Create an Account
Bid Opening Information for March 2018
Help
View Another Bid Opening:
Bid Information Updated
Notice of Bid Openings 02/08/2018
Bid Express
Plan Holder List (MoDOT Planroom)
Preliminary Quantities 02/08/2018
DBE.bin 02/08/2018
State Wage Rates 02/08/2018
General Provisions and Supplemental Specs 02/08/2018
Supplemental Plans 02/08/2018

Call
for
180316
Description Proposal

Plans

Cross
Sections
Electronic
Deliverables
Download Files
A01
(1): Job J0I3004B Route I-29 ANDREW, ATCHISON, HOLT County. Job Order Contract for asphalt pavement repair from the Iowa State Line south to Route K in Andrew County, the total length of improvement being 63.979 miles.
Select All

Download Selected Files for
Call A01
A02
(1): Job J0I3004C Route I-29, I-229 ANDREW, BUCHANAN, PLATTE County. Job Order Contract for asphalt pavement repair from Route K in Andrew County south to Route 92 in Platte County, the total length of improvement being 41.901 miles.
Select All

Download Selected Files for
Call A02
A03
(1): Job J0I3004D Route I-35 DAVIESS, HARRISON County. Job Order Contract for asphalt pavement repair from the Iowa State Line south to Route 6 in Daviess County, the total length of improvement being 49.203 miles.
Select All

Download Selected Files for
Call A03
A04
(1): Job J0I3004E Route I-35 CALDWELL, CLAY, CLINTON, DAVIESS, DEKALB County. Job Order Contract for asphalt pavement repair from Route 6 in Daviess County south to Route 92 in Platte County, the total length of improvement being 38.776 miles.
Select All

Download Selected Files for
Call A04
A05
(1): Job J1P3067 Route 136 PUTNAM County. Bridge replacement at West Locust Creek, 6 miles east of Lucerne, the total length of improvement being 0.213 miles.
(2): Job J2P2186 Route 136 PUTNAM County. Bridge replacement at Elm Branch, 3 miles east of Lucerne, the total length of improvement being 0.154 miles.

Select All

Download Selected Files for
Call A05
A06
(1): Job J1S0579 Route 13 DAVIESS County. Bridge replacement over Honey Creek, 0.5 miles north of Route HH near Gallatin, the total length of improvement being 0.103 miles.
Select All

Download Selected Files for
Call A06
A07
(1): Job J1S3125 Route 116 CLINTON County. Culvert replacement over McGuire Creek 1.7 miles west of Route 169 near Gower, the total length of improvement being 0.02 miles.
Select All

Download Selected Files for
Call A07
B01
(1): Job J2P3059B Route 151 SHELBY County. Bridge replacement 1.1 miles east of Route B near Leonard, the total length of improvement being 0.239 miles.
(2): Job J2S3123 Route 151 SHELBY County. Bridge replacement 1.1 miles north of Route MM near Clarence, the total length of improvement being 0.267 miles.

Select All

Download Selected Files for
Call B01
B02
(1): Job J2P3059D Route 94 MONTGOMERY County. Bridge rehabilitation over Loutre River 0.1 mile west of Rte. 19 near McKittrick, the total length of improvement being 0.095 miles.
Select All

Download Selected Files for
Call B02
B03
(1): Job J2S3004 Route J AUDRAIN County. Bridge replacement 0.2 miles west of Route O near Rush Hill, the total length of improvement being 0.097 miles.
Select All

Download Selected Files for
Call B03
B04
(1): Job J2S3122 Route Y CLARK County. Bridge replacement over Honey Creek 1.3 miles west of Route 81 near Kahoka, the total length of improvement being 0.097 miles.
Select All

Download Selected Files for
Call B04
C01
(1): Job J3I3010 Route I-70 LAFAYETTE County. Grading, paving and bridge over Route E and Route H, the total length of improvement being 0.49 miles.
Select All

Download Selected Files for
Call C01
C02
(1): Job J3P3086 Route 65 PETTIS County. Coldmill and Resurface from Saline County Line to Route 765 north of Sedalia, the total length of improvement being 13.945 miles.
Select All

