Northeast District Facebook Twitter Flickr Instagram YouTube RSS
 
District Map
Northeast District
spacer
Traveler Information
Traveler Map
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Your Local Area Engineer
Report a Road Concern
Moving Forward
On the Move
spacer
Your Local MoDOT
Get your local district information.
Districts Map Northwest Northeast Kansas City Central St. Louis Southwest Southeast

Map of 2014 Pavement Work

Map of 2014 Bridge Work

2014 Pavement Work - PDF

2015-2019 Statewide Transportation Improvement Program






This page under construction

Adair County


Major Routes

Resurfacing

US 63 - Micrtosurface from south of Kirksville to north of Macon, 20.917 miles; Contractor: Microsurfacing Contractors, LLC $921,194.68

Minor Routes

Resurfacing
MO 6 - Resurface and upgrade shoulders from east of MO 149 at the Chariton River to Route B in Kirksville; bids to open November 2014

Bus. 63  - Resurface from MO 6 west to Alternate 63 north intersection at Kirksville; bids to open November 2014

Route P  - Resurface and shoulder improvements from Bus. 63 to Alternate 63 in Kirksville; bids to open November 2014

MO 11 - Resurface and shoulder improvements from Bus. 63 to Alternate 63 in Kirksville ; bids to open November 2014


Patching at various locations
MO 6 east – COMPLETED from US 63 south of Kirksville to the Knox County line; 11.4 miles
MO 149 – COMPLETED from Route AA in Putnam County to MO 6 at Novinger; 9.9 miles
MO 149 – COMPLETED from MO 6 west of Novinger to MO 11; 12.3 miles
MO 149 – COMPLETED from MO 11 to MO 156 in Macon County; 6.2 miles
Route B – COMPLETED from Route K in Schuyler County to MO 6; 12.7 miles
Route BB – from Route FF at the Sullivan County line to MO 149; 4.1 miles
Route CC – COMPLETED from MO 11 to MO 156 west of South Gifford in Macon County; 7.5 miles
Route D – from the Sullivan County line to MO 149; 8 miles
Route DD – COMPLETED from Doe Run and Pure Air Trail at the beginning of State Maintenance to Route K at Midland; 2.2 miles
Route E – COMPLETED from US 63 north of LaPlata to Route V; 6.2 miles
Route F – COMPLETED from MO 6 to Route V; 7 miles
Route HH – COMPLETED from Gifford Trail at the beginning of State Maintenance to MO 3; 5.8 miles
Route J north – COMPLETED from Route A at Wilmathsville to MO 11 west of Adair; 5.5 miles
Route J south – COMPLETED from MO 11 west of Adair to MO 6 at Brashear; 7.4 miles
Route K – from MO 6 near Novinger to MO 11; 8.6 miles
Route KK – COMPLETED from US 63 at Millard to Route F; 3.7 miles
Route N – COMPLETED from MO 11 to Route CC west of Yarrow; 7.1 miles
Route O – from Route D to MO 6 at Novinger; 9.6 miles
Route P – COMPLETED from US 63 at Kirksville to the end of State Maintenance at East Center Way Co. Rd.; 5.3 miles
Route T – COMPLETED from US 63 north of Kirksville to the end of State Maintenance at Olive Hill Way Co. Rd.; 7.8 miles
Route V – COMPLETED from MO 6 west of Brashear to Route E; 7.9 miles

Route Y – COMPLETED from Route BB to MO 11; 8.4 miles

Bridges
Route D – Bridge redeck at Shuteye Creek located 1.8 miles east of Route O near Novinger; road to be closed at the bridge;Contractor:Bleigh Const. Co. for $255,559.10

Route J – COMPLETED - Bridge redeck at North Fork South Fabius River located 1.5 miles south of Route A near Kirksville; Contractor:Bleigh Const. Co. for $203,944

Route K – COMPLETED - Bridge redeck at Billy's Creek located 2.1 miles south of Route DD near Novinger; Contractor:Bleigh Const. Co. for $221,320.60

Route KK – COMPLETED - Bridge redeck at Bear Creek located almost 1 miles west of Route F near Millard; road to be closed at the bridge; Contractor:Bleigh Const. Co. for $235,876.70

Go To Active/Current Road Work in Adair County


Audrain County

Major Routes
Resurfacing and Other Improvements
US 54 – Pavement surface treatment on various sections, includes parts in Ralls and Pike Counties, 25.87 miles; Contractor: Interstate Improvement, Inc. for $936,771.15

US 54 - Resurface from Route J to Scott's Corner at MO 19; Contractor: Chester Bross Const. Co. for $1,285,748.05

Minor Routes
Patching at various locations
Route A – COMPLETED from US 54 east of Mexico to the Callaway County line; 11.1 miles
Route AA – from US 54 at Farber to Route K; 3.2 miles
Route B – COMPLETED from Route D in Ralls County to Route J; 5.9 miles
Route BB – from MO 19 at Scott’s Corner to the Montgomery County line; 10.1 miles
Route C – from Route CC to MO 151 at the Boone County line near Centralia; 6.9 miles

