| |

Local News Releases

Southwest District Office: (417) 895-7600

October 13, 2016 08:24 AM
Project Freeway: U.S. 60 Rogersville
Update for Week of October 17, 2016
  • Daytime and nighttime lane closings on Route 60 between Farm Roads 253 and 247

 

Work Scheduled:  

  • Finishing grading and installing base rock on the west side of Farm Road 253/Route 60 interchange
  • Paving west side of Farm Road 253/Route 60 interchange

 

Traffic Impacts:

  • East side of Farm Road 253/Route 60 interchange is OPEN including the new Farm Road 253 bridge over Route 60. Drivers are able to use the westbound off ramp from Route 60 to Farm Road 253 and the eastbound on ramp from Farm Road 253 to eastbound Route 60.
  • One lane of Route 60 closed in either direction between Farm Roads 247 and 253 during lower traffic volume times
  • New three-way stop at Farm Road 247 and Route 60 eastbound off ramp (south end of new Farm Road 247/Route 60 interchange)
  • Crews and equipment entering and leaving work areas

(Weather or construction delays could alter the work schedule.)

Project Summary:

  • Build an interchange at Route 60 and Routes B/VV -- COMPLETED
  • Build an interchange at Route 60 and Farm Road 253
  • Build an interchange at Route 60 at Farm Road 247 -- COMPLETED
  • Build turn lanes on Route 60 at Chicory Road and at Peck Hollow Road -- COMPLETED
  • Widen Farm Road 253 between Route 60 and Center Street -- COMPLETED
  • Reconfigure intersection of Route VV and Redbud Street -- COMPLETED
  • Improve the intersection of Route VV and Johnstown Drive
  • Build outer roads in areas to connect Rogersville streets to new interchanges

Design-Build Contractor: Ozark Regional Road Constructors

Completion Date: December 2016

Total Project Cost: $35 million 

 

For more information, call MoDOT at 417-895-7600 or visit modot.org/southwest. Follow MoDOT's Southwest District:

  • Facebook: MoDOT.Southwest
  • Twitter: MoDOT_Southwest
  • Instagram: @MoDOT_Southwest

 


 

 
District Map
Southwest District
spacer
Traveler Information
Traveler Map
Ozarks Traffic
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Report a Road Concern
Media Inquiries
Your Local Area Engineer
Route 65: THE REBUILD
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Bates Vernon Barton Jasper Newton McDonald Barry Stone Taney Lawrence Dade Cedar St. Clair Henry Christian Greene Polk Hickory Benton Dallas Webster Northwest Northeast Kansas City Central St. Louis Southwest Southeast iTunes Android Facebook Twitter Flickr Instagram Blog YouTube RSS Facebook Twitter Flickr Google+ Blogspot YouTube RSS Feed