This Week's Work Schedule



 

September 20 - September 24, 2010

Regional Map HickoryDallas Laclede PolkWebster WrightGreeneDouglasChristian Ozark TaneyStone

Please Click on a County:

 

Christian County

  • Linden area:  Lay long patches on Routes U and VV
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers

Dallas County

Construction Projects -

Route 65 Widening and Resurfacing: Buffalo (Dallas County)

  • Resurfacing Route 65 between Truman Road and Route 32
  • Grinding off top layer of asphalt on shoulders along southbound Route 65 between Route 73 and Route 32

Traffic Impacts:

  • NIGHT WORK: Lane closings possible at times. Work hours: 9 p.m. to 6 a.m.
  • Daytime traffic shifts are possible in various locations

Project Information:

  • Resurfacing Route 65 between Truman Road and Route 32
  • Widening Route 65 between Route 32 and Route 73 to add a center turn lane
  • Project completion: November 2010.

Roadway Maintenance -

  • Bennett Springs area:  Mow Route OO
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers.

Douglas Counties

Roadway Maintenance -

  • Ava area:  Patch potholes on state routes
  • Drury area:  Lay long patches on Route W; mow state routes
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers

Greene County

Construction Projects -

Route 60/65 Interchange Reconstruction:  Springfield (Greene County)

  • Building concrete forms and pouring concrete for the deck on the eastbound Route 60-to-northbound Route 65 “flyover” ramp
  • Placing deck panels and tying reinforcing steel into place on the bridge deck for the eastbound Route 60 ramps west of Route 65 over the railroad tracks
  • Paving in various locations around the project
  • Paving the new westbound Route 60 auxiliary lane between Route 65 and Glenstone Avenue

Traffic Impacts:

  • Northbound Route 65 traffic shifted to the median south of Route 60. Also, northbound Route 65-to-eastbound Route 60 ramp entrance moved to the south. Speed limit reduced to 45 mph.
  • Nighttime ramp and lane closings possible throughout week for bridge work and equipment moves
  • Dump trucks and other equipment entering and leaving work areas
  • Traffic shifted and driving lanes narrowed on Route 65 and Route 60
  • Work zone speed limit: 60 mph
  • Work zone speed limit when ramps or lanes are closed: 45 mph

Trail Impacts:

  • James River Greenway Trail is closed south of Route 60 to Brunswick Avenue on the east side of Route 65.  The trail will be closed indefinitely to allow crews to build two new flyover ramps and complete other bridge work on Route 60 east of Route 65.  
  • Galloway Creek Greenway trail is closed at Route 60 near the railroad tracks. Trail access at that point will be closed indefinitely.

Project Background:

  • Build directional, "flyover" ramps to eliminate a tight conflict point on the existing northbound                    Route 65 bridge over Route 60
  • Build new bridges over the railroad tracks on Route 60
  • Replace the northbound Route 65 bridge over Route 60 and the westbound Route 60 bridge over Lake Springfield
  • Widen the eastbound Route 60 bridge over Lake Springfield
  • Rehabilitate the southbound Route 65 bridge over Route 60
  • Install new highway lighting.
  • Project completion: October 2012.      

Route 65 Six-Laning Project:  Springfield (Greene County)

  • Building bridge in median of Route 65 at Chestnut Expressway and repairing the existing Route 65 bridges over Chestnut Expressway
  • Building bridge footings at northbound Route 65 railroad bridge south of Chestnut Expressway
  • Building bridges in median at railroad tracks south of Kearney Street and at Catalpa Street
  • Paving in median in areas between Route 60 and Kearney Street

Traffic Impacts:

  • NIGHTTIME ROAD CLOSING:  Westbound Chestnut Expressway closed underneath Route 65.  Work hours: 8 p.m. to 5 a.m. Road closed at night until late November.
  • ROAD CLOSING: Catalpa Street closed underneath Route 65.  Road closed until late November.
  • TRAFFIC SHIFT: Northbound Route 65 traffic shifted to median at new railroad bridge south of Chestnut Expressway.  Northbound speed limit reduced to 50 mph.
  • TRAFFIC SHIFT: Both northbound and southbound traffic shifted to right at railroad bridges south of Kearney Street and at Catalpa Street. Southbound traffic shifted to right at railroad bridge south of Chestnut Expressway.
  • Nighttime lane closings where crews are working. Work hours: 7 p.m. to 6 a.m. Monday through Thursday
  • Speed limit in work zones: 50 mph when crews present and when hazards exist in median

Project Background:

  • Widen Route 65 to six lanes, with lanes added in median
  • Rebuild and widen railroad bridges between Sunshine Street and Chestnut Expressway
  • Rehabilitate and widen railroad bridges between Division and Kearney streets
  • Widen bridges at Chestnut Expressway and Catalpa Street
  • Project completion: October 2011.

