The Safe & Sound Bridge Program in Northwest Missouri will improve 155 bridges by the end of 2013. Some of these bridges will be completely replaced with new structures, while others will receive new bridge decks and possible improvements to other bridge structural components.
Please note that all dates listed below for upcoming bridge construction and closures are tentative and subject to change.
| Comments about our bridges are welcomed! |
 |
|
|
NOW CLOSED


|
|
Route: U.S. 59 Hwy. / Bus. 71 Hwy. (northbound)
Bridge location: at Interstate 29
Work to be done: Bridge redeck
Originally built: 1962
Awarded on: May 11, 2010
Award amount: $1,816.999.30 (Includes work on north & southbound bridges)
Awarded to: Loch Sand & Construction, Co.
Construction begins: June 14, 2010
Closure date: July 21, 2010 (Six to eight week closure)
Detour information: Ramps will remain open throughout project & traffic will run head to head on southbound U.S. 59 / Bus. 71 bridge.
Route: U.S. 59 Hwy. / Bus. 71 Hwy. (southbound)
Bridge location: at Interstate 29
Work to be done: Bridge redeck
Originally built: 1962
Awarded on: May 11, 2010
Award amount: $1,816.999.30 (Includes work on north & southbound bridges)
Awarded to: Loch Sand & Construction, Co.
Construction begins: June 14, 2010
Detour information: Ramps will remain open throughout project & traffic will run head to head on southbound U.S. 59 / Bus. 71 bridge.
|
| |
|
|

|
|
Route: U.S. 169 Hwy.
Bridge location: at Niagara Creek at Rochester
Work to be done: Bridge replacement
Originally built: 1928
Scheduled for construction: 2012
Detour map: Click here for U.S. 169 Hwy. Detour
|
| |
|
|

|
|
Route: MO 48
Bridge location: MO 48 at Platte River Overflow
Work to be done: Bridge replacement
Originally built: 1932
Scheduled for construction: 2010
Detour map: Click here for MO 48 Detour
|
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route H
Bridge location: at Pedlar Creek
Work to be done: Bridge redeck
Originally built: 1954
Awarded on: December 5, 2008
Award amount: $208,455.90
Awarded to: Boone Construction Company
Closure date: April 6, 2009
Construction completed: May 20, 2009 (Closed 44 days)
|
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route DD
Bridge location: at Dillon Creek
Work to be done: Bridge replacement
Originally built: 1958
Closure date: June 21, 2010
Construction completed: August 24, 2010 (Closed 65 days)
|
| |
|
|

|
|
Route: Route Y
Bridge location: at Owl Creek
Work to be done: Bridge replacement
Originally built: 1954
Scheduled for construction: 2011
Detour map: Click here for Route Y Detour
|
| |
|
|

|
|
Route: Route H
Bridge location: at Arapahoe Creek
Work to be done: Bridge replacement
Originally built: 1954
Scheduled for construction: September 7, 2010
Detour map: Click here for Route H Detour
|
| |
|
|
 |
|
Route: Route A
Bridge location: at drainage ditch
Work to be done: Bridge replacement
Originally built: 1930
Tentative closure date: August 2010
Detour map: Click here for Route A Detour
|
 |
|
Route: U.S. 59 Hwy.
Bridge location: at Tarkio Creek
Work to be done: Bridge replacement
Originally built: 1936
Scheduled for construction: 2011 Detour Map: Click here for Route 59 Detour
|
| |
|
|
 |
|
Route: U.S. 136 Hwy.
Bridge location: at Cow Creek
Work to be done: Bridge replacement
Originally built: 1946
Scheduled for construction: 2011 Detour Map: Click here for 136 Detour
|
| |
|
|
PROJECT COMPLETE  
Before After |
|
Route: U.S. 275 Hwy.
Bridge location: at Kings Bridge
Work to be done: Bridge redeck
Originally built: 1951
Awarded on: March 4th
Award amount: $255,037.80
Awarded to: A.M. Cohron & Sons, Inc.
Closure date: June 1, 2009
Completed: July 27, 2009 (Closed 53 days)
|
| |
|
|
 |
|
Route: Route C
Bridge location: at Mid Tarkio Creek
Work to be done: Bridge replacement
Originally built: 1938
Scheduled for construction: 2011
Detour Map: Click here for Route C Detour |
| |
|
|
 |
|
Route: Route C
Bridge location: at Tarkio River
Work to be done: Bridge replacement
Originally built: 1938
Scheduled for construction: 2011
Detour Map: Click here for Route C Detour |
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route M
Bridge location: at Long Branch Creek
Work to be done: Bridge redeck
Originally built: 1961
Awarded on: March 4th
Award Amount: $216,274.78
Awarded to: A.M. Cohron & Sons, Inc.
Closure Date : April 7, 2009
Completed: May 28th (Closed 50 days)
|
| |
|
|
 |
|
Route: Route V
Bridge location: at the Main Drainage Ditch #6
Work to be done: Bridge replacement
Originally built: 1954
Scheduled for construction: 2010
Detour Map: Click here for Route V Detour |
| |
|
|
 |
|
Route: Route B
Bridge location: at Halls Branch
Work to be done: Bridge replacement
Originally built: 1930
Scheduled for construction: 2010
Detour Map: Click here for Route B Detour |
| |
|
|
 |
|
Route: MO 46
Bridge location: at the Little Tarkio Drainage Ditch
Work to be done: Bridge replacement
Originally built: 1935
Scheduled for construction: 2010
Detour Map: Click here for MO 46 Detour |
| |
|
|
 |
|
Route: MO 46
Bridge location: at Hickory Creek
Work to be done: Bridge replacement
Originally built: 1936
Scheduled for construction: 2012
Detour Map: Click here for MO 46 Detour
|
| |
|
|
 |
|
Route: MO 46
Bridge location: at East Fork Hickory Creek
Work to be done: Bridge replacement
Originally built: 1936
Scheduled for construction: 2011
Detour Map: Click here for MO 46 Detour |
| |
|
|
 |
|
Route: MO 111
Bridge location: at Turkey Creek
Work to be done: Bridge replacement
Originally built: 1936
Scheduled for construction: 2011
Detour Map: Click here for MO 111 Detour |
| |
|
|
 |
|
Route: MO 111
Bridge location: Drainage Ditch
Work to be done: Bridge replacement
Originally built: 1936
Scheduled for construction: 2011
Detour Map: Click here for MO 111 Detour |
| |
|
|
 |
|
Route: Route B
Bridge location: at Rock Creek
Work to be done: Bridge replacement
Originally built: 1948
Scheduled for construction: 2011
Detour Map: Click here for Route B Detour |
PROJECT COMPLETE
 
