R2 2600 Gallon Tank and Skid with Leg Stands and Sample Drawing - 2600 gallon tank and Sample Drawing - 2600 gallon tank skid and Sample Picture 1 and Sample Picture 2 |
March 28, 2017 |
1:00 PM |
2600 Gallon Tank and Skid with Leg Stands Tabulation Sheet |
| NE17-37Q-R2 Tree Removal |
March 24, 2017 |
1:00 PM |
Tree Removal Tabulation Sheet |
| NE17-33Q-R2 Tree Cutting and Addendum 001 |
March 1, 2017 |
1:00 PM |
Tree Cutting Tabulation Sheet |
| NE17-34Q-R2 Fence Repair (I-70 MM 199.8) |
February 24, 2017 |
1:00 PM |
Fence Repair Tabulation Sheet |
| NE17-32Q-R2 Dowel Bars and Baskets |
February 23, 2017 |
1:00 PM |
Dowel Bars and Baskets Tabulation Sheet |
| NE17-31Q-R2 Tree Removal |
February 21, 2017 |
1:00 PM |
Tree Removal Tabulation Sheet |
| NE17-30Q-R2 Fence Repair (Highway 36 - Hannibal, MO) |
February 16, 2017 |
1:00 PM |
Fence Repair Tabulation Sheet |
| NE17-29B-R2 Rental and Lease Equipment |
February 9, 2017 |
1:00 PM |
Rental and Lease Equipment Tabulation Sheet |
| NE17-28B-R2 Large Rock - 3 to 4 Foot |
February 7, 2017 |
1:00 PM |
Large Rock Tabulation Sheet |
NE17-26B-R2 Quarry Price Agreement - Aggregates and NE17-26B-R2A Quarry Price Agreement - Cinders |
February 2, 2017 |
1:00 PM |
Quarry Price Agreement Tabulation Sheet |
| NE17-25B-R2 Hot Mix Cold Mix and Winter Mix |
January 31, 2017 |
1:00 PM |
Hot Mix Cold Mix and Winter Mix Tabulation Sheet |
| NE17-24B-R2 Concrete - Ready Mix |
January 27, 2017 |
1:00 PM |
Concrete Tabulation Sheet |
NE17-27Q-R2 Chain Link Fence Repair (I-70 MM 194.3 and 200.3) and Addendum 001 and NE17-27Q-R2 - UPDATED 01-24-17 |
January 24, 2017
January 30, 2017 |
1:00 PM |
Fence Repair Tabulation Sheet |
| NE17-21B-R2 Aggregates and Clean Cinders |
January 11, 2017 |
1:00 PM |
REVISED - Aggregates and Clean Cinders Tabulation Sheet
Aggregates and Clean Cinders Tabulation Sheet
|
| NE17-23Q-R2 Bush Hog 10-Foot 3-Point Rear Blade |
January 9, 2017 |
1:00 PM |
Bush Hog Rear Blade Tabulation Sheet |
| NE17-22Q-R2 Broom Refills |
January 5, 2017 |
1:00 PM |
Broom Refills Tabulation Sheet |
| NE17-20Q-R2 Dual Arm Grapple Rake |
January 4, 2017 |
1:00 PM |
Dual Arm Grapple Rake Tabulation Sheet |
| NE17-19Q-R2 2600 Gallon Tanks and Sample Drawing - 2600 gallon tank |
January 3, 2017 |
1:00 PM |
2600 Gallon Tanks Tabulation Sheet |
| NE17-18Q-R2 Federal Signal LED Highlighters |
December 30, 2016 |
1:00 PM |
Federal Signal LED Highlighters Tabulation Sheet |
| NE17-17Q-R2 Tire Chains and Crosslinks |
December 29, 2016 |
1:00 PM |
Tire Chains and Crosslinks Tabulation Sheet |
| NE17-16B-R2 Multiquip GloBug GBW Light Systems |
November 29, 2016 |
1:00 PM |
Multiquip GloBug GBW Light Systems Tabulation Sheet |
| NE17-15Q-R2 Honda EU2000i Generators |
November 28, 2016 |
1:00 PM |
Honda EU2000i Generators Tabulation Sheet |
| NE17-14B-R2 Tires - UPDATED 11-09-16 and Addendum 001 and Addendum 002 and Addendum 003 |
November 14, 2016 |
1:00 PM |
Tires Tabulation Sheet |
| NE17-13B-R2 Cinders For Winter Operations |
November 8, 2016 |
1:00 PM |
Cinders for Winter Operations Tabulation Sheet |
| NE17-11B-R2 On-Call Hauling Service |
October 14, 2016 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet |
| NE17-10B-R2 Snow Removal Assistance - Equipment with Operator |
October 13, 2016 |
1:00 PM |
Snow Removal Assistance Tabulation Sheet |
| NE17-12Q-R2 Special Hardened Maintainer Blades and Specification MGS-03-03A |
October 12, 2016 |
1:00 PM |
NO QUOTES RECEIVED - NOT AWARDED |
| NE17-09B-R2 Hauling Cinders |
September 28, 2016 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
| NE17-08B-R2 Aggregates |
August 18, 2016 |
1:00 PM |
Aggregates Tabulation Sheet |
| NE17-07Q-R2 Dodge Transmission |
July 21, 2016 |
1:00 PM |
Dodge Transmission Tabulation Sheet |
| NE17-06Q-R2 Skid Steer Hopper Brooms |
July 19, 2016 |
1:00 PM |
Skid Steer Hopper Brooms Tabulation Sheet |
| NE17-05Q-R2 Self-Contained Oil Dispensers |
July 15, 2016 |
1:00 PM |
Self-Contained Oil Dispensers Tabulation Sheet |
| NE17-01B-R2 Propane |
July 14, 2016 |
1:00 PM |
Propane Tabulation Sheet |
| NE17-02Q-R2 John Deere 410G Backhoe Parts |
July 13, 2016 |
1:00 PM |
John Deere 410G Backhoe Parts Tabulation Sheet |
| NE17-03Q-R2 Air Compressor |
July 12, 2016 |
1:00 PM |
Air Compressor Tabulation Sheet |
| NE17-04Q-R2 Used Oil Tank |
July 11, 2016 |
1:00 PM |
Used Oil Tank Tabulation Sheet |
| NE16-46Q-R2 Trap Rock |
June 17, 2016 |
1:00 PM |
Trap Rock Tabulation Sheet |
| NE16-45B-R2 Metal Pipe - CMP and ARCH Pipe and Bands |
May 10, 2016 |
1:00 PM |
Metal Pipe Tabulation Sheet |
| NE16-44B-R2 Clean Cinders |
May 6, 2016 |
1:00 PM |
Clean Cinders Tabulation Sheet |
| NE16-43Q-R2 Trailer |
April 29, 2016 |
1:00 PM |
Trailer Tabulation Sheet |
| NE16-42Q-R2 EZ-Line Lifeline Systems |
April 27, 2016 |
1:00 PM |
EZ-Line Lifeline Systems Tabulation Sheet |
| NE16-41Q-R2 Chevy Engine |
April 20, 2016 |
1:00 PM |
Chevy Engine Tabulation Sheet
NOT AWARDED |
| NE16-40Q-R2 Chain Link Fence Repair (located near I-70 - Warren County - Near Rt. A-B Overhead at Flying J Truck Stop) |
April 18, 2016 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE16-39Q-R2 Broom Refills |
April 15, 2016 |
1:00 PM |
Broom Refills Tabulation Sheet |
| NE16-37B-R2 Equipment Leases - Rollers |
March 29, 2016 |
1:00 PM |
Equipment Leases - Rollers Tabulation Sheet |
| NE16-35B-R2 Equipment Rentals |
March 24, 2016 |
1:00 PM |
Equipment Rentals Tabulation Sheet |
| NE16-38Q-R2 Dowel Bars |
March 23, 2016 |
1:00 PM |
Dowel Bars Tabulation Sheet |
| NE16-34B-R2 Large Rock - 3 to 4 Foot |
March 22, 2016 |
1:00 PM |
Large Rock Tabulation Sheet |
| NE16-36Q-R2 ChemFree SmartWashers |
March 17, 2016 |
1:00 PM |
ChemFree SmartWashers Tabulation Sheet |
| NE16-33B-R2 Trap Rock and Cinders |
March 3, 2016 |
1:00 PM |
Trap Rock and Cinders Tabulation Sheet |
| NE16-32B-R2 Large Rock - 3 to 4 Foot |
March 1, 2016 |
1:00 PM |
Large Rock Tabulation Sheet |
| NE16-31Q-R2 Used Oil Disposal |
February 25, 2016 |
1:00 PM |
NO QUOTES RECEIVED - NOT AWARDED |
| NE16-30Q-R2 Miller Bobcat 225 Welder-Generator |
February 23, 2016 |
1:00 PM |
Miller Bobcat 225 Welder-Generator Tabulation Sheet |
| NE16-26B-R2 Quarry Price Agreement - Aggregates and/or NE16-26B-R2A Quarry Price Agreement - Cinders |
February 5, 2016 |
1:00 PM |
Quarry Price Agreement Tabulation Sheet |
| NE16-29Q-R2 Aggregates For Drainage Plan |
February 4, 2016 |
1:00 PM |
Aggregates For Drainage Plan Tabulation Sheet |
| NE16-25B-R2 Hot Mix Cold Mix and Winter Mix |
February 3, 2016 |
1:00 PM |
Hot Mix Cold Mix and Winter Mix Tabulation Sheet |
| NE16-28Q-R2 Chain Link Fence Repair (located near I-70 - Warren County - Two Locations) |
February 2, 2016 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE16-24B-R2 Concrete - Ready Mix |
February 1, 2016 |
1:00 PM |
Concrete Tabulation Sheet |
| NE16-27Q-R2 MALP or similar Concrete Repair Material |
January 29, 2016 |
1:00 PM |
MALP or similar Concrete Repair Material Tabulation Sheet |
| NE16-23Q-R2 Guardrail Removal and Grading |
December 29, 2015 |
1:00 PM |
Guardrail Removal and Grading Tabulation Sheet |
| NE16-22B-R2 Large Rock - 3 to 4 Foot |
December 11, 2015 |
1:00 PM |
Large Rock Tabulation Sheet |
| NE16-21B-R2 Cinders For Winter Operations |
December 4, 2015 |
1:00 PM |
Cinders For Winter Operations Tabulation Sheet |
| NE16-20Q-R2 Tire Chains and Crosslinks |
December 1, 2015 |
1:00 PM |
Tire Chains and Crosslinks Tabulation Sheet |
| NE16-19B-R2 24-Inch Rip Rap Aggregate |
November 30, 2015 |
1:00 PM |
24-Inch Rip Rap Aggregate Tabulation Sheet |
| NE16-18Q-R2 Rut Repair |
November 19, 2015 |
1:00 PM |
Rut Repair Tabulation Sheet |
| NE16-17Q-R2 Chain Link Fence Repair (located near I-70 MM 199.4 in Warren County) and General Wage Order No. 59 |
November 18, 2015 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE16-16B-R2 Tires (updated version 11-12-15) and Addendum 001 |
November 17, 2015 |
1:00 PM |
Tires Tabulation Sheet |
| NE16-12Q-R2 Drainage Work and Site Photo 1 with notes and measurements and Site Photo 2 with notes and measurements and General Wage Order No. 59 and Addendum 001 |
October 12, 2015
October 13, 2015 |
1:00 PM |
NO QUOTES RECEIVED - NOT AWARDED |
| NE16-11B-R2 Equipment Rentals |
October 9, 2015 |
1:00 PM |
Equipment Rentals Tabulation Sheet |
| NE16-10B-R2 Large Rock - 3 to 4 Foot (updated version 10-07-15) and Addendum 001 and Addendum 002 and Addendum 003 |
October 8, 2015 |
1:00 PM |
Large Rock Tabulation Sheet |
| NE16-15Q-R2 Suspended Scaffolding System |
October 7, 2015 |
1:00 PM |
Suspended Scaffolding System Tabulation Sheet
Re-Quote - Suspended Scaffolding System Tabulation Sheet |
| NE16-14Q-R2 Two-Part Epoxy |
October 6, 2015 |
1:00 PM |
Two-Part Epoxy Tabulation Sheet |
| NE16-13Q-R2 Bridge Hardware - Bolts Nuts and Washers |
October 5, 2015 |
1:00 PM |
Bridge Hardware Tabulation Sheet |
NE16-09B-R2 BendPak HDS-35X Four-Post Truck Lift and Annual Wage Order No. 22 - Macon County
Additional Information Items: BendPak HDS-35X Specifications and BendPak HDS-35X Installation and Operation Manual |
September 24, 2015 |
1:00 PM |
BendPak HDS-35X Four-Post Truck Lift Tabulation Sheet |
| NE16-08Q-R2 Chain Link Fence Repair (located at I-70 and Hwy 47 intersection NW commuter lot) and General Wage Order No. 59 |
September 18, 2015 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE16-07Q-R2 Reznor UDAS Unit Heaters |
September 17, 2015 |
1:00 PM |
Reznor UDAS Unit Heaters Tabulation Sheet |
| NE16-06B-R2 On-Call Hauling Service |
September 16, 2015 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet |
| NE16-05B-R2 Snow Removal Assistance - Equipment with Operator |
September 15, 2015 |
1:00 PM |
Snow Removal Assistance - Equipment with Operator Tabulation Sheet |
| NE16-04Q-R2 Overhead Door Replacement and Annual Wage Order No. 22 - Montgomery County |
September 10, 2015 |
1:00 PM |
Overhead Door Replacement Tabulation Sheet |
| NE16-03Q-R2 Backflow Preventers |
September 1, 2015 |
1:00 PM |
Backflow Preventers Tabulation Sheet |
| NE16-02B-R2 Sullair 375 Air Compressor |
August 27, 2015 |
1:00 PM |
Sullair 375 Air Compressor Tabulation Sheet |
| NE16-01Q-R2 Chain Link Fence Repair (located near I-70 MM 199.9 in Warren County) and General Wage Order No. 59 |
August 10, 2015 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| |
|
|
|
| NE15-54B-R2 Propane |
June 24, 2015 |
1:00 PM |
Propane Tabulation Sheet |
| NE15-52B-R2 Aerial Unit Chassis Removal and Installation |
June 23, 2015 |
1:00 PM |
NOT AWARDED - Due to budget constraints, it was decided to accomplish this project using our internal labor and equipment.
