The Missouri Department of Transportation held a public meeting on November 6, 2017 to provide preliminary plans for replacing the Interstate 44 Outer Road bridge over the Gasconade River, west of Hazelgreen. The work is currently scheduled to begin in the summer of 2018. Here are the materials presented at the public meeting:

WelcomeLetter OR I-44 Gasconade

Welcome Letter

FAQ OR I-44 Laclede County Gasconade

Frequently Asked Questions

Strip Display I44 OR Laclede

Bridge Strip Map Display

The Missouri Department of Transportation presented the following proposed options for moving forward with replacing the Interstate 44 outer road bridge over the Gasconade River near Hazelgreen at a public meeting on December 14, 2016, in Lebanon:

  1. Gasconade River Bridge PhotoDo nothing.
  2. Rehabilitate the existing structure using either MoDOT or contract workers.
  3. Build a new, standard bridge in the same place as the existing structure.
  4. Construct a new, standard bridge nearby.
  5. Build a connection between the north outer roadway segments using the existing bridge piers from a previous rehabilitation project.
  6. Construct a new truss bridge (similar to the current bridge) in the same location as the existing bridge.

Employees with MoDOT’s Historic Preservation Unit were also on hand to explain the federal Section 106 Process, which identifies historic properties, analyzes potential effects on them and determines what action will need to be taken to avoid, minimize or mitigate those effects. More information on historic preservation and the Section 106 Process can be found at www.modot.mo.gov/ehp/HistoricPreservation.htm.

MoDOT closed the Laclede County bridge on Dec. 18, 2014, after an inspection determined it was unsafe for travel. In July of 2016, the Missouri Highways and Transportation Commission approved funding for a new bridge.

Here are the materials that were presented at the public meeting:

Welcome Gasconade OR44 2016

Welcome Letter

Gasconade River BR OR44 Fact Sheet

Fact Sheet

Bridge Vehicle Weight Gasconade

Bridge Vehicle Weight

Chart

Gasconade Option One Do Nothing

Option One:

Do Nothing

Option Two Gasconade Rehab

Option Two:

Rehabilitate

Option Three Gasconade New Bridge New Align

Option Three:

New Bridge at Existing Site

New Bridge Gasconade New Align

Option Four:

New Bridge on New Alignment

New Bridge Gasconade Option five

Option Five:
New Bridge/New Outer Road
on
 North Side

Option Six Gasconade River Bridge

Option Six:

New Truss Style Bridge

at Exisitng Location

Pub Involvement 106 Flyer

Public Involvement

Fact Sheet

Bridge Flyer Gasconade 106

Bridge Stat Sheet

Bridge Reuse Gasconade

Bridge Reuse Information

Citizens Guide to Section 106

Citizens Guide to

Section 106 Review

Participation

Public Participation in

Section 106 Process

Section 106

Section 106 Flyer

For more information about this project, contact Project Manager Troy Hughes at (573) 522-5163 or Troy.Hughes@modot.mo.gov.

 

 
District Map
Central District
spacer
Traveler Information
Traveler Map
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Your Local Area Engineer
Report a Road Concern
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Howard Boone Cooper Morgan Camden Laclede Pulaski Phelps Dent Moniteau Miller Cole Crawford Washington Maries Callaway Osage Gasconade Northwest Northeast Kansas City Southwest Southeast Central St. Louis iTunes Android