I-44 Bridge Rehabilitation/Resurfacing:  Springfield (Greene County)

  • Applying pavement stripes in areas on I-44 between Route 65 and Kansas Expressway
  • Repairing guardrail near bridges
  • General clean up work

Traffic Impacts:

  • NIGHT WORK: Lane closings on I-44 between Route 65 and Kansas Expressway. Work hours: 8 p.m. to 6 a.m. Sunday through Thursday.
  • Work zone speed limit at bridges: 50 mph

Project Background:

  • Rehabilitate I-44 bridges over National, Grant and Broadway avenues
  • Repair pavement on I-44 between Kansas Expressway (Route 13) and Route 65
  • Resurface I-44 between Kansas Expressway (Route 13) and Route 65
  • Project completion: August 2011.

Route 65 Guard Cable Installation:  Ozark to Springfield (Christian and Greene Counties)

  • Installing guard cable in median in areas between the Finley River bridge in Ozark and Evans Road in Springfield

Traffic Impacts:

  • Much of the work taking place in the median with NO lane closings
  • NIGHT WORK: Some nighttime lane closings possible on Route 65.  Work hours: 8 p.m. to 6 a.m.
Project Background:
  • Installing guard cable in median of Route  65 between a point south of Route 14 in Ozark and Route 60 in Springfield
  • Project completion: November 2010

Route 125 at James River Bridge Replacement: East of Springfield (Greene County)

  • Building concrete forms for the future bridge deck

Traffic Impacts:

  • Route 125 CLOSED at the James River until November 1. 
  • Detour route: Greene County Route D (East Sunshine Street), Route 65 and Greene County Route YY (East Division Street)
  • Drivers have access to roads and driveways north of Route D and south of Route YY

Project Information:

  • Replace bridge
  • Rebuild 600 feet of pavement on either end of the bridge
  • Safe & Sound Bridge Improvement Project
  • Project completion: Nov. 1, 2010.

Route D Bridge Rehabilitation at Pearson Creek and BNSF Railroad: East of Springfield (Greene County)

  • Pouring concrete for bridge walls on the railroad bridge
  • Pouring concrete for the deck on the Pearson Creek bridge

Traffic Impacts:

  • Traffic shifted to the north side of the bridges
  • Two lanes open during daytime hours.  Lanes narrowed to 9-1/2 feet each
  • One-lane traffic possible at night when needed. Work hours: 7 p.m. to 6 a.m.
  • Speed limit on Route D is reduced to 45 mph in work zone

Project Information:

  • Rehabilitating Pearson Creek bridge
  • Replacing bridge deck on Burlington Northern-Santa Fe bridge
  • Project completion: Dec. 1, 2010

Roadway Maintenance -

  • Republic area:  Repair pavement on Route 174 between Lawrence-Greene county line and Republic; mow state routes
  • Springfield area:  Repair curbs on Kansas Expressway (Route 13) at Bennett Street; Replace a drain pipe on Route FF; repair pavement on Route 60; mow West Bypass (Route 160) and Routes H, M, FF; repair and replace signs and sweep state routes
  • Strafford area:  Mow Route 125
  • Walnut Grove area:  Mow Routes V, Z and BB
  • Willard area:  Mow Routes O and HH
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers

Hickory County

Roadway Maintenance -

  • Wheatland/Preston areas:  Mow state routes
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers.

Laclede County

Construction Projects -

Route 5 Widening:  Route 64 to Greenfield Road in Lebanon (Laclede County)

  • Pouring concrete to widen Route 5 between Greenfield Road and Route YY
  • Working on new traffic signals at the intersection of Route 64 and Route 5
  • Laying sod along shoulders

Traffic Impacts:

  • One southbound lane closed between Greenfield Road and Route YY
  • Entrances could be narrowed or closed in some areas where crews are paving, but drivers will have access to homes, streets and businesses

Project Information:

  • Widen Route 5 to five lanes, two through lanes in each direction with a continuous center turn lane
  • Add a second left-turn lane for southbound Route 5 traffic at intersection of Route 5/Jefferson Avenue/Route 64/Seventh Street
  • Resurface the intersection of Route 5 and Route 64 to eliminate rutted pavement
  • Modify traffic signals on Route 5 at Route 64 and at Brice Street
  • Build new sidewalks and modify storm drains in areas.
  • Project completion: November 2010.

Route 5 “Shared 4-Lane” (Alternating Passing Lanes):   Camden/Laclede county line to Greenfield Road (Laclede County)

  • Paving along the northbound lane of Route 5 in areas between Lebanon and the Camden County line
  • Driveway entrances, county road approaches and state road approaches may be CLOSED for up to 24 hours at times
  • Laying asphalt for shoulders along the new Route 5 in Camden County

Traffic Impacts:

  • One-lane traffic on Route 5 'round the clock. Drivers can expect traffic delays.
  • Route 5 traffic shifted to temporary bypass at Camden/Laclede county line
  • Speed limit on temporary bypass: 45 mph

Project Information:

  • Build alternating passing lanes
  • Project completion: December 2010.

I-44 Resurfacing:  Conway/Phillipsburg/Lebanon areas:  (Laclede County)

  • Resurfacing eastbound lanes between Laclede County Route J/Y at Conway and Route 5 at Lebanon (Mile Markers 113-129)

Traffic Impacts:

  • NIGHT WORK: One eastbound lane closed in areas.  Work hours: 8 p.m. to 6 a.m. Monday through Friday.