Aerial Unit Chasiss Removal and Installation Tabulation Sheet |
| NE15-55Q-R2 Chain Link Fence Repair (located near I-70 Eastbound Mile Marker 199.9) and General Wage Order No. 58 |
June 22, 2015 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE15-53Q-R2 Portable Eye Wash Stations |
June 17, 2015 |
1:00 PM |
Portable Eye Wash Stations Tabulation Sheet |
| NE15-51Q-R2 John Deere 410G Backhoe Parts |
June 2, 2015 |
1:00 PM |
John Deere 410G Backhoe Parts Tabulation Sheet |
| NE15-50B-R2 Lighting |
May 28, 2015 |
1:00 PM |
Lighting Tabulation Sheet |
| NE15-49Q-R2 Tractor Rental |
May 11, 2015 |
1:00 PM |
NOT AWARDED - No Quotes Received |
| NE15-47Q-R2 Installing Underground Pipe and General Wage Order No. 58 |
April 30, 2015 |
1:00 PM |
Installing Underground Pipe Tabulation Sheet |
| NE15-46B-R2 Metal Pipe - CMP and ARCH Pipe and Bands |
April 28, 2015 |
1:00 PM |
Metal Pipe Tabulation Sheet |
| NE15-48Q-R2 Ford Engine |
April 27, 2015 |
1:00 PM |
Ford Engine Tabulation Sheet
Updated Posting - Ford Engine Tabulation Sheet |
| NE15-45Q-R2 Hot Water Pressure Washer |
April 16, 2015 |
1:00 PM |
Hot Water Pressure Washer Tabulation Sheet |
| NE15-44Q-R2 Chain Link Fence Repair (Marion County in Hannibal, MO, along Westbound Highway 36 at the Harrison Hill ramp) and General Wage Order No. 58 |
April 9, 2015 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE15-43Q-R2 Ford Engine |
March 19, 2015 |
1:00 PM |
Ford Engine Tabulation Sheet |
| NE15-42Q-R2 Chain Link Fence Repair (located near I-70 Eastbound Mile Markers 197 and 198.8 and Westbound Mile Markers 198.9, 198, and 194.1) and General Wage Order No. 58 |
March 12, 2015 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE15-40Q-R2 9-Foot Stainless Steel Dump Bed |
March 11, 2015 |
1:00 PM |
9-Foot Stainless Steel Dump Bed Tabulation Sheet |
| NE15-41Q-R2 Large Rock - 3 to 4 foot |
March 6, 2015 |
1:00 PM |
Large Rock Tabulation Sheet |
| NE15-39Q-R2 Chain Link Fence Repair (located near I-170 Eastbound Mile Markers 188, 199.3, 199.4, and 199.5) and General Wage Order No. 58 |
February 25, 2015 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE15-38Q-R2 Dowel Bars |
February 24, 2015 |
1:00 PM |
Dowel Bars Tabulation Sheet |
| NE15-37Q-R2 Rut Repair and Addendum 001 |
February 19, 2015 |
1:00 PM |
Rut Repair Tabulation Sheet |
| NE15-36Q-R2 Tree Removal and Addendum 001 |
February 18, 2015 |
1:00 PM |
Tree Removal Tabulation Sheet |
NE15-35Q-R2 Televisions and Addendum 001 |
February 17, 2015 |
1:00 PM |
Televisions Tabulation Sheet |
NE15-34Q-R2 Paint Tank Cleaning |
February 11, 2015 |
1:00 PM |
Paint Tank Cleaning Tabulation Sheet |
| NE15-31Q-R2 Used Oil Disposal |
January 21, 2015 |
1:00 PM |
Used Oil Disposal Tabulation Sheet |
| NE15-29B-R2 Equipment Leases - Rollers |
January 20, 2015 |
1:00 PM |
Equipment Leases - Rollers Tabulation Sheet |
| NE15-33Q-R2 Chain Link Fence Repair (located near I-70 Eastbound Mile Marker 198.4) and General Wage Order No. 58 |
January 16, 2015 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE15-32Q-R2 Chain Link Fence Repair (located near I-70 Eastbound Mile Marker 188.2) and General Wage Order No. 58 |
January 15, 2015 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE15-30Q-R2 Headlamps For Hard Hats |
January 9, 2015 |
1:00 PM |
Headlamps for Hard Hats Tabulation Sheet |
| NE15-28Q-R2 Steel |
December 23, 2014 |
1:00 PM |
Steel Tabulation Sheet |
NE15-27Q-R2 Chain Link Fence Repair (located near I-70 Eastbound South Outer Road Mile Marker 198) and General Wage Order No. 58 |
December 22, 2014 |
1:00 PM |
REQUEST CANCELLED - This work will be the responsibility of MoDOT's contracted vendor who maintains the roadside rest areas. Interested vendors should contact:
Joel L. Turnham, Project Manager
Infrastructure Corporation of America
3505 N Kimball Drive
Kansas City, MO 64161
Phone: 816-455-0103
Cellular: 816-398-1746
Fax: 816-455-0183
Email: jturnham@ica-onramp.com |
| NE15-25B-R2 Quarry Price Agreement |
December 19, 2014 |
1:00 PM |
Quarry Price Agreement Tabulation Sheet |
| NE15-24B-R2 Hot Mix Cold Mix and Winter Mix |
December 18, 2014 |
1:00 PM |
Hot Mix Cold Mix and Winter Mix Tabulation Sheet |
| NE15-23B-R2 Concrete - Ready Mix |
December 17, 2014 |
1:00 PM |
Concrete Tabulation Sheet |
| NE15-22B-R2 Clean Cinders |
December 16, 2014 |
1:00 PM |
Cinders Tabulation Sheet |
NE15-26Q-R2 Paint Separator Tanks Cleaning and Addendum 001
For Reference Purposes Only:
Paint Separator Tanks - Drawing 1
Paint Separator Tanks - Drawing 2
Paint Separator Tanks - Drawing 3 |
December 11, 2014
Special Note: Responses to this RFQ should be sent to Tayna Dauma, at our Hannibal Headquarters. |
1:00 PM |
Paint Separator Tanks Cleaning Tabulation Sheet |
| NE15-21B-R2 Spring Aggregate and Addendum 001 |
December 11, 2014 |
1:00 PM |
NOT AWARDED - Due to budget constraints
Spring Aggregate Tabulation Sheet |
| NE15-20Q-R2 HVAC System and Annual Wage Order No. 21 - Macon County |
December 9, 2014 |
1:00 PM |
HVAC System Tabulation Sheet |
| NE15-19B-R2 Forestry Head and Addendum 001 and Addendum 002 |
December 2, 2014 |
1:00 PM |
Forestry Head Tabulation Sheet |
| NE15-18B-R2 Large Rock - 1 to 4 foot |
November 14, 2014 |
1:00 PM |
Large Rock Tabulation Sheet |
| NE15-17Q-R2 Tire Chains and Crosslinks |
November 6, 2014 |
1:00 PM |
Tire Chains and Crosslinks Tabulation Sheet |
| NE15-14B-R2 Janitorial Services and Addendum 001 |
October 22, 2014 |
1:00 PM |
Janitorial Services Tabulation Sheet |
| NE15-16Q-R2 Chain Link Fence Repair (located near I-70 Westbound Mile Markers 194 & 194.1, North Outer Road) and General Wage Order No. 58 |
October 20, 2014 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE15-13B-R2 On-Call Hauling Service |
October 17, 2014 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet |
| NE15-12B-R2 Snow Removal Assistance - Equipment with Operator |
October 16, 2014 |
1:00 PM |
Snow Removal Assistance - Equipment with Operator Tabulation Sheet |
| NE15-15B-R2 Cinders for Winter Operations |
October 14, 2014 |
1:00 PM |
Cinders Tabulation Sheet |
| NE15-11Q-R2 Rugs and Mats |
October 2, 2014 |
1:00 PM |
Rugs and Mats Tabulation Sheet |
| NE15-10Q-R2 Underground Boring and General Wage Order No. 58 |
September 30, 2014 |
1:00 PM |
Underground Boring Tabulation Sheet |
| NE15-09Q-R2 Spec 8 Aggregate |
September 23, 2014 |
1:00 PM |
Spec 8 Aggregate Tabulation Sheet |
| NE15-07Q-R2 Bad Boy Mower |
September 4, 2014 |
1:00 PM |
Bad Boy Mower Tabulation Sheet |
NE15-06B-R2 Tires (Use updated version only) - Addendum 001 and NE15-06B-R2 Tires - UPDATED |
September 3, 2014 |
1:00 PM |
Tires Tabulation Sheet |
| NE15-05B-R2 Premix |
August 8, 2014 |
1:00 PM |
Premix Tabulation Sheet |
| NE15-04B-R2 Hot-In-Place Recycling and Addendum 001 and Addendum 002 and General Wage Order No. 58 |
July 24, 2014
July 30, 2014 |
1:00 PM |
Not Awarded - Hot-In-Place Recycling Tabulation Sheet |
| NE15-03Q-R2 Erosion Control Blanket |
July 16, 2014 |
1:00 PM |
Erosion Control Blanket Tabulation Sheet |
| NE15-02B-R2 Surface Sealing Treatment Equipment with Operator and General Wage Order No. 57 |
July 15, 2014 |
1:00 PM |
Surface Sealing Treatment Equipment with Operator Tabulation Sheet |
| NE15-01B-R2 Surface Sealing Treatment Materials |
July 15, 2014 |
1:00 PM |
Surface Sealing Treatment Materials Tabulation Sheet |
| NE14-65Q-R2 Chain Link Fence Repair (located near I-70 Westbound Mile Marker 193, North Outer Road) and General Wage Order No. 57 |
June 24, 2014 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE14-64Q-R2 Repair Parts for JD 7130 Tractor |
June 23, 2014 |
1:00 PM |
Repair Parts for JD 7130 Tractor Tabulation Sheet |
| NE14-63Q-R2 Truck Wash Doors |
June 19, 2014 |
1:00 PM |
Truck Wash Doors Tabulation Sheet |
| NE14-62Q-R2 Concrete Saw |
June 18, 2014 |
1:00 PM |
Concrete Saw Tabulation Sheet |
| NE14-57B-R2 Poly Pipe |
June 16, 2014 |
1:00 PM |
Poly Pipe Tabulation Sheet |
| NE14-61Q-R2 E-Z Drill 210B SRA Slab Rider |
June 12, 2014 |
1:00 PM |
E-Z Drill 210B SRA Slab Rider Tabulation Sheet |
| NE14-60Q-R2 Supreme Tank Gauge |
June 11, 2014 |
1:00 PM |
Supreme Tank Gauge Tabulation Sheet |
| NE14-59Q-R2 Curtis Tractor Cab and Heater |
June 10, 2014 |
1:00 PM |
Curtis Tractor Cab and Heater Tabulation Sheet |
| NE14-58Q-R2 JLG Drop Deck Trailer (Updated Posted) and Addendum 001 |
June 9, 2014
June 5, 2014
|
1:00 PM |
JLG Drop Deck Trailer Tabulation Sheet |
| NE14-56Q-R2 Broom Refills |
May 27, 2014 |
1:00 PM |
Broom Refills Tabulation Sheet |
| NE14-54B-R2 Propane |
May 23, 2014 |
1:00 PM |
Propane Tabulation Sheet |
| NE14-53B-R2 Cinders |
May 22, 2014 |
1:00 PM |
Cinders Tabulation Sheet |
| NE14-55Q-R2 Dowel Bars |
May 21, 2014 |
1:00 PM |
Dowel Bars Tabulation Sheet |
| NE14-52B-R2 Haydite VS. Trap Rock |
May 20, 2014 |
1:00 PM |
Haydite VS. Trap Rock Tabulation Sheet |
| NE14-51B-R2 Fuel Tanks |
May 19, 2014 |
1:00 PM |
Fuel Tanks Tabulation Sheet |
| NE14-50Q-R2 Pavement Repair and General Wage Order No. 57 |
May 7, 2014 |
1:00 PM |
Pavement Repair Tabulation Sheet |
| NE14-49Q-R2 Chain Link Fence Repair (Updated Posting)(located near I-70 Westbound Mile Marker 200.2, North Outer Road in Wright City) and General Wage Order No. 57 and Addendum 001 |
April 30, 2014 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE14-48B-R2 Metal Pipe - CMP and ARCH Pipe and Bands |
April 28, 2014 |
1:00 PM |
Metal Pipe Tabulation Sheet |
| NE14-47Q-R2 Chain Link Fence Repair (Updated Posting)(located near I-70 Westbound Mile Marker 194.2) and General Wage Order No. 57 and Addendum 001 |
April 14, 2014 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE14-46Q-R2 Overhead Door Replacement and Annual Wage Order No. 20 - Lincoln County |
April 10, 2014 |
1:00 PM |
Overhead Door Replacement Tabulation Sheet |
| NE14-45Q-R2 Fuel Tanks |
April 1, 2014 |
1:00 PM |
Fuel Tanks Tabulation Sheet |
| NE14-44B-R2 Scrap Aluminum Recycling |
March 11, 2014 |
1:00 PM |
Scrap Aluminum Recycling Tabulation Sheet |
| NE14-43B-R2 Tires (Updated Posting) and Addendum 001 |
March 7, 2014 |
1:00 PM |
Tires Tabulation Sheet |
| NE14-41B-R2 Equipment Leases - Rollers |
February 27, 2014 |
1:00 PM |
Equipment Leases - Rollers Tabulation Sheet |
| NE14-42Q-R2 Chain Link Fence Repair and General Wage Order No. 57 |
February 26, 2014 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE14-40Q-R2 High Lift and Trackhoe Rental |
January 21, 2014 |
1:00 PM |
High Lift and Trackhoe Rental Tabulation Sheet |
| NE14-38Q-R2 Used Oil Disposal |
January 21, 2014 |
1:00 PM |
Used Oil Disposal Tabulation Sheet |
| NE14-36B-R2 Quarry Price Agreement |
January 17, 2014 |
1:00 PM |
Quarry Price Agreement Tabulation Sheet |
| NE14-35B-R2 Hot Mix Cold Mix and Winter Mix |
January 15, 2014 |
1:00 PM |
Hot Mix Cold Mix and Winter Mix Tabulation Sheet |
| NE14-34B-R2 Concrete (Ready Mix) |
January 13, 2014 |
1:00 PM |
Concrete (Ready Mix) Tabulation Sheet |
| NE14-37Q-R2 Fullriver DC224-6 Batteries |
January 9, 2014 |
1:00 PM |
Fullriver DC224-6 Batteries Tabulation Sheet |
| NE14-33Q-R2 3-Foot Rock - Lincoln County and Lincoln County Bridge Locations Map |
January 7, 2014 |
1:00 PM |
3-Foot Rock - Macon County - Tabulation Sheet |
| NE14-31Q-R2 Winter Windshield Washer Fluid |
December 9, 2013 |
1:00 PM |
Not Awarded - Winter Windshield Washer Fluid Tabulation Sheet |
| NE14-29Q-R2 Steel (Corrected Posting) and Addendum 001 |
December 5, 2013 |
1:00 PM |
Steel Tabulation Sheet |
| NE14-28Q-R2 Chain Link Fence Repair (located near I-70 Westbound Mile Marker 194.2) and General Wage Order No. 57 |
December 3, 2013 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE14-30Q-R2 Air Compressors |
November 27, 2013 |
1:00 PM |
Air Compressors Tabulation Sheet |
| NE14-23B-R2 On-Call Hauling Service |
November 13, 2013 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet |
| Cover Letter and NE14-22B-R2 Snow Removal Assistance - Equipment with Operator |
November 7, 2013 |
1:00 PM |
Snow Removal Assistance - Equipment with Operator Tabulation Sheet |
| NE14-25Q-R2 Tire Chains and Crosslinks |
October 31, 2013 |
1:00 PM |
Tire Chains and Crosslinks Tabulation Sheet |
| NE14-24Q-R2 Galaxy Loader Tires |
October 29, 2013 |
1:00 PM |
Galaxy Loader Tires Tabulation Sheet |
| NE14-21Q-R2 Trackhoe with Operator and General Wage Order No. 57 |
September 27, 2013 |
1:00 PM |
Trackhoe with Operator Tabulation Sheet |
| NE14-20B-R2 3-Foot Rock - Macon County |
September 26, 2014 |
1:00 PM |
3-Foot Rock - Macon County - Tabulation Sheet |
| NE14-18Q-R2 Tires |
September 5, 2013 |
1:00 PM |
Tires Tabulation Sheet |
NE14-15B-R2 Metal Pipe - CMP and ARCH
The following document is for reference purposes only: Initial Order - Delivery Point Breakdown |
September 4, 2013 |
1:00 PM |
Metal Pipe - CMP and ARCH - Tabulation Sheet |
| NE14-17Q-R2 Galaxy Loader Tires |
September 3, 2013 |
1:00 PM |
Galaxy Loader Tires Tabulation Sheet |
| NE14-14Q-R2 Tree Removal |
August 19, 2013 |
1:00 PM |
Not Awarded - Tree Removal Tabulation Sheet |
| NE14-13Q-R2 Chain Link Fence Repair (located on I-70 North Outer Road) and General Wage Order No. 57 |
August 15, 2013 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE14-11Q-R2 Bulldozer Undercarriage Parts |
August 8, 2013 |
1:00 PM |
Bulldozer Undercarriage Parts Tabulation Sheet |
| NE14-12Q-R2 Dowel Bars |
August 6, 2013 |
1:00 PM |
Dowel Bars Tabulation Sheet |
| NE14-10Q-R2 Whelen Warning Lights |
August 1, 2013 |
1:00 PM |
Whelen Warning Lights Tabulation Sheet |
| NE14-09Q-R2 Chain Link Fence Repair (located near I-70 Westbound Mile Marker 200.2) and General Wage Order No. 56 |
July 30, 2013 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE14-08Q-R2 Scope of Work - Macon RE Office HVAC Replacement and Annual Wage Order No. 20 for Macon County |
July 25, 2013 |
1:00 PM |
Macon RE Office HVAC Replacement Tabulation Sheet |
| NE14-07Q-R2 Etnyre Chipspreader Parts |
July 19, 2013 |
1:00 PM |
Etnyre Chipspreader Parts Tabulation Sheet |