Download Selected Files for
Call C02
C03
(1): Job J3S3071 Route OO, M JOHNSON County. Resurface from Route 50 to Route OO and from Route M to Route 13, the total length of improvement being 19.5 miles.
Select All

Download Selected Files for
Call C03
C04
(1): Job J4M0259 Route I-70 JACKSON County. Mowing from Paseo Blvd to I-470 in Jackson County, the total length of improvement being 0 miles.
Select All

Download Selected Files for
Call C04
C05
(1): Job J4P3163 Route Various JACKSON County. Signal improvements in Jackson County, the total length of improvement being 0 miles.
Select All

Download Selected Files for
Call C05
C07
(1): Job J4S3220 Route DD CLAY County. Bridge replacement over Wilkerson Creek in Clay County, the total length of improvement being 0.095 miles.
Select All

Download Selected Files for
Call C07
D01
(1): Job J5M0277 Route OR 44 PULASKI County. Culvert replacement 0.1 mile west of outer road and Route 7 intersection, the total length of improvement being 0.243 miles.
Select All

Download Selected Files for
Call D01
D02
(1): Job J5S3187 Route E, B CALLAWAY, MONTGOMERY County. Resurface from Route DD in Callaway Co to Route 19 in Montgomery Co, the total length of improvement being 32.337 miles.
Select All

Download Selected Files for
Call D02
D03
(1): Job J5O3309 Route CR 245, Old Hwy 54 CALLAWAY County. Resurface near Auxvasse, the total length of improvement being 2.3 miles.
Select All

Download Selected Files for
Call D03
D06
(1): Job J5S3307 Route TT, AW PULASKI, TEXAS County. Resurface near Ft. Leonard Wood, the total length of improvement being 10.387 miles.
Select All

Download Selected Files for
Call D06
F01
(1): Job J6I2418 Route I-70 ST CHARLES County. Grading, paving and bridge from West of Route K to T.R. Hughes Blvd, the total length of improvement being 1.61 miles.
Select All

Download Selected Files for
Call F01
F02
(1): Job J0I3004L Route Various FRANKLIN, JEFFERSON County. Job Order Contract for asphalt pavement repair in Franklin and Jefferson Counties, the total length of improvement being 0 miles.
Select All

Download Selected Files for
Call F02
F03
(1): Job J0I3004M Route Various ST CHARLES, ST LOUIS, ST LOUIS CITY County. Job Order Contract for asphalt pavement repair in St. Louis City, St. Louis County and St. Charles County, the total length of improvement being 0 miles.
Select All

Download Selected Files for
Call F03
F04
(1): Job J6I3166 Route 70/270 ST LOUIS County. Concrete pavement repair at the 70/270 access ramps including Route 180 interconnecting ramps, the total length of improvement being 1.044 miles.
Select All

Download Selected Files for
Call F04
F05
(1): Job J6M0265 Route BL 44 FRANKLIN County. Culvert Repair on Route I-44 BL (Osage St) west of Intergram Drive in Pacific, the total length of improvement being 0.059 miles.
Select All

Download Selected Files for
Call F05
F06
(1): Job J6P0876R Route 21 JEFFERSON County. Grading and drainage between Old Route 21 and Klable Road, the total length of improvement being 0.776 miles.
Select All

Download Selected Files for
Call F06
F07
(1): Job J6P3198 Route Various VARIOUS County. Job Order Contract for asphalt pavement repair (Non Interstate) at various primary route locations in the St. Louis District, the total length of improvement being 0 miles.
Select All

Download Selected Files for
Call F07
F08
(1): Job J6S3220 Route 231 ST LOUIS County. Signal improvements and ADA improvements from Hoffmeister Ave to Jeffersonian Road, the total length of improvement being 0.237 miles.
Select All

Download Selected Files for
Call F08
F09
(1): Job J6S3238 Route 67 ST LOUIS County. Signal improvements at Quailways Dr, Ladue Rd, Chaminade Dr, the total length of improvement being 0 miles.
Select All

