Project Updates (updated 2/2)
- A public hearing was held on Thursday, February 1. All information that will be presented at the hearing is posted below.

What is being done on Route 21?
A southbound left turn lane will be added on Route 21 at three locations. This will be done by widening existing Route 21 and replacing the existing shoulders. All entrances along the widened area will be reconstructed and the road will be resurfaced and restriped. In addition, guardrail will be added on southbound Route 21 at Hilltop/MacKenzie Ridge and northbound at Lowry Lane.
The below information was presented at a public hearing held on February 1, 2018:
Project Fact Sheet
Map #1 (Hilltop/MacKenzie Ridge Improvements)
Map #2 (Lowry Lane Improvements)
Map #3 (Amvets Drive Improvements)
Why is this work being done?
The addition of a left turn lane is expected to improve safety and reduce the number of crashes, as well as help overall traffic flow on Route 21.
How will traffic be impacted during construction?
Traffic will be shifted several times during construction which will allow one lane of Route 21 to remain open at all times. Flaggers will be on hand to direct traffic when there is only one lane open. The majority of work will be done during off-peak times.
What is the construction schedule?
Public hearing |
January 2018 |
Right of way property acquisition |
Fall 2018 |
Contract award |
March 2019 |
Construction begins |
Late spring 2019 |
Construction complete |
Late 2019 |
How much will the project cost?
The project is expected to cost $1.9 million.
Where can I get more information?
For more information, contact MoDOT Franklin/Jefferson County Area Engineer Judy Wagner at 314-453-5021 or by email at Judy.Wagner@modot.mo.gov.
|