St. Louis District Facebook Twitter Flickr Blog YouTube RSS

Route 364 (Page Extension)

Phase 3 logoRoute 364/Page Ave Phase 3

***IMPORTANT TRAFFIC NOTES***

***More Changes Coming to Mid Rivers Mall Drive/Route 94***

More changes are coming to the Mid Rivers Mall Drive/Route 94 area as crews work to make the final connection from Route 94/Route 364 to the new Route 364/Page Phase 3.  The first step will be to shift traffic to the new ramp from Mid Rivers Mall Drive to westbound Route 94.  Drivers on westbound Route 94/Route 364 will then be moved over to the new bridge following a weekend closure of westbound Route 94/Route 364.  The date of the upcoming weekend closure will be available in the coming weeks.

Map of Upcoming WB Route 94 Changes


Making the final connection from Route 94/Route 364 to the new Route 364/Page Phase 3 will require traffic on eastbound Route 94 to be detoured at Mid Rivers Mall Drive for about a month. Drivers will have to exit eastbound Route 94 at Mid Rivers, go through the intersection and back onto Route 94/Route 364. The exact date of the detour and further details will be available in the next few weeks.

Map of Upcoming EB Route 94 Changes


***Lane Shifts on Route 364 (updated 8/6/14)***

Motorists traveling on westbound Route 364 can expect traffic shifts at Mid Rivers Mall Drive for the next several weeks as part of the Route 364/Page Phase 3 project.  Crews on Thursday, August 7 will start work to narrow the lanes and shift them to the left.  This will allow for the completion of the tie in work for the new ramp from westbound Route 364 to westbound Route 94.  In addition, the speed limit will be lowered to 45 mph.

***Traffic Changes for Mid Rivers Mall Drive/Route 94***

Temporary traffic changes have been made at the intersection of Mid Rivers Mall Drive and Route 94.  The ramp from Mid Rivers Mall Drive to westbound Route 94 is narrowed and the merge has been shortened.  In addition, motorists will no longer be able to go straight onto westbound Route 94 from the left-most lane of the North Outer Road.  That lane is now a left turn only lane onto Mid Rivers Mall Drive.  The middle lane will still go to westbound Route 94.  The changes are necessary so crews can work on the connection from Route 94 to the new Route 364. 

***Henke Road/Technology Drive Connection to I-64 Closed***

MoDOT, and its contractor Page Constructors, has permanently closed a connection between Henke Road/Technology Drive and Interstate 64.  That means there is no access from Henke Road onto Route N or Interstate 64.  This is part of the final design for the Route 364/Page Phase 3 project which will tie into Henke Road. 

Map of Closure Area (pdf)

Final Configuration of Route 364/Henke Road (pdf)

Alternate Route Map (pdf)

***DESIGN AND SCHEDULE CHANGE NOTICE***

Changes have been made to the design of an intersection on the Route 364/Page Phase 3 project.  Route 364 is a design-build project, which means the design of the road is happening at the same time as construction.  The westbound Route 364 exit to Bryan Road will now be a roundabout instead of a folded diamond interchange.  The change means Route 364 will now open in two phases instead of three. The stretch from I-64 to Route K will open in early October, with all lanes of the new road open by October 31. 

Map of New Bryan Road Design (pdf)

________________________________________________________________________________________

About the project:

MoDOT, St. Charles County and local municipalities teamed together to allocate $118.2 million towards building Route 364/Page Phase 3.  The $118.2 million will be used for purchasing property, utility relocations, design and construction.  The project includes building an improved connection from Page Phase 2 at Route 94 and Mid Rivers Mall Drive to I-64/US Route 40/61 at Route N.

MoDOT used a Design-Build contracting process to have contractor teams compete to win the contract.  The Missouri Highways and Transportation Commission approved the contract on February 6, 2013, awarding the project to the Page Constructors Joint Venture, which includes Fred Weber Inc., Millstone-Bangert Inc., Kolb Grading and lead designer, Parsons Transportation Group.