| NE14-06Q-R2 Six Inch Aggregate |
July 18, 2013 |
1:00 PM |
Six Inch Aggregate Tabulation Sheet |
| NE14-03B-R2 Underground Boring and General Wage Order No. 56 |
July 17, 2013 |
1:00 PM |
Underground Boring Tabulation Sheet |
| NE14-02B-R2 Tanks and Skids and Sample Drawing - 535 gallon tank and Sample Drawing - 535 gallon tank skid and Sample Drawing - 1035 gallon tank and Sample Drawing - 1035 gallon tank skid and Sample Drawing - 2600 gallon tank and Sample Drawing - 2600 gallon tank skid |
July 16, 2013 |
1:00 PM |
Tanks and Skids Tabulation Sheet |
| NE14-05Q-R2 Spec. 3 Aggregate |
July 15, 2013 |
1:00 PM |
Spec. 3 Aggregate Tabulation Sheet |
| NE14-01B-R2 Cold Mix Partial Overlay and General Wage Order No. 56 |
July 12, 2013 |
1:00 PM |
Cold Mix Partial Overlay Tabulation Sheet |
| NE14-04Q-R2 Chain Link Fence Repair (located near I-70 Westbound Mile Marker 198.8) and General Wage Order No. 56 |
July 11, 2013 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE13-64B-R2 Surface Sealing Treatment Equipment with Operator andGeneral Wage Order No. 56 |
June 20, 2013 |
1:00 PM |
Surface Sealing Treatment Equipment with Operator Tabulation Sheet |
| NE13-63B-R2 Surface Sealing Treatment Materials |
June 19, 2013 |
1:00 PM |
Surface Sealing Treatment Materials Tabulation Sheet |
| NE13-65Q-R2 John Deere 410G Backhoe Parts |
June 12, 2013 |
1:00 PM |
John Deere 410G Backhoe Parts Tabulation Sheet |
| NE13-60Q-R2 Pavement Marking Removal and TA-33 Traffic Control and General Wage Order No. 56 |
May 7, 2013 |
1:00 PM |
Pavement Marking Removal Tabulation Sheet |
| NE13-58B-R2 Propane |
May 1, 2013 |
1:00 PM |
Propane Tabulation Sheet |
| NE13-56Q-R2 Broom Refills |
April 17, 2013 |
1:00 PM |
Broom Refills Tabulation Sheet |
| NE13-54Q-R2 Chain Link Fence Repair (located near I-70 Westbound Mile Marker 199.8) and General Wage Order No. 56 |
April 16, 2013 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE13-57Q-R2 Tanks and Skids and Sample Drawing - 535 gallon tank and Sample Drawing - 535 gallon tank skid and Sample Drawing - 1035 gallon tank |
April 16, 2013 |
10:00 AM |
Tanks and Skids Tabulation Sheet |
| NE13-52Q-R2 Mailboxes |
March 12, 2013 |
1:00 PM |
Mailboxes Tabulation Sheet |
| NE13-49Q-R2 Chain Link Fence Repair (located near Hwy 61 & 24 junction at Taylor, MO) and General Wage Order No. 56 |
March 6, 2013 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE13-51Q-R2 Tire Chains and Crosslinks |
March 1, 2013 |
1:00 PM |
Tire Chains and Crosslinks Tabulation Sheet |
| NE13-48Q-R2 Used Oil Disposal |
February 5, 2013 |
1:00 PM |
Used Oil Disposal Tabulation Sheet |
| NE13-47Q-R2 Reznor UDAS Unit Heaters |
January 31, 2013 |
1:00 PM |
Reznor UDAS Unit Heaters Tabulation Sheet |
| NE13-46Q-R2 Motorgrader Tires |
January 30, 2013 |
1:00 PM |
Motorgrader Tires Tabulation Sheet |
| NE13-35B-R2 Clean Cinders and Addendum 001 and Addendum 002 |
January 10, 2013
December 27, 2012
|
1:00 PM |
Clean Cinders Tabulation Sheet |
| NE13-44Q-R2 Equipment Rental - Tractor with Boom Mower |
January 9, 2013 |
1:00 PM |
Equipment Rental - Tractor with Boom Mower Tabulation Sheet |
| NE13-41Q-R2 Chain Link Fence Repair (located near I-70 Eastbound Mile Marker 188.4) and General Wage Order No. 56 |
January 8, 2013 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE13-43Q-R2 Dump-Lok Bed Stands |
January 7, 2013 |
1:00 PM |
Dump-Lok Bed Stands Tabulation Sheet |
| NE13-40Q-R2 Chain Link Fence Repair (located near I-70 Eastbound Mile Marker 199.8) and General Wage Order No. 56 |
January 4, 2013 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE13-38B-R2 Equipment Leases - Rollers |
January 3, 2013 |
1:00 PM |
Equipment Leases - Rollers Tabulation Sheet |
| NE13-34Q-R2 Trap Rock |
December 21, 2012 |
1:00 PM |
Trap Rock Tabulation Sheet |
| NE13-33B-R2 Quarry Price Agreement |
December 20, 2012 |
1:00 PM |
Quarry Price Agreement Tabulation Sheet |
| NE13-32B-R2 Hot Mix, Cold Mix, and Winter Mix |
December 13, 2012 |
1:00 PM |
Hot Mix, Cold Mix, and Winter Mix Tabulation Sheet |
| NE13-31B-R2 Concrete (Ready Mix) |
December 6, 2012 |
1:00 PM |
Concrete (Ready Mix) Tabulation Sheet |
| NE13-36Q-R2 Loader Tires |
December 4, 2012 |
1:00 PM |
Loader Tires Tabulation Sheet |
| NE13-29Q-R2 Rip-Rap |
November 29, 2012 |
1:00 PM |
Rip-Rap Tabulation Sheet |
| NE13-28B-R2 Aggregates |
November 27, 2012 |
1:00 PM |
Aggregates Tabulation Sheet |
| NE13-27Q-R2 Tree Removal |
November 15, 2012 |
1:00 PM |
Tree Removal Tabulation Sheet |
| NE13-26B-R2 Cinder Hauling |
November 13, 2012 |
1:00 PM |
Cinder Hauling Tabulation Sheet |
| NE13-25Q-R2 Fullriver DC224-6 Batteries |
October 31, 2012 |
1:00 PM |
Fullriver DC224-6 Batteries Tabulation Sheet |
| NE13-20B-R2 Bridge Rehabilitation and Attachment A - Work Plan Sheets and Attachment B - Existing Bridge Plan Sheets and Attachment C - Job Special Provisions and Attachment D - Lincoln County Bridge Map and Attachment E - General Wage Order No. 56 and Addendum 001 |
September 28, 2012 |
1:00 PM |
Bridge Rehabilitation Tabulation Sheet |
| NE13-19Q-R2 Steel For V-Bed Stands |
September 21, 2012 |
1:00 PM |
Steel For V-Bed Stands Tabulation Sheet |
| NE13-18Q-R2 Auctioneering Services and Addendum 001 |
September 20, 2012 September 24, 2012 |
1:00 PM |
Auctioneering Services Tabulation Sheet |
| NE13-17B-R2 Camera Installations andAnnual Wage Order No. 19 - Montgomery County and Annual Wage Order No. 19 - Warren County |
September 18, 2012 |
1:00 PM |
Camera Installations Tabulation Sheet |
| NE13-14Q-R2 Materials Lab Granite Countertops and Annual Wage Order No. 19 and Addendum 001 |
September 7, 2012 |
1:00 PM |
Materials Lab Granite Countertops Tabulation Sheet |
| NE13-11Q-R2 On-Call Hauling Service |
August 31, 2012 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet |
| NE13-09B-R2 Poly Pipe |
August 30, 2012 |
1:00 PM |
Poly Pipe Tabulation Sheet |
| NE13-10Q-R2 Motorgraders or Loaders with Operators |
August 29, 2012 |
1:00 PM |
Motorgraders or Loaders with Operators Tabulation Sheet |
| NE13-08Q-R2 Rip-Rap |
August 16, 2012 |
1:00 PM |
Rip-Rap Tabulation Sheet |
| NE13-02Q-R2 Regional Office Fence Gate and Specification Section 607.10 - Fencing and Specification Section 1043 - Fence Material and Annual Wage Order No. 19 |
August 7, 2012 |
1:00 PM |
Regional Office Fence Gate Tabulation Sheet |
| NE13-01B-R2 Ten-Foot Arch Pipe |
August 6, 2012 |
1:00 PM |
Ten-Foot Arch Pipe Tabulation Sheet |
| NE13-03Q-R2 Gabion Stone |
August 3, 2012 |
1:00 PM |
Gabion Stone Tabulation Sheet |
| NE12-65Q-R2 Flooring Installation and Annual Wage Order No. 18 |
May 7, 2012 |
1:00 PM |
Flooring Installation Tabulation Sheet |
| NE12-63B-R2 Propane |
May 4, 2012 |
1:00 PM |
Propane Tabulation Sheet |
| NE12-62Q-R2 Mineola Vault Cleaning and Addendum 001 |
April 18, 2012 |
1:00 PM |
Mineola Vault Cleaning Tabulation Sheet |
| NE12-61Q-R2 72-Inch Zero-Turn Mower |
April 17, 2012 |
1:00 PM |
72-Inch Zero-Turn Mower Tabulation Sheet |
| NE12-60Q-R2 Tractor Tires |
April 16, 2012 |
1:00 PM |
Tractor Tires Tabulation Sheet |
| NE12-59Q-R2 Fullriver DC224-6 Batteries |
April 12, 2012 |
1:00 PM |
Fullriver DC224-6 Batteries Tabulation Sheet |
| NE12-58Q-R2 Type S Poly Culvert Pipe and Addendum 001 |
April 11, 2012 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| NE12-55Q-R2 Mineola Rest Area Well Closures and Annual Wage Order No. 18 |
April 2, 2012 |
1:00 PM |
Mineola Rest Area Well Closures Tabulation Sheet |
| NE12-56B-R2 Dirty Cinders and Addendum 001 |
March 29, 2012 |
1:00 PM |
Dirty Cinders Tabulation Sheet |
| NE12-53B-R2 Hot Mix, Cold Mix, and Winter Mix and Addendum 001 |
March 12, 2012 |
1:00 PM |
Hot Mix, Cold Mix, and Winter Mix Tabulation Sheet |
| NE12-52B-R2 Concrete (Ready Mix) |
March 9, 2012 |
1:00 PM |
Concrete (Ready Mix) Tabulation Sheet |
| NE12-50B-R2 Quarry Price Agreement |
March 7, 2012 |
1:00 PM |
Quarry Price Agreement Tabulation Sheet |
| NE12-49Q-R2 Chain Link Fence Repair and General Wage Order No. 55 |
March 5, 2012 |
1:00 PM |
Chain Link Fence Repair Tabulation Sheet |
| NE12-48Q-R3 Overhead Doors with AWO #18 - Marion County |
February 22, 2012 |
1:00 PM |
Tabulation |
| NE12-47Q-R2 Contract Mowing |
February 22, 2012 |
1:00 PM |
Contract Mowing Tabulation Sheet |
| NE12-46B-R2 Equipment Leases - Rollers |
February 21, 2012 |
1:00 PM |
Lease Rollers Tabulation Sheet |
| NE12-44B-R3 Auctioneer Services |
February 15, 2012 |
1:00 PM |
Tabulation |
| NE12-45B-R2 Shot Rock |
February 14, 2012 |
1:00 PM |
Shot Rock Tabulation Sheet |
| NE12-39Q-R2 Gabion Project Aggregates |
February 1, 2012 |
1:00 PM |
RFQ Cancelled and Not Awarded - Gabion Project Aggregates Tabulation Sheet |
| NE12-38B-R2 Filters |
January 19, 2012 |
1:00 PM |
Filters Tabulation Sheet |
| NE12-37Q-R2 Used Oil Disposal |
January 6, 2012 |
1:00 PM |
Used Oil Disposal Tabulation Sheet |
| NE12-36Q-R2 John Deere Backhoe Parts |
December 29, 2011 |
1:00 PM |
John Deere Backhoe Parts Tabulation Sheet |
| Cover Sheet and NE12-35Q-R2 Motorgraders and Loaders with Operators |
December 16, 2011 |
1:00 PM |
Motorgraders and Loaders with Operators Tabulation Sheet |
| NE12-34Q-R2 Tractor Tires |
December 15, 2011 |
1:00 PM |
Tractor Tires Tabulation Sheet |
| NE12-33Q-R2 Tractor Cab |
December 8, 2011 |
1:00 PM |
Tractor Cab Tabulation Sheet |
| NE12-32Q-R2 Plate Steel |
November 29, 2011 |
1:00 PM |
Plate Steel Tabulation Sheet |
| NE12-31Q-R2 Backhoe Tires and Addendum 001 |
November 18, 2011
November 22, 2011 |
1:00 PM |
Backhoe Tires Tabulation Sheet |
| NE12-30Q-R3 Cinders |
November 9, 2011 |
10:30 AM |
Tabulation |
| NE12-29B-R2 Cinder Hauling |
November 8, 2011 |
1:00 PM |
Cinder Hauling Tabulation Sheet |
| NE12-28Q-R2 Metal for Welding Shop and Addendum 001 |
November 2, 2011
November 3, 2011 |
1:00 PM |
Metal for Welding Shop Tabulation Sheet |
| NE12-27Q-R3 Poly Pipe Liner |
September 30, 2011 |
10:30 AM |
Tabulation |
| NE12-26Q-R2 Loader Tires |
September 27, 2011 |
1:00 PM |
Loader Tires Tabulation Sheet |
NE12-25B-R2 Premix |
September 13, 2011 |
1:00 PM |
Premix Tabulation Sheet |
| NE12-24Q-R2 John Deere WH48A Walk-Behind Mower |
September 8, 2011 |
1:00 PM |
John Deere WH48A Walk-Behind Mower Tabulation Sheet |
NE12-21Q-R3 Poly Pipe Liner |
September 7, 2011 |
10:30 AM |
Tabulation |
| NE12-23Q-R2 Loader Tires and Addendum 001 |
September 6, 2011 |
1:00 PM |
Loader Tires Tabulation Sheet |
| NE12-22Q-R2 Plywood and Lumber |
September 1, 2011 |
1:00 PM |
Plywood and Lumber Tabulation Sheet |
| NE12-20Q-R2 Metal for Welding Shop |
August 18, 2011 |
1:00 PM |
Metal for Welding Shop Tabulation Sheet |
| NE12-19Q-R2 Plate Steel |
August 17, 2011 |
1:00 PM |
Plate Steel Tabulation Sheet |
NE12-18Q-R3 Equipment Rentals |
August 16, 2011 |
10:30 AM |
Tabulation |
| NE12-17Q-R2 Target Pro 66 Concrete Saw Parts |
August 3, 2011 |
1:00 PM |
Target Pro 66 Concrete Saw Parts Tabulation Sheet |
| NE12-15Q-R2 Pipe Liner |
August 2, 2011 |
1:00 PM |
Pipe Liner Tabulation Sheet |
NE12-13Q-R3 HVAC
AWO #18, Montgomery County |
August 2, 2011 |
10:45 AM |
Tabulation |
NE12-12Q-R3 Overhead Doors
AWO #18, Marion County |
August 2, 2011 |
10:30 AM |
Not Awarded |
| NE12-11B-R3 Type 2 Rock Blanket- Clark County |
August 2, 2011 |
11:00 AM |
Tabulation |
| NE12-14Q-R2 Jackhammer Bits |
August 1, 2011 |
1:00 PM |
Jackhammer Bits Tabulation Sheet |
| NE12-09B-R2 Slide Repair Rip-Rap |
July 29, 2011 |
1:00 PM |
Slide Repair Rip-Rap Tabulation Sheet |
| NE12-16Q-R2 Fullriver DC224-6 Batteries |
July 29, 2011 |
10:00 AM |
Fullriver DC224-6 Batteries Tabulation Sheet |
| NE12-07Q-R2 Sand - Chariton County |
July 28, 2011 |
1:00 PM |
Sand - Chariton County Tabulation Sheet |
| NE12-10Q-R2 Trackhoe with Operator - Saline County |
July 27, 2011 |
3:00 PM |
Trackhoe with Operator Tabulation Sheet |
| NE12-06Q-R2 Type 2 Rock Blanket - Putnam County |
July 26, 2011 |
1:00 PM |
Type 2 Rock Blanket - Putnam County Tabulation Sheet |
| NE12-05Q-R2 Rip-Rap - Mercer and Putnam Counties |
July 25, 2011 |
1:00 PM |
Rip-Rap - Mercer and Putnam Counties Tabulation Sheet |
| NE12-03Q-R2 Three Inch Rock |
July 22, 2011 |
1:00 PM |
Three Inch Rock Tabulation Sheet |
| NE12-04B-R2 Slide Repair Rock Blanket - Saline County |
July 21, 2011 |
1:00 PM |
Slide Repair Rock Blanket - Saline County Tabulation Sheet |
| NE12-02Q-R2 Type 2 Rip-Rap |
July 20, 2011 |
1:00 PM |
Type 2 Rip-Rap Tabulation Sheet |
| NE12-01Q-R2 Type 2 Rock Blanket |
July 18, 2011 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
Single Feasible Sources Bid Opportunities:
| Item |
Date Posted |
Vendor/Bid Information |
| NE17-SFS-R2 Single Feasible Source Posting |
September 1, 2016
November 7, 2016
January 23, 2017
January 30, 2017
February 2, 2017
February 2, 2017 |
Parking Lot Sealing Contractor Assist Program
(Missouri Sealcoat Products)
Fullriver DC224-6 & DC250 Batteries
(Battery Outfitters)
Henderson Plow Parts
(Henderson Products)
Weedeater Heads
(Brian Holton's Welding Service)
Landoll 835 Gooseneck Trailers
(Landoll Corporation)
GPS-Based Distance Measuring Devices
(Jamar Technologies) |
| NE16-SFS-R2 Single Feasible Source Posting |
November 16, 2015
January 4, 2016
January 25, 2016
April 14, 2016
April 18, 2016 |
Spreader Chain Materials (Baum Hydraulics)
Facility Security Systems (Stanley Security Solutions)
Message Sign Face (National Sign and Signal)
Propane Training (Missouri Propane Gas Association)
Temporary Raised Pavement Markers (Pexco, LLC)
|
| NE15-SFS-R2 Single Feasible Source Posting |
July 1, 2014 (Original Posting)
August 20, 2014 (Updated Posting)
December 1, 2014 (Updated Posting)
April 27, 2015 (Updated Posting) |
Coal Slag Materials (Charah/Harsco Minerals)
Dangerous Driving Simulators (Simulator Systems International)
Elevator Service (Otis Elevator)
Facility Security (Stanley Security/DH Pace)
Fullriver DC224-6 Batteries (Battery Outfitters)
Galvanizing (Bob Monnig Industries)
Goedecke Materials (Goedecke Company)
GPS-based Distance Measuring Devices (Jamar Tech.)
