Lane closures are subject to change
due to weather or priority adjustments.
Audrain County
-- Route 15 - Road closed for bridge replacement at Lick Creek. Traffic will be detoured over Routes 22 and E. Roadway will be open to traffic fall 2006.
Lewis County
-- Route 61 - Trucks/equipment crossing roadway 6 miles north of Canton; traffic controlled with signals during working hours through May 2006; working 20 hours a day 6:30 a.m. to 2:30 a.m. Delays should be expected.
-- Route C over North Fabius River - Roadway closed to thru traffic for bridge replacement 2.3 miles east of Route BB. Traffic will be detoured over State Routes BB, 16 and Z. Roadway will be open to traffic fall 2006.
Marion County
-- Route 61 - Resurfacing completed; tentatively beginning guardrail and striping on northbound lanes from Route 168 to Bus. 61 south of Palmyra; daylight working hours Monday through Friday, roadway opened to two lanes at the end of the workday.
-- Route 61 - McMasters Avenue through Hannibal, milling and resurfacing on McMasters Avenue, working between Route MM and Market Street at night from 7 p.m. to
7 a.m. to ease traffic congestion.
Monroe County
-- Route 24 - slide repair just east of the west junction of Business 24 - from 6 am to 7 pm Mon. thru Friday from June 19-23. Shoulder and guardrail work in the same location during regular working hours.
Montgomery County
-- Route E - Crews will be chip sealing
using oil and cinders
from Bellflower to the east Route O junction from June 29-30. Alternate routes are suggested during daytime work hours.
-- Route 19 over the Missouri River at Hermann - Periodic lane closures Monday thru Friday, usually 2 to 3 hours in length to pour concrete for the new bridge. During the concrete pours one lane will be open to traffic with 10 ft. width restriction on bridge, roadway opened to two lanes at the end of the workday.
Pike County
-- Route NN - Replacing two culverts between Little Buffalo Creek Bridge and Hickory Grove Road on Tuesday, June 27, 8 a.m. to 3 p.m. weather permitting. Roadway will be closed to all traffic, including local traffic until the culverts are replaced.
-- Route NN - Closed at the Little Buffalo Creek Bridge near Bowling Green and will remain closed until construction of the new bridge at the same location is complete this fall. Traffic will be detoured over State Routes 54 and 61.
For further details on Northeast Missouri roadwork please click on the link below.
http://www.modot.org/northeast/Thisweeksroadwork.htm
|