Counties :
Andrew County
Maintenance Projects:
Construction Projects:
Route 48: Herzog Contracting Corp., has been awarded a contract for a thin-lift overlay on Route 48 in Andrew County. The contractor will begin at Route 71 to the Gentry County line on Route 48 for a length of 15.502 miles. This project is expected to begin in Summer 2008.
Back to Top
Atchison County
Maintenance Projects:
Route CC: Scheduled for an oil and chip seal operation beginning Tuesday, July 8 (weather permitting) from the Iowa state line to Route 275. Route CC will be narrowed to one lane along this route for approximately one week.
Route T: Scheduled for an oil and chip seal operation beginning as soon as Route CC is completed. Route T will be narrowed to one lane from the Iowa state line to Route 275. The project should take a week to complete.
Construction Projects:
Interstate 29: Hot-in-place recycling will be done on I-29 beginning in May from the Iowa State line south to Route 111 at Rock Port. The resurfacing project will utilize the hot-in-place recycling method in which asphalt pavement surfaces are corrected by softening the existing surface with heat, then mechanically removing the pavement surface, mixing it with a recycling or rejuvenating agent, possibly adding virgin asphalt and/or aggregate, and replacing it on the pavement without removing the recycled material from the existing roadway. The contractor on this project will be Ideker Corporation of St. Joseph. This project is currently in progress.
Back to Top
Buchanan County
Maintenance Projects:
Construction Projects:
Route 169: Vance Brothers, Inc., has been awarded a contract for roadwork on Route 169 in Buchanan and Clinton Counties. Microsurfacing will be done on Route 169 from Route FF in St. Joseph to the Clay County line near Trimble for a length of approximately 23 miles. Pavement repairs will be done initially before the resurfacing begins. During the roadwork the road will be narrowed to one lane around the work zone. A pilot car and flaggers will be directing traffic through the work zone. This project is expected to begin later this summer.
Back to Top
Caldwell County
Maintenance Projects:
Route Z, Route B and Route D: roadwork has been scheduled on various routes in Caldwell County during the month of June. During the next several weeks area maintenance crews will be patching and sealing on the routes listed below. These routes may be narrowed to one lane in the work zone at various times.
Route Z: patching various locations and sealing throughout the route.
Route B: patching and sealing from Route 116 through Cowgill to the Ray County line.
Route D: patching and sealing from Route HH to Route 116.
Route 13: Scheduled for concrete replacement from Kinston to the Ray County line starting the week of July 7th through July 25th (weather permitting). Work will start at 7:00 am and conclude at 4:00 pm each day. Flaggers will be directing traffic on this two lane road, but drivers should expect moderate delays.
Construction Projects:
Route 13: a resurfacing project is scheduled for this summer on Route 13 in Caldwell County. Route 13 will be resurfaced from Business 36 in Hamilton to south of Route V near Polo, for a total length of approximately 15 miles. Prior to contract work scheduled for the road, MoDOT maintenance forces in the area will be continuing to make surface repairs in preparation of the asphalt overlay. During the contractors resurfacing project, Route 13 will be narrowed to one lane and motorists will be guided through the work zone by a pilot car. The contractor on the project will be Ideker, Inc. of St. Joseph. This project is tentative to begin in September 2008.
Route 36: Norris Asphalt Paving Co. has been awarded a contract to resurface Route 36 in Caldwell County. The length of the project is 15.872 miles from east of the intersection of Route P to west of the intersection of Route M and Route A near Hamilton. This project is expected to begin Summer 2008.
Route M: Norris Asphalt Paving Co., has been awarded a contract on Route M in Caldwell and Daviess County. A thin-lift overlay is scheduled from Route 13 to Route 36 near Breckenridge on Route M for a total length of 13.789 miles. This project is expected to begin in July 2008.
Route A: Norris Asphalt Paving Co., has been awarded a contract on Route A in Caldwell County. A thin-lift overlay is scheduled for Route A from north of Route N to the Ray County line near Braymer. The total length of the project is 4.949 miles. This project is expected to begin in July 2008.
Back to Top
Clinton County
Maintenance Projects:
Route 169: Beginning Wednesday, July 2, crews will be sealing shoulders on both sides of Route 169 from Route U south for approximately 1/4 mile.
Route 169: Beginning the week of July 7, crews will be fixing edge lines (both north and southbound) from Route 116 north to Route V V in preparation for a micro-sealing project scheduled for later in the summer.