Haydite (Buildex)
Hot AC Underseal (Missouri Petroleum)
Kompakt Mobile Shelving (Diversified Storage)
Pull Paver (JMG Equipment)
Shoulder Recycling Disc (Retriever, LLC)
Spreader Chain Materials (Baum Hydraulics)
Temporary Raised Pavement Markers (Pexco, LLC)
Traficon Video Detection Equipment (Control Technologies/Mid American Signal)
URETEK Urethane Deep Injection Process (URETEK USA) |
| NE14-SFS-R2 Single Feasible Source Posting |
December 31, 2013 |
Coal Slag Materials (Charah/Harsco Minerals)
Elevator Service (Otis Elevator)
Facility Security (Stanley Security/DH Pace)
Galvanizing (Bob Monnig Industries)
Goedecke Materials (Goedecke Company)
Haydite (Buildex)
Hot AC Underseal (Missouri Petroleum)
Kompakt Mobile Shelving (Diversified Storage)
Pull Paver (JMG Equipment)
Shoulder Recycling Disc (Retriever, LLC)
Spreader Chain Materials (Baum Hydraulics)
Traficon Video Detection Equipment (Control Technologies/Mid American Signal)
|
| NE13-59S-R2 Hot AC Underseal SFS |
April 30, 2013 |
Missouri Petroleum |
| NE13-50S-R2 Kompakt Mobile Shelving SFS |
February 27, 2013 |
Diversified Storage Systems |
| The MoDOT NE District is renewing the 9 SFS postings listed below through January 31, 2014 |
January 10, 2013 |
Geodecke Company, Baum Hydraulics, JMG Equipment, Stanley Security Solutions, Retriever, Control Technologies/Mid American Signal, Buildex, Charah/Harsco Minerals, and Bob Monnig Industries |
| NE13-39S-R2 Goedecke Materials SFS |
December 2012 |
Goedecke Company |
| NE13-24S-R2 Spreader Chain Fabrication Materials SFS |
October 2012 |
Baum Hydraulics |
| NE13-13S-R2 Pull Paver SFS |
August 2012 |
JMG Equipment |
| NE12-67S-R2 Facility Security Systems SFS |
May 2012 |
Stanley Security Solutions |
| NE12-57S-R2 Retriever SFS |
April 2012 |
Retriever, LLC |
| NE12-43S-R2 Traficon Video Detection SFS |
January 2012 |
Control Technologies/Mid American Signal |
| NE12-42S-R2 Haydite SFS |
January 2012 |
Buildex, Inc. |
| NE12-41S-R2 Cinders SFS |
January 2012 |
Charah/Harsco Minerals (SFS depending on geographical location of facilities in the NE District) |
| NE12-40S-R2 Galvanizing SFS |
January 2012 |
Bob Monnig Industries |
Archives from Former District 2 Macon Location - 2011 and Prior
| Title |
Closing Date |
Closing Time
(DST) |
Tabulations |
| D211-072-RO Annual Propane RFB |
June 20, 2011 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D211-071-R2 Cinder Hauling RFB |
June 6, 2011 |
1:00 PM |
Cinder Hauling Tabulation Sheet |
D211-070-RO Truck Wash Doors RFQ and Prevailing Wage Order 17 - Schuyler County and Addendum 001 |
May 13, 2011 |
1:00 PM |
Truck Wash Doors Tabulation Sheet |
| D211-068-R2 Grade E Concrete Rock and Concrete Sand RFQ |
May 2, 2011 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
| D211-067-R2 Spec 8 Aggregate RFQ |
April 29, 2011 |
1:00 PM |
Spec 8 Aggregate Tabulation Sheet |
| D211-066-R2 Tree Removal RFQ |
April 28, 2011 |
1:00 PM |
Tree Removal Tabulation Sheet |
| D211-064-RN Lease Rollers RFQ |
April 19, 2011 |
10:00 AM |
Lease Rollers Tabulation Sheet |
| D211-063-R2 Aggregate - Rip-Rap RFQ |
April 14, 2011 |
1:00 PM |
Aggregate - Rip-Rap Tabulation Sheet |
| D211-060-RN Roofing - Brookfield Concrete Crew RFQ and Prevailing Wage Order 17 - Linn County |
April 14, 2011 |
1:00 PM |
Roofing - Brookfield Concrete Crew Tabulation Sheet |
| D211-062-R2 Bush Hog 2715L Cutters RFB |
April 13, 2011 |
1:00 PM |
Bush Hog 2715L Cutters Tabulation Sheet |
| D211-061-R2 Lumber For Bridge Crew RFQ |
April 7, 2011 |
1:00 PM |
Lumber For Bridge Crew Tabulation Sheet |
| D211-056-RO Annual Hot Mix RFB |
March 31, 2011 |
1:00 PM |
Annual Hot Mix Tab Sheet |
| D211-058-R2 Type S Poly Culvert Pipe RFQ |
March 29, 2011 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D211-057-R2 Metal For Bridge Crew RFQ |
March 28, 2011 |
1:00 PM |
Metal For Bridge Crew Tabulation Sheet |
| D211-055-R2 Epoxy Coated Rebar RFQ |
March 25, 2011 |
1:00 PM |
Epoxy Coated Rebar Tabulation Sheet |
| D211-054-R2 Flexible Delineators RFQ |
March 23, 2011 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D211-053-R2 Metal Grates RFQ |
March 21, 2011 |
1:00 PM |
Metal Grates Tabulation Sheet |
D211-049-RO Car Wash RFB
Wage Order No. 17 |
March 11, 2011 |
1:00 PM |
Car Wash Tabulation Sheet |
| D211-051-RO Annual Concrete RFB |
March 10, 2011 |
1:00 PM |
2011 Annual Concrete Tab Sheet |
D209-062-R2-B Contract Mowing (Additional Areas) RFQ |
March 8, 2011 |
1:00 PM |
Contract Mowing (Additional Areas) Tabulation Sheet |
| D211-052-R2 Plywood RFQ |
March 7, 2011 |
1:00 PM |
Plywood Tabulation Sheet |
| D211-047-R2 Rubber Tired Excavator Lease RFB and Addendum 001 and Addendum 002 |
February 10, 2011 |
1:00 PM |
Rubber Tired Excavator Lease Tabulation Sheet |
| D211-046-R2 Cinder Hauling RFB |
February 8, 2011 |
1:00 PM |
Cinder Hauling Tabulation Sheet |
| D211-045-R2 Haydite VS. Trap Rock RFB |
February 4, 2011 |
1:00 PM |
Haydite VS. Trap Rock Tabulation Sheet |
| D211-043-R2 Type S Poly Culvert Pipe RFQ |
January 31, 2011 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D211-048-R2 Sand RFQ |
January 27, 2011 |
2:30 PM |
Sand Tabulation Sheet |
| D211-042-R2 Type 2 Rock Blanket RFQ |
January 27, 2011 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-041-R2 Aggregate - Rip-Rap RFQ |
January 25, 2011 |
1:00 PM |
Aggregate - Rip-Rap Tabulation Sheet |
| D211-039-R2 Type 2 Rock Blanket RFB |
January 21, 2011 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-036-RO Paint Tank Cleaning RFQ |
January 19, 2011 |
1:00 PM |
Paint Tank Cleaning Tabulation Sheet |
| D211-037-R2 Aggregate - 1.5 Inch Rock RFQ |
January 12, 2011 |
1:00 PM |
Aggregate - 1.5 Inch Rock Tabulation Sheet |
D211-028-R2 Pull Pavers RFB
and Addendum 001 |
January 5, 2011 |
1:00 PM |
Pull Pavers Tabulation Sheet |
| D211-035-R2 Solar Powered Street Light RFQ |
January 3, 2011 |
1:00 PM |
Solar Powered Street Light Tabulation Sheet |
| D211-034-R2 Light Fixtures and Bulbs RFQ |
December 28, 2010 |
1:00 PM |
Light Fixtures and Bulbs Tabulation Sheet |
| D211-031-RN Recap Tire Program RFB |
December 28, 2010 |
1:00 PM |
Recap Tire Program Tabulation Sheet |
| D211-033-R2 Type 2 Rock Blanket RFQ |
December 27, 2010 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-032-R2 Gabion Stone RFQ |
December 22, 2010 |
1:00 PM |
Gabion Stone Tabulation Sheet |
| D211-026-R2 Trackhoe Excavator Rental RFQ |
November 30, 2010 |
1:00 PM |
Trackhoe Excavator Rental Tabulation Sheet |
| D211-025-R2 Treated Wood Posts RFQ |
November 4, 2010 |
1:00 PM |
Treated Wood Posts Tabulation Sheet |
| D211-024-R2 Hauling Cinders RFB |
October 29, 2010 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
| D211-023-R2 Type 2 Rock Blanket RFQ |
October 25, 2010 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-022-R2 3-Inch and Type 5 Base Rock RFQ |
October 15, 2010 |
1:00 PM |
3-Inch and Type 5 Base Rock Tabulation Sheet |
| D211-020-R2 Crane and Pile Hammer Work RFQ |
October 5, 2010 |
1:00 PM |
Crane and Pile Hammer Work Tabulation Sheet |
| D211-019-R2 Type 2 Rock Blanket RFQ |
October 4, 2010 |
2:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D211-018-R2 Spec 8 Aggregate RFQ |
October 4, 2010 |
1:00 PM |
Spec 8 Aggregate Tabulation Sheet |
| D211-007-RN Diesel Fuel Tank Cleaning RFB and Addendum 001 |
September 27, 2010 |
1:00 PM |
RFB NOT AWARDED
DUE TO BUDGET CONSTRAINTS |
| D211-017-RN PVC Caps for Pipe Bollards RFQ |
September 22, 2010 |
1:00 PM |
PVC Caps for Pipe Bollards Tabulation Sheet |
| D211-016-RO Used Oil Disposal RFB |
September 16, 2010 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D211-015-R2 Chicago Pneumatic Jackhammers RFQ |
September 9, 2010 |
1:00 PM |
Chicago Pneumatic Jackhammers Tabulation Sheet |
| D211-014-RN Steel Pipe for Bollards RFB and Addendum 001 |
September 8, 2010
September 9, 2010 |
1:00 PM |
Steel Pipe for Bollards RFB Tabulation Sheet |
| D211-013-R2 Various Aggregates RFQ |
August 30, 2010 |
1:00 PM |
Various Aggregates Tabulation Sheet |
| D211-009-RN Stump Grinding Services RFQ |
August 19, 2010 |
1:00 PM |
Stump Grinding Service RFQ Tabulation Sheet |
| D211-011-R2 Emergency Premix RFQ |
August 19, 2010 |
10:00 AM |
Emergency Premix Tabulation Sheet |
| D211-010-RN Emergency Lease - Vibratory Rollers RFQ |
August 18, 2010 |
10:00 AM |
Emergency Lease - Vibratory Rollers RFQ Tabulation Sheet |
| D211-002-RN Collection & Disposal of Scrap Metal RFB and Addendum 001 |
August 6, 2010
August 12, 2010 |
1:00 PM |
RFB NOT AWARDED |
D211-008-R2 Sand RFQ |
August 4, 2010 |
9:00 AM |
Sand Tabulation Sheet |
| D211-006-R2 Two-Inch Rock (Wetlands Road) RFQ |
August 3, 2010 |
1:00 PM |
Two-Inch Rock (Wetlands Road) Tabulation Sheet |
| D211-003-R2 9-Foot Diameter Metal Pipe RFB and Addendum 001 |
August 2, 2010
August 3, 2010 |
1:00 PM |
9-Foot Diameter Metal Pipe Tabulation Sheet |
D211-005-R2 Rock Blanket and Gabion Stone RFQ |
July 27, 2010 |
1:00 PM |
Rock Blanket and Gabion Stone Tabulation Sheet |
| D211-001-RO Flexible Delineators RFQ |
July 20, 2010 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D210-075-R2 Hydrodemolition - Bridge A1970 RFB |
June 24, 2010 |
1:00 PM |
Hydrodemolition Tabulation Sheet |
| D210-073-R2 Type 2 Rock Blanket RFB |
June 23, 2010 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D210-072-R2 Aggregates - Rip-Rap RFB |
June 22, 2010 |
1:00 PM |
Aggregates - Rip-Rap Tabulation Sheet |
| D210-074-R2 Plate Steel RFQ |
June 15, 2010 |
1:00 PM |
Plate Steel Tabulation Sheet |
| D210-068-RN Tree Removal Services |
June 8, 2010 |
1:00 PM |
Tree Removal Service Tabulation Sheet |
| D210-071-R2 Trackhoe Rental RFQ |
June 2, 2010 |
1:00 PM |
Trackhoe Rental Tabulation Sheet |
| D210-069-R2 Trailer RFQ |
May 28, 2010 |
1:00 PM |
Trailer Tabulation Sheet |
| D210-066-RO Annual Propane RFB |
May 27, 2010 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D210-067-R2 Diamond Grinding RFQ and Addendum 001 |
May 18, 2010 |
1:00 PM |
Diamond Grinding Tabulation Sheet |
| D210-065-R2 Rock Blanket and Rip-Rap RFQ |
April 27, 2010 |
1:00 PM |
Rock Blanket and Rip-Rap Tabulation Sheet |
| D210-062-R2 Hauling Cinders RFB |
April 22, 2010 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
| D210-061-R2 Grade E Concrete Rock and Concrete Sand RFQ |
April 13, 2010 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
| D210-060-R2 Coal Slag Abrasive RFQ |
April 9, 2010 |
1:00 PM |
RFQ NOT AWARDED
DUE TO BUDGET CONSTRAINTS |
| D210-049-RO Annual Hot Mix RFB |
March 25, 2010 |
1:00 PM |
Annual Hot Mix Tabulation Sheet |
D210-048-R2 Lubricant Storage and Dispensing Apparatus RFQ and Addendum 001 |
March 18, 2010 |
1:00 PM |
Lubricant Storage and Dispensing Apparatus Tabulation Sheet |
| D210-058-R2 Hydraulic Breaker Rental RFQ |
March 17, 2010 |
1:00 PM |
Hydraulic Breaker Rental Tabulation Sheet |
| D209-062-R2-A Contract Mowing (Additional Areas) RFQ |
March 16, 2010 |
1:00 PM |
RFQ CANCELLED
DUE TO BUDGET CUTBACKS |
D210-053-RO Vehicle Maintenance RFB and Sample list of vehicles |
March 9, 2010 |
1:00 PM |
Vehicle Maintenance Tabulation Sheet |
| D210-057-R2 Solar Flashing Beacons RFQ |
March 4, 2010 |
1:00 PM |
Solar Flashing Beacons Tabulation Sheet |
| D210-054-RO Annual Concrete RFB |
February 25, 2010 |
1:00 PM |
Annual Concrete Tabulation Sheet |
| D210-056-R2 Trailers RFQ |
February 22, 2010 |
1:00 PM |
Trailers Tabulation Sheet |
| D210-055-R2 Timber For Bridge Backwall RFQ |
February 18, 2010 |
1:00 PM |
Timber for Bridge Backwall Tabulation Sheet |
| D210-052-RN 9' Pickup Material Spreaders RFQ |
February 10, 2010 |
1:00 PM |
9' Pickup Material Spreaders Tabulation Sheet |
D210-047-RN Lease - Wheeled Excavator RFB and Addendum 001 |
February 1, 2010 |
1:00 PM |
Lease - Wheeled Excavator Tabulation Sheet |
| D210-051-R2 Hauling Cinders RFB |
January 27, 2010 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
| D210-050-R2 Carpentry and Plumbing Supplies RFQ |
January 22, 2010 |
1:00 PM |
Carpentry and Plumbing Tabulation Sheet |
D210-044-RN Filters (Air, Fuel, Oil, Etc.) RFB and 2010 Filter Pricing Sheet and Addendum 001 - Informational Only and MoDOT D2 Equipment Counts |
January 20, 2010 |
1:00 PM |
Filters (Air, Oil, Fuel, etc.) Tabulation Sheet |
| D210-046-R2 Spill Containment Pallets RFQ |
January 12, 2009 |
1:00 PM |
Spill Containment Pallets Tabulation Sheet |
| D210-040-RN Undercarriage For Bulldozer RFB and Addendum 001 and Addendum 002 |
December 23, 2009
December 29, 2009 |
1:00 PM |
Undercarriage for Bulldozer Tabulation Sheet |
| D210-039-R2 Elliptical Leg Tank RFQ |
December 16, 2009 |
1:00 PM |
Elliptical Leg Tank Tabulation Sheet |
| D210-042-R2 Various Aggregates RFQ |
December 16, 2009 |
10:00 AM |
Various Aggregates Tabulation Sheet |
| D210-043-R2 Trackhoe With Operator RFQ |
December 16, 2009 |
9:00 AM |
RFQ NOT AWARDED - Trackhoe With Operator Tabulation Sheet |
| D210-038-R2 Haydite VS. Trap Rock RFB |
December 15, 2009 |
1:00 PM |
Haydite VS. Trap Rock Tabulation Sheet |
| D210-041-R2 Plant Pick-Up Rip-Rap RFQ |
December 15, 2009 |
10:00 AM |
Plant Pick-Up Rip-Rap Tabulation Sheet |
| D210-037-RN Pressure Washers RFQ |
December 11, 2009 |
1:00 PM |
