I-44 at Shrewsbury


What is the I-44 Study:

A Feasibility study to examine alternatives to improve access to I-44 and to improve local circulation.

Where We Are Today:

The study is complete. We presented the findings to the public in February 2004.   The I-44/Shrewsbury Planning Study was conducted to determine the feasibility of alternatives to improve access to I-44 and to improve local circulation.  This project is listed on the Long Range Plan in the 2021 - 2030 timeframe.  However, it is currently not funded. 

Study Area

The study is centered on I-44 from Arsenal to west of Laclede Station Road and Shrewsbury Avenue from Big Bend Avenue to Weil Avenue.


Purpose and Need

Provide better access to the interstate
Improve connectivity to surrounding communities
Improve local circulation, including access to MetroLink
Foster economic development in the area

The present interchange at Shrewsbury Avenue along with the Murdoch Avenue interchange functions as a split diamond. Movements to and from the east are handled at Shrewsbury Avenue and western movements are served at Murdoch Avenue. These access points are almost on-half mile apart requiring travel on residential streets between the two points.

There is a strong northbound commute path in the AM peak from River Des Peres Boulevard to westbound Lansdowne to Shrewsbury to Big Bend. The major congestion points are at the intersection of Big Bend Boulevard and Shrewsbury Avenue. The unsignalized intersection at Lansdowne and Murdoch Cut-off is over capacity. Traffic south and east of the study area makes it way through the study area to access westbound I-44 at Murdoch and traffic from the south and west travels through the study area to Shrewsbury for eastbound I-44. The PM has the reverse commute patterns than the AM.

In the future traffic volumes are projected to grow increasing congestion. The opening of the MetroLink station will draw more traffic into the area.


Final Alternatives


TABLE 1
FINAL ALTERNATIVE DESCRIPTIONS


Alternative Total Conceptual Cost*
Description

No Build Zero No improvements resulting from this study
1 - $2,582,000 Shrewsbury Ramp Additions
2 - $8,730,000 Shrewsbury Diamond Ramps
2a - $11,422,000 Shrewsbury Loop Ramps
5 - $57,888,000 Single Point Diamond Interchange with I-44 realignment
C1 - $37,548,000 Des Peres Parkway Extension to the east of MetroLink Station with loop ramp under I-44
C2 - $53,948,000 Des Peres Parkway Extension to the east of MetroLink Station
C3 - $54,756,000 Des Peres Parkway Extension to the west of the MetroLink Station with Single Point Urban Interchange
* Total conceptual cost includes design, procurement costs and contingencies. Mitigation of the Laclede Gas storage facility is not included. Costs are expressed in year 2003 dollars with no inflation added.Source: Parsons Brinckerhoff Quade & Douglas, Inc., March 2003.

Alternatives 3, 4, 6, 6a and 7 were eliminated in the preliminary stage of the study. See Figures 2 through 8 for sketches of the final alternatives.

Figure 2 - Alternative 1
Figure 3 - Alternative 2
Figure 4 - Alternative 2a
Figure 5 - Alternative 5
Figure 6 - Alternative C-1
Figure 7 - Alternative C-2
Figure 8 - Alternative C-3




Status of Project and Next Steps



The East-West Gateway Coordinating Council (EWGCC) has included this project in their Legacy 2025 Long Range Plan in the 2011 to 2020 timeframe. However, no funding is currently available for environmental study, project design or construction.

After the final public meeting to present the finding of this study, the study will be completed. Once funding is dedicated the preliminary engineering and environmental analysis and document must be developed and approved. Then if funding is available, design work can begin.

Contact
Lawrence Welty, P.E.
Transportation Planning Coordinator
1590 Woodlake Drive
Chesterfield, MO 63017
314/340-4116
1-888-ASK-MODOT (1-888-275-6636)


Contact Person
: Larry Welty or Kara Price   at 1-888-ASK-MODOT

Work Zone Map

Check Your Route
for
Work Zones

Road Conditions

Weather-Related
Road Conditions
Map

Report a Road Concern

Potholes
Mowing
Traffic Signals & Signs

MoDOT Job Opportunities

Job Listings
and
Applications

Welcome to MoDOT
Welcome to MoDOT
Click Another District to
Visit Their Site
Arrive Alive
511 Logo
Map My Trip
Planning for Progress
Realty For Sale
Red colored links point to a PDF. Click here for more information.
   
   
TRAFFIC CONTACT CONTACT SURVEY SURVEY CAREERS CAREERS NEWS NEWS SITEMAP SITEMAP TRAFFIC Kansas City Area Southwest District North Central District Central District Springfield Area Northeast District St. Louis Area South Central District Southeast District Northwest District