Before After |
|
Route: Route O
Bridge location: at Interstate 29
Work to be done: Bridge redeck
Originally built: 1958
Community briefing held: Tuesday, February 24, 2009
Awarded on: April 1, 2009
Award amount: $401,870.00
Awarded to: Clarkson Construction Company
Closure date: September 8, 2009
Completed: October 9, 2009 (Closed 30 days) |
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: U.S. 169 Hwy.
Bridge location: at Interstate 29
Work to be done: Bridge redeck
Originally built: 1962
Community briefing held: Thursday, February 26, 2009
Awarded on: April 1, 2009
Award amount: $1,067,858.00
Awarded to: Clarkson Construction Company
Closure date: July 10, 2009
Completed: August 25, 2009 (Closed 48 days) |
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route CC
Bridge location: South Fork of Bee Creek
Work to be done: Bridge redeck
Originally built: 1969
Community briefing held: Tuesday, February 24, 2009
Awarded on: April 1, 2009
Award amount: $326,088.40
Awarded to: Clarkson Construction Company
Closure date: June 8, 2009
Completed: July 18, 2009 (Closed 41 days) |
| |
|
|
 |
|
Route: U.S. 59 Hwy.
Bridge location: at Cloverdale Ditch
Work to be done: Bridge replacement
Originally built: 1941
Scheduled for construction: 2011
Detour Map: Click here for U.S. 59 Detour
|
| |
|
|
 |
|
Route: U.S. 59 Hwy.
Bridge location: at Gay Branch
Work to be done: Bridge replacement
Originally built: 1920
Scheduled for construction: 2011
Detour Map: Click here for U.S. 59 Detour
|
| |
|
|
 |
|
Route: MO 116
Bridge location: Lost Creek
Work to be done: Bridge replacement
Originally built: 1950
Scheduled for construction: 2011
Detour Map: Click here for MO 116 Detour
|
| |
|
|
 |
|
Route: Route M
Bridge location: at Sugar Creek
Work to be done: Bridge replacement
Originally built: 1956
Scheduled for construction: 2012
Detour Map: Click here for Route M Detour
|
| |
|
|
 |
|
Route: Route DD
Bridge location: at Malden Creek
Work to be done: Bridge replacement
Originally built: 1954
Scheduled for construction: 2012
Detour Map: Click here for Route DD Detour
|
| |
|
|
 |
|
Route: MO 116
Bridge location: at Bee Creek
Work to be done: Bridge replacement
Originally built: 1933
Scheduled for construction: 2011
Detour Map: Click here for MO 116 Detour
|
| |
|
|
 |
|
Route: MO 116
Bridge location: at Little Bee Creek
Work to be done: Bridge replacement
Originally built: 1933
Scheduled for construction: 2011
Detour Map: Click here for MO 116 Detour
|
| |
|
|
 |
|
Route: Route P
Bridge location: at Third Fork of Platte River
Work to be done: Bridge replacement
Originally built: 1934
Scheduled for construction: 2011
Detour Map: Click here for Route P Detour
|
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route KK
Bridge location: at Puckett Slu
Work to be done: Bridge replacement
Originally built: 1936
Awarded on: May, 2009
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: October 19, 2009
Completed: November 10, 2009 (Closed 22 days)
|
| |
|
|
 |
|
Route: Route H
Bridge location: at Wolfpen Creek
Work to be done: Bridge replacement
Originally built: 1948
Scheduled for construction: 2012
