Frequently Asked Questions

 

What is the status of the project?
Public hearings were held in November 2005. The design was approved at the January 2006 meeting of the Missouri Highways and Transportation Commission.

What is the proposed construction schedule?
The construction schedule is as follows:

Late 2006 – Construction begins on an overpass bridge on existing Route 54. The bridge is between Home Depot and Wal-Mart.

Late 2007– Construction begins on a four-lane expressway from 1.0 mile west of Business Route 54 to the Grand Glaize Bridge.

Late 2008– Construction begins on a four-lane expressway from Business 54 to 1.0 miles west of Business 54.

Late 2008 - Construction begins on a four-lane expressway from  the Grand Glaize Bridge to 1.3 miles west of Route KK.

The entire corridor should be completed by December 2010.

How is the project being funded?
The estimated total cost of the project for right of way and construction is $158 million. Here is the breakdown:

· $27 million – previous right of way acquisition
· $99 million – Amendment 3 funding
· $22 million – MoDOT’s Statewide Transportation Improvement Program
· $3 million – Federal Transportation Bill earmark for Jefferies Road Interchange (Lake Road 54-37)
· $7 million – Private funding


How is traffic being handled during construction?

Most of the construction will be completed under traffic.  Short-term bypasses will be required as the new and existing roadways are connected.

What public involvement has been done on this project?

Several public meetings/hearings have been held in the past on various sections of the project.  MoDOT has already received location and design approval from the Missouri Highways and Transportation Commission for Route 54 from Route 42 to west of Route KK.  MoDOT has received location approval for the section of highway from Business Route 54 to Route 42, but must still obtain design approval.  Significant changes have been made to earlier plans and MODOT held public hearings in November 2005 to seek additional public input on the entire project.

What happens if the new Route 54 Expressway is not constructed?

By 2028 traffic levels are projected to increase to 65,000 per day.  If nothing is done to improve existing conditions, gridlock will result on Route 54.

What traffic volume is the new Route 54 being designed to handle?

The existing peak traffic volumes on existing Route 54 during the summer months is 43,000 vehicles per day.  In 20 years, the new Route 54 expressway and existing Route 54 are projected to attract 72,000 vehicles per day.

Will Motorists be able to continuously travel existing Route 54 after crossing over the Grand Glaize Bridge?

Yes.  The two Grand Glaize Bridges will be striped to accommodate three lanes for motorists wishing to continue on existing Route 54.  The additional lane on each bridge will provide continuous connection between the Passover Road and Jefferies Road interchanges.  The Grand Glaize Bridge traffic model shows how traffic moves through this area.

What part of Route 54 will MoDOT own and maintain after construction of the new Route 54 Expressway is completed?

MoDOT will own and maintain the new Route 54 Expressway, associated interchange areas and the Grand Glaize Bridge.  The City of Osage Beach has agreed to take over ownership and maintenance of existing Route 54 and newly constructed outer roadways.

What is the proposed speed limit for the new Route 54 Expressway?

The proposed speed limit is 65 mph.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
District Map
Central District
spacer
Traveler Information
Traveler Map
map
call, cell, mobile, phone iconText Alerts - Sign Up!
spacer
Quick Links
Your Local Area Engineer
Report a Road Concern
Moving Forward
On the Move
spacer
Your Local MoDOT
Get your local district information.
Districts Map
Northwest Northeast Kansas City Central St. Louis Southwest Southeast
About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
Howard Boone Cooper Morgan Camden Laclede Pulaski Phelps Dent Moniteau Miller Cole Crawford Washington Maries Callaway Osage Gasconade Northwest Northeast Kansas