Create an Account
Bid Opening Information for September 2018
Help
View Another Bid Opening:
Bid Information Updated
Notice of Bid Openings 08/09/2018
Bid Express
Plan Holder List (MoDOT Planroom)
Preliminary Quantities 08/09/2018
DBE.bin 08/09/2018
State Wage Rates 08/09/2018
General Provisions and Supplemental Specs 08/09/2018

Call
for
180921
Description Proposal

Plans

Cross
Sections
Electronic
Deliverables
Download Files
A01
(1): Job J1I3186 Route Various BUCHANAN County. Bridge rehabilitation various bridge ramps in the Saint Joseph area, the total length of improvement being 0.53 miles.
(2): Job J1P3120 Route 36 BUCHANAN County. Bridge rehabilitation in various locations in St. Joseph, the total length of improvement being 0.229 miles.

Select All

Download Selected Files for
Call A01
A02
(1): Job J1P3010 Route 148 NODAWAY County. Resurface and add shoulders from Iowa State line to US 71 near Maryville, the total length of improvement being 14.149 miles.
Select All

Download Selected Files for
Call A02
B01
(1): Job J2M0276 Route 63 ADAIR, MACON County. Pavement improvements from 1.2 miles south of Route KK near Kirksville to 0.5 miles north of Route DD near Macon, the total length of improvement being 20.917 miles.
Select All

Download Selected Files for
Call B01
C01
(1): Job J4P3081E Route 58 CASS County. Resurface and ADA improvements from Route D to Dean/Avenue/Clint Drive in Belton, the total length of improvement being 4.512 miles.
(2): Job J4P3081H Route Y CASS County. Intersection improvements at MO 58 in Belton, the total length of improvement being 0.142 miles.

Select All

Download Selected Files for
Call C01
C01
ADDENDUM C01 -001
Letter View View Letter
Select All

Download Selected Files for
Call C01
- 001
C02
(1): Job J4S3284 Route 69 CLAY, PLATTE County. Grading, drainage, bridge and paving at Frontier Road in Northmoor, the total length of improvement being 0.094 miles.
Select All

Download Selected Files for
Call C02
C03
(1): Job J4P3295C Route 45 PLATTE County. Pavement marking from Route 45 at Riss Lake Dr. and Klamm Road, the total length of improvement being 0.546 miles.
Select All

Download Selected Files for
Call C03
D01
(1): Job J5P3212 Route 21, 32 WASHINGTON County. Resurface from Route 21 in Jefferson County to Route 32 in Iron County and Route 32 from Route 21 to Bismarck in St. Francis County, the total length of improvement being 41.045 miles.
Select All

Download Selected Files for
Call D01
D03
(1): Job J5P3246 Route 54 CAMDEN County. Pavement improvements from east of Key Largo to east of Route 5, the total length of improvement being 6.31 miles.
Select All

Download Selected Files for
Call D03
D04
(1): Job J5S0276 Route J CAMDEN County. Bridge replacement over Little Niangua River and Rainwater Creek, the total length of improvement being 0.532 miles.
Select All

Download Selected Files for
Call D04
D06
(1): Job J5S3268 Route Y, CC, HH PHELPS County. Chip seal Route Y from E To SME, Route CC from Route 63 to SEM, Route HH From E to SME, the total length of improvement being 14.795 miles.
(2): Job J5S3364 Route I- 44 Outer Rd PHELPS County. Resurface and guradrail on Arlington Road from Doolittle to 0.3 miles east of Gasconade River, the total length of improvement being 2.914 miles.
Select All

Download Selected Files for
Call D06
D09
(1): Job J5S3306 Route 100 OSAGE County. Slide repair along Route 100 just east of Chamois, the total length of improvement being 0.095 miles.
Select All

Download Selected Files for
Call D09
D10
(1): Job J5S3339 Route C, W OSAGE County. Chip seal from Route A to Route 100 and Route W from Route A to Route 50, the total length of improvement being 17.85 miles.
Select All