Detour Map: Click here for Route H Detour
|
 |
|
Route: US 36 Hwy.
Bridge location: UP RR
Work to be done: Bridge replacement
Originally built: 1958
Scheduled for construction: 2012
|
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: MO 116
Bridge location: N. Mud Creek
Work to be done: Bridge redeck
Originally built: 1964
Awarded on: September 2, 2009
Award amount: $267,963.00
Awarded to: Chester Bross Cons. Co./C.B. Equipment, Inc.
Closure date: April 5, 2010
Completed: May 20th 2010 (Closed 45 days)
|
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route A
Bridge location: Dead Oak Creek
Work to be done: Bridge redeck
Originally built: 1966 Awarded on: September 2, 2009
Award amount: $177,808.50
Awarded to: Chester Bross Cons. Co./C.B. Equipment, Inc.
Closure date: May 24, 2010
Completed: June 23rd (Closed 29 days) |
| |
|
|
 |
|
Route: Route W
Bridge location: East Sheep Creek
Work to be done: Bridge replacement
Originally built: 1923
Scheduled for construction: 2011
Detour map: Click here for Route W Detour
|
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route N
Bridge location: Mud Creek
Work to be done: Bridge redeck
Originally built: 1958 Awarded on: September 2, 2009
Award amount: $236,095.00
Awarded to: Chester Bross Cons. Co./C.B. Equipment, Inc.
Closure date: April 19, 2010
Construction Completed: June 4, 2010 (Closed 47 days) |
| |
|
|
 |
|
Route: Route U
Bridge location: Otter Creek
Work to be done: Bridge redeck
Originally built: 1960
Scheduled for construction: 2011
Detour map: Click here for Route U Detour
|
| |
|
|
 |
|
Route: Route D
Bridge location: Goose Creek
Work to be done: Bridge replacement
Originally built: 1954 Scheduled for construction: 2011
Detour map: Click here for Route D Detour
|
| |
|
|
 |
|
Route: Route HH
Bridge location: Plum Creek
Work to be done: Bridge redeck
Originally built: 1965
Scheduled for construction: 2011
Detour map: Click here for Route HH Detour
|
| |
|
|
 |
|
Route: Route A
Bridge location: Panther Creek
Work to be done: Bridge replacement
Originally built: 1947 Scheduled for construction: 2012 Detour map: Click here for Route A Detour
|
 |
|
Route: Route PP
Bridge location: New Hope Creek
Work to be done: Bridge replacement
Originally built: 1959
Scheduled for construction: 2011 Detour Map: Click here for Route PP Detour
|
| |
|
|
 |
|
Route: Route K
Bridge location: Castile Creek
Work to be done: Bridge redeck
Originally built: 1960
Scheduled for construction: 2011
Detour Map: Click here for Route K Detour |
| |
|
|
 |
|
Route: Route V
Bridge location: Interstate 35
Work to be done: Bridge redeck
Originally built: 1964
Scheduled for construction: 2011
Detour Map: Click here for Route V Detour |
| |
|
|
 |
|
Route: MO 121
Bridge location: Deer Creek
Work to be done: Bridge replacement
Originally built: 1935
Scheduled for construction: 2011
Detour Map: Click here for MO 121 Detour |
| |
|
|
 |
|
Route: Route NN
Bridge location: McGuire Creek
Work to be done: Bridge replacement
Originally built: 1947
Scheduled for construction: 2012
Detour Map: Click here for Route NN Detour |
PROJECT COMPLETE
 
