Callaway County
Population: 44,332
Maintenance Buildings located in: Fulton, Mokane, and Williamsburg
Callaway County Connector - Environmental Assessment
The Missouri Department of Transportation's Environmental Assessment evaluates strategies and proposes the identified preferred strategy to improve transportation safety and access in Callaway County. The Callaway County Connector study area is located in Callaway County, Missouri, and is an assessment of the existing roadway system and alternative routes for reaching Route 54 from within the study area.
Online Public Meeting, Jan. 15-Jan. 25
Callaway County Connector Environmental Assessment, December, 2012
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Appendix F
Appendix G
Architect Survey 2011
Public Meeting Information, June 4, 2009
Your input is important! Please tell us what you think about the Callaway County Connector Environmental Assessment.
Electronic Comment Form
http://modot.org/central/callawaycomments.htm
Printable Comment Form

Route 94 Auxvasse Creek Bridge Improvements
The Missouri Department of Transportation will improve the Auxvasse Creek bridge, located three miles east fo Route C on Route 94 in Callaway County. The bridge's deck and beams will be replaced, and work is scheduled to take place starting Sept. 19, 2011.
Lehman Construction, LLC of California, Mo. was awarded the contract for the work. The bridge is part of MoDOT's Safe & Sound Bridge Improvement Program.
Bridge Improvements to Begin for Auxvasse Creek Bridge on Route 94 in Callaway County (News Release, Sept. 6, 2011)
Construction Contract Awarded for Auxvasse Creek Bridge on Route 94 in Callaway County (News Release, Jan. 12, 2011)
Business Route 54 and Second Street Intersection in Fulton
The Missouri Department of Transportation realigned the intersection of Business Route 54 and Second Street in Fulton and constructed a roundabout. The Stinson Creek Bridge on Business Route 54 and the Stinson Creek Bridge on Second Street were removed and replaced with one box culvert. The work cost $1.7 million.

Ribbon-Cutting Ceremony Program (pdf, 353 KB, Dec. 17, 2010)
Ribbon Cutting Scheduled for Business Route 54 and Second Street Roundabout (News Release, Dec. 14, 2010)
Roundabout Project Added to State Transportation Improvement Program (News Release, Nov. 4, 2009)

Sept. 1 Public Hearing Documents
Public Hearing on Sept. 1, 2009 (News Release, Aug. 7, 2009)
I-70 Improvement Study
The I-70 Improvement Study is an effort by the Missouri Department of Transportation to determine how to improve the safety and efficiency of travel on 199 miles of Interstate 70 between Kansas City and St. Louis, Missouri. The study identified widening and reconstructing the existing I-70 as the preferred approach to improving the corridor. It also considered the location and configuration of improvements to be made.
In September 2007, the U.S. Department of Transportation announced Interstate 70 through Missouri as one of six interstates nationwide included in its “Corridors of the Future” program to look at innovative ways to reduce congestion and improve freight delivery.
The program calls for the Interstate 70 corridor through Missouri, Illinois, Indiana and Ohio to add four dedicated truck lanes. Missouri will receive $2 million to supplement the existing I-70 study to consider the truck lanes concept.
MoDOT Hosts Public Hearings for Draft Supplemental Environmental Impact Statement
MoDOT Hosting Online Public Meeting on Truck-Only Lanes Concept for I-70
Sept. 2007 News Release -- MoDOT to Conduct Supplemental "Truck Lanes Only" Study for I-70
Click here to look at the Improve I-70 Web site.
|