Route 69: Beginning the week of July 7, crews will be working on Route 69 between Route 116 and Route 131 milling and patching in various locations. Motorists should be advised of various lane closures throughout this area. The work is expected to take two weeks to complete.
Construction Projects:
Route 69: The Missouri Department of Transportation has announced that the resurfacing project scheduled for Route 69 in Clinton County will begin on Tuesday, May 27th (weather permitting.) Herzog Contracting Corp. of St. Joseph was awarded the contract for the project. A six-mile section of Route 69 will be resurfaced from Route 116 to the Clay County line. Initial pavement repairs will begin on May 27th and paving will begin once those repairs are completed. The work is anticipated to take approximately six weeks to complete (weather permitting.) During this resurfacing project the road will be narrowed to one lane and flaggers will direct motorists through the work zone.
Route 169: Vance Brothers, Inc., has been awarded a contract for roadwork on Route 169 in Buchanan and Clinton Counties. Microsurfacing will be done on Route 169 from Route FF in St. Joseph to the Clay County line near Trimble for a length of approximately 23 miles. Pavement repairs will be done initially before the resurfacing begins. During the roadwork the road will be narrowed to one lane around the work zone. A pilot car and flaggers will be directing traffic through the work zone. This project is expected to begin later this summer.
Back to Top
Gentry County
Maintenance Projects:
Route C: [Note: This project has been delayed due to weather.] Will be closed for one day six miles north of Albany for an emergency culvert replacement on Wednesday, July 2 beginning at 7:30 am and ending at 4:30 pm the same day. (weather permitting).
Construction Projects:
Daviess County
Maintenance Projects:
Construction Projects:
Route M: Norris Asphalt Paving Co., has been awarded a contract on Route M in Daviess and Caldwell County. A thin-lift overlay is scheduled from Route 13 to Route 36 near Breckenridge on Route M for a total length of 13.789 miles. This project is expected to begin in July 2008.
Back to Top
Dekalb County
Maintenance Projects:
Route 36: MoDOT crews will be making repairs to the westbound approach lanes of the Grindstone Bridge sometimethe week of July 7. The bridge is located approximately three miles west of CAmeron, Mo. Traffic will be reduced to one lane, and all work should be completed in one day. [Project delayed]
Construction Projects:
Back to Top
Harrison County
Maintenance Projects:
Route NN: Closed on Tuesday, July 8 for an emergency culvert replacement from Route M north to Route 46 beginning at 7:00 am and reopening at 4:00 pm the same day. Drivers should seek an alternate route during this period.
Construction Projects:
Back to Top
Holt County
Maintenance Projects:
Construction Projects
Interstate 29: Hot-in-place recycling will be done on I-29 beginning in May from Mound City south to Route 59 near Oregon. The resurfacing project will utilize the hot-in-place recycling method in which asphalt pavement surfaces are corrected by softening the existing surface with heat, then mechanically removing the pavement surface, mixing it with a recycling or rejuvenating agent, possibly adding virgin asphalt and/or aggregate, and replacing it on the pavement without removing the recycled material from the existing roadway. The contractor on this project will be Ideker Corporation of St. Joseph. This project is in progress.
Route B: Culvert replacement scheduled for Wednesday, July 9 (weather permitting). Area maintenance crews will be replacing a culvert approximately four miles south of Route 113. The road will remain open to traffic but will be narrowed to one lane.
Route 159: resurfacing has been scheduled to begin on April 21, 2008 on Route 159 in Holt County. Herzog Contracting has been awarded the contract on this project which consists of resurfacing 14 miles from the Nebraska State line to Interstate 29. During the project the road will be narrowed to one lane around the work zone. Motorists will be directed by flaggers and a pilot car. The work is expected to take three to four weeks to complete (weather permitting). This project is essentially completed with only striping remaining.
Back to Top
Nodaway County
Maintenance Projects:
Construction Projects:
Route E: Has been scheduled for an asphalt overlay from Route 246 to Route 136 near Ravenwood for a total of 14 miles. The contract has been awarded to Herzog Contracting Corp. of St. Joseph. During this resurfacing project the contractor will have the road narrowed to one lane and motorists will be directed by a pilot car. The work is expected to take approximately two and a half weeks to complete. This project begins on Monday, June 9th (weather permitting).
Back to Top
Worth County
Maintenance Projects:
Construction Projects:
Back to Top