Before After |
|
Route: Route RA
Bridge location: E. Brushy Creek
Work to be done: Bridge redeck
Originally built: 1972
Awarded on: January 8, 2009
Award amount: $299,419.00
Awarded to: Chester Bross Construction Company
Closure date: May 26, 2009
Construction completed: June 30, 2009 (Closed 35 days)
|
| |
|
|

|
|
Route: MO 13
Bridge location: Little Cypress Creek
Work to be done: Bridge replacement
Originally built: 1937
Scheduled for construction: 2011
Detour Map: |
| |
|
|
 |
|
Route: Route T
Bridge location: Sampson Creek
Work to be done: Bridge redeck
Originally built: 1957
Scheduled for construction: 2011
Detour Map: Click here for Route T Detour
|
| |
|
|
 |
|
Route: Route CC
Bridge location: Dog Creek
Work to be done: Bridge bridge replacement
Originally built: 1953
Scheduled for construction: 2012
Detour Map: Click here for Route CC Detour
|
| |
|
|
 |
|
Route: Route P
Bridge location: Pilot Grove Creek
Work to be done: Bridge replacement
Originally built: 1954
Scheduled for construction: 2012
Detour Map: Click here for Route P Detour
|
| |
|
|
 |
|
Route: Route P
Bridge location: Big Muddy Creek
Work to be done: Bridge replacement
Originally built: 1954
Scheduled for construction: 2011
Detour Map: Click here for Route P Detour
|
| |
|
|
 |
|
Route: Route E
Bridge location: Grindstone Creek
Work to be done: Bridge replacement
Originally built: 1954
Scheduled for construction: 2012
Detour Map: Click here for Route E Detour
|
| |
|
|
 |
|
Route: Route V
Bridge location: Muddy Creek
Work to be done: Bridge redeck
Originally built: 1963
Scheduled for construction: 2011
Detour Map: Click here for Route V Detour |
| |
|
|
 |
|
Route: Route Z
Bridge location: Drainage ditch
Work to be done: Bridge redeck
Originally built: 1961
Scheduled for construction: 2011
Detour Map: Click here for Route Z Detour |
| |
|
|
 |
|
Route: Route HH
Bridge location: Marrowbone Creek
Work to be done: Bridge redeck
Originally built: 1962
Scheduled for construction: 2011
Detour Map: Click here for Route HH Detour
|
| |
|
|
 |
|
Route: Route J
Bridge location: Dog Creek
Work to be done: Bridge replacement
Originally built: 1931
Scheduled for construction: 2011
Detour Map: Click here for Route J Detour
|
| |
|
|
 |
|
Route: Route K
Bridge location: East Creek
Work to be done: Bridge replacement
Originally built: 1934
Scheduled for construction: 2011
Detour Map: Click here for Route K Detour |
| |
|
|
 |
|
Route: Route K
Bridge location: Pilot Grove Creek
Work to be done: Bridge replacement
Originally built: 1934
Scheduled for construction: 2012
Detour Map: Click here for Route K Detour |
| |
|
|
 |
|
Route: Route J
Bridge location: Marrowbone Creek
Work to be done: Bridge replacement
Originally built: 1935
Scheduled for construction: 2011
Detour Map: Click here for Route J Detour |
| |
|
|
 |
|
Route: Route M
Bridge location: Lick Fork Creek
Work to be done: Bridge replacement
Originally built: 1947
Scheduled for construction: 2012
Detour Map: Click here for Route M Detour
|
PROJECT COMPLETE
 
Before After
|
|
Route: MO 33
Bridge location: Branch of Lost Creek (Red Horse Creek)
Work to be done: Bridge redeck
Originally built: 1959
Awarded on: December 2, 2009
Award amount: $258,526.93
Awarded to: Loch Sand & Construction Co.
Closure date: March 22, 2010
Construction completed: April 27, 2010 (Closed 36 days)
|
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: MO 33
Bridge location: West Fork Lost Creek
Work to be done: Bridge redeck
Originally built: 1959
Awarded on: December 2, 2009
Award amount: $252,744.35
Awarded to: Loch Sand & Construction Co.
Closure date: April 27, 2010
Construction completed: June 3, 2010 (Closed 37 days)
|
| |
|
|
 |
|
Route: U.S. 36 Hwy.
Bridge location: Castile Creek
Work to be done: Bridge redeck
Originally built: 1966 Scheduled for construction: 2011
Detour map: Click here for U.S. 36 Hwy. Detour
|
| |
|
|
 |
|
Route: U.S. 36 Hwy.
Bridge location: Grindstone Creek
Work to be done: Bridge redeck
Originally built: 1966 Scheduled for construction: 2011 Detour map: Click here for U.S. 36 Hwy. Detour
|
| |
|
|
 |
|
Route: U.S. 36 Hwy.
Bridge location: Castile Creek
Work to be done: Bridge redeck
Originally built: 1923 Scheduled for construction: 2011 Detour map: Click here for U.S. 36 Hwy. Detour
|
| |
|
|
 |
|
Route: Route A
Bridge location: East Fork Lost Creek
Work to be done: Bridge replacement
Originally built: 1947 Scheduled for construction: 2011 Detour map: Click here for Route A Detour |
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route E
Bridge location: North Fork Lost Creek
Work to be done: Bridge redeck
Originally built: 1956
Awarded on: January 8, 2009
Award amount: $227,405.00
Awarded to: St. Joseph Fuel Oil & Mfg. Co.
Closure date: June 22, 2009
Construction Completed: August 6, 2009 (Closed 45 days)
|
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route V
Bridge location: 3rd Fork Platte River
Work to be done: Bridge redeck
Originally built: 1957
Award amount: $277,330.00
Awarded to: St. Joseph Fuel Oil & Mfg. Co.
Closure date: March 30, 2009
Construction Completed: May 14, 2009 (Closed 46 days) |
| |
|
|
 |
|
Route: Route F
Bridge location: Crooked Creek
Work to be done: Bridge redeck
Originally built: 1961 Scheduled for construction: 2011 Detour map: Click here for Route F Detour |
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route C
Bridge location: Grindstone Creek
Work to be done: Bridge redeck
Originally built: 1952
Awarded on: January 8, 2009
Award amount: $271,372.00
Awarded to: St. Joseph Fuel Oil & Mfg. Co.
Closure date: May 11, 2009
Construction completed: June 25, 2009 (Closed 45 days) |
| |
|
|
 |
|
Route: Route H
Bridge location: Dry Branch
Work to be done: Bridge replacement
Originally built: 1953 Scheduled for construction: 2012 Detour map: Click here for Route H Detour |
| |
|
|
NOW CLOSED

