Route 45 Improvement




Project Details:

FAQ

Newsletter

Project map 1

Project map 2

Project map 3

Online meeting

Receive e-mail updates

 

 

verticle rule

Project Status: This project is complete!

 

Why is MoDOT doing this project?

 

Route 45 is a critical east/west route and capacity is expected to increase substantially by the year 2030. These improvements will accommodate economic development, and most important, improve traffic safety. It will also create a safe, efficient, environmentally sound, and economical transportation facility that meets the needs of the area.

How does this project benefit me?

Widening Route 45 will ease congestion and offer a safer road for thousands of motorists daily.  Based on the current design, there are more than 80 access points available for vehicles to pull off the roadway. With the construction of an additional lane in each direction, vehicles will be able to go around stalled vehicles with no chance for a head on collision with opposing traffic. The design for the new roadway is also safer than the existing road.

MoDOT will also construct a 10 foot shared use path on the south side of the road. This path will help accommodate multiple users with different modes of transportation.  This path will help link the rest of Platte County's trail system which has similar widths in other parts of the county.

What is the project time line?

 

Construction will be conducted in Four Phases. 

  • Phase One — Temporary pavement construction on westbound lane of Route 45. This work includes grading, temporary asphalt pavement, culvert extensions, demolition work, temporary signals, etc.
    • 100 % complete
  • Phase Two — Construct new eastbound lanes of Route 45. The work includes grading, concrete pavement , storm drainage, curb & gutter, lighting, share use path, etc.
    • 100 % complete
  • Phase Three — Includes construction of the new westbound lanes of Route 45. The work includes grading, concrete pavement , storm drainage, curb & gutter, MSE Walls, median, etc.
    • 100 % complete
  • Phase Four — Median work and clean up.
    • 100 % complete

Contractors will strive to maintain one open lane of traffic in each direction at all times along Route 45 during construction. However, some side roads may need to be closed temporarily to rebuild them. Detoured routes will be in place during any such closures.

  

How much does this project cost?

In November 2004, Missouri voters passed Amendment 3, which allowed the funding of new major projects including Route 45 between Route 9 and Route K.  The total construction cost for the project is about $16 million.

How do I learn more?

For more information, review the project maps and materials listed in the left column. You can also submit a comment, send an e-mail or give us a call. Lend your voice to the transportation process!

thank you

 

route 45

 

finished project

 

    Comment

 

Comment         Call          E-mail   

 
District Map
Kansas City District
spacer
Traveler Information
Traveler Map
Kansas City Scout
Motorist Assist
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Your Local Area Engineer
Report a Road Concern
Moving Forward
On the Move
spacer
Your Local MoDOT
Get your local district information.
Districts Map
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Platte Clay Jackson Cass Johnson Lafayette Ray Saline Pettis Northwest Northeast Kansas City Southwest Southeast Central St. Louis iTunes Android