Route CC – from Route C north of Centralia to MO 15; 6.1 miles
Route D – COMPLETED from Route M to Bus. 54 at Mexico; 6.2 miles
Route DD – from Route D to the Callaway County line; 1.6 miles
Route EE – from Audrain County Rd. 117 at the beginning of State Maintenance to MO 151 at the Boone County line; 4.9 miles
Route HH – from Route D to US 54 south of Mexico; 8.3 miles
Route K – COMPLETED from MO 19 at Laddonia to Route AC in Pike County; 15.9 miles
Route M – from Route FF to Route E near Hatton in Callaway County; 10 miles
Route T – from Route C north of Centralia to MO 15 north of Mexico; 11.6 miles
Route U – COMPLETED from Route A to Route N near Martinsburg; 6.1 miles

Chip/Cinder/Fog Seal
Route D – from Route Z near the Boone County line to Route M; 6.1 miles
Route DD – from Route D to the Callaway County line; 1.6 miles
Route T – from Route E north of Thompson to MO 15 north of Mexico; 5.2 miles
MO 15
– from MO 154 near Paris to just north of MO 22 in Audrain County; Contractor: Vance Bros. Const. for $487,369.62

Bridges

Route T – CLOSED AUG. 4 Bridge redeck at Young's Creek; Contractor:Widel, Inc. for $361,168.94

Route Z – Bridge redeck at Long Branch; road to be closed at the bridge; Contractor:Widel, Inc. for $253,107.50

Route Z – CLOSED JULY 21 Bridge redeck at Young's Creek; Contractor:Widel, Inc. for $252,995.50

Go To Active/Current Road Work in Audrain County


Clark County

Major Routes
Patching at various locations
US 136 – from Route A west of Luray to Medill; 11.2 miles

Minor Routes
Patching at various locations
Route AA – from Route NN west of Chambersburg to Route K near Luray; 6.4 miles
Route C
– from MO 81 thru Revere to Route B north of Wayland; 10.3 miles
Route CC – from MO 81 to Clark County Rd. 27 at the end of State Maintenance; 4.1 miles
Route DD – from Clark County Rd. 95 at the beginning of State Maintenance to Route C in Revere; 4.4 miles
Route EE – from MO 81 at Kahoka to the end of State Maintenance at the intersection of Clark County Rds. 173 and 180; 5.2 miles
Route H – from MO 81 south of Kahoka to US 61; 12 miles
Route K – from the Iowa State line to US 136 at Luray; 13.3 miles
Route NN – from Route K to MO 81; 12.2 miles
Route V – from the Iowa State line to MO 81; 6.5 miles

Bridges

US 61 – IN PROGRESS - Bridge redeck at Buck Run Creek; one lane traffic; Contractor: Chester Bross Const. Co. for $293,988

US 61 – IN PROGRESS - Bridge redeck at Honey Creek; one lane traffic; Contractor: Chester Bross Const. Co. for $411,935

Go To Active/Current Road Work in Clark County


Knox County

Minor Routes

Patching at various locations
MO 151COMPLETED from MO 156 east of Novelty to Route M at Leonard; 9 miles
Route A – COMPLETED from MO 6 east of Hurdland to MO 156 west of Novelty; 10.7 miles
Route AA – COMPLETED from MO 15 north of Edina to Route V north of Knox City; 9.2 miles
Route C – COMPLETED from MO 11 west of Baring to MO 15 at Greensburg; 8.6 miles
Route E – from MO 6 at Knox City to MO 156 near Newark and from MO 156 at Newark to MO 15 in Shelby County; 15 miles
Route HH – COMPLETED from Route V to the end of State Maintenance at Lewis County Rd. 348 (165th Street); 3.5 miles
Route J – COMPLETED from MO 11 to Route Z at Hurdland; 7 miles
Route O – COMPLETED from MO 6 west of Hurdland to the end of State Maintenance at Knox County Rd. 211; 4 miles
Route P – from MO 11 west of Baring to MO 15 at Edina; 9.2 miles
Route T – from MO 6 near Edina to Route E; 13.5 miles
Route TT – COMPLETED from MO 15 to MO 156; 12 miles
Route U – from Route E to Route D south of LaBelle in Lewis County; 4 miles

Go To Active/Current Road Work in Knox County


Lewis County

Minor Routes
Resurfacing and Other Improvements

MO 16 - COMPLETED Resurfacing project from MO 6 at Lewistown to Route B in Canton; Contractor: Chester Bross Const. Co. for $1,448.640.09

MO 16 - IN PROGRESS Sidewalk improvements on both sides of road from .2 mile east of US 61 to Route B in Canton; Sidewalk improvements on both sides fo road from .2 mile south of East Lafayette Street to east Clay Street in Monticello; Contractor: BRS Construction, LLC for $633,993.70

Patching at various locations
MO 156 – COMPLETED from Route E in Newark in Knox County to MO 6 at Ewing; 13.7 miles
Route A – COMPLETED from Route E in Williamstown to MO 16 at Monticello; 9.7 miles
Route BB – COMPLETED from MO 16 just west of Monticello to Route C north of Ewing; 4.8 miles
Route D – COMPLETED from MO 6 at LaBelle to MO 156; 8.5 miles
Route DD – COMPLETED from MO 6 east of LaBelle to the end of State Maintenance at Lewis County Rd. 211 (330th St.); 2.6 miles
Route E – COMPLETED from Route K to MO 81 north of Canton; 19 miles
Route F – COMPLETED from Route E to MO 16 west of Canton; 6.2 miles
Route H – COMPLETED from Route Y to MO 6 at Lewistown; 5.7 miles
Route J – COMPLETED from MO 6 at Lewistown to MO 156; 6.3 miles
Route N – COMPLETED from MO 6 at Ewing to the end of State Maintenance at the Marion County line; 4.4 miles
Route P – COMPLETED from Bus. 61 in Canton to Route C west of LaGrange; 7.9 miles
Route U – from the Knox County line to Route D south of LaBelle; 1.9 miles
Route Y – from Route K near Deer Ridge to MO 16 west of Monticello; 14.7 miles
Route Z– COMPLETED from MO 16 east of Monticello to Route V east of Maywood; 15.4 miles