Download Selected Files for
Call D10
D11
(1): Job J5M0282 Route NN, YY BOONE County. Seal coat from Route 63 to Route 124 and from Route 124 to Red Rock Road, the total length of improvement being 10.729 miles.
Select All

Download Selected Files for
Call D11
F02
(1): Job J6Q3284 Route Various ST CHARLES, ST LOUIS, ST LOUIS CITY County. ITS improvements in various location in the St. Louis District, the total length of improvement being 0 miles.
Select All

Download Selected Files for
Call F02
F03
(1): Job J6S3219 Route H ST LOUIS CITY County. Intersection improvements at Route H and Riverview, the total length of improvement being 0.208 miles.
Select All

Download Selected Files for
Call F03
F04
(1): Job J6S3365 Route E FRANKLIN County. Pavement improvements between Route 100 and Route Y, the total length of improvement being 2.75 miles.
(2): Job J6S3366 Route K FRANKLIN County. Pavement improvements between Route 30 and Route 185, the total length of improvement being 14.34 miles.
(3): Job J6S3367 Route P JEFFERSON County. Pavement improvements between Route A and Route 110, the total length of improvement being 8.62 miles.

Select All

Download Selected Files for
Call F04
G01
(1): Job J7P3130 Route 83 BENTON, HICKORY County. Resurface from Route 65 to Route 54 on Route 83 and from Route 65 to end of Route on Route MM, the total length of improvement being 32.325 miles.
(2): Job J7S3183 Route A ST CLAIR County. Resurface from Route 52 to Route 13, the total length of improvement being 16.938 miles.

Select All

Download Selected Files for
Call G01
G02
(1): Job J7S3123 Route Z, TT BARRY, STONE County. Coldmill and resurface from Route 60 to Route 30 and from Route 39 to Route D, the total length of improvement being 15.389 miles.
(2): Job J7S3274 Route D BARRY, STONE County. Resurface from Mo 248 to Pirate Lane in Crane, the total length of improvement being 6.613 miles.
Select All

Download Selected Files for
Call G02
G03
(1): Job J7S3273 Route Loop 44 LAWRENCE County. Coldmill and resurface from I-44 at Route H to west of I-44 at Route 265 in Mt. Vernon, the total length of improvement being 2.88 miles.
Select All

Download Selected Files for
Call G03
G05
(1): Job J7S3364 Route B MCDONALD County. Slide repair at various locations 0.3 mile west of Rte. Y east of Hart, the total length of improvement being 0.198 miles.
(2): Job J7S3364B Route H MCDONALD County. Slide repair 0.4 mile east of Blankenship Road near Noel, the total length of improvement being 0.058 miles.
Select All

Download Selected Files for
Call G05
G06
(1): Job J7P3374 Route 13 STONE County. Scour repair from North Connection of BUS 13 to .4 Miles South of Rte OO, the total length of improvement being 1.386 miles.
Select All

Download Selected Files for
Call G06
H01
(1): Job J9P3199 Route 60 CARTER County. Resurface from 0.4 miles west of Route y to Freemont, the total length of improvement being 0.581 miles.
(2): Job J9P3200 Route 60 CARTER County. Resurface at County Road 143 to Parsons Drive, the total length of improvement being 6.035 miles.
Select All

Download Selected Files for
Call H01
H02
(1): Job J9P3501 Route 67 WAYNE County. Slide repair various locations along Rte. 67 in Wayne County, the total length of improvement being 0.316 miles.
Select All

Download Selected Files for
Call H02
H03
(1): Job J9S3241 Route W HOWELL County. Resurface from Route 17 to Mountain View, the total length of improvement being 17.903 miles.
(2): Job J9S3434 Route CC HOWELL, OZARK County. Resurface from Route 181 to Route 63, the total length of improvement being 20.333 miles.
Select All

Download Selected Files for
Call H03