Pressure Washer Tabulation Sheet |
| D210-033-R2 Diamond Saw Blades RFQ |
December 11, 2009 |
1:00 PM |
Diamond Saw Blades Tabulation Sheet |
| D210-032-R2 Rip-Rap RFB |
December 10, 2009 |
1:00 PM |
Rip-Rap Tabulation Sheet |
| D210-031-R2 Type S Poly Culvert Pipe RFQ |
December 9, 2009 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D210-030-R2 Culvert Pipe Liner RFQ |
December 8, 2009 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D210-029-R2 Type 2 Rock Blanket RFQ |
December 7, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D210-034-R2 On-Call Hauling Service RFQ |
December 3, 2009 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet |
| D210-027-RM Solar Flashing Amber Beacon RFQ |
November 12, 2009 |
1:00 PM |
Solar Flashing Amber Beacon Tabulation Sheet |
D210-008-RM Tree Removal Services RFB and Addendum 001 |
November 10, 2009 |
1:00 PM |
Tree Removal Services Tabulation Sheet |
D210-026-RN Motorgrader Tires RFB and Addendum 001 |
October 28, 2009 |
1:00 PM |
Motorgrader Tires Tabulation Sheet |
| D210-025-RO Used Oil Disposal RFB |
October 23, 2009 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D210-023-R2 Underground Boring RFB |
October 16, 2009 |
1:00 PM |
Underground Boring Tabulation Sheet |
D210-017-RO Janitorial Services RFB and Building Floor Plans and Addendum 001 |
October 6, 2009 |
1:00 PM |
Janitorial Services Tabulation Sheet |
D210-018-RM One-Month Trackhoe Lease RFQ and 902 North Missouri Street (Map) |
September 21, 2009 |
1:00 PM |
One-Month Trackhoe Lease Tabulation Sheet |
| D210-022-R2 Type 2 Rock Blanket RFQ |
September 18, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D210-021-R2 Metal Pipe RFQ |
September 17, 2009 |
1:00 PM |
Metal Pipe Tabulation Sheet |
| D210-016-RN Shoulder Recycler RFQ |
September 17, 2009 |
1:00 PM |
Shoulder Recycler Tabulation Sheet |
D210-020-R2 Steel Piling RFQ
and Addendum 001 |
September 16, 2009 |
1:00 PM |
Steel Piling Tabulation Sheet |
| D210-015-R2 Dozer Rental RFQ |
August 24, 2009 |
1:00 PM |
Dozer Rental Tabulation Sheet |
| D210-014-R2 Trailers RFQ |
August 21, 2009 |
1:00 PM |
Trailers RFQ Tabulation Sheet |
| D210-013-R2 Hauling Cinders RFB |
August 20, 2009 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
D210-005-RM Guardrail Repair Randolph County RFB and General Wage Order and Map of Randolph Co. Guardrail Projects and Plan Sheet - Proposed Guardrail at the Norfolk and Southern Railroad Overpass and Plan Sheet - Proposed Guardrail at McKinsey St. Overpass and Missouri Standard Specification for Highway Construction 2004 Edition and Typical Work Zone Applicaitons |
August 20, 2009 |
1:00 PM |
Guardrail Repair Randolph County Tabulation Sheet |
| D210-012-R2 Aluminum Box Culvert RFQ and Addendum 001 |
August 19, 2009 |
1:00 PM |
Aluminum Box Culvert Tabulation Sheet |
| D210-011-R2 Coal Slag Abrasive RFQ |
August 18, 2009 |
1:00 PM |
Coal Slag Abrasive Tabulation Sheet |
| D210-007-R2 Dust Control RFQ |
August 10, 2009 |
1:00 PM |
Dust Control Tabulation Sheet |
| D210-006-R2 Spec 8 Aggregate RFQ |
August 7, 2009 |
1:00 PM |
Spec 8 Aggregate Tabulation Sheet |
D210-004-RM Concrete Pad RFQ
and Addendum 001 |
August 3, 2009 |
1:00 PM |
Concrete Pad Tabulation Sheet |
| D210-002-R2 Arched Metal Pipe RFQ and Addendum 001 |
July 17, 2009 |
1:00 PM |
Arched Metal Pipe Tabulation Sheet |
| D210-001-R2 Metal Pipe RFQ |
July 16, 2009 |
1:00 PM |
RFQ CANCELLED (NOT AWARDED) |
| D209-097-R2 Rip-Rap RFB |
July 15, 2009 |
1:00 PM |
Rip-Rap Tabulation Sheet |
D209-100-RM Electrical Components RFQ and Addendum 001 |
July 8, 2009 |
1:00 PM |
Electrical Components Tabulation Sheet |
| D209-096-R2 Poly Pipe RFB |
July 8, 2009 |
1:00 PM |
Poly Pipe Tabulation Sheet |
| D209-095-R2 Metal Pipe RFB |
July 7, 2009 |
1:00 PM |
Metal Pipe Tabulation Sheet |
| D209-094-R2 Western Snowplows RFQ |
July 6, 2009 |
1:00 PM |
Western Snowplows Tabulation Sheet |
| D209-093-R2 Bush Hog 2715 Cutter RFQ |
July 2, 2009 |
2:00 PM |
Bush Hog 2715 Cutter Tabulation Sheet |
| D209-092-R2 Pipe Liner RFQ |
July 1, 2009 |
1:00 PM |
Pipe Liner Tabulation Sheet |
| D209-099-R2 Plate Arch Pipe RFQ and Addendum 001 |
July 1, 2009 |
10:00 AM |
RFQ CANCELLED (NOT AWARDED) |
| D209-091-R2 Tire Chains RFQ |
June 30, 2009 |
1:00 PM |
Tire Chains Tabulation Sheet |
| D209-090-R2 Flexible Delineators RFQ |
June 29, 2009 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D209-089-R2 18-Foot Trailer RFQ |
June 29, 2009 |
10:00 AM |
18-Foot Trailer Tabulation Sheet |
| D209-087-RM Loader Tires RFQ |
June 8, 2009 |
10:00 AM |
Loader Tire Tabulation Sheet |
| D209-086-R2 Walk-Behind Mower RFQ |
June 4, 2009 |
1:00 PM |
Walk-Behind Mower Tabulation Sheet |
| D209-085-R2 Corrugated Metal Pipe RFQ |
June 3, 2009 |
10:00 AM |
Corrugated Metal Pipe Tabulation Sheet |
D209-084-R2 Digitizing Microfiche RFQ and Addendum 001 |
May 28, 2009 |
1:00 PM |
Digitizing Microfiche Tabulation Sheet |
| D209-083-RM 2009-2010 Annual Propane RFB |
May 28, 2009 |
1:00 PM |
2009-2010 Annual Propane Tabulation Sheet |
| D209-081-RM Retaining Wall Knob Style Concrete Interlocking Blocks RFQ |
May 18, 2009 |
1:00 PM |
Retaining Wall Knob Style Concrete Interlocking Blocks Tabulation Sheet |
| D209-054-RM Hot Water Pressure Washer RFQ |
May 4, 2009 |
1:00 PM |
Hot Water Pressure Washer Tabulation Sheet |
| D209-080-RM Concrete Slab Unionville Salt Bldg. RFQ |
April 30, 2009 |
1:00 PM |
Concrete Slab Tabulation Sheet |
D209-074-RM Courier Service RFB and Addendum 001 |
April 15, 2009
April 21, 2009 |
1:00 PM |
NO AWARD - Utilized In-house Services
Courier Service Tabulation Sheet |
| D209-079-R2 Plywood and Lumber RFQ |
April 17, 2009 |
1:00 PM |
Plywood and Lumber Tabulation Sheet |
| D209-078-R2 Culvert Pipe Liner RFQ |
April 16, 2009 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D209-077-R2 Corrugated Metal Pipe RFQ |
April 15, 2009 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-076-R2 Steel RFQ |
April 14, 2009 |
10:00 AM |
Steel Tabulation Sheet |
| D209-067-RN Chassis Removal and Installation RFQ |
April 8, 2009 |
1:00 PM |
Chassis Removal and Installation Tabulation Sheet |
| D209-075-R2 Grade E Concrete Rock and Concrete Sand RFQ |
March 30, 2009 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
| D209-073-RM Annual Hot Mix RFB |
March 25, 2009 |
1:00 PM |
Annual Hot Mix Price Agreements |
| D209-059-RM Fuel Pump Dispensers RFB |
March 16, 2009 |
1:00 PM |
Fuel Pump Dispensers Tabulation Sheet |
D209-072-R2 Crushed Porphyry Rock RFB
and Addendum 001 |
March 13, 2009 |
10:00 AM |
Crushed Porphyry Rock Tabulation Sheet |
| D209-066-RN Motorgrader Shoulder Conditioning Attachment RFQ |
March 12, 2009 |
1:00 PM |
Motorgrader Shoulder Conditioning Attachment Tabulation Sheet |
| D209-071-R2 Truck Conspicuity D.O.T. Tape RFQ |
March 12, 2009 |
10:00 AM |
Truck Conspicuity D.O.T. Tape Tabulation Sheet |
| D209-070-R2 Bush Hog 2715 Cutter RFQ |
March 11, 2009 |
2:00 PM |
NOT AWARDED due to budget constraints
Bush Hog 2715 Cutter Tabulation Sheet |
| D209-069-R2 Pull Broom RFQ |
March 11, 2009 |
12:00 PM (Noon) |
Pull Broom Tabulation Sheet |
| D209-068-R2 Steel RFQ |
March 10, 2009 |
1:00 PM |
Steel Tabulation Sheet |
| D209-064-R2 Plate Steel RFQ |
March 10, 2009 |
10:00 AM |
Plate Steel Tabulation Sheet |
D209-065-R2 Hauling Cinders RFQ |
March 4, 2009 |
1:00 PM |
Hauling Cinders Tabulation Sheet |
D209-062-R2 Contract Mowing RFQ |
February 24, 2009 |
1:00 PM |
Contract Mowing Tabulation Sheet |
| D209-063-R2 Corrugated Metal Pipe RFQ |
February 18, 2009 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-053-RE Annual Concrete RFB |
February 17, 2009 |
1:00 PM |
Annual Concrete Tabulation Sheet |
| D209-061-R2 Corrugated Metal Pipe RFQ |
February 11, 2009 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-058-R2 Type 2 Rock Blanket RFQ |
January 30, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D209-082-R2 Uretek Pavement Leveling SFS Posting |
May 12, 2009 |
1:00 PM |
Uretek USA, Inc. |
| D209-060-R2 Video Detection System Parts RFQ |
February 5, 2009 |
1:00 PM |
Delta Technologies, Inc.
Video Detection System Parts Tabulation Sheet |
D209-047-RM One-Month Lease Trackhoe RFQ
and Addendum 001 |
January 29, 2009 |
1:00 PM |
One-Month Lease Trackhoe Tabulation Sheet |
D209-050-R2 Type 2 Rock Blanket RFB and Addendum 001 |
January 7, 2009
January 5, 2009 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D209-052-R2 Aggregates - Sand RFQ |
January 2, 2009 |
1:00 PM |
Aggregates - Sand Tabulation Sheet |
| D209-049-R2 Corrugated Metal Pipe RFQ |
December 17, 2008 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-044-R2 Crushed Porphyry Rock RFB |
December 16, 2008 |
1:00 PM |
Crushed Porphyry Rock Tabulation Sheet |
| D209-048-R2 4X4 Utility Vehicle RFQ |
December 15, 2008 |
1:00 PM |
4X4 Utility Vehicle Tabulation Sheet |
| D209-043-R2 Aggregates - Shot Rock RFB |
December 12, 2008 |
1:00 PM |
Aggregates - Shot Rock Tabulation Sheet |
D209-042-R2 Aggregates - Rip-Rap RFB and
Addendum 001 |
December 11, 2008 |
1:00 PM |
Aggregates - Rip-Rap Tabulation Sheet |
| D209-035-RE Repair Fencing RFQ |
December 11, 2008 |
1:00 PM |
Repair Fencing Tabulation Sheet |
| D209-046-R2 Aggregates - 1.5 Inch Rock RFQ |
December 9, 2008 |
1:00 PM |
Aggregates - 1.5 Inch Rock Tabulation Sheet |
| D209-041-R2 Diamond Saw Blades RFQ |
December 8, 2008 |
1:00 PM |
Diamond Saw Blades Tabulation Sheet |
| D209-045-R2 Corrugated Metal Pipe RFQ |
December 5, 2008 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-039-R2 Lockout Tagout Kits RFQ |
December 2, 2008 |
1:00 PM |
Lockout Tagout Kits Tabulation Sheet |
| D209-040-R2 Protect-a-Rail and Mounting Kit RFQ |
November 26, 2008 |
1:00 PM |
Protect-a-Rail and Mounting Kit Tabulation Sheet |
| D209-038-R2 Corrugated Metal Pipe RFQ |
November 26, 2008 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D209-037-R2 Type S Poly Culvert Pipe RFQ |
November 25, 2008 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
D209-030-R2 Crushed Porphyry Rock RFB and
Addendum 001 |
November 20, 2008 |
1:00 PM |
Crushed Porphyry Rock Tabulation Sheet |
| D209-031-R2 Coal Slag Abrasive RFQ |
November 18, 2008 |
1:00 PM |
Coal Slag Abrasive Tabulation Sheet |
| SFS 7 - D209-028-RM Screened, Washed & Cleaned Cinders |
November 17, 2008 |
1:00 PM |
Reed Minerals, Inc. - Screened Washed and Cleaned Cinders Tabulation Sheet |
| D209-029-RM Loader Tires RFQ |
November 10, 2008 |
1:00 PM |
Loader Tire Tabulation Sheet |
| D209-025-R2 On-Call Hauling Service RFQ |
October 30, 2008 |
1:00 PM |
On-Call Hauling Service Tabulation Sheet
Haul Rate Chart:
1) Haul Rate Chart - Effective 11-01-08
2) Haul Rate Chart - Effective 12-01-08
3) Haul Rate Chart - Effective 02-01-09
4) Haul Rate Chart - Effective 03-01-09 |
| D209-015-RM ProLaser III Laser Radar Gun RFQ |
October 29, 2008 |
1:00 PM |
ProLaser III Laser Radar Gun Tabulation Sheet |
D209-024-R2 Recap Tire Program RFB
and Addendum 001 |
October 28, 2008 |
1:00 PM |
Recap Tire Program Tabulation Sheet |
| D209-027-RM Knob Style Interlocking Concrete Blocks RFQ |
October 16, 2008 |
2:00 PM |
Knob Style Interlocking Concrete Blocks Tabulation Sheet |
| D209-026-RM Video Detection Equipment RFB |
October 9, 2008 |
1:00 PM |
Video Detection Equipment Tabulation Sheet |
| D209-023-RE Light Strips and Bulbs RFB |
October 8, 2008 |
1:00 PM |
Light Strips and Bulbs Tabulation Sheet |
| D209-022-R2 Flexible Delineators RFQ |
October 3, 2008 |
1:00 PM |
Flexible Delineators Tabulation Sheet |
| D209-021-R2 Plate Steel and Pipe RFQ |
October 1, 2008 |
1:00 PM |
Plate Steel and Pipe Tabulation Sheet |
| D209-020-R2 Used Oil Disposal RFB |
September 29, 2008 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D209-019-R2 Culvert Pipe Liner RFQ |
September 25, 2008 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D209-018-R2 Type S Poly Culvert Pipe RFB |
September 23, 2008 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D209-014-R2 GPS Survey Equipment RFB |
September 18, 2008 |
1:00 PM |
GPS Survey Equipment Tabulation Sheet |
| D209-017-R2 Type 2 Rock Blanket RFQ |
September 15, 2008 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
| D209-008-RE Crane and Pile Hammer RFB |
September 10, 2008 |
1:00 PM |
Crane and Pile Hammer Tabulation Sheet |
| D209-012-R2 Premium Hardwood Mulch RFQ |
August 29, 2008 |
1:00 PM |
Premium Hardwood Mulch Tabulation Sheet |
| D209-013-RM One-Month Lease Trackhoe RFQ |
August 28, 2008 |
1:00 PM |
One-Month Lease Trackhoe Tabulation Sheet |
| D209-011-R2 Western Snowplow RFQ |
August 26, 2008 |
1:00 PM |
Western Snowplow Tabulation Sheet |
| D209-010-R2 Type 2 Rock Blanket RFQ |
August 19, 2008 |
1:00 PM |
Type 2 Rock Blanket Tabulation Sheet |
D209-007-RE Bridge Repair RFQ Attachments:
|
August 7, 2008 |
1:00 PM |
Bridge Repair Tabulation Sheet |
| D209-006-R2 Tire Chains and Crosslinks RFQ |
August 6, 2008 |
1:00 PM |
Tire Chains and Crosslinks Tabulation Sheet |
| D209-005-R2 Waste Aggregate Scalpings RFQ |
August 5, 2008 |
1:00 PM |
Waste Aggregate Scalpings Tabulation Sheet |
| D209-003-RN Whelen LED Lights SFS |
July 21. 2008 |
1:00 PM |
Whelen Engineering Co.