Click here for information on the Design-Build Contractor

RevisedRoute364Map

Click here for a larger version of the corridor map (pdf)

What will be built?

Page Constructors is designing and building a four lane divided freeway for nine miles from Route 94 at Mid Rivers Mall Drive in St Peters to Interstate 64 in Lake Saint Louis.  The new highway will include the following:

  • additional ramps connecting Route 94 and Mid Rivers Mall Drive to Route 364

  • bridge over Motherhead Road

  • Gutermuth Road bridge over Route 364

  • Single point interchange at Route K with widening of Route K to six lanes north and south of the interchange

  • roundabout at Bryan Road with north outer road extended from Stump Road to Bryan Road

  • bridge over Hanley Road

  • bridge over Henke Road with ramps to and from the east

  • new ramps to complete the cloverleaf interchange at I-64

Schedule for construction:

Route 364/Page Phase 3 construction started in May 2013.  There will be construction activity along all nine miles of the project until the new road opens in sections in the fall of 2014 with the entire new road open by the end of October 2014.  The entire project will be complete by late November 2014.

Schedule map (pdf) (updated April 15, 2014)

________________________________________________________________________________________

Construction Newsletter

2014

January 2014 Monthly Construction Newsletter (pdf)

February 2014 Monthly Construction Newsletter (pdf)

March 2014 Monthly Construction Newsletter (pdf)

April 2014 Monthly Construction Newsletter (pdf)

May 2014 Monthly Construction Newsletter (pdf)

June 2014 Monthly Construction Newsletter (pdf)

July/August Monthly Construction Newsletter (pdf - 2 pages)

2013

June 2013 Monthly Construction Newsletter (pdf)

July 2013 Monthly Construction Newsletter (pdf)

August 2013 Monthly Construction Newsletter (pdf)

September 2013 Monthly Construction Newsletter (pdf)

October 2013 Monthly Construction Newsletter (pdf)

November 2013 Monthly Construction Newsletter (pdf)

December 2013 Monthly Construction Newsletter (pdf)

________________________________________________________________________________________

Photo Library (updated August 2014)

           

PavingPaving

Paving on Route 364 between I-64 and Rte K

To see the photo library of construction activities, click here.

To see aerial photos taken in April 2014, click here.

Aerial3

Click on the above picture to see a great video of the project done by St. Charles County.

________________________________________________________________________________________

 

Public Displays and Maps

A public meeting was held Tuesday, March 26, 2013, at the St. Charles Community College.  All of the material presented is available here.

Nine-mile corridor map from Route 94 to I-64 (601 Kb)

Nine-mile corridor map shown with profile grade of new road

All information displays and interchanges in one file (7.3 Mb)

Construction Schedule (170 Kb)

Completion Schedule (2.2 Mb)

General Project information (866 Kb)

I-64 interchange (1.5 Mb)

Henke Road interchange (492 Kb)

Bryan Road interchange (466 Kb)

Route K interchange (867 Kb)

Gutermuth and Motherhead roads (475 Kb)

Route 94/Mid Rivers Mall Drive interchange (589 Kb)

Environmental Impact Statement Documents

Route 364 History

Click here for information on sections of Route 364 already complete from I-270 in St Louis County to Mid Rivers Mall Drive in St Peters.

For more information

Contact Project Director Dave Simmons at 314-275-1500 or 1-888-ASK-MoDOT (275-6636) or by Route.364@modot.mo.gov.

To sign up for email updates, please send an email to Route.364@modot.mo.gov.

 

 

 

 

 

 

 

 

 

 

 
District Map
St. Louis District
spacer
Traveler Information
Traveler Map
Gateway Guide
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Your Local Area Engineer
Report A Road Concern
Mississippi River Bridge
I-270 North
Route 364
I-64 Daniel Boone Bridge
On the Move
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Facebook Twitter Flickr Blog YouTube Franklin Northwest Northeast Kansas City Central St. Louis Southwest Southeast iTunes Android