Bridges

Route V – Bridge redeck at North Fabius River, road to be closed at the bridge up to 45 days; Contractor: L. F. Krupp Const., Inc. for $259,499.25

Route N – CLOSED Aug. 18-Sept. 19 Bridge redeck at Grassy Creek, road closed at the bridge up to 32 days; Contractor: L. F. Krupp Const., Inc. for $699,705

Go To Active/Current Road Work in Lewis County


Lincoln County

Major Road Improvements
US 61 - IN PROGRESS Pedestrian bridge on Old Cap Au Gris at Troy; Contractor: R. V. Wagner, Inc. for $669,795.98

US 61 - Pavement undersealing on southbound lanes from Pike County Road 310 near Bowling Green to Route E near Eolia; 18.816 miles; Contractor: Missouri Petroleum Products Co. for $770,142.64

Minor Road Improvements
Patching at various locations
MO 47 – COMPLETED from US 61 at Troy to Route A at Hawk Point; 9.1 miles
MO 79 West Outer Rd. – COMPLETED from Route C near Old Monroe to the end of State Maintenance north of Blackhawk Estates
Route A
– from MO 47 at Hawk Point to Route DD; 6.5 miles
Route AA – COMPLETED from Bohemian Church Road at the beginning of State Maintenance to MO 47 east of Hawk Point; 2.5 miles
Route B – from US 61 south of Eolia to MO 79 at Elsberry; 10.6 miles
Route BB – from Route H north of Troy to the end of State Maintenance at Davis; 2 miles
Route C – COMPLETED from US 61 at Moscow Mills to MO 79 at Old Monroe; 10 miles
Route E – from Route O north of Olney to Route UU near Silex; 11 miles
Route H – COMPLETED from Route PP to Route E; 2.8 miles
Route J
– COMPLETED from MO 47 at Troy to Interstate 70 at Wright City; 11.8 miles
Route JJ – COMPLETED from MO 79 near Elsberry to Route W south of New Hope; 8 miles
Route K – COMPLETED from Briscoe at the beginning of State Maintenance to US 61; 2.3 miles
Route KK – COMPLETED from US 61 at Old Alexandria to Route W at Brussels; 9.4 miles
Route M – COMPLETED from MO 79 to the end of State Maintenance at Norton Woods and Sterung Harbor Road; 3 miles
Route N – COMPLETED from MO 79 to the end of State Maintenance at Sandy Slough Road; 2.4 miles
Route P – from MO 79 at Elsberry to the end of State Maintenance at the Hamberg Ferry Access; 5.6 miles
Route PP – COMPLETED from MO 161 in Pike County to Route H; 11.9 miles
Route RA – COMPLETED from Robey Road at the beginning of State Maintenance to Route E east of Silex; 3 miles
Route TT – COMPLETED from Mary Jo and Quarry Rds. at the beginning of State Maintenance to Route D north of Hawk Point; 2.5 miles
Route U west – COMPLETED from Route J south of Troy to MO 47 south of Hawk Point; 8.8 miles
Route V – COMPLETED from US 61 to Route W south of New Hope; 6.2 miles
Route W – from Route V to MO 47 east of Troy; 9 miles
Route W – from Route H in Paynesville to Route JJ south of New Hope; 12.6 miles
Route WW
– from Route J to the end of State Maintenance at English and Myers Road; 2.5 miles

Chip/Cinder/Fog Seal
Route EE – COMPLETED from Route Y to MO 47; Contractor: Chester Bross Const. Co. for $103,738.66
Route J – from MO 47 to I-70 North Outer Road; Contractor: Chester Bross Const. Co. for $205,521.33
Route KK – COMPLETED from US 61 Outer Road to Route W; Contractor: Chester Bross Const. Co. for $124,304.64
MO 147 – COMPLETED from Park and Frenchman Bluff Roads at the beginning of State Maintenance to MO 47 just east of Troy; 2.3 miles
Route CC – from MO 79 north of Elsberry to Route F; 6.5 miles
Route D – COMPLETED from Route E west of Millwood to Route O; 3.7 miles
Route F – from route CC to US 61 south of Eolia; 7.1 miles

Bridges
MO 47 – IN PROGRESS Bridge rehabilitation on US 61 overpass at Troy; one lane traffic; Contractor: St. Louis Bridge Const. Co. for $225,783

Go To Active/Current Road Work in Lincoln County


Macon County

Major Road Improvements

US 63 - Intersection improvements at Route M at Atlanta; Contractor: W. L. Miller Co. for $650,088.51

Resurfacing

US 63 - Microsurface from south of Kirksville to north of Macon, 20.917 miles; Contractor: Microsurfacing Contractors, LLC $921,194.68