|
|
Route: Route J
Bridge location: Abandoned Railroad Bridge
Work to be done: Bridge removal
Originally built: 1964
Awarded on: May 11, 2010
Award amount: $178,145.79
Awarded to: Widel, Inc.
Closure date: August 2, 2010 (Six to eight week closure) Detour map: Click here for Route J Detour
|
| |
|
|
 |
|
Route: Route E
Bridge location: Little 3rd Fork Platte
Work to be done: Bridge replacement
Originally built: 1947 Scheduled for construction: 2012 Detour map: Click here for Route E Detour |
| |
|
|
 |
|
Route: Route E
Bridge location: Lost Creek
Work to be done: Bridge replacement
Originally built: 1947 Scheduled for construction: 2012
Detour map: Click here for Route E Detour |
| |
|
|
 |
|
Route: Route E
Bridge location: East Fork Lost Creek
Work to be done: Bridge replacement
Originally built: 1941 Scheduled for construction: 2011 Detour map: Click here for Route E Detour
|
 |
|
Route: U.S. 169 Hwy.
Bridge location: Old Channel Island Creek
Work to be done: Bridge redeck
Originally built: 1941
Scheduled for construction: 2011
Detour Map: Click here for U.S. 169 Hwy. Detour |
| |
|
|
 |
|
Route: MO 85
Bridge location: Thompson Bridge
Work to be done: Bridge redeck
Originally built: 1925
Scheduled for construction: 2011
Detour Map: Click here for MO 85 Detour |
| |
|
|
 |
|
Route: MO 85
Bridge location: Town Bridge
Work to be done: Bridge replacement
Originally built: 1925 Scheduled for construction: 2011
Detour Map: Click here for MO 85 Detour
|
| |
|
|
 |
|
Route: U.S. 136 Hwy.
Bridge location: Town Bridge
Work to be done: Bridge replacement
Originally built: 1929 Scheduled for construction: 2011 Detour Map: Click here for U.S. 136 Hwy. Detour
|
| |
|
|
 |
|
Route: U.S. 136 Hwy.
Bridge location: Moccasin Creek
Work to be done: Bridge replacement
Originally built: 1929 Scheduled for construction: 2011
Detour Map: Click here for U.S. 136 Hwy. Detour
|
| |
|
|
 |
|
Route: Route UU
Bridge location: Turkey Creek
Work to be done: Bridge replacement
Originally built: 1958 Closure date: September 7, 2010
Detour Map: Click here for Route UU Detour
|
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route BB
Bridge location: Island Creek
Work to be done: Bridge redeck
Awarded on: January 9, 2009
Award amount: $230,416.00
Awarded to: Chester Bross Construction Company
Closure date: June 8, 2009
Construction completed: July 10, 2009 (Closed 33 days) |
| |
|
|
 |
|
Route: Route O
Bridge location: West Fork Grand River
Work to be done: Bridge replacement
Originally built: 1960 Scheduled for construction: 2011
Detour Map: Click here for Route O Detour
|
| |
|
|
 |
|
Route: Route A
Bridge location: Evona Creek
Work to be done: Bridge replacement
Originally built: 1930 Scheduled for construction: October 2010 Detour Map: Click here for Route A Detour
|
| |
|
|
 |
|
Route: Route H
Bridge location: West Fork Grand River
Work to be done: Bridge replacement
Originally built: 1947 Scheduled for construction: 2011 Detour Map: Click here for Route H Detour
|
| |
|
|
 |
|
Route: Route M
Bridge location: Island Creek
Work to be done: Bridge replacement
Originally built: 1948 Scheduled for construction: 2011 Detour Map: Click here for Route M Detour
|
 |
|
Route: U.S. 69 Hwy
Bridge location: Big Creek
Work to be done: Bridge replacement
Originally built: 1928
Awarded to: KTU Constructors (Design-Build Contract)
Scheduled for construction: September 2010
Detour map: Click here for U.S. 69 Hwy. Detour
|
| |
|
|
 |
|
Route: U.S. 69 Hwy.
Bridge location: Big Creek Overflow
Work to be done: Bridge replacement
Originally built: 1928
Awarded to: KTU Constructors (Design-Build Contract)
Scheduled for construction: October 2010 Detour map: Click here for U.S. 69 Hwy. Detour
|
| |
|
|
 |
|
Route: U.S. 136 Hwy.
Bridge location: Sugar Creek
Work to be done: Bridge replacement
Originally built: 1937
Awarded to: KTU Constructors (Design-Build Contract)
Scheduled for construction: 2011
Detour map: Click here for U.S. 136 Hwy. Detour |
| |
|
|
NOW CLOSED

