Updated 2/16/2023: Two bridges complete, five to be rehabilitated in 2023

The expansion joints, driving surfaces and substructures of seven bridges along U.S. Route 24 in Carroll County are in need of rehabilitation.

Project Progress

Complete
Planning & Design Phase

MoDOT's Planning and Design team designed a project which will rehabilitate seven bridges in Carroll County along U.S. Route 24. The project will repair expansion joints, repair the substructure and replace the epoxy wearing surface on the bridges.

milestone_icon
Complete
Contract Letting, Award & Notice to Proceed

The projects to rehabilitate the seven bridges on Carroll County U.S. Route 24 were part of the April 2022 letting where contractors submitted competitive bids on the project bundle. The Missouri Highways and Transportation Commission awarded the $6,123,090.85 project to Capital Paving & Construction, Inc. at their May 2022 meeting. At that time they gave the contractor a July 5, 2022 Notice to Proceed. This is the earliest date the contractor could begin work.

milestone_icon
In Progress
Project Construction

COMPLETE:

  • Missouri Route 10, Outer Road 24 and Norfolk Southern Bridge on U.S. Route 24/65 just south of Carrollton, Aug. 31 through Dec. 12, 2022. 
    • Ramp from Route 10 to northbound U.S. Route 24/65 CLOSED at this location, Aug. 31 through Dec. 12, 2022.
  • Moss Creek Drainage Ditch Bridge on U.S. Route 24, approx. 4 miles south of Missouri Route 10, Aug. 15, 2022, through Jan. 4, 2023.

SCHEDULED TO BEGIN SOON - each bridge will be narrowed to one lane, each direction, beginning Feb. 27 and continuing through mid-June

  • U.S. Route 24 (Benton Street) over U.S. Route 65
  • The northbound and southbound U.S. Route 24/65 bridges over Old U.S. Highway 24/Outer Road 24 and the BNSF railroad, located just south of the Benton Street Bridge

The contractor is working with the railroads and MoDOT to determine the construction schedule for the two remaining bridges to be completed in 2023:

  • U.S. Route 24 over BNSF Railroad just east of the U.S. Route 65 interchange
  • U.S. Route 24 over Little Wakenda Creek east of Carrollton
milestone_icon

Bridges Included in this Project

Embed
Summary

Completed routes = green

Routes under construction = orange

Future routes = blue

Is Responsive
Embed Code

Frequently Asked Questions:

Q: Will the road be closed during construction?

A: The project was designed to be completed under staged construction where only one lane is closed at a time. One lane of U.S. Route 24 should remain open, with restrictions, throughout construction.

 

Q: Who can I contact if I have further questions?

A: Questions about the project may be directed to MoDOT's Customer Service team at NWCR@modot.mo.gov or by phone at 888 ASK MODOT (1-888-275-6636).

 

Q: How can I stay updated on the project's progress?

A: Keep visiting this page and our Traveler Information Map at: traveler.modot.org/map for updates. 