American Recovery and Reinvestment Act in District 4





Missouri was the first state in the nation to begin construction on highway projects funded by the American Recovery and Reinvestment Act. The department has obligated all of the $524.6 million it received in American Recovery and Reinvestment Act funds for MoDOT administered projects, meeting the required deadline a month ahead of schedule.  The Missouri Highways and Transportation Commission has awarded 187 economic stimulus projects totaling $469 million. The ARRA funding awarded to date will support 12,524 direct, indirect and induced jobs based on Federal Highway Administration estimates. 

   

Route:

Route 2 – Thin lift overlay from Commercial St. to Route ZZ.

Cost: $822,000

Status:

PROJECT COMPLETE.
Map:
   
   

Route:

Route 169 – Sidewalk improvements from Route 92 to Route KK.

Cost:

$1,500,000

Status:

PROJECT COMPLETE.

Map:
 
   

Route:

Route 69 – Thin lift overlay from the Clinton County line to Route 92. Total length of project is 5.977 miles.

Cost: $338,000

Status:

PROJECT COMPLETE.

Map:
 
 

Route:

Route 9 – Rehabilitate Heart of America Bridge bridge structure over the Missouri River, including addition of a bicycle and pedestrian facility.

Cost: $4,545,000 (Balance of project being funded by other sources; total project costs are $7.1 million.)

Status:

PROJECT COMPLETE.
Map:
 
 

Route:

Route 1 – Sidewalk improvements from Vivion Road to 72nd Street.

Cost: $1,500,000

Status:

PROJECT COMPLETE.

Map:

 

Route:

Route 52 Thin lift overlay from the St. Clair County line to Route 13.

Cost:

$850,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location

 

Route:

Route 150 – Widen from two lanes to four lanes from Horridge Road to Route 291.

Cost: $17,226,000 estimate

Status:

PROJECT COMPLETE. A $14,101,938 contract (Significant Savings!) was awarded Aug. 5 to Emery Sapp & Sons Inc.of Columbia, Mo.
Map:
 
 

Route:

Route I-70 and 435 Interchange – Construct new half diamond interchange at Route 40/I-435, replace Blue Ridge Cut-off bridge over I-70, add lanes to I-70 and modify some ramps.

Cost: $39,337,177

Status:

PROJECT TO CONCLUDE JULY 1. Contract awarded to Clarkson Construction Co.
Map:
Review the Web site for complete details.
 
 

Route:

Route 50Complete diamond interchange at Bynum Rd.

Cost: $5,920,000 (Balance of project being funded by other sources; total project costs are $7.4 million)

Status:

PROJECT IS COMPLETE.

Map:
 
 

Route:

I-70 – Rehabilitate eastbound bridges from Troost to Route 40.

Cost: $$6,673,349

Status:

PROJECT COMPLETE

Map:

Route:

Route 131Pavement improvements and resurfacing from Route 50 to Route 2.

Cost:

$1,209,710

Status:

PROJECT COMPLETE. The contract was awarded to Hilty Quarries Inc. work inlcuded paving, shoulder work and striping with the addition of rumble stipes to enhance safety along this route.

Map:  Review the Google Map of this location

Route:

Route 70 – Pavement improvements on the eastbound and westbound lanes from the Jackson County line to Odessa.

Cost:

$7,000,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   

Route:

Route FFThin lift overlay from Gillespie Drive to Route O. Total length of project is 12.287 miles.

Cost:

$694,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location

Route:

Interstate 29 – Resurface pavement and shoulders on northbound and southbound lanes at various locations from Route 273 to Vivion Road 

Cost:

$11,799,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   

Route:

Route 45Thin lift overlay from Route 273 to Spur 45 south.

Cost:

$667,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   

Route:

Route 273 – Pavement improvements on Route 273 from Route JJ to I-29 and Spur 92 from Route 273 to Route 92.

Cost:

$1,170,000

Status:

PROJECT COMPLETE. Project was awarded to Ideker, Inc. Work began along Route 273 in early October. All work was complete on November 15.

Map: Review the google map of the location
   
   

Route:

Route 9Replace bridge over White Aloe Branch, south of Route FF

Bridge:

ARRA providing $105,000; $599,000 funded by other source

Status:

PROJECT COMPLETE

Map: Review the google map of the location

Route:

Route CThin overlay from Route U to Route 10. Total length of project is 5.117 miles.

Bridge:

$289,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   

Route:

Route MThin lift overlay from Route C to Route 10. Total length of project is 5.763 miles.

Bridge:

$323,000

Status:

PROJECT COMPLETE.

Map: Review the google map of the location
   
 
District Map
Kansas City District
spacer
Traveler Information
Traveler Map
Kansas City Scout
Emergency Response Operators
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Your Local Area Engineer
Report a Road Concern
Rate Our Workzones
spacer
Your Local MoDOT
Get your local district information.
Districts Map
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
 
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Platte Clay Jackson Cass Johnson Lafayette Ray Saline Pettis Northwest Northeast Kansas City Southwest Southeast Central St. Louis iTunes Android