|
|
Route: Route MM
Bridge location: Fox Creek
Work to be done: Bridge redeck
Originally built: 1962
Awarded on: October 7, 2009
Award amount: $135,150.00
Awarded to: Chester Bross Construction Co.
Closure date: August 10, 2010 (six to eight week closure)
Detour map: Click here for Route MM Detour |
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route M
Bridge location: Big Muddy Creek
Work to be done: Bridge redeck
Originally built: 1957
Awarded on: January 8, 2009
Award amount: $234,973.32
Awarded to: Loch Sand and Construction Co.
Closure Date: May 6, 2009
Construction completed: June 9, 2009 (Closed 34 days)
Bridge Painting Project: Scheduled For 2010
|
| |
|
|
 |
|
Route: Route UU
Bridge location: Indian Creek
Work to be done: Bridge replacement
Originally built: 1958
Awarded to: KTU Constructors (Design-Build Contract)
Scheduled for construction: October 2010
Detour map: Click here for Route UU Detour |
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route KK
Bridge location: Shain Creek
Work to be done: Bridge replacement
Originally built: 1959
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: April 26, 2010
Construction completed: June 9, 2010 (Closed 44 days)
|
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route HH
Bridge location: Lotts Creek
Work to be done: Bridge redeck
Originally built: 1960
Awarded on: January 8, 2009
Award amount: $268,942.92
Awarded to: Loch Sand and Construction Co.
Closure Date: May 26, 2009
Construction completed: July 8, 2009 (Closed 43 days) Bridge Painting Project: Scheduled For 2010
|
| |
|
|

|
|
Route: Route MM
Bridge location: Sugar Creek
Work to be done: Bridge redeck
Originally built: 1962
Awarded on: October 7, 2009
Award amount: $174,338.00
Awarded to: Chester Bross Construction Co.
Scheduled for construction: 2010
Detour map: Click here for Route MM Detour
|
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route N
Bridge location: Brush Creek
Work to be done: Bridge replacement
Originally built: 1950
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: April 12, 2010
Construction Completed: June 1, 2010 (Closed 51 days)
|
| |
|
|
NOW CLOSED

|
|
Route: Route O
Bridge location: Indian Creek
Work to be done: Bridge replacement
Originally built: 1950
Awarded to: KTU Constructors (Design-Build Contract)
Closure date : August 16, 2010 (six to eight week closure)
Detour map: Click here for Route O Detour |
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route O
Bridge location: Donaby Creek
Work to be done: Bridge replacement
Originally built: 1950
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: July 6, 2010 (Six to eight week closure)
Construction Completed: August 13, 2010 |
| |
|
|
 |
|
Route: Route F
Bridge location: Panther Creek
Work to be done: Bridge replacement
Originally built: 1951
Awarded to: KTU Constructors (Design-Build Contract)
Scheduled for construction: September 2010
Detour map: Click here for Route F Detour |
| |
|
|
 |
|
Route: Route CC
Bridge location: Cat Creek
Work to be done: Bridge replacement
Originally built: 1953
Awarded to: KTU Constructors (Design-Build Contract)
Scheduled for construction: 2011
Detour map: Click here for Route CC Detour |
| |
|
|
NOW CLOSED

|
|
Route: Route Z
Bridge location: Shain Creek
Work to be done: Bridge replacement
Originally built: 1954
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: July 14, 2010 (six to eight week closure)
Detour map: Click here for Route Z Detour |
| |
|
|
NOW CLOSED

|
|
Route: Route M
Bridge location: West Fork Big Creek
Work to be done: Bridge replacement
Originally built: 1955
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: August 18, 2010 (six to eight week closure)
Detour map: Click here for Route M Detour |
| |
|
|
 |
|
Route: Route Y
Bridge location: Trail Creek
Work to be done: Bridge replacement
Originally built: 1956
Awarded to: KTU Constructors (Design-Build Contract)
Scheduled for construction: September 2010
Detour map: Click here for Route Y Detour |
| |
|
|
NOW CLOSED

|
|
Route: Route AA
Bridge location: Big Creek
Work to be done: Bridge redeck
Originally built: 1962
Awarded on: October 7, 2009
Award amount: $353,788.00
Awarded to: Chester Bross Construction Co.
Closure date: August 30, 2010 (six to eight week closure)
Detour map: Click here for Route AA detour |
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route B
Bridge location: BR
Work to be done: Bridge replacement
Originally built: 1931
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: June 7, 2010
Construction completed: July 12, 2010 ( Closed 36 days)
|
|
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route B
Bridge location: Panther Creek
Work to be done: Bridge replacement
Originally built: 1931
Awarded to: KTU Constructors (Design-Build Contract)
Closure Date : July 19, 2010
Construction completed: August 25, 2010 (Closed 38 days) |
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route B
Bridge location: Drainage Ditch
Work to be done: Bridge replacement
Originally built: 1931
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: May 25, 2010
Construction completed: June 23,2010 (Closed 30 days) |
| |
|
|
 |
|
Route: MO 46
Bridge location: West Fork Big Creek
Work to be done: Bridge replacement
Originally built: 1946
Awarded to: KTU Constructors (Design-Build Contract)
Scheduled for construction: 2011
Detour map: Click here for MO 46 Detour |
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: MO 46
Bridge location: East Fork Big Creek
Work to be done: Bridge replacement
Originally built: 1946
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: June 1, 2010
Construction completed: July 23, 2010 (Closed 53 days) |
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: MO 46
Bridge location: Shain Creek
Work to be done: Bridge replacement
Originally built: 1946
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: March 22, 2010
Construction completed: May 14, 2010 (Closed 54 days)
|
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route A
Bridge location: Big Panther Creek
Work to be done: Bridge replacement
Originally built: 1949
Awarded to: KTU Constructors (Design-Build Contract)
Closure date: April 5, 2010
Construction completed: May 18, 2010 (Closed 44 days)
|
PROJECT COMPLETE
|
|
Route: U.S. 136 Hwy.
Bridge location: White Oak Creek
Work to be done: Bridge deck replacement
Originally built: 1965
Awarded to: Chester Bross Construction Co.
Closure date: July 28, 2010
Construction completed: September 3, 2010
This bridge is not a part of the Safe & Sound program but will be constructed in 2010. |
PROJECT COMPLETE