Project Information:

  • Resurfacing the eastbound lanes of I-44.  Mile Markers 113-129.
  • Project completion: December 2010.

Roadway Maintenance -

  • Lebanon area:  Mow Routes 32, 64, N, AA, KK, MM and WW
  • Bennett Springs area:  Mow Route OO
  • Conway area:  Clean out drainage culverts on Route J
  • Stoutland area:  Mow Routes T and FF
  • Sleeper area:  Mow Routes F, BB and JJ
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers.

Ozark County

Roadway Maintenance -

  • Gainesville area:  Smooth the pavement on Route 160; repair and replace signs on Route 95
  • Drury area:  Patch Route W
  • Long Lane area:  Seal Route 95 bridge at Pond Fork with a mixture of rock and oil.  Traffic stopped up to 20 minutes
  • Thornfield area:  Seal Route JJ bridge at Little Creek with a mixture of rock and oil.  Traffic stopped up to 20 minutes
  • Dora area:  Mow state routes
  • Tecumseh area:  Mow Route PP
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers.

Polk County

Roadway Maintenance -

  • Humansville area:  Seal Route V bridge at Rute Creek
  • Bolivar area:  Mow state routes
  • Eudora area:  Mow Route JJ
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers.

Stone County

Roadway Maintenance -

  • Galena area:  Resurface Route V
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers.

Taney County

Construction Projects -

Lake Taneycomo Bridge Project: Route 76/Bus. 65, Branson/Hollister (Taney County)

  • Pouring concrete for sections of the bridge deck on the new Lake Taneycomo bridge
  • Building a retaining wall, grading dirt and installing road signs for the new round-about east of Lake Taneycomo along Route 76/Business 65

Traffic/Lake Impacts:

  • NIGHT WORK: One-lane traffic at times on Route 76/Bus. 65 on east side of lake. Work hours: 8 p.m. to 6:30 a.m.
  • Trucks entering and leaving work areas
  • Lake Taneycomo boat traffic stopped or diverted toward shore during bridge work
  • Work zone speed limit 25 mph

Project Information:

  • Build a new Lake Taneycomo bridge, connecting Branson and Hollister
  • Rehabilitate the existing Lake Taneycomo bridge
  • Build an oval “round-about” on the east side of Lake Taneycomo connecting the two    bridges with Route 76/Business 65
  • Project completion: December 2011.

Roadway Maintenance -

  • Branson area:  Patch Routes 465 and 176
  • Protem area:  Seal Route 125 bridge at Shoal Creek with a mixture of rock and oil.  Traffic stopped up to 20 minutes
  • Forsyth area:  Seal Route 160 bridge at Beaver Creek with a mixure of rock and oil.  Traffic stopped up to 20 minutes
  • Bradleyville area:  Mow state routes; spray herbicides to control weeds 
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers.

Webster County

Construction Projects -

Webster County Route B/VV at Route 60 Intersection Widening:  Rogersville (Webster County)

  • Installing traffic signal bases and traffic signal poles

Traffic Impacts:

  • NIGHT WORK: Lane closings possible in areas on Route 60 and Routes BB and V.  Work hours: 7 p.m. to 6 a.m.
  • Equipment entering and leaving work areas

Project Information:

  • Widen Routes B and VV to build left-turn lanesBuild new right-turn lane on Route B from Route 60 into Logan-Rogersville Upper Elementary SchoolRelocate south school entrance to line up with Cedar StreetBuild left-turn lanes on Route B into Cedar Street and school entranceInstall new traffic signals at Routes B/VV and Route 60 intersection
  • Project completion: Oct. 31, 2010

Roadway Maintenance -

  • Springfield/Rogersville area:  Repair pavement on Route 60
  • Rogersville area:  Lay long patches on Routes U and VV
  • Marshfield area:  Repair pavement on I-44 between Marshfield and the Webster/Laclede County line (Mile Markers 101 and 110); mow Routes EE and KK
  • March area:  Mow Routes O, AA and UU
  • Seymour area:  Mow state routes
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers.

Wright County

Roadway Maintenance -

  • Hartville/Manes/Mountain Grove:  Mow state routes
  • Watch for lane closings and slow-moving work vehicles.  Obey flaggers.

 

For highway construction or maintenance information, call MoDOT at 1-888-275-6636.

 
 
 
District Map
Southwest District
spacer
Traveler Information
Traveler Map
Ozarks Traffic
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Your Local Area Engineer
Report a Road Concern
Project Freeway: U.S. 60 Rogersville
On the Move
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Bates Vernon Barton Jasper Newton McDonald Barry Stone Taney Lawrence Dade Cedar St. Clair Henry Christian Greene Polk Hickory Benton Dallas Webster Northwest Northeast Kansas City Central St. Louis Southwest Southeast iTunes Android Facebook Twitter Flickr Google+ Blog YouTube RSS Facebook Twitter Flickr Google+ Blogspot YouTube RSS Feed