Whelen LED Lights Tabulation Sheet |
D208-057-RE Fuel Tank Installation RFB
and Addendum 001 |
July 10, 2008 |
1:00 PM |
Fuel Tank Installation Tabulation Sheet |
| D209-002-R2 Aggregates - Rip-Rap RFQ |
July 9, 2008 |
10:00 AM |
Aggregates - Rip-Rap Tabulation Sheet |
| D208-055-RE Fayette Force Main RFB |
July 3, 2008 |
1:00 PM |
Fayette Force Main Tabulation Sheet |
| D208-058-R2 Oils, Lubricants & Fluids RFQ |
July 1, 2008 |
1:00 PM |
Initial Award Sheet:
Oils, Lubricants & Fluids Tabulation Sheet
Revised Award Sheets:
1) Pricing Sheet - Effective 08-01-08
2) Pricing Sheet - Effective 10-01-08
3) Pricing Sheet - Effective 11-01-08
4) Pricing Sheet - Effective 12-01-08 |
D208-050-RE Fuel Tank Removal RFQ and Addendum 001 |
June 4, 2008
June 12, 2008 |
1:00 PM |
Fuel Tank Removal Tabulation Sheet |
D208-054-R2 Contract Mowing RFQ and Addendum 001 - Informational Only |
June 11, 2008 |
1:00 PM |
Contract Mowing Tabulation Sheet |
D208-051-RE Fuel Tank Installation RFB and
Addendum 001 |
May 29, 2008
June 5, 2008 |
1:00 PM |
RFB CANCELLED (NOT AWARDED) |
D208-052-RN 36 Inch Steel Pipe RFQ |
June 3, 2008 |
1:00 PM |
36 Inch Steel Pipe Tabulation Sheet |
| D208-059-R2 Video Detection Equipment SFS RFQ |
June 18, 2008 |
1:00 PM |
Delta Technologies, Inc. - Video Detection Equipment Tabulation Sheet |
| D208-056-RN Portable Tank Cleaning Unit SFS RFQ |
June 10, 2008 |
1:00 PM |
RCI Technologies - Portable Tank Cleaning Unit Tabulation Sheet |
| D208-046-RE Annual Propane RFB |
May 29, 2008 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D208-053-R2 Materials Lab Equipment SFS RFQ |
May 28, 2008 |
1:00 PM |
Gilson Company, Inc. - Materials Lab Equipment Tabulation Sheet |
| D208-048-RN Concrete Screed SFS RFQ |
May 23, 2008 |
1:00 PM |
Lura Enterprises, LLC. -
Concrete Screed Tabulation Sheet |
| D208-049-RE Kirksville Project Office Addition RFQ |
May 20, 2008 |
1:00 PM |
Kirksville Project Office Addition Tabulation Sheet |
| D208-047-RE Heavy Duty 10 Foot Rear Mount Blade RFQ |
May 7, 2008 |
1:00 PM |
Heavy Duty 10 Foot Rear Mount Blade Tabulation Sheet |
| D208-044-RE Annual Hot Mix RFB |
April 15, 2008 |
1:00 PM |
Annual Hot Mix Tabulation Sheet |
| D208-042-RE 2nd Quarter Oil Lube and Fluids RFQ |
April 4, 2008 |
1:00 PM |
2nd Quarter Oil Lube and Fluids Tabulation Sheet |
| D208-043-R2 Plant Pick Up Sand SFS RFQ |
March 31, 2008 |
1:00 PM |
Missouri Contractors, LLC. -
Plant Pick Up Sand Tabulation Sheet |
D208-040-RE Fabric Door RFB and Addendum 001 |
March 20, 2008 |
1:00 PM |
Fabric Door Tabulation Sheet |
| D208-039-R2 Grade E Concrete Rock and Concrete Sand RFQ |
March 6, 2008 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
D208-038-R2 Poly Tanks RFQ and Poly Tank Pictures - For Example Only |
March 4, 2008 |
1:00 PM |
Poly Tank Tabulation Sheet |
| D208-037-R2 Pull Broom RFQ |
March 3, 2008 |
1:00 PM |
Pull Broom Tabulation Sheet |
| D208-036-R2 Black Cat Joma Blades SFS RFQ |
February 27, 2008 |
1:00 PM |
Winter Equipment Co. -
Black Cat Joma Blades Tabulation Sheet |
| D208-033-RE Annual Concrete RFB |
February 14, 2008 |
1:00 PM |
Annual Concrete Tabulation Sheet |
| D208-034-R2 Wireless Interconnect SFS RFQ |
February 13, 2008 |
1:00 PM |
Brown Traffic Products -
Wireless Interconnect Tabulation Sheet |
D208-032-R2 Employee Recognition Shirts RFQ
and Addendum 001 and Addendum 002 |
January 22, 2008
January 24, 2008 |
1:00 PM |
Employee Recognition Shirts Tabulation Sheet |
| D208-029-R2 Culvert Pipe Liner RFQ |
January 16, 2008 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D208-028-R2 Type S Poly Culvert Pipe RFB |
January 15, 2008 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
D208-027-R2 Diamond Saw Blades RFQ
and Addendum 001 - Informational Only |
January 10, 2008 |
1:00 PM |
Diamond Saw Blades Tabulation Sheet |
D208-026-R2 Aggregates - 1 Inch Driveway Rock - RFQ and Addendum 001 and Addendum 002 |
January 9, 2008 |
1:00 PM |
Aggregates - 1 Inch Driveway Rock - Tabulation Sheet |
D208-025-R2 Aggregates - Rip-Rap - RFB
and Addendum 001 |
January 8, 2008 |
1:00 PM |
Aggregates - Rip-Rap - Tabulation Sheet |
D208-031-RE 1st Quarter Oil Lube and Fluids RFQ and Addendum 001 |
December 27, 2007
January 2, 2008 |
1:00 PM |
1st Quarter Oil Lube and Fluids Tabulation Sheet (Vendor withdrew their quote) 1st Quarter Oil Lube and Fluids Tabulation Sheet - Revised 02-04-08
|
| D208-030-R2 Video System SFS RFQ |
January 17, 2008 |
1:00 PM |
Enforcement Video, LP
(DBA: WatchGuard Video) -
Video System SFS Tabulation Sheet |
| D208-024-R2 Haydite - Fine Grade - SFS RFB |
January 3, 2008 |
1:00 PM |
Buildex, Inc. -
Haydite - Fine Grade - SFS Tabulation Sheet |
| D208-003-R2 Floor Mat and Shop Towel Service RFQ |
December 20, 2007 |
1:00 PM |
Floor Mat and Shop Towel Service Tabulation Sheet |
| D208-022-RN Geomelt RFQ |
November 14, 2007 |
1:00 PM |
Smith Fertilizer & Grain, Inc. |
| D208-017-RN Motorgrader Shouldering Tool RFQ |
October 29, 2007 |
1:00 PM |
Motorgrader Shouldering Tool Tabulation Sheet |
| D208-020-R2 Used Oil Disposal RFB |
October 26, 2007 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D208-015-R2 4th Quarter Oil Lube and Fluids RFQ |
October 2, 2007 |
1:00 PM |
Oil Lube and Fluids Tabulation Sheet |
D208-014-R2 Rally Towels RFQ and Addendum 001 |
October 1, 2007 |
1:00 PM |
Rally Towels Tabulation Sheet |
D208-012-RN Diesel Tank Cleaning RFB and
Addendum 001 |
September 18, 2007 |
1:00 PM |
Diesel Tank Tabulation Sheet |
| D208-013-R2 Poly Pipe RFQ |
September 11, 2007 |
1:00 PM |
Poly Pipe Tabulation Sheet |
| D208-006-RE Fabric Doors RFB (Cancelled) |
August 30, 2007 |
1:00 PM |
RFB CANCELLED (NOT AWARDED) |
| D208-010-RE Paint Tank Cleaning RFQ |
August 28, 2007 |
1:00 PM |
Paint Tank Cleaning Tabulation Sheet |
| D208-009-RN Material Spreaders RFQ |
August 22, 2007 |
1:00 PM |
Spreader RFB Tabulation Sheet |
| D208-011-R2 Child Car Seats RFQ |
August 21, 2007 |
1:00 PM |
Child Car Seats Tabulation Sheet |
| D208-008-R2 Aluminum Backing Bars RFQ (Cancelled) |
August 9, 2007 |
1:00 PM |
RFQ CANCELLED (NOT AWARDED) |
| D208-007-R2 Posts - Slip Bases RFQ |
August 8, 2007 |
1:00 PM |
Posts - Slip Bases Tabulation Sheet |
D208-004-R2 Pavement Leveling RFB
and General Wage Order No. 50 and D208-004-R2 Addendum 001 |
August 3, 2007 |
1:00 PM |
Pavement Leveling Tabulation Sheet |
| D208-002-R2 Transportation Options RFI (Request For Information Only) |
July 6, 2007 |
1:00 PM |
The following were the responses received to the RFI:
RFI Response - Hornblower Marine Services
RFI Response - OATS Inc
RFI Response - Sunset Tours Inc
RFI Response - White Knight Coaches Inc |
| D208-001-RN Pressure Washer RFQ |
June 27, 2007 |
1:00 PM |
Pressure Washer Tabulation Sheet |
| D207-082-R2 Aggregates - Rip-Rap - RFQ |
June 21, 2007 |
1:00 PM |
Aggregates - Rip-Rap - Tabulation Sheet |
| D207-081-R2 Trackhoe With Operator RFQ |
June 15, 2007 |
1:00 PM |
RFQ CANCELLED (NOT AWARDED ) |
D207-052-RN Lease Trackhoe RFB and Addendum 001 |
June 14, 2007 |
1:00 PM |
Lease Trackhoe Bid Tabulation Sheet |
D207-078-R2 Contract Mowing - Saline County - RFQ and D207-078-R2 Addendum 001 |
June 6, 2007 |
1:00 PM |
Contract Mowing - Saline County - Tabulation Sheet |
| D207-073-RE Annual Propane RFB |
May 30, 2007 |
1:00 PM |
Annual Propane Tabulation Sheet |
| D207-076-R2 Haydite - Fine Grade - SFS RFB |
May 18, 2007 |
1:00 PM |
Buildex, Inc. - Haydite SFS Tabulation Sheet |
| D207-075-RN Walk-Behind Mower RFQ |
May 15, 2007 |
1:00 PM |
Walk-Behind Mower Tabulation Sheet |
D207-072-RE Refurbish and Repair Salt Buildings RFQ and Addendum 001 and Addendum 002 |
May 9, 2007 |
1:00 PM |
Refurbish and Repair Salt Buildings Tabulation Sheet |
| D207-070-RN Leased Aggregate Screen RFQ |
May 9, 2007 |
1:00 PM |
Leased Aggregate Screen Tabulation Sheet |
| D207-074-R2 Child Car Seats RFQ |
May 3, 2007 |
1:00 PM |
Child Car Seats Tabulation Sheet |
| D207-071-RN Zero-Turn Radius Mower RFQ |
May 3, 2007 |
1:00 PM |
Zero-Turn Radius Mower Tabulation Sheet |
| D207-069-R2 Flowable Backfill RFQ |
April 30, 2007 |
1:00 PM |
Flowable Backfill Tabulation Sheet |
| D207-067-R2 Topcon GPS Survey Equipment RFB |
April 24, 2007 |
1:00 PM |
Topcon GPS Survey Equipment Tabulation Sheet |
D207-065-RE Milan Furnace RFQ and Addendum 001 |
April 24, 2007 |
1:00 PM |
Milan Furnace Tabulation Sheet |
| D207-064-RE Oil Separator for Princeton and Keytesville RFQ |
April 19, 2007 |
1:00 PM |
Oil Separator for Princeton and Keytesville Tabulation Sheet |
D207-062-RE Seal Coating - D2 HQ Complex - RFQ and Addendum 001 |
April 17, 2007 |
1:00 PM |
Seal Coating - D2 HQ Complex - Tabulation Sheet |
| D207-057-RE Annual Hot Mix RFB |
April 19, 2007 |
1:00 PM |
Annual Hot Mix Tabulation Sheet |
D207-058-R2 Corrugated Metal Pipe RFB
and D207-058-R2 Addendum 001 |
April 11, 2007 |
1:00 PM |
Corrugated Metal Pipe Tabulation Sheet |
| D207-055-RN Mobile Lab RFQ |
April 10, 2007 |
1:00 PM |
Mobile Lab RFQ Tabulation Sheet |
D207-061-R2 Haydite - Grade B - SFS RFB
SFS RFB Cancelled (Not Awarded) |
April 3, 2007 |
1:00 PM |
Buildex, Inc.
Product not available in the required timeframe |
| D207-060-R2 Tire Chains and Cross Links RFQ |
April 3, 2007 |
1:00 PM |
Tire Chains and Cross Links Tabulation Sheet |
| D207-059-R2 Grade E Concrete Rock and Concrete Sand RFQ |
April 2, 2007 |
1:00 PM |
Grade E Concrete Rock and Concrete Sand Tabulation Sheet |
D207-056-RE 2nd and 3rd Quarter Oil Lube and Fluids and Addendum 001 |
March 29, 2007 |
1:00 PM |
2nd and 3rd Quarter Oil Lube and Fluids Tabulation Sheet |
| D207-053-RN Walk-Behind Mower RFQ |
March 29, 2007 |
1:00 PM |
Walk-Behind Mower Tabulation Sheet |
| D207-051-RN Guardrail RFQ |
March 28, 2007 |
1:00 PM |
Guardrail RFQ Tabulation Sheet |
| D207-050-RN Lumber RFQ |
March 22, 2007 |
1:00 PM |
Lumber RFQ Tabulation Sheet |
| D207-049-R2 Arrive Alive T-Shirts RFQ |
March 6, 2007 |
1:00 PM |
Arrive Alive T-Shirts Tabulation Sheet |
| D207-048-R2 Promotional Items RFQ |
March 1, 2007 |
1:00 PM |
Promotional Items Tabulation Sheet |
| D207-022-RN Weed Control Matting RFQ |
February 8, 2007 |
1:00 PM |
Weed Control Matting Tabulation Sheet |
| D207-046-RN Pull Broom RFQ |
February 22, 2007 |
1:00 PM |
Pull Broom Tabulation Sheet |
D207-045-RN Guardrail Repairs RFQ - Randolph County Prevailing Wage Information General Wage Order No. 50 |
February 14, 2007 |
1:00 PM |
Guardrail Repairs Tabulation Sheet - Randolph County |
D207-044-RN Guardrail Repairs RFQ - Macon County Prevailing Wage Information General Wage Order No. 50 |
February 14, 2007 |
1:00 PM |
Guardrail Repairs Tabulation Sheet - Macon County |
| D207-042-RN Surplus Asphalt Millings RFB |
February 21, 2007 |
1:00 PM |
Surplus Asphalt Millings Tabulation Sheet |
| D207-041-RE Annual Concrete RFB |
February 15, 2007 |
1:00 PM |
D207-041-RE Annual Concrete Tabulation Sheet |
| D207-039-RN Lease Roller RFB |
February 15, 2007 |
1:00 PM |
Lease Roller Bid Tabulation Sheet |
| D207-035-RE Grease and Oil Trap Tank RFQ |
January 31, 2007 |
1:00 PM |
D207-035-RE Grease and Oil Trap Tank Tabulation Sheet |
D207-034-RE 2 Inch Back Flow Preventor RFQ |
January 30, 2007 |
1:00 PM |
RFQ CANCELLED
(NOT AWARDED) |
| D207-020-RN Truck Body RFQ |
January 25, 2007 |
1:00 PM |
Truck Body RFQ Tabulation Sheet |
| D207-038-R2 Iron Mountain Chips - Trap Rock RFQ |
January 24, 2007 |
1:00 PM |
Iron Mountain Chips - Trap Rock Tabulation Sheet |
D207-030-RE Fabric Door RFB and D207-030-RE Addendum 001 |
January 9, 2007 |
1:00 PM |
D207-030-RE Fabric Door Tabulation Sheet |
| D207-037-RN Gabion Stone RFQ |
January 18, 2007 |
1:00 PM |
Gabion Stone Tabulation Sheet |
| D207-019-R2 Culvert Pipe Liner RFB |
January 17, 2007 |
1:00 PM |
Culvert Pipe Liner Tabulation Sheet |
| D207-032-RN PVC Coated Gabion Baskets RFQ |
January 12, 2007 |
1:00 PM |
Gabion Baskets Tabulation Sheet |
| D207-033-RE 1st Qtr Oil Lube and Fluids |
December 28, 2006 |
1:00 PM |
Oil Lube and Fluids Tabulation Sheet |
| D207-031-RE Replacing Existing Car Wash Equipment RFB |
December 28, 2006 |
1:00 PM |
Replacing Existing Car Wash Equipment Tabulation Sheet |
| D207-029-RE Atlanta Overhead Door Installation RFQ |
December 14, 2006 |
1:00 PM |
Atlanta Overhead Door Installation Tabulation Sheet |
| D207-027-RN Polyethylene Tank RFQ |
November 30, 2006 |
1:00 PM |
Polyethylene Tank Tabulation Sheet |
| D207-028-RE Furnace for Kirksville Truck Wash Bay RFQ |
November 29, 2006 |
1:00 PM |
Furnace for Kirksville Truck Wash Bay Tabulation Sheet |
| D207-026-R2 Child Car and Booster Seats RFQ |
November 20, 2006 |
1:00 PM |
Child Car and Booster Seats Tabulation Sheet |
| D207-024-R2 Arrive Alive T-Shirts RFQ |
November 14, 2006 |
1:00 PM |
Arrive Alive T-Shirts Tabulation Sheet |
| D207-023-RE Concrete Forms for Atlanta Bosworth and New Cambria RFQ |
November 13, 2006 |
1:00 PM |
Concrete Walls for Atlanta Bosworth and New Cambria Tabulation Sheet |
| D207-021-RN Pull Broom RFQ |
October 31, 2006 |
1:00 PM |
Pull Broom Tabulation Sheet |
| D207-018-R2 Type S Poly Culvert Pipe RFB |
October 24, 2006 |
1:00 PM |
Type S Poly Culvert Pipe Tabulation Sheet |
| D207-015-RN Riding Lawn Mower RFB |
October 24, 2006 |
1:00 PM |
Riding Lawn Mower Bid Tabulation Sheet |
| D207-017-RO Used Oil Disposal RFB |
October 19, 2006 |
1:00 PM |
Used Oil Disposal Tabulation Letter |
| D207-016-RO Tree Removal - Sullivan County - RFQ |
October 18, 2006 |
1:00 PM |
Tree Removal Tabulation Sheet |
D207-012-RN Guardrail Repair RFQ and General Wage Order No. 50 |
October 10, 2006 |
1:00 PM |
Guardrail Repair Tabulation Sheet |
D207-008-RO Nine Wheel Pneumatic Roller RFB
and D207-008-RO Addendum |
October 3, 2006 |
1:00 PM |
Nine Wheel Pneumatic Roller Tabulation Sheet |
| D207-014-RN Electric Jackhammer RFQ |
September 27, 2006 |
1:00 PM |
Electric Jackhammer Tabulation Sheet |
| D207-011-RE 4th Quarter Oil Lube Fluids RFQ |
September 27, 2006 |
1:00 PM |
4th Quarter Oil Lube Fluids Tabulation Sheet |
| D207-013-RE Concrete Piers for Liquid Storage Tanks RFQ |
September 21, 2006 |
1:00 PM |
Concrete Piers for Liquid Storage Tanks Tabulation Sheet |
| D207-010-R2 Coal Slag Sand RFQ - Rebid |
September 8, 2006 |
1:00 PM |
Coal Slag Sand Tabulation Sheet |
| D207-009-R2 Coal Slag Sand RFQ (Not awarded) |
August 31, 2006 |
1:00 PM |
RFQ NOT AWARDED
(REBID # D207-010-R2) |
| D207-007-R2 Slip Bases For Telespar Posts RFQ |
August 29, 2006 |
2:00 PM |
Slip Bases For Telespar Posts Tabulation Sheet |
D207-006-R2 Omni Anchors For Telespar Posts RFB and D207-006-R2 Addendum 001 |
August 29, 2006 |
1:30 PM |
Omni Anchors For Telespar Posts Tabulation Sheet |
| D207-005-R2 Aluminum Backing Bars RFQ |
August 29, 2006 |
1:00 PM |
Aluminum Backing Bars Tabulation Sheet |
| D207-003-RE Man Doors and Paint RFQ |
August 23, 2006 |
1:00 PM |
Man Doors and Paint Tabulation Sheet |
| D207-002-RN Front-Mount Snow Plow RFQ |
August 15, 2006 |
1:00 PM |
