Counties Impacted
Bates
Completed

Project Facts:

  • Replace bridge over Marais des Cygnes River
    • New bridge will be slightly wider, longer than existing
  • Rehabilitate driving surface of bridge over Pecan Creek
    • Driving surface will be slightly wider than existing
  • Add guardrail to ends of both bridges

Bridge History:

  • Both bridges built in 1961
  • Bridges deteriorating; last inspection bridges rated in poor condition

Construction: Summer 2018

Traffic Impacts:

  • Route V CLOSED -- both bridges at the same time
  • No signed detour, drivers should find alternate routes