If you'd like to comment on any of the online public meetings below, please click here.
| I-44/Range Line Road Interchange Reconstruction |
Jan. 17, 2012 |
MoDOT Regional Office (2915 Doughboy Drive) in Joplin |
Replace I-44 bridges over Range Line Road, replace cloverleaf ramps with straight ramps in a conventional diamond shape and covert Range Line Road to a Diverging Diamond interchange. |
| St. Clair County Bridge Projects |
Nov. 29, 2011 |
Roscoe Elementary School |
Rehabilitate Route H/Osage River, Route E/Truman Reservoir and Route O/Little Clear Creek bridges |
| Dallas County Route C Low-Water Crossing Replacement |
Physical meeting: Sept. 22, 2011
Online comment period open until Oct. 6, 2011 |
O'Bannon Bank Community Room
1347 S. Ash Street (Route 65) in Buffalo |
Replace low-water crossing at Little Lindley Creek with new drainage structure; raise the road to help reduce flooding issues |
| Appleton City Railroad Crossing Improvements |
Physical meeting: September 12, 2011
Online comment period open until September 23, 2011 |
Appleton City Parks Building |
Upgrade railroad crossings on 4th Street (Route 52) and 3rd Street. Permanently close crossing on Burbank Street. |
| Route 60 at Oakwood Street/Farm Road 93 Intersection Improvements |
Physical meeting: August 30, 2011
Online comment period open until September 9, 2011 |
Republic Fire Station |
Install traffic signals and lengthen turn lanes at Route 60 at Oakwood Street/Farm Road 93; proposal also calls for closing Farm Road 93 railroad crossing |
| Route 95/Thornfield Bridge Replacement |
Physical meeting: August 25, 2011 |
Thornfield Elemenary School |
Replacement of Little North Fork of the White River bridge in Thornfield. |
St. Clair County Route H Bridge Replacement
St. Clair County Route E Bridge Replacement
St. Clair County Route O Bridge Replacement |
Physical meeting: June 30, 2011
Online comment period open until July 30, 2011 |
El Dorado Springs Public Library
Online |
Replacement of the Osage River bridge west of Roscoe.
Replacement of the Truman Reservoir bridge north of Roscoe.
Replacement of the Little Clear Creek bridge west of Roscoe. |
| Jasper County Route O Bridge Replacement |
Physical meeting: June 29, 2011
Online comment period open until July 29, 2011 |
Route 66 Event Center, Webb City
Online |
Replacement of the Spring River bridge south of Route D. |
| Jasper County Route 96 Bridge Replacement |
Physical meeting: June 28, 2011
Online comment period open until July 28, 2011 |
Ulmer Community Room, Carthage
Online |
Replacement of the Spring River bridge south of Route V. |
Vernon County Route K Bridge Replacement
Vernon County Historic Route B Bridge Replacement |
Physical meeting: June 27, 2011
Online comment period open until July 27, 2011 |
El Dorado Springs Public Library
Online |
Replacement of the West Fork Creek bridge southeast of Walker.
Replacement of the historic Horse Creek bridge east of Sheldon. |
| St. Clair County Route TT Bridge Replacement |
Physical meeting: June 23, 2011
Online comment period open until July 23, 2011 |
St. Clair County Library
Online |
Replacement of the Weaubleau Creek bridge south of Osceola. |
| Cedar County Route J Bridge Replacement |
Physical meeting: June 22, 2011
Online comment period open until July 22, 2011 |
Stockton Public Library
Online |
Replacement of the Sac River bridge north of Stockton. |
| Vernon County Route V Bridge Replacement |
Physical meeting: June 21, 2011
Online comment period open until July 21, 2011 |
Nevada Community Center
Online |
Replacement of the Little Osage River bridge near Stotesbury. |
| Barry County Route 39 Bridge Replacement |
Physical meeting: March 28, 2011
Online comment period open until April 11, 2011 |
Shell Knob Elementary School
Online |
Replacement of the Table Rock Lake bridge deck, and painting the bridge structure. |
| Barry County Route E Bridge Replacement |
Physical meeting: March 3, 4-6 p.m.
Online meeting comment period open until March 17, 2011 |
Eagle Rock-Golden-Mano Fire Station 1
Online |
Replacement of the Scotts Branch bridge and the planned emergency crossing for use during construction. |
| Barton County Route T Bridge Replacement |
Comment period open until Feb. 18, 2011 |
Golden City meeting Feb. 3, Lamar meeting Feb. 4 or online |
Replacement of the Pettis Creek bridge. |
| US 71 Old Town Access Improvements |
Thursday, September 9, 2010 |
Rich Hill High School Auditorium |
Review of outer road design plans, based on community input and invovlement. |
| US 71/Route TT Interchange Improvements |
Tuesday, April 14, 2010, 5-7 p.m. |
Rich Hill High School Auditorium |
Meeting to discuss construction of the new interchange at Route TT and 71, and the 14th Street extension south of Rich Hill. |
US 71 Improvements
Route 71/D: Outer Roads or Interchange
Old Town Access |
Wednesday, April 28, 2010
Route 71/D at Horton, 5-6 p.m.
Old Town Access, 6-7 p.m. |
Rich Hill High School Auditorium |
MoDOT would like to know if the public is in favor of the outer road option or if the public prefers construction of an interchange at Route D.
MoDOT would like to know if the public is in favor of a half-diamond access, which is the original option, or building outer roads from Rich Hill. |
| Route FF Median Installation, Joplin |
Tuesday, May 4, 2010, 4-6 p.m. |
MoDOT Southwest District Office Building, 3901 East 32nd, Joplin |
Widening Route FF slightly to install raised concrete medians in front of Flyinig J's entrances to restrict left turns out of Flying J. |