Download Selected Files for
Call F09
F10
(1): Job J6S3249 Route AC ST LOUIS County. Coldmill and resurface from Lindbergh Blvd to the end of state maintenance, the total length of improvement being 5.667 miles.
(2): Job J6S3250 Route 67 ST LOUIS County. Coldmill and resurface at Route AC intersection, the total length of improvement being 0.064 miles.
Select All

Download Selected Files for
Call F10
F11
(1): Job J6I3111 Route I-64 ST LOUIS CITY County. Coldmill and resurface from Sarah Street to Vandeventer Street, the total length of improvement being 1.714 miles.
Select All

Download Selected Files for
Call F11
F12
(1): Job J6S3160 Route 30 JEFFERSON County. Microsurfacing from St. Louis county line to west of Route PP near High Ridge, the total length of improvement being 5.272 miles.
Select All

Download Selected Files for
Call F12
G01
(1): Job J7M0261 Route 59 MCDONALD County. Drainage improvements 0.07 mile north of Route 76 in the city of Anderson, the total length of improvement being 0.056 miles.
Select All

Download Selected Files for
Call G01
G02
(1): Job J8P2293 Route 65 GREENE County. Bridge replacement from 0.2 miles north of Interstate 44 to 0.14 miles south of Interstate 44 in Springfield, the total length of improvement being 0.364 miles.
(2): Job J8P3079C Route 65 GREENE County. Guardrail replacement from Valley Water Mill Road to Kearney Street, the total length of improvement being 1.138 miles.
(3): Job J8P3080B Route 65 GREENE County. Pavement improvements from Valley Water Mill Road to Kearney Street, the total length of improvement being 1.138 miles.
(4): Job J8S3061 Route LP44, Bus 65 GREENE County. Resurface and ADA improvements disconnected sections of Glenstone Ave. from I-44 to Lombard St. in Springfield, the total length of improvement being 0.473 miles.

Select All

Download Selected Files for
Call G02
H01
(1): Job J0S3018J Route 14 VARIOUS County. ADA improvements in Houston and West Plains, the total length of improvement being 0.749 miles.
Select All

Download Selected Files for
Call H01
H03
(1): Job J9S3217 Route HH WAYNE County. Bridge deck replacement south of Piedmont, the total length of improvement being 0.139 miles.
(2): Job J9S3283 Route Z WAYNE County. Bridge replacement over Stanley Creek A2982, the total length of improvement being 0.149 miles.

Select All

Download Selected Files for
Call H03
H04
(1): Job J9S3235 Route BB HOWELL County. Resurface from Route 160 to end of state maintenance, the total length of improvement being 5.652 miles.
(2): Job J9S3342 Route E SHANNON County. Resurface from the Route 60 intersection to the intersection of Route 106, the total length of improvement being 11.368 miles.
Select All

Download Selected Files for
Call H04
H05
(1): Job J9S3253 Route 80 MISSISSIPPI, NEW MADRID County. Coldmill, resurface and add shoulder from Route 61 to Route 102, the total length of improvement being 12.561 miles.
(2): Job J9S3254 Route 80 MISSISSIPPI County. Resurface at Route 77 to .2 miles east of County Road 501, the total length of improvement being 2.4 miles.
Select All

Download Selected Files for
Call H05
H06
(1): Job J9S3284 Route ZZ BOLLINGER County. Bridge deck replacement .25 miles north of Route 34, over Little Crooked Creek, the total length of improvement being 0.176 miles.
Select All

Download Selected Files for
Call H06
H07
(1): Job J9S3334 Route PP CAPE GIRARDEAU County. Resurface and add shoulder from Route 34 to the end of state maintenance and Route 34 Spur from Farmington Road to just north of Route 34 intersection, the total length of improvement being 2.321 miles.
(2): Job J9S3335 Route D CAPE GIRARDEAU County. Resurface from Route 51 to Route CC, the total length of improvement being 2.695 miles.
Select All

Download Selected Files for
Call H07