|
|
Route: MO 13
Bridge location: I-35 Overpass
Work to be done: Bridge deck replacement
Originally built: 1972
Awarded to: Chester Bross Construction Co.
Closure date: June 7, 2010
Construction completed: August 6, 2010
This bridge is not a part of the Safe & Sound program but will be constructed in 2010. |
 |
|
Route: U.S. 59 Hwy.
Bridge location: Little Tarkio Creek
Work to be done: Bridge replacement
Originally built: 1926
Scheduled for construction: 2010
Detour map: Click here for US 59 Hwy. Detour
|
| |
|
|
 |
|
Route: Route B
Bridge location: Nichols Creek
Work to be done: Bridge replacement
Originally built: 1953
Scheduled for construction: 2010
Detour map: Click here for Route B detour |
| |
|
|
 |
|
Route: MO 111
Bridge location: Old Channel of Big Tarkio
Work to be done: Bridge replacement
Originally built: 1956
Scheduled for construction: 2011
Detour map: |
| |
|
|
 |
|
Route: MO 111
Bridge location: Cannon Creek
Work to be done: Bridge replacement
Originally built: 1956
Scheduled for construction: 2011
Detour map: Click here for MO 111 detour |
| |
|
|
 |
|
Route: Route C
Bridge location: Mid Branch of Squaw Creek
Work to be done: Bridge replacement
Originally built: 1955
Scheduled for construction: 2011
Detour map: Click here for Route C detour |
| |
|
|
 |
|
Route: Route C
Bridge location: Squaw Creek
Work to be done: Bridge replacement
Originally built: 1955
Scheduled for construction: 2011
Detour map: Click here for Route C detour |
| |
|
|
 |
|
Route: Route B
Bridge location: Nichols Creek
Work to be done: Bridge replacement
Originally built: 1931
Scheduled for construction: 2011 Detour map: Click here for Route B detour
|
| |
|
|
 |
|
Route: Route B
Bridge location: Lincoln Creek
Work to be done: Bridge replacement
Originally built: 1954
Scheduled for construction: 2012
|
| |
|
|
 |
|
Route: Route N
Bridge location: East Branch of Squaw Creek
Work to be done: Bridge replacement
Originally built: 1947
Scheduled for construction: 2010
Detour map: Click here for Route N detour |
| |
|
|
 |
|
Route: Route N
Bridge location: Mid Branch of Squaw Creek
Work to be done: Bridge replacement
Originally built: 1947
Scheduled for construction: 2011
Detour map: Click here for Route N detour |
| |
|
|
 |
|
Route: MO 111
Bridge location: Corn Creek
Work to be done: Bridge replacement
Originally built: 1936
Scheduled for construction: 2010
Detour map: Click here for MO 111 detour |
| |
|
|
 |
|
Route: Route C
Bridge location: Wildcat Creek
Work to be done: Bridge replacement
Originally built: 1949
Scheduled for construction: 2011
Detour map: Click here for Route C detour |
| |
|
|
 |
|
Route: Route C
Bridge location: Minnesota Valley Creek
Work to be done: Bridge replacement
Originally built: 1947
Scheduled for construction: 2011
Detour map: Click here for Route C detour |
 |
|
Route: U.S. 136 Hwy.
Bridge location: Wildcat Creek
Work to be done: Bridge replacement
Originally built: 1931
Scheduled for construction: 2011 Detour map: Click here for US 136 Hwy detour
|
| |
|
|
 |
|
Route: U.S. 71 Hwy.
Bridge location: White Cloud Creek
Work to be done: Bridge replacement
Originally built: 1933
Scheduled for construction: 2011
Detour map: Click here for US 71 Hwy detour |
| |
|
|
 |
|
Route: Route J
Bridge location: Sleek Creek
Work to be done: Bridge replacement
Originally built: 1939
Scheduled for construction: September 2010
Detour map: Click here for Route J detour |
| |
|
|
 |
|
Route: MO 246
Bridge location: Honey Creek
Work to be done: Bridge replacement
Originally built: 1947
Scheduled for construction: 2011
Detour map: Click here for MO 246 detour |
| |
|
|
 |
|
Route: MO 246
Bridge location: Brushy Creek
Work to be done: Bridge replacement
Originally built: 1947
Scheduled for construction: 2010
Detour map: Click here for MO 246 detour |
| |
|
|
 |
|
Route: Route A
Bridge location: Elkhorn Creek
Work to be done: Bridge redeck
Originally built: 1953
Scheduled for construction: 2011
Detour map: Click here for Route A detour |
| PROJECT COMPLETE |
|
|
 
