Warrenton Maintenance Facility

800 W. Boonslick

Warrenton, MO  63383

Maintenance Supervisor:  Norman  Hellebusch
Maintenance Superintendent: Dan Brumagin
Area Engineer: Erik Maninga, P.E.

 

Today's Lane/Road Closures

Road Work

Bridge Repairs and Replacements

2014-2018 Highway and Bridge Construction Schedule

 


 

MO Route 47 Lake Creek Bridge Replacement

 

Improvements on MO 47
South of Warrenton at Hopewell Hill

Bi-Weekly Update - June 23, 2014 (PDF)

Construction to Begin on Monday, June 23 at Lake Creek Bridge on MO 47 in Warren County

Work Zone Info:

9 a.m. June 23, 2014

One lane traffic 24/7 across the bridge on northbound side with a 15 ft. width restriction.

  • Traffic signals will be activated to control both northbound and southbound MO 47 and MO 94 traffic across the bridge and through the intersection.
  • Flagmen may be used during peak traffic events to alleviate congestion and traffic problems.
  • Concrete barriers in place on the bridge with narrow, (15 ft. width restriction) restricting use of the bridge for oversize loads.
  • Work requiring lane closures outside the barrier may only take place during nighttime hours.

Estimated Completion: Fall 2014

Troy Project Office-Resident Engineer Rick Domzalski

 

Informational Handout

Lake Creek Bridge - Phases of Construction

Project Map

 

Specifics on Blasting (PDF)

Project Schedule

Detour Map

Rainy weather over the last several weeks has caused ground conditions to be less than ideal for rock hauling; however, blasting crews have been on site working to get ahead of the rock haulers who have returned to the job. Expect trucks to be really active and be particularly careful when crossing the haul road at the Aspenhoff Drive.

The rain had created an issue with water and material running off Hopewell Hill across the new Aspenhoff entrance. To resolve the issue, we deepened and
re-graded the ditch along the north side of the drive to help catch the runoff allowing it drain to the new pipe under Aspenhoff Drive. This should redirect the water into the sediment basin on the south side of the drive where the material will settle out and help the surface of Aspenhoff Drive, which had seen some sloppy conditions. We have placed additional temporary erosion control on the south side of the entrance to stop any material and runoff from leaving the project area.

Some excess material is being hauled from Hopewell Hill to the Lake Creek Bridge project near Dutzow and to Route N where MoDOT is partnering with Warren County to widen the approach onto MO 47. Due to high water levels in the Missouri River and Lake Creek itself, the Lake Creek bridge replacement project was delayed a week. This morning, June 23rd, the contractor closed down one lane of traffic at that location to allow for the partial removal of the bridge. Please be careful when passing through the area as motorist get used to the new signals. When completed, we expect this will be an improvement many will appreciate.

***July 18 at 7:30 a.m.-Weather permitting, road closes for up to 18 days to work on connection of new section of road to existing MO 47.

Stay updated on the project by subscribing to

MoDOT’s email alert system at www.modot.org

under the Travelers tab.

North of rock cut looking south at Hopewell Hill

North end of the rock cut looking south

June 5, 2014

Rock cut looking south-Hopewell Hill

 

Informational Meeting Displays

(Some files may be large and make take some time to download.)

 
Informational Handout
Modified Alignment
Detour Map
Project Schedule
 

Modified RealignmentHopewell Hill

(this is a large file)


 

Information specific to Warren County:

2014 Construction Projects



Adair | Audrain | Clark | Knox | Lewis | Lincoln | Macon | Marion | Monroe | Montgomery | Pike | Ralls | Randolph | Schuyler | Shelby | Scotland | Warren


Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Schuyler Adair Macon Randolph Scotland Clark Knox Lewis Shelby Marion Monroe Audrain Montgomery Warren Ralls Pike Lincoln iTunes Android