Minor Road Improvements
Patching at various locations
MO 3 – COMPLETED from MO 156 west of LaPlata to Route T south of Callao; 32.4 miles
MO 149
– COMPLETED from MO 156 to US 36 at New Cambria; 24 miles
MO 156 – COMPLETED from MO 149 to MO 3, 9.2 miles
MO 156 West
– from MO 3 to Clark Street at the west city limits of LaPlata; 5 miles
Route AA
– from Route K at Ten Mile to the end of State Maintenance at Orpheus Avenue; 3.9 miles
Route AX
– from Route O to US 63 at Axtell; 3.2 miles
Route BB
– from Jade and Jenny Place at the beginning of State Maintenance to Route C south of Bevier; 2.5 miles
Route DD
– from US 63 north of Macon to Route K at Ten Mile; 5.8 miles
Route F
– from Route J to MO 149 at Ethel; 5.7 miles
Route FF – from Heron Street/Thomas Hill Reservoir at the beginning of State Maintenance to Route C south of Bevier; 4.7 miles
Route H
– from MO 156 east of LaPlata to Route MM at Sue City; 3.9 miles
Route HH
– from Route J near Elmer to MO 3 north of Cash; 6.7 miles
Route J
– COMPLETED from MO 129 at Goldsberry in Linn County to MO 3 east of Elmer; 17.7 miles
Route J
– COMPLETED from MO 3 east of Elmer to US 63 north of Atlanta; 8.9 miles
Route JJ
– from Aspen Street and Academy Avenue at the beginning of State Maintenance to Route J between New Boston and Goldsberry; 2.5 miles
Route K – from Nuthatch Avenue at the beginning of State Maintenance to US 36 east of Atlanta; 15.4 miles
Route KK
– from Route K to MO 151 just west of Hagers Grove in Shelby County; 9.9 miles
Route NN
– from US 63 south of LaPlata to the end of State Maintenance at Mustang Street; 3.9 miles
Route O
– from Route J to US 36 near Bevier; 13 miles
Route OO – from Hornet Street at Barnesville at the beginning of State Maintenance to Route O in Bloomington; 8.4 miles
Route P
– COMPLETED from US 36 near New Cambria to MO 129 between Wien and Bynumville; 11.5 miles
Route PP
– from US 63 at Macon to Route V; 8 miles
Route RA
– from Route J to the end of State Maintenance at Jupiter Avenue at the Atlanta Conservation Area; 2.5 miles
Route T
– COMPLETED from Route C in College Mound to US 63 near Excello; 6.2 miles
Route TT
– from Concord Street at the beginning of State Maintenance to Route Z north of New Cambria; 3.2 miles
Route V
– from US 36 west of Clarence to the end of State Maintenance at Onyx Avenue; 9 miles
Route VV
– COMPLETED from Ballpark Avenue at the beginning of State Maintenance to Route Z east of Hart; 7.1 miles
Route WW – from the Linn County line to MO 129 east of Marceline; 3 miles
Route Y – from US 63 near Excello to Route J; 10.8 miles
Route Z
– from Anchor Avenue near Hart at the beginning of State Maintenance to MO 149 at New Cambria; 7.1 miles


Chip/Cinder/Fog Seal

MO 156 East – from Clark Street at the west city limits of LaPlata to the Knox County Line; 9 miles
Route D – from US 63 at Lantern Street north edge of LaPlata to MO 156 in LaPlata; .9 mile


Bridges

Route WW – Bridge redeck at Brush Creek 1.4 miles west of MO 129 near Marceline; road to be closed at the bridge; Contractor: Bleigh Const. Co. for $284,996.80

Go To Active/Current Road Work in Macon County


Marion County

Minor Road Improvements

Patching at various locations
Route B – from Route JJ spur near BASF to the end of State Maintenance at Marion County Road 411 and 413; 1.5 miles
Route D
– COMPLETED from MO 156 east of Newark to MO 168 at Philadelphia; 16.2 miles
Route E
– from Route C west of Palmyra to US 36; 7.9 miles
Route F – from Route E in Woodland to US 24 south of Palmyra; 4.6 miles
Route M – from Route D north of Philadelphia to Route A; 7.1 miles
Route W – COMPLETED from US 61 in Hannibal at north entrance to Huck Finn Shopping Center to US 61 north of Hannibal; 3.1 miles

Bridges
Route A - COMPLETED Bridge redeck on Grassy Creek Bridge 1.7 miles south of Mo 6 near Taylor; Contractor: L. F. Krupp Const., Inc. for $357,068.75

Go To Active/Current Road Work in Marion County


Monroe County

Minor Road Improvements
Patching at various locations
MO 107 – from US 24 east of Stoutsville to MO 154; 8.8 miles
MO 151 – COMPLETED from Route J at Woodlawn to US 24 at Madison; 10.2 miles

MO 154 – from US 24 at Paris to MO 107; 13.7 miles
Route A
– COMPLETED from Route J to US 24 south of Holliday; 7.3 miles