Before After |
|
Route: Route JJ
Bridge location: West Fork 102 River
Work to be done: Bridge redeck
Originally built: 1955
Awarded on: March 4th
Award Amount: $314,107.11
Awarded to: A.M. Cohron & Sons, Inc.
Closure date: July 27, 2009
Completion Date: September 14, 2009 (Closed 48 days) |
| |
|
|
 |
|
Route: Route VV
Bridge location: Long Branch
Work to be done: Bridge redeck
Originally built: 1956
Scheduled for construction: 2011
Detour map: Click here for Route VV detour |
| |
|
|
 |
|
Route: MO 246
Bridge location: Norvey Creek
Work to be done: Bridge replacement
Originally built: 1952
Scheduled for construction: 2010
Detour map: Click here for MO 246 detour |
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route NN
Bridge location: Honey Creek
Work done: Bridge redeck
Originally built: 1955
Award amount: $238,560.34
Awarded to: Loch Sand and Construction Co.
Closure date: March 17, 2009
Construction completed: April 29, 2009 (Closed 43 Days)
|
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route NN
Bridge location: Brushy Creek
Work to be done: Bridge redeck
Originally built: 1955
Award amount: $194,738.84
Awarded to: Loch Sand and Construction Co.
Closure date: April 1, 2009
Construction completed: May 12, 2009 (Closed 42 Days)
|
| |
|
|
PROJECT COMPLETE
 
Before After
|
|
Route: Route PP
Bridge location: Huff Creek
Work to be done: Bridge redeck
Originally built: 1961
Awarded on: September 2, 2009
Award amount: $255,609.75
Awarded to: Boone Construction Co.
Closure date: October 13, 2009 Construction completed: November 17, 2009 (Closed 35 days)
|
| |
|
|
PROJECT COMPLETE
 
Before After |
|
Route: Route PP
Bridge location: Maupin Creek
Work to be done: Bridge redeck
Originally built: 1961
Awarded on: September 2, 2009
Award amount: $259,039.75
Awarded to: Boone Construction Co.
Closure date: March 8, 2010 Construction completed: April 12, 2010 (Closed 37 days)
|
| |
|
|
 |
|
Route: Route A
Bridge location: Bridge replacement
Work to be done: Jenkins Creek
Originally built: 1930
Scheduled for construction: 2010
Detour map: Click here for Route A detour |
| |
|
|
 |
|
Route: MO 113
Bridge location: Bridge replacement
Work to be done: Nodaway River
Originally built: 1932
Scheduled for construction: 2011
Detour map: Click here for MO 113 detour |
| |
|
|
 |
|
Route: MO 113
Bridge location: Bridge replacement
Work to be done: Nodaway River Overflow (a)
Originally built: 1932
Scheduled for construction: 2011
Detour map: Click here for MO 113 detour |
| |
|
|
 |
|
Route: MO 113
Bridge location: Bridge replacement
Work to be done: Nodaway River Overflow (b)
Originally built: 1932
Scheduled for construction: 2012
Detour map: Click here for MO 113 detour |
| |
|
|
 |
|
Route: MO 113
Bridge location: Bridge replacement
Work to be done: Cayhoga Creek
Originally built: 1950
Scheduled for construction: 2011
Detour map: Click here for MO 113 detour |
| |
|
|
 |
|
Route: MO 113
Bridge location: Bridge replacement
Work to be done: Bowman Creek
Originally built: 1934
Scheduled for construction: 2011
Detour map: Click here for MO 113 detour |
| |
|
|
 |
|
Route: MO 113
Bridge location: Bridge replacement
Work to be done: Sand Creek
Originally built: 1934
Scheduled for construction: 2011
Detour map: Click here for MO 113 detour |
| |
|
|
NOW CLOSED

|
|
Route: Route F
Bridge location: Bridge replacement
Work to be done: Mozingo Creek
Originally built: 1936
Closure date: August 30, 2010 (Six to eight week closure)
Detour map: Click here for Route F detour |
 |
|
Route: Route PP
Bridge location: Mid Fork Grand River
Work to be done: Bridge replacement
Originally built: 1958
Scheduled for construction: 2011
Detour map: Click here for Route PP Detour |
| |
|
|
 |
|
Route: Route C
Bridge location: Little Rock Creek
Work to be done: Bridge replacement
Originally built: 1951
Scheduled for construction: 2011
Detour map: Click here for Route C Detour |
| |
|
|
 |
|
Route: Route W
Bridge location: Bear Creek
Work to be done: Bridge replacement
Originally built: 1937
Scheduled for construction: 2011
Detour map: Click here for Route W Detour |
| |
|
|
 |
|
Route: Route T
Bridge location: Lotts Creek
Work to be done: Bridge replacement
Originally built: 1934
Scheduled for construction: 2011
Detour map: Click here for Route T Detour |
| |
|
|
 |
|
Route: Route W
Bridge location: Oxcart Creek
Work to be done: Bridge replacement
Originally built: 1948
Scheduled for construction: 2011
Detour map: Click here for Route W Detour |
|
| |
| |
| |
`
|
 |
 |
 |
 |
|
 |
 |