| |

Local News Releases

Southwest District Office 417.895.7600

August 12, 2016 08:13 AM
Project Freeway: U.S. 60 Rogersville
Update for Week of August 15, 2016
  • Removing Route 60 median crossover at Business 60
  • Lane closings possible at times on Route 60 at Business 60  

Work Scheduled:  

  • Removing Route 60 median crossover at Business 60
  • Route 60 at Greene County Farm Road 253 Interchange
    • Grading rock and dirt to finish remaining ramps at Farm Road 253/Route 60 interchange
  • Grading rock for connector roads on the north and south sides of Route 60 near Farm Road 253 

Traffic Impacts:

  • One lane of Route 60 closed in either direction at Business 60 during lower traffic volume times
  • INTERCHANGE/ROAD OPENING: Farm Road 247 interchange at Route 60 and Center Street extension OPEN west of Rogersville
  • ROAD CLOSING: Business 60 at Route 60 CLOSED PERMANENTLY. However, drivers using Business 60 on south side of Route 60 can make right turns only to reach Route 60 or exit Route 60.
  • Route 60 crossover at Farm Road 243 CLOSED permanently
  • Greene County Farm Road 253 south of Route 60 CLOSED along with the Route 60 median crossover
  • Crews and equipment entering and leaving work areas, especially along Route 60 at Greene County Farm Roads 247 and 253 

(Weather or construction delays could alter the work schedule.) 

Project Summary:

  • Build an interchange at Route 60 and Routes B/VV -- COMPLETED
  • Build an interchange at Route 60 and Farm Road 253
  • Build an interchange at Route 60 at Farm Road 247 -- COMPLETED
  • Build turn lanes on Route 60 at Chicory Road and at Peck Hollow Road -- COMPLETED
  • Widen Farm Road 253 between Route 60 and Center Street
  • Reconfigure intersection of Route VV and Redbud Street -- COMPLETED
  • Improve the intersection of Route VV and Johnstown Drive
  • Build outer roads in areas to connect Rogersville streets to new interchanges

Design-Build Contractor: Ozark Regional Road Constructors

Completion Date: December 2016

Total Project Cost: $35 million

Follow MoDOT's Southwest District:

  • Facebook: MoDOT.Southwest
  • Twitter: MoDOT_Southwest
  • Instagram: @MoDOT_Southwest
Links to related information:

 

 
District Map
Southwest District
spacer
Traveler Information
Traveler Map
Ozarks Traffic
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Report a Road Concern
Media Inquiries
Your Local Area Engineer
Route 65: THE REBUILD
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Bates Vernon Barton Jasper Newton McDonald Barry Stone Taney Lawrence Dade Cedar St. Clair Henry Christian Greene Polk Hickory Benton Dallas Webster Northwest Northeast Kansas City Central St. Louis Southwest Southeast iTunes Android Facebook Twitter Flickr Instagram Blog YouTube RSS Facebook Twitter Flickr Google+ Blogspot YouTube RSS Feed