Route C – COMPLETED from Route AA to Route M; 2.5 miles
Route D – COMPLETED from MO 15 south of Paris to Route B south of Perry; 17.6 miles
Route F – COMPLETED from Route A north of Holliday to MO 15 north of Paris; 8.4 miles
Route J – from the Randolph County line west of Duncans Bridge to MO 15; 12.9 miles
Route JJ – COMPLETED from Monroe County Road 141 at the beginning of State Maintenance to US 24 east of Madison; 2.8 miles
Route K – COMPLETED from the Randolph County line to MO 151 north of Madison; 6 miles
Route M – COMPLETED from MO 151 to MO 15; 11.4 miles
Route OO – from Route J near Duncans Bridge to the end of State Maintenance at Monroe County Road 1131; 1.5 miles
Route U – from US 24 at Goss to MO 107 at Florida; 8.9 miles
Route V – COMPLETED from Route FF to US 24 at Stoutsville; 3.4 miles
Route YY – COMPLETED from US 24 in Randolph County to MO 151 south of Madison; 9 miles
Route ZZ – COMPLETED from Route D to Route Z in Audrain County; 7.8 miles

Chip/Cinder/Fog Seal
MO 151 – COMPLETED from US 36 at Clarence to the east junction of Route M south of Madison; Contractor: Vance Bros. Const. for $511,148.48

MO 15 – COMPLETED from MO 154 near Paris to just north of MO 22 in Audrain County; Contractor: Vance Bros. Const. for $487,369.62
Route JJ – COMPLETED from Monroe County Road 141 at the beginning of State Maintenance to US 24 east of Madison; 2.8 miles
Route OO
– from Route J near Duncans Bridge to the end of State Maintenance at Monroe County Road 1131; 1.5 miles
Route V – COMPLETED from Route FF to US 24 at Stoutsville; 3.4 miles

Route W - Chip seal from US 24 at west city limits of Monroe City to Route J in Ralls County; Contractor: Chester Bross Const. Co. for $86,218.77

Bridges

Route Z – Bridge redeck at Long Branch; road to be closed at the bridge; Contractor:Widel, Inc. for $253,107.50

Route MM (Shelby) - June 2, one lane traffic at various locations for patching operations

Go To Active/Current Road Work in Monroe County


Montgomery County

Major Road Improvements

Resurfacing
Interstate 70 – COMPLETED Resurfacing eastbound lanes from west of Route E and Y junction to west of MO 47; Contractor: Magruder Paving LLC for $1,096,240.65

Interstate 70 - Resurfacing westbound lanes from 1.1 miles east of Route F to the Callaway County line near New Florence; Contractor: Mid Rivers Asphalt, Inc. for $860,181.62

Interstate 70 - Scheduled to begin week of Aug. 11 - Resurfacing (UBAWS) westbound lanes from St. Charles County line to 1 mile east of Route F near High Hill, 22.224 miles; Contractor: Magruder Paving, LLC for $2,824,161.99

Minor Road Improvements
Resurfacing
Route F – COMPLETED - Resurfacing from Route V to I-70 S. Outer Road near High Hill; Contractor: Magruder Paving, LLC. for $640,631.78

Patching at various locations
MO 94 - from the Callaway County line to Route P just west of Rhineland; 6.8 miles

North Outer Rd. I-70 - from MO 161 at Danville to Route F near High Hill; 9.8 miles

South Outer Rd. I-70 - COMPLETED from Route J near Mineola to Route F near High Hill; 12 miles

Route A - from MO 19 at Wellsville to MO 161 south of Middletown; 9 miles

Route AA - from Route BB to MO 19 at Wellsville; 5.1 miles

Route AC - from the Pike County line to MO 161 at Middletown; 1.4 miles

Route B - from Route ZZ to MO 19 at Montgomery City; 6.9 miles

Route EE - COMPLETED from Leach Branch Road at the beginning of State Maintenance to MO 94 just east of Rhineland; 1.9 miles

Route HH – COMPLETED from Overkamp Road at the beginning of State Maintenance to Route K; 1.5 miles

Route J - COMPLETED from Interstate 70 near Mineola to MO 19 at Big Spring; 12.8 miles

Route JJ - COMPLETED from Route F to Route E; 3.3 miles
Route K – from the Callaway County line to MO 19 at Big Spring; 10.6 miles
Route MM – COMPLETED from MO 161 south of Middletown to the end of State Maintenance at Harby Road; 4.3 miles
Route N – from Whetstone Road at the beginning of State Maintenance to Route J at Mineola; 3 miles
Route PP
– from Route AA to the end of State Maintenance at Howard Road; 2.7 miles

Chip/Cinder/Fog Seal

Route CC - COMPLETED from MO 161 north of Buell to Route E in Gamma; 5.3 miles

Route J - from Route N at Mineola to MO 19 at Big Spring; 10.3 miles
Route ZZ – COMPLETED from MO 19 at Wellsville to Route B near the Callaway County line; 4.3 miles


Bridges

MO 161 – CLOSED Bridge redeck at Coon Creek located just west of Route BB in Middletown; Bleigh Const. Co. for $206,957.65

Go To Active/Current Road Work in Montgomery County


Pike County

Major Road Improvements
Resurfacing
US 61 - COMPLETED - Pavement surface treatment on various section of Route 61 in Pike and Ralls counties and Route 54 in Audrain, 25.87 miles; Contractor: Interstate Improvement, Inc. for $936,771.15
US 61 - Pavement undersealing on southbound lanes from Pike County Road 310 near Bowling Green to Route E near Eolia, 18.816 miles; Contractor: Missouri Petroleum Products Co. for $770,142.64