Snow Plow Wing Tabulation Sheet |
| D207-004-RM Cinder Coal Slag - Pick up at Plant - RFB |
August 4, 2006 |
1:00 PM |
Cinder Coal Slag Tabulation Sheet |
RFB 6-060803 D2 Janitorial Bid
RFB 6-060803 Addendum 001 |
August 3, 2006 |
1:00 PM |
RFB 6-060803 D2 Janitorial Services Tabulation |
| D206-072-RN Winter Snow Fence RFB |
July 12, 2006 |
1:00 PM |
Winter Snow Fence Tabulation Sheet |
RFB 6-060706A D02 District Uniform Bid
RFB 6-060706A Addendum 001 |
July 6, 2006 |
1:00 PM |
Contact MoDOT's Central Office Procurement Section For Information |
| D206-074-RE Tree Removal Services RFQ |
July 6, 2006 |
1:00 PM |
Tree Removal Services Tabulation Sheet |
| D206-076-RN Ice Machines RFQ |
July 17, 2006 |
1:00 PM |
Ice Machines Tabulation Sheet |
| D206-078-RN Asphalt Paver RFQ |
June 30, 2006 |
1:00 PM |
Asphalt Paver Tabulation Sheet |
| D206-075-R2 Oil Lubricants and Fluids - 3rd Qtr - RFQ |
June 27, 2006 |
1:00 PM |
Oil Lubricants and Fluids - 3rd Qtr - Tabulation Sheet |
| D206-077-R2 Spec 1 Rock - Brookfield - RFQ |
June 22, 2006 |
1:00 PM |
RFQ CANCELLED
(NOT AWARDED)
|
| D206-071-RN Walk-Behind Mower RFQ |
June 15, 2006 |
1:00 PM |
RFQ CANCELLED
(NOT AWARDED) |
| D206-070-R2 Car and Booster Seats RFQ |
June 8, 2006 |
1:00 PM |
Seats Tabulation Sheet |
| RFB 2-060524 District 2 Aggregate |
May 24, 2006 |
2:00 p.m. |
Aggregate Tabulation |
| RFB 2-060519 Plant Mix Oil Mat Material - Special |
May 19, 2006 |
10:00 a.m. |
Plant Mix - Tabulation |
| RFB D206-047-RM Wet Bottom Boiler Slag - Cinders |
May 2, 2006 |
1:00 p.m. |
2006 Wet Bottom Boiler Slag Tabulation Sheet |
| D211-044-R2 Haydite SFS |
January 20, 2011 |
February 2, 2011 at 1:00 PM |
Buildex, Inc. is the sole provider of Haydite aggregate material. |
| D211-030-R2 Girder Repairs SFS Posting |
December 10, 2010 |
December 20, 2010 at 1:00 PM |
International Straightening of North Dakota is a qualified vendor for heat straightening repairs needed on Bridge A2043 on U.S. Highway 63 (over U.S. Highway 36) in Macon, Missouri, on three girders, which sustained collision damage. |
| D211-004-RN Traficon Video Detection Equipment SFS Posting |
August 6, 2010 |
August 16, 2010 at 1:00 PM |
Control Technologies of Texas controls the distribution of Traficon Video Detection Equipment, Model VIP 3D.1 and VIP 3D.2 for the State of Missouri. MoDOT will use these materials and equipment as needed during the contract period for various jobs and projects. |
| D209-098-R2 Cinders SFS Posting |
July 7, 2009 |
July 17, 2009 at 1:00 PM |
Reed Minerals controls the distribution of coal slag materials (cinders) that are a by-product of electrical generation activities at the Thomas Hill Power Plant. These materials come in two forms: clean & washed cinders and dirty cinders. |
| |
|
|
|
Archives from Former District 3 - Hannibal Location - 2011 and Prior
| Title |
Closing Date |
Closing Time
(DST) |
Tabulations |
Q03-11-0032A Tree Removal
Quotation may be returned by fax or email. |
June 15, 2011 |
11:00 am |
Tabulation |
| B03-11-0034 Posts_Mast Arms |
June 15, 2011 |
10:30 am |
Tabulation |
Q03-11-0033 Pavement Temperature Sensors
Quotation may be returned by fax. |
June 9, 2011 |
10:30 am |
Tabulation |
Q03-11-0032 Tree Removal
Quotation may be returned by fax. |
June 6, 2011 |
1:00 pm |
No bids received. Reposting. |
Q03-11-0031 Pneumatic Paving Breakers
Quotation may be returned by fax. |
May 27, 2011 |
10:30 am |
Tabulation |
Q03-11-0030 Plastic Sheeting
Quotation may be returned by fax. |
May 26, 2011 |
10:30 am |
Tabulation |
B03-11-0029 Broom Rentals
Quotation may be returned by fax. |
May 4, 2011 |
10:30 am |
Tabulation |
B03-11-0028 Leased Rollers
Roller specification |
April 28, 2011 |
11:00 am |
Tabulation |
Q03-11-0027 Broom Rentals
Quotation may be returned by fax. |
April 14, 2011 |
10:30 am |
no bids received |
B03-11-0026 Containments
AWO17 Ralls County
AWO17 Lincoln County
AWO17 Callaway County |
April 12, 2011 |
11:00 am |
Tabulation |
Q03-11-0025 Gator
Quotation may be returned by fax |
April 6, 2011 |
10:30 am |
Rejected bids
Tabulation |
| B03-11-0024 Asphalt Price Agreement |
March 30, 2011 |
11:00 am |
Tabulation |
| B03-11-0023 Polyethylene Pipe Liner |
March 22, 2011 |
10:30 am |
Tabulation |
Q03-11-0022 Equipment with Operators
Quotation may be returned by fax. |
March 17, 2011 |
10:30 am |
Tabulation |
| B03-11-0021 Cinders |
March 22, 2011 |
11:15 am |
Tabulation |
| B03-11-0020 Trap Rock (Porphyry Aggregate) |
March 22, 2011 |
11:00 am |
Tabulation |
Q03-11-0019 Engine Block Heaters
Quotation may be returned by fax. |
February 24, 2011 |
10:30 am |
Tabulation |
| B03-11-0018 Quarry Price Agreement |
February 18, 2011 |
10:45 am |
Tabulation |
| B03-11-0017 Ready Mix Price Agreement |
February 18, 2011 |
10:30 am |
Tabulation |
B03-11-0016 Louisiana Pedestrian Bridge Demolition
MANDATORY PRE-BID Meeting: February 17, 2011 at 9:30 am, at bridge site. |
March 1, 2011 |
1:00 pm |
Tabulation |
Q03-11-0015 Scraper with Operator
Quotation may be returned by fax. |
February 1, 2011 |
10:30 am |
Tabulation |
Q03-11-0014 Engine Block Heaters
Quotation may be returned by fax. |
January 25, 2011 |
10:30 am |
Rejected - to rebid |
Q03-11-0013 Tow Ropes
Quotation may be returned by fax. |
January 11, 2011 |
10:30 am |
Tabulation |
Q03-11-0012 Leased Tractor with Boom Mower
Quotation may be returned by fax. |
December 28, 2010 |
10:30 am |
Not awarded |
Q03-11-0011 Scraper with Operator
Quotation may be returned by fax. |
December 17, 2010 |
10:30 am |
Not awarded |
B03-11-0010 Janitorial Services
Pre-bid meeting and Building Tour 11/09/10, 9:00am |
November 22, 2010 |
1:00 pm |
Not awarded |
Q03-11-0009 Track Loader Rental
Quotation may be returned by fax. |
October 4, 2010 |
10:30 am |
Tabulation |
| B03-11-0008 Dirty Cinders |
September 28, 2010 |
10:45 am |
Tabulation |
| B03-11-0007 Natural Sand |
September 28, 2010 |
10:30 am |
Tabulation |
Q03-11-0006 Leased Tractors with Boom Mowers
Quotation may be returned by fax. |
September 22, 2010 |
10:30 am |
Tabulation |
| B03-11-0004 Chain Link Fencing Project |
September 16, 2010 |
10:30 am |
Tabulation |
Q03-11-0005 Polyethylene Pipe Liner
Quotation may be returned by fax. |
September 8, 2010 |
10:30 am |
Tabulation |
Q03-11-0003 Trackhoe Rental
Quotation may be returned by fax. |
September 7, 2010 |
10:30 am |
Tabulation |
Q03-11-0002 Balloon Lighting Systems
Quotation may be returned by fax. |
August 3, 2010 |
10:30 am |
Tabulation |
Q03-11-0001 LED Blank Out Signs
Quotation may be returned by fax. |
July 20, 2010 |
10:30 am |
Tabulation |
| B03-10-0048 Plant Mix Oil Material (Premix) |
May 25, 2010 |
11:00 am |
Tabulation |
Q03-10-0047 Rumble Strip Repair
Quotation may be returned by fax. |
May 17, 2010
Extending to:
May 20, 2010 |
11:00 am |
Tabulation |
| B03-10-0044 Trap Rock |
May 18, 2010 |
11:00 am |
Tabulation |
| B03-10-0046 Leased Rollers |
May 5, 2010 |
11:00 am |
Tabulation |
Q03-10-0045 Fire Extinguisher Inspection
Quotation may be returned by fax. |
May 5, 2010 |
10:30 am |
Not Awarded |
| B03-10-0043 Chip Seal Equipment Rental |
April 29, 2010 |
11:00 am |
Tabulation |
Q03-10-0042 Trencher Rental
Quotation may be returned by fax. |
April 15, 2010 |
10:30 am |
Tabulation |
Q03-10-0041 Bowling Green Fencing
Quotation may be returned by fax.
Addendum 001 - Signed addendum must be returned with Quotation. |
April 20, 2010 |
10:45 am |
Tabulation |
Q03-10-0040 Troy Fencing
Quotation may be returned by fax.
Addendum 001 - Signed addendum must be returned with Quotation. |
April 20, 2010 |
10:30 am |
Tabulation |
Q03-10-0039 Metal Panels
Quotation may be returned by fax. |
April 13, 2010 |
10:30 am |
Tabulation |
Q03-10-0038 Carport
Quotation may be returned by fax. |
April 9, 2010 |
10:30 am |
Not Awarded |
Q03-10-0037 Gates
Quotation may be returned by fax. |
April 13, 2010 |
1:00 pm |
Tabulation |
Q03-10-0036 Interlocking Blocks
Addendum 001
Quotation may be returned by fax. |
March 24, 2010 |
10:45 am |
Not Awarded |
Q03-10-0035 Carport
Quotation may be returned by fax. |
March 24, 2010 |
10:30 am |
No Bids Received |
Q03-10-0034 Oil Tanks & Containments
Quotation may be returned by fax. |
March 4, 2010 |
11:00 am |
Tabulation |
Q03-10-0033 Excavator Rental
Quotation may be returned by fax. |
February 17, 2010 |
12:15 pm |
Tabulation |
Q03-10-0032 Trackhoe Rental
Quotation may be returned by fax. |
February 17, 2010 |
11:15 am |
Tabulation |
Q03-10-0031 Dozer Rental
Quotation may be returned by fax. |
February 17, 2010 |
11:00 am |
Tabulation |
Q03-10-0030 Quarry Pricing
Quotation may be returned by fax. |
February 17, 2010 |
1:15 pm |
Tabulation |
Q03-10-0029 Ready Mix
Quotation may be returned by fax. |
February 17, 2010 |
1:00 pm |
Tabulation |
Q03-10-0028 Spill Containment
Quotation may be returned by fax. |
February 2, 2010 |
10:30 am |
Tabulation |
| B03-10-0026 Quarry Run |
January 5. 2010 |
11:00 am |
Tabulation |
| B03-10-0025 Dirty Cinders |
January 5, 2010 |
10:30 am |
Tabulation |
Q03-10-0024 Oxygen & Acetylene
Quotation may be returned by fax. |
December 22, 2009 |
11:00 am |
Tabulation |
Q03-10-0023 Poly Pipe
Quotation may be returned by fax. |
December 22, 2009 |
10:30 am |
Tabulation |
Q03-10-0022 Vehicle Lift
Quotation may be returned by fax. |
December 15, 2009 |
10:30 am |
Tabulation |
Q03-10-0021 Aerial Truck Rental
Quotation may be returned by fax. |
November 12, 2009 |
10:45 am |
Tabulation |
Q03-10-0020 Tree Removal Services
Quotation may be returned by fax. |
November 12, 2009 |
10:30 am |
Not awarded |
Q03-10-0019 Folding Tables
Quotation may be returned by fax. |
October 20, 2009 |
10:30 am |
Tabulation |
Q03-10-0018 Excavator Rental
Quotation may be returned by fax. |
October 8, 2009 |
10:30 am |
Tabulation |
Q03-10-0017 Mexico Project Office HVAC
Quotation may be returned by fax. |
October 14, 2009 |
10:45 am |
Tabulation |
Q03-10-0016 Hannibal Project Office HVAC
Quotation may be returned by fax. |
October 14, 2009 |
10:30 am |
Tabulation |
Q03-10-0015 Motorgrader Rental
Quotation may be returned by fax. |
October 15, 2009 |
10:30 am |
Tabulation |
Q03-10-0014 Overhead Doors
Quotation may be returned by fax. |
October 13, 2009 |
10:30 am |
Tabulation |
Q03-10-0013 Portable Screen Rental
Quotation may be returned by fax. |
October 6, 2009 |
10:30 am |
Tabulation |
| B03-09-0055 Haydite SFS RFB |
April 20, 2009 |
May 5, 2009,
1:00 pm |
Buildex, Inc. Tabulation |
| B03-10-0012 Dirty Cinders |
September 29, 2009 |
11:00 am |
Tabulation |
Q03-10-0011 Hot Mix
Quotation may be returned by fax. |
September 22, 2009 |
10:45 am |
Tabulation |
Q03-10-0010 Paver Services
Quotation may be returned by fax.
General Wage Order #53 |
September 22, 2009 |
10:30 am |
Tabulation |
Q03-10-0009 CMP
Quotation may be returned by fax. |
September 15, 2009 |
10:45 am |
Tabulation |
| B03-10-0008 Rotary Mowers |
September 15, 2009 |
10:30 am |
Tabulation |
Q03-10-0007 Interlocking Blocks
Quotation may be returned by fax. |
August 27, 2009 |
10:30 am |
no bids received |
Q03-10-0006 Trackhoe Rental
Quotation may be returned by fax. |
September 1, 2009 |
11:00 am |
Tabulation |
Q03-10-0005 Dozer Rental
Quotation may be returned by fax. |
September 1, 2009 |
10:45 am |
Tabulation |
Q03-10-0004 Flooring
Quotation may be returned by fax. |
September 1, 2009 |
10:30 am |
Tabulation |
Q03-10-0001A Shelbina Mechanic Building
Renovations - Quotation may be returned by fax. |
August 13, 2009 |
10:30 am |
Tabulation |
| B03-10-0003 Rotary Mower |
August 20, 2009 |
10:30 am |
Reject - rebid 8/31 |
Q03-10-0002 Trailer
Quotation may be returned by fax. |
August 18, 2009 |
10:30 am |
Tabulation |
| Q03-10-0001 Shelbina Mechanic Building Renovations - Quotation may be returned by fax. |
August 4, 2009 |
10:30 am. |
no bids received |
| B03-09-0066 Guard Cable |
July 24, 2009 |
1:00 pm |
Tabulation |
Q03-09-0067 Retaining Wall Blocks
Quotation may be returned by fax. |
June 25, 2009 |
10:30 am |
Tabulation |
Q03-09-0065 Poly Liner
Quotation may be returned by fax. |
June 11, 2009 |
10:45 am |
Tabulation |
Q03-09-0063 Overhead Doors
Quotation may be returned by fax. |
June 11, 2009 |
10:30 am |
Tabulation |
Q03-09-0064 Utility Locator
Quotation may be returned by fax. |
May 29, 2009 |
10:45 am |
Tabulation |
B03-09-0062 Document Conversion
Note: As stated in the bid, all documents need to be reproduced as original: if in color, they PDF needs to be color. |
June 2, 2009 |
11:00 am |
Tabulation |
Q03-09-0061 Radar Units
Quotation may be returned by fax. |
May 12, 2009 |
10:30 am |
Tabulation |
Q03-09-0060 CMP Replacement
Quotation may be returned by fax. |
May 12, 2009 |
11:00 am |
Tabulation |
Q03-09-0052 Poly Coated CMP
Quotation may be returned by fax. |
May 6, 2009 |
10:30 am |
Tabulation |
Q03-09-0059 Steam Cleaner
Quotation may be returned by fax. |
May 5, 2009 |
10:45 am |
Tabulation |
Q03-09-0058 CMP
Quotation may be returned by fax. |
May 5, 2009 |
10:30 am |
Tabulation |
| B03-09-0057 Porphyry Aggregate |
May 7, 2009 |
11:00 am |
Tabulation |
| B03-09-0056 Cinders |
May 5, 2009 |
11:15 am |
Tabulation |
Q03-09-0054 Bulk Oil
Quotation may be returned by fax. |
April 28, 2009 |
10:30 am |
Tabulation |
Q03-09-0053 Bulk Oil CANCELLED 4/15
Quotation may be returned by fax. |
April 22, 2009 |
10:30 am |
CANCELLED 4/15 - Rebid at later date. |
Q03-09-0051 Paver Services
Quotation may be returned by fax. |
April 16, 2009 |
11:00 am |
Tabulation |
Q03-09-0050 Hot Mix
Quotation may be returned by fax. |
April 16, 2009 |
10:45 am |
Tabulation |
| B03-09-0049 Trailers |
April 7, 2009 |
10:30 am |
Tabulation |
| B03-09-0048 Leased Rollers |
March 25, 2009 |
10:30 am |
Tabulation |
Q03-09-0047 CMP
Quotation may be returned by fax. |
March 12, 2009 |
11:00 am |
Tabulation |
Q03-09-0046 Electronic Flush Valves
Quotation may be returned by fax. |
March 11, 2009 |
10:30 am |
Tabulation |
| B03-09-0045 Leased Tractors with Boom Mowers |
March 17, 2009 |
1:00 pm |
Tabulation |
| B03-09-0044 Porphyry Aggregate |
March 13, 2009 |
11:00 am |
Tabulation |
Q03-09-0043 Quarry Price Agreement
Quotation may be returned by fax. |
February 19, 2009 |
11:15 am |
Tabulation |
Q03-09-0042 Ready Mix Price Agreement
Quotation may be returned by fax. |
February 19, 2009 |
11:00 am |
Tabulation |
| B03-09-0041 Diamond Saw Blades |
February 19, 2009 |
1:00 pm |
Tabulation |
Q03-09-0040 Louisiana Siding
Quotation may be returned by fax. |
February 20, 2009 |
11:15 pm |
Tabulation |
Q03-09-0039 Shelbina Siding Installation
Quotation may be returned by fax. |
February 20, 2009 |
11:00 am |
Tabulation |
Q03-09-0038 Cappeln Roof
Quotation may be returned by fax. |
February 18, 2009 |
10:45 am |
Tabulation |
Q03-09-0037 Bowling Green Roof
Quotation may be returned by fax. |
February 18, 2009 |
10:30 am |
Tabulation |
| B03-09-0036 Hannibal Roofs |
February 25. 2009 |
10:30 am |
Tabulation |
Q03-09-0035 MODIFIED Light Fixtures (2/5/09)
Please use this form when bidding.
Q03-09-0035 Light Fixtures
Quotation may be returned by fax. |
February 17, 2009 |
10:30 am |
Tabulation |
| B03-09-0034 Rock Blanket |
February 10, 2009 |
10:30 am |
Tabulation |
Q03-09-0033 Dozer Rental
Quotation may be returned by fax. |
February 4, 2009 |
10:30 am |
Tabulation |
Q03-09-0032 Trackhoe Rental
Quotation may be returned by fax. |
January 30, 2009 |
10:30 am |
Tabulation |
Q03-09-0031 Aluminum Sign Bracing
Quotation may be returned by fax. |
January 28, 2009 |
10:30 am |
Tabulation |
Q03-09-0030 Poly Pipe Liner
Quotation may be returned by fax. |
January 27, 2009 |
10:30 am |
Tabulation |
Q03-09-0029 Tractor Loader
Quotation may be returned by fax. |
January 23, 2009 |
10:30 am |
|
Q03-09-0028 Filters
Quotation may be returned by fax. |
January 5, 2009 |
10:00 am |
Tabulation |
Q03-09-0027 Oxygen and Acetylene
Quotation may be returned by fax. |
December 17, 2008 |
10:30 am |
|
Q03-09-0026 Beacons
Quotation may be returned by fax. |
December 2, 2008 |
10:30 am |
Tabulation |
Q03-09-0025 Wheel Lifts
Quotation may be returned by fax. |
October 31, 2008 |
10:45 am |
Tabulation |
Q03-09-0024 Tool Boxes
Quotation may be returned by fax. |
October 31, 2008 |
10:30 am |
Tabulation |
Q03-09-0023 Bulk Oil
Quotation may be returned by fax. |
October 28, 2008 |
10:30 am |
Tabulation |
Q03-09-0022 Poly Pipe
Quotation may be returned by fax. |
October 21, 2008 |
10:30 am |
Tabulation |
Q03-09-0021 9' Spreader
Quotation may be returned by fax. |
October 15, 2008 |
10:45 am |
Tabulation |
Q03-09-0020 9' Plow
Quotation may be returned by fax. |
October 15, 2008 |
10:30 am |
Tabulation |
Q03-09-0019 Pest Control
Quotation may be returned by fax. |
October 20, 2008 |
10:30 am |
Tabulation |
Q03-09-0018 Motorgrader Leases
Quotation may be returned by fax. |
October 14, 2008 |
10:30 am |
Tabulation |
Q03-09-0015 Microfilm
Clarification/Example
Quote may be returned by fax. |
September 2, 2008 |
11:00 am |
Tabulation |
Q03-09-0014 Williamsburg Furnace
Quote may be returned by fax. |
September 2, 2008 |
10:50 am |
Tabulation |
Q03-09-0013 Bowling Green Furnace
Quote may be returned by fax. |
September 2, 2008 |
10:40 am |
Tabulation |
Q03-09-0012 Farber Furnace
Quote may be returned by fax. |
September 2, 2008 |
10:30 am |
Tabulation |
Q03-09-0017 Hot Mix
Quote may be returned by fax. |
August 29, 2008 |
11:00 am |
Tabulation |
Q03-09-0016 Paver Services
Quote may be returned by fax. |
August 29, 2008 |
10:45 am |
Tabulation |
Q03-09-0011 Luminaires
Quote may be returned by fax. |
August 19, 2008 |
11:00 am |
Tabulation |
Q03-09-0010 Trailer
Quote may be returned by fax. |
August 5, 2008 |
10:30 am |
Tabulation |
Q03-09-0009 Luray Roof
Quote may be returned by fax. |
August 6, 2008 |
10:30 am |
Tabulation |
Q03-09-0008 Elsberry Roof
Quote may be returned by fax. |
August 6, 2008 |
10:15 am |
Tabulation |
Q03-09-0007 Eolia Roof
Quote may be returned by fax. |
August 6, 2008 |
10:00 am |
Tabulation |
B03-09-0006 Security Cameras
Pre-Bid meeting set for 7/31/08 at 1:00pm
Pre-Bid meeting notes
New Florence map/distances
Warrenton map/distances
Williamsburg map/distances
Cappeln map/distances |
August 19, 2008 |
1:00 pm |
Tabulation |
| B03-09-0005 Cinders |
August 4, 2008 |
10:45 am |
Tabulation |
| B03-09-0004 Porphyry Aggregate |
August 4, 2008 |
10:30 am |
Tabulation |
| B03-09-0003 Hot Mix |
July 22, 2008 |
10:30 am |
Tabulation |
Q03-09-0002 Paver Services
Quote may be returned by fax. |
July 17, 2008 |
10:45 am |
Tabulation |
Q03-09-0001 Paver Services
Quote may be returned by fax. |
July 17, 2008 |
10:30 am |
Tabulation |
Q03-08-0054 Shelbina Building
Quote may be returned by fax. |
July 2, 2008 |
10:45 am |
No bids received. |
Q03-08-0052 Reflective Panels
Quote may be returned by fax. |
June 12, 2008 |
10:30 am |
Tabulation |
| B03-08-0050 Roofing Granules |
June 5, 2008 |
11:00 am |
No bids received. |
| B03-08-0049 Porphyry Aggregate |
June 5, 2008 |
10:30 am |
Tabulation |
Q03-08-0051 Shelbina Mechanic Building Enhancements |
June 3, 2008 |
10:45 am |
No bids received. |
B03-08-0048 Aggregate
Emergency Slide Repair |
May 22, 2008 |
10:30 am |
Tabulation |
Q03-08-0047 Concrete Saw
Quote may be returned by fax.
Q0047 Addendum 001
Must be signed and returned with quotation. |
May 14, 2008 |
10:45 am |
Tabulation - will not be purchasing due to budget - will rebid later. |
Q03-08-0046 Dowel Drill
Quote may be returned by fax. |
May 14, 2008 |
10:30 am |
Tabulation - will not be purchasing due to budget - will rebid later. |
Q03-08-0045 Paver
Quote may be returned by fax. |
May 14, 2008 |
1:45 pm |
Tabulation |
| B03-08-0044 Hot Mix |
May 14, 2008 |
1:30 pm |
Tabulation |
| B03-08-0042 Video Monitoring |
May 14, 2008 |
1:00 pm |
CANCELLED DUE TO SPECIFICATION CHANGES - Will rebid at a later date |
Q03-08-0043 Sewer
Quote may be returned by fax. |
April 30, 2008 |
10:00 am |
Tabulation |
| B03-08-0041 Quarry Run aggregate |
April 24, 2008 |
1:00 pm |
Tabulation |
Q03-08-0040 Bulk Oil
Quote may be returned by fax. |
April 18, 2008 |
10:30 am |
|
Q03-08-0039 Roller Rental
Quote may be returned by fax. |
April 7, 2008 |
10:30 am |
Tabulation |
Q03-08-0038 Tool Boxes
Quote may be returned by fax. |
April 7, 2008 |
10:15 am |
Tabulation |
Q03-08-0037 Wheel Lifts
Quote may be returned by fax. |
April 7, 2008 |
10:00 am |
Rejected |
Q03-08-0036 Skidsteer Rental
Quote may be returned by fax. |
April 1, 2008 |
10:00 am |
Tabulation |
| B03-08-0035 Intrusion Alarms |
April 11, 2008 |
1:15 pm |
Tabulation |
B03-08-0034 Video Monitoring
Addendum 001 Video Monitoring
Addendum 002 Video Monitoring |
April 11, 2008 |
1:00 pm |
Rejected |
Q03-08-0033 Beacons
Quote may be returned by fax.
Addendum 001
Must be returned with quotation. |
March 25, 2008 |
10:15 am |
Tabulation |
B03-08-0032 Leased Rollers |
March 25, 2008 |
10:00 am |
Tabulation |
Q03-08-0031 Mower
Quote may be returned by fax to 573-248-2468. |
February 27, 2008 |
10:00 am |
Tabulation |
Q03-08-0030 Wright City windows
Quote may be returned by fax to 573-248-2468. |
February 22, 2008 |
10:15 am |
Tabulation |
Q03-08-0029 Mineola windows
Quote may be returned by fax to 573-248-2468. |
February 22, 2008 |
10:00 am |
Tabulation |
Q03-08-0028 Axle
Quote may be returned by fax to 573-248-2468. |
February 14, 2008 |
10:00 am |
Tabulation |
Q03-08-0027 Paver
Quote may be returned by fax to 573-248-2468. |
February 20, 2008 |
1:15 pm |
Tabulation |
| B03-08-0026 Hot Mix |
February 20, 2008 |
1:00 pm |
Tabulation |
Q03-08-0025 Ready Mix
Quote may be returned by fax to 573-248-2468. |
February 20, 2008 |
10:30 am |
Tabulation |
Q03-08-0024 Quarry
Quote may be returned by fax to 573-248-2468. |
February 20, 2008 |
10:00 am |
|
Q03-08-0023 Generator
Quote may be returned by fax to 573-248-2468. |
January 29, 2008 |
10:00 am |
Tabulation |
Q03-08-0022 Beacons
Quote may be returned by fax to 573-248-2468. |
January 14, 2008 |
10:15 am |
Tabulation |
Q03-08-0021 Aerial Truck Rental
Quote may be returned by fax to 573-248-2468. |
January 14, 2008 |
10:00 am |
Tabulation |
Q03-08-0019 Filters
Quote may be returned by fax to 573-248-2468. |
December 19, 2007 |
10:00 a.m. |
|
Q03-08-0018 Wire
Quote may be returned by fax to 573-248-2468. |
October 19, 2007 |
10:00 a.m. |
Tabulation |
Q03-08-0017 Bulk Oil
Quote may be returned by fax to 573-248-2468. |
October 15, 2007 |
10:30 a.m. |
Tabulation |
Q03-08-0016 Tire Chains
Quote may be returned by fax to 573-248-2468. |
October 15, 2007 |
10:00 a.m. |
Tabulation |
Q03-08-0015 Sign
Quote may be returned by fax to 573-248-2468. |
August 28, 2007 |
10:30 a.m. |
Tabulation |
Q03-08-0014 Spreader
Quote may be returned by fax to 573-248-2468. |
August 16, 2007 |
10:45 a.m. |
Tabulation |
Q03-08-0013 Plow
Quote may be returned by fax to 573-248-2468. |
August 16, 2007 |
10:30 a.m. |
Tabulation |
Q03-08-0011 Trucking
Quote may be returned by fax to 573-248-2468. |
August 2, 2007 |
10:30 a.m. |
Tabulation |
Q03-08-0010 Luminaires
Quote may be returned by fax to 573-248-2468. |
August 8, 2007 |
10:30 a.m. |
Tabulation |
Q03-08-0009 Pull Broom
Quote may be returned by fax to 573-248-2468. |
August 7, 2007 |
11:00 a.m. |
Tabulation |
Q03-08-0008 Sewer Line
Quote may be returned by fax to 573-248-2468. |
August 7, 2007 |
10:30 a.m. |
|
Q03-08-0007 Countertops
Quote may be returned by fax to 573-248-2468. |
August 7, 2007 |
10:30 a.m. |
|
Q03-08-0006 Skidsteer Rental
Quote may be returned by fax to 573-248-2468. |
July 23, 2007 |
10:30 a.m. |
Tabulation |
Q03-08-0005 Aluminum Sign Bars
Quote may be returned by fax to 573-248-2468. |
July 19, 2007 |
10:30 a.m. |
|
Q03-08-0004 Trailer
Quote may be returned by fax to 573-248-2468. |
July 24, 2007 |
10:30 a.m. |
Tabulation |
B03-08-0003 Porphyry Aggregate
Please return in a sealed envelope, clearly marked B03-08-0003 |
July 11, 2007 |
10:30 a.m. |
Tabulation |
B03-08-0001 Traffic Alert System
Please return in a sealed envelope, clearly marked B03-08-0001. |
July 10, 2007 |
10:30 a.m. |
|
B03-07-0042 Porphyry Aggregate
* Please return the bid in a sealed envelope, clearly marked B03-07-0042. |
May 3, 2007 |
10:30 a.m. |
Tabulation |
B03-07-0038 Demolition Services - Parcel #7
Shelby County
Request for Bid - Demolition Parcel #7
Bid Form - Demolition Parcel #7
JSP & Terms - Parcel #7
Parcel #7 Attachment A - Sketches
Parcel #7 Attachment B - Specifications
Parcel #7 Attachment C - Asbestos Information
Parcel #7 Attachment D - Well Information
Parcel #7 Attachment E - Demolition Info
Parcel #7 Attachment F - Paint Information
* Please return only the Bid Form in a sealed envelope, clearly marked B03-07-0038. |
April 19, 2007 |
10:45 a.m. |
Tabulation |
B03-07-0036 Demolition Services - Parcel #6 Marion County
Request for Bid - Demolition Parcel #6
Bid Form - Demolition Parcel #6
JSP & Terms - Parcel #6
Parcel #6 Attachment A - Sketches
Parcel #6 Attachment B - Specifications
Parcel #6 Attachment C - Asbestos Information
Parcel #6 Attachment D - Well Information
Parcel #6 Attachment E - Demolition Info
Parcel #6 Attachment F - Paint Information
* Please return only the Bid Form in a sealed envelope, clearly marked B03-07-0036. |
April 19, 2007 |
10:30 a.m. |
Tabulation |
B03-07-0037 Demolition Services - Parcel #7 Marion County
Request for Bid - Demolition Parcel #7
Bid Form - Demolition Parcel #7
JSP & Terms - Parcel #7
Parcel #7 Attachment A - Sketches
Parcel #7 Attachment B - Specifications
Parcel #7 Attachment C - Asbestos Information
Parcel #7 Attachment D - Well Information
Parcel #7 Attachment E - Demolition Info
Parcel #7 Attachment F - Paint Information
* Please return only the Bid Form in a sealed envelope, clearly marked B03-07-0037. |
April 19, 2007 |
10:15 a.m. |
Tabulation |
| B03-07-0027 Excavator |
January 31, 2007 |
10:15 a.m. |
Tabulation |
B03-07-0026 Blades
Addendum 001 Line Item 4 - change in size. |
January 31, 2007 |
10:30 a.m. |
Tabulation |
B03-07-0005 Cinders |
August 1, 2006 |
10:30 a.m. |
Tabulation |
RFB 6-060706B D03 District Uniform Bid
RFB 6-060706B Addendum 001 |
July 6, 2006 |
2:00 p.m. |
|
| B03-06-0068 Belly Dump Trailer |
May 15, 2006 |
10:30 am, Local Time |
Bid Tab |
B03-06-0067 Cinders for Centralia
0067 Addendum 1 |
May 1, 2006 |
11:30 am, Local Time |
Bid Tab |
B03-06-0066 Cinders for Mexico
0066 Addendum 1 |
May 1, 2006 |
11:20 am, Local Time |
Bid Tab |
B03-06-0065 Cinders for Farber
0065 Addendum 1 |
May 1, 2006 |
11:10 am, Local Time |
Bid Tab |
B03-06-0064 Cinders for Frankford
0064 Addendum 1 |
May 1, 2006 |
11:00 am, Local Time |
Bid Tab |
B03-06-0063 Cinders for Hannibal
0063 Addendum 1 |
May 1, 2006 |
10:50 am, Local Time |
Bid Tab |
B03-06-0062 Cinders for Paris
0062 Addendum 1 |
May 1, 2006 |
10:40 am, Local Time |
Bid Tab |
B03-06-0061 Cinders for Center
0061 Addendum 1 |
May 1, 2006 |
10:30 am, Local Time |
Bid Tab |
B03-06-0060 Cinders for Shelbyville
0060 Addendum 1 |
May 1, 2006 |
10:20 am, Local Time |
Bid Tab |
B03-06-0059 Cinders for Luray
0059 Addendum 1 |
May 1, 2006 |
10:10 am, Local Time |
Rejected |
B03-06-0058 Cinders for Wayland
0058 Addendum 1 |
May 1, 2006 |
10:00 am, Local Time |
Rejected |
| |
|
|
|
| |
|
|
|
The documents are provided in Acrobat Reader format. Free Acrobat Reader download 
Northeast District
1711 Highway 61 South
Hannibal, MO
(573) 248-2486
|