County: Washington
Location: Route AA to Route 185
Length: 9.16 Miles
Description: Asphalt overlay
Contractor: APAC Missouri Inc., Columbia, Mo.
Project Cost: $737,581
Construction Began: Spring 2005
Construction Completed: Fall 2005
|
| |
|
|
|
|
County: Crawford
Location: 1.9 miles east of Route 68 to just east of Route 19 North
Length: 8.52 Miles
Description: Asphalt overlay
Contractor: Lake Asphalt Paving and Construction, LLC, Osage Beach, Mo.
Project Cost: $938,203
Construction to Begin: July 2007
Construction Complete: Oct. 1, 2007
This project is part of the
Better Roads Brighter Future Program
|
| |
|
|
|
|
County: Crawford and Washington
Location: (2 disconnected sections)
Section 1) Steelville, Mo., to Route AA in Washington County and
Section 2) Route 21 to the St. Francois County line
Length: 25.86
Description:
Asphalt overlay and paved shoulders
Contractor: Lake Asphalt Paving and Construction, LLC, Osage Beach, Mo.
Project Cost:
$3,506,544
Construction to Begin: March 2008
Construction Complete: July 2008
This project is part of the
Better Roads Brighter Future Program
|
| |
|
|
|
|
County: Washington
Location: Route 185 to Route O
Length: 2.2 Miles
Description: Resurface: Thin Lift Overlay
This project is included in the 2008-2012 STIP
|
|
|
|
|
| |
| |
|
| |
|
| |
|
Missouri Department of Transportation
South Central District
910 Springfield Road, P.O. Box 220
Willow Springs, MO 65793
1-888-Ask-MoDOT
1-888-275-6636
Fax: 417-469-4555
Email Us: d9csc@modot.mo.gov
Request More Information
|
| |
|
|
|
 |
 |
 |
 |
|
 |
 |