Minor Road Improvements

Patching at various locations
MO 79 – COMPLETED from US 54 at Louisiana to the Lincoln County line south of Annada; 22 miles
Route D
– from MO 79 near Louisiana to US 61 at Eolia; 15.2 miles
Route H
– from Route D at Eolia to Route W at Paynesville; 6 miles
Route M
– COMPLETED from US 54 at Curryville to MO 161 at the Montgomery County line; 15.8 miles
Route N
– from Route D at Calumet to MO 79 at Roblee just north of Clarksville; 6 miles
Route TT
–COMPLETED from MO 79 to Ashburn; 1.2 miles
Route V
– COMPLETED from Route W at Vandalia to Route M; 9.8 miles
Route W
– from MO 79 at Clarksville to Route H in Paynesville; 7.9 miles
Route WW
– from Route D to Route W just north of Paynesville; 4.4 miles
Route Y – COMPLETED from Bus. 61 in Bowling Green to the end of State Maintenance at Pike County Road 491 at Estes; 4.4 miles

Chip/Cinder/Fog Seal

Route M – COMPLETED from US 54 at Curryville to MO 161 at the Montgomery County line; 15.8 miles
Route TT
– COMPLETED from MO 79 to Ashburn; 1.2 miles
Route V
– COMPLETED from Route W at Vandalia to Route M; 9.8 miles
Route Y
– from Bus. 61 in Bowling Green to the end of State Maintenance at Pike County Road 491 at Estes; 4.4 miles

Go To Active/Current Road Work in Pike County


Ralls County

Major Road Improvements
Resurfacing
US 61 - COMPLETED - Pavement surface treatment on various section of Route 61 in Audrain and Pike counties and Route 54 in Audrain, 25.87 miles; Contractor: Interstate Improvement, Inc. for $936,771.15

Minor Road Improvements
Patching at various locations

Outer Road US 61 – COMPLETED from Hannibal to Frankford; 10.9 miles
Route E – COMPLETED from MO 79 to the end of State Maintenance at Saverton; 1.6 miles
Route F
– COMPLETED from MO 19 to US 54 at Vandalia; 17.3 miles
Route H
– COMPLETED from US 36 at Rensselaer to MO 19 at Center; 13.7 miles
Route K – COMPLETED from MO 19 to Route P; 4.2 miles
Route M – COMPLETED from Sunnyside Lane at the beginning of State Maintenance to US 61; 3.8 miles
Route N
– COMPLETED from Route T to MO 79 near Saverton; 2.9 miles
Route O
– COMPLETED from Robinson Avenue at the city limits of Hannibal to US 61 just north of New London; 6.7 miles
Route PP – COMPLETED from Route P to US 54 at Farber; 3 miles
Route T
– COMPLETED from MO 79 at the city limits of Hannibal to MO 79; 16.5 miles

Chip/Cinder/Fog Seal
Outer Road US 61 – COMPLETED from Hannibal to Frankford; 10.9 miles
Route EE
- COMPLETED from US 24 near Monroe City to Route J; Contractor: Chester Bross Const. Co. for $95,487.57

Route F – COMPLETED from MO 19 to US 54 at Vandalia; 17.3 miles
Route H
– COMPLETED from US 36 at Rensselaer to MO 19 at Center; 13.7 miles
Route J - COMPLETED from US 36 near Monroe City to MO 154 at Perry; Contractor: Chester Bross Const. Co. for $415,203.44
Route K – COMPLETED from MO 19 to Route P; 4.2 miles
Route PP – COMPLETED from Route P to US 54 at Farber; 3 miles
Route W
 - COMPLETED from US 24 near Monroe City to Route J; Contractor: Chester Bross Const. Co. for $86,218.77

Bridges
MO 154 - COMPLETED - Bridge redeck at Spencer Creek Bridge - Contractor: L. F. Krupp Const., Inc. for $178,669.40
Route A - COMPLETED - Bridge redeck at Turkey Creek Bridge - Contractor: L. F. Krupp Const., Inc. for $224,899.60
Route A - COMPLETED - Bridge redeck at Ely Creek Bridge-closed at the bridge up to 37 days; Contractor: L. F. Krupp Const., Inc. for $194,026

Route B – Bridge replacement at Hurley Branch located 2.5 miles south of MO 154 near Perry; road to be closed at the bridge; Contractor:Bleigh Const. Co. for $290,791

Route B – Bridge replacement at Lick Creek located 2.9 miles south of MO 154 near Perry; road to be closed at the bridge; Contractor:Bleigh Const. Co. for $380,151.50

Go To Active/Current Road Work in Ralls County


Randolph County

Major Road Improvements

US 63 - New median opening at County Road 1635 and US 63 just north of Cairo; Contractor:W. L. Miller Co. for $256,664.35

US 63 -Intersection improvements-median accel and decel lanes and J-turns at Routes B and P at Clark; Intersection improvements-north and southbound offset right turn lanes at Routes K and Z at Cairo; Contractor: APAC-Missouri, Inc. for $2,182,603.50

Minor Road Improvements
Patching at various locations
Route AA - from Route A at Moberly to Route B; 7.6 miles
Route BB – from MO 3 at Mount Airy to Route A near Moberly; 10.3 miles
Route CC
– from Route J near Levick Mill to Route K east of Cairo; 5.1 miles
Route D
– from Route C in Huntsville to Route BB; 3.7 miles
Route DD
– from Randolph County Road 1650 at the beginning of State Maintenance to Randolph County Road 1310 northwest of Moberly; 8.1 miles
Route EE
– from US 63 in Moberly to Randolph County Road 2380 and Rollins Street; 5 miles
Route F
– COMPLETED from MO 3 near Thomas Hill to Route C near Darksville; 7 miles
Route J
– from US 63 at Jacksonville to the Monroe County line; 6.4 miles
Route K
– from US 63 at Cairo to the Monroe County line; 7.1 miles
Route P – from US 63 to east city limit of Clark, and from Clark north to Route NN; 6.3 miles

Chip/Cinder/Fog Seal
Route C - COMPLETED from Route T in Macon County to railroad tracks north of US 24 at Huntsville; Contractor: Vance Bros., Inc.. for $228,581.89
Route JJ - COMPLETED from Route C at Huntsville to US 24 west of Moberly; Contractor: Vance Bros., Inc.. for $86,983.11

Route DD - COMPLETED from County Road 1257 to US 24 west of Moberly; Contractor: Vance Bros., Inc.. for $82,697.55
Route EE - COMPLETED from Bus. 63 to US 63 interchange at Moberly; Contractor: Vance Bros., Inc.. for $45,150.15
Route M - COMPLETED from Bus. 63 to US 63 interchange at Moberly; Contractor: Vance Bros., Inc.. for $26,716.73
Business 63 - COMPLETED from Route M to US 63 at Moberly; Contractor: Vance Bros., Inc.. for $124,516.13
Route A - COMPLETED from Bus. 63 to Route B at Higbee; Contractor: Vance Bros., Inc.. for $179,918.43

Go To Active/Current Road Work in Randolph County


Schuyler County

Minor Road Improvements

Patching at various locations
Route A – COMPLETED from US 136 at Downing to US 63 south of Greentop; 21 miles
Route AA
– COMPLETED from US 136 to MO 202 at Glenwood; 3.4 miles
Route C
– COMPLETED from US 136 at Lancaster to Route N at Bunker Hill; 10.8 miles
Route D
– COMPLETED from Route U at Lancaster to Route A south of Downing; 10.5 miles
Route E
– COMPLETED from US 63 at Queen City to Route A; 9.6 miles
Route F
– COMPLETED from MO 202 west of Glenwood to US 136 east of Livonia; 5.5 miles
Route H
– COMPLETED from US 136 to Route W east of Worthington; 5.6 miles
Route J
– COMPLETED from US 63 north of Greentop to the end of State Maintenance at Schuyler County Road 250 and 252; 6.3 miles
Route JJ
– COMPLETED from Route N  north of Downing to Route B in Scotland County; 5.6 miles
Route K
– COMPLETED from Schuyler County Road 203 at the beginning of State Maintenance to US 63 at Greentop; 5.1 miles
Route N – COMPLETED from the Iowa State line to US 136 at Livonia; 8 miles
Route O – COMPLETED from US 63 at Queen City to the end of State Maintenance at Schuyler county Road 157; 4.2 miles
Route P
– COMPLETED from Schuyler County Road 175 at the beginning of State Maintenance to US 63 north of Queen City; 3.1 miles
Route U
– COMPLETED from US 136 at Lancaster to US 63; 6.4 miles
Route V
– COMPLETED from Route D south of Lancaster to Route A at Downing; 7.6 miles
Route W
– from the Putnam County line east of Worthington to US 63 at Queen City;7.4 miles

Chip/Cinder/Fog Seal

US 136 – from Putnam County line east of Livonia to US 63 south of Lancaster; 7.5 miles
MO 202 – from the Iowa State line near Coatsville to US 63 to Lancaster; 8.6 miles

Bridges

Route C – COMPLETED - Bridge replacement at South Fork North Fabius River Bridge located 3/4 mile west of Route CC north of Lancaster; Contractor:Bleigh Const. Co. for $578,678

Route H – COMPLETED - Bridge redeck at Elm Creek located 3/4 mile north of Route W near Worthington; Contractor:Bleigh Const. Co. for $235,867

Go To Active/Current Road Work in Schuyler County


Scotland County

Minor Road Improvements

Patching at various locations
Route AA – COMPLETED from MO 15 at Memphis to the end of State Maintenance at Scotland County Road 458; 4.4 miles
Route B
– from the Iowa State line north of Hitt to US 136 between Downing and Memphis; 14 miles

Route BB – COMPLETED from MO 15 north of Memphis to the end of State Maintenance at Scotland County Road 706; 3.7 miles
Route C
– from Route B south of Hitt to MO 15 near Brock; 5.1 miles
Route CC
– from Route B south of Hitt to MO 15; 6.6 miles
Route D
– COMPLETED from Route A in Schuyler County to MO 15 south of Memphis; 10.4 miles
Route E
– from Route A north of Gorin in Scotland County to Route A at Wyaconda in Clark County; 6.9 miles
Route EE
– from MO 15 north of Brock to the end of State Maintenance at Scotland County Road 852; 3 miles
Route H
– COMPLETED from MO 15 at Brock to US 136 spur at Arbela; 14.3 miles
Route M
– COMPLETED from MO 15 south of Memphis to Route K in Knox County south of Rutledge; 17.5 miles
Route MM
– from US 136 at Memphis to Route M; 5.2 miles
Route N
– COMPLETED from Route H north of Arbela to Route K in Clark County north of Luray; 7 miles
Route T – from Route A in Schuyler County north of Willmathsville to MO 15; 10.3 miles
Route U – from US 136 between Memphis and Arbela to Route A north of Fairmont in Clark County; 15.5 miles

Bridges

Route A – COMPLETED - Bridge redeck at North Fabius River located 3 miles east of Route M near Rutledge; Contractor: Bleigh Const. Co. for $793,064.90

Route U – CLOSED (Opening to traffic Friday, August 29 by 5 p.m.) Bridge redeck at Bear Creek located almost 1 mile east of Route RA near South Gorin; Contractor: Bleigh Const. Co. for $793,064.90

Go To Active/Current Road Work in Scotland County


Shelby County

Minor Road Improvements
Patching at various locations
MO 151 – COMPLETED from Route M west of Leonard to US 36 at Clarence; 14.6 miles
Route AA
– COMPLETED from MO 15 south of Shelbyville to Route T north of Lakenan; 9.3 miles
Route BB
– COMPLETED from MO 15 at Plevna in Knox County to Route M in Epworth; 6.1 miles
Route DD
– COMPLETED from MO 151 south of Enterprise to Route A; 7 miles
Route H
– COMPLETED from Route M at Leonard to Route K east of Hagers Grove; 4.5 miles
Route MM
– COMPLETED from MO 151 to the end of State Maintenance at Shelby County Roads 315/317; 3.3 miles
Route PP
– COMPLETED from US 36 at Lakenan to Route FF in Monroe County; 5 miles
Route T – COMPLETED from MO 168 east of Shelbyville to US 36 at Lakenan; 10 miles
Route TT
– COMPLETED from US 36  west of Lentner to Route DD near Maud; 6.4 miles
Route V
– COMPLETED from US 36 at Hunnewell to Route FF north of Stoutsville in Monroe County; 4.5 miles


Chip/Cinder/Fog Seal

MO 151 – COMPLETED from US 36 at Clarence to the east junction of Route M south of Madison; Contractor: Vance Bros. Const. for $511,148.48
Route PP – COMPLETED from US 36 at Lakenan to Route FF in Monroe County; 5 miles
Route V – COMPLETED from US 36 at Hunnewell to Route FF north of Stoutsville in Monroe County; 4.5 miles

Go To Active/Current Road Work in Shelby County


Warren County

Major Road Improvements
Interstate 70 – COMPLETED Resurfacing eastbound lanes from west of Route E and Y junction in Montgomery County to west of MO 47; Contractor: Magruder Paving LLC for $1,096,240.65
Interstate 70 - SCHEDULED TO BEGIN WEEK OF AUG. 11 - Resurfacing (UBAWS) westbound lanes from St. Charles County line to 1 mile east of Route F near High Hill, 22.224 miles; Contractor: Magruder Paving, LLC for $2,824,161.99

Minor Road Improvements

Route 47- COMPLETED Improvements at Hopewell Hill located 1.4 miles south of Route CC to 3/4 mile north of Route N near Warrenton; Contractor: H. R. Quadri Contractors, LLC for $2,345,551.03

Resurfacing
MO 94 - Resurfacing and add shoulders from MO 47 in Warren County to Route F in St. Charles County; bids to open December 2014

Patching at various locations
MO 94 west – from MO 19 at McKittrick north of Hermann to MO 47 at Marthasville; 26.3 miles
MO 94 east
– from MO 47 at Marthasville to Route T west of Augusta in St. Charles County; 7.1 miles
Route A
- COMPLETED from Truxton in Lincoln County to Interstate 70 near Pendleton; 19.5 miles
Route B – COMPLETED from Interstate 70 near Pendleton to MO 94 east of Case; 12.1 miles
Route D
– from MO 47 at Marthasville to Route T near Cappeln; 6.4 miles
Route EE
– COMPLETED from Route B at Pendleton to the end of State Maintenance at Low Gap Road near Little Lost Creek Conservation Area; 5.9 miles
Route H
– from the south outer road of Interstate 70 at Wright City to Route M west of Innsbrook; 3.6 miles
Route N
– from MO 47 at Hopewell to MO 94 at Treloar; 4.9 miles
Route O
– COMPLETED from Route M to MO 47 at Marthasville; 10.1 miles
Route OO
– COMPLETED from Route M east of Innsbrook to Route T south of Foristell; 1.5 miles
Route TT
– COMPLETED from Route T in St. Charles County to MO 94 at Dutzow; 3.5 miles
Route U
– from Route MM in Warrenton to MO 94 just west of Pinckney; 11.5 miles
Route W
– COMPLETED from Route A  south of New Truxton to the north outer road of Interstate 70 at Warrenton; 9.3 miles

Chip/Cinder/Fog Seal
Route J – from MO 47 to I-70 North Outer Road; Contractor: Chester Bross Const. Co. for $205,521.33
Route TT – COMPLETED from Route T to MO 94; Contractor: Chester Bross Const. Co. for $74,125.45
Route U – COMPLETED from Route MM to MO 94; Contractor: Magruder Paving, LLC. for $504,206.41

Bridges

MO 47 – IN PROGRESS staged construction with one lane traffic 24/7 controlled by signals thru August 29; Bridge replacement at Lake Creek located just south of MO 94 south junction near Dutzow;; Contractor: Kozeny-Wagner, Inc. for $1,621,988.38

Go To Active/Current Road Work in Warren County

Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Schuyler Adair Macon Randolph Scotland Clark Knox Lewis Shelby Marion Monroe Audrain Montgomery Warren Ralls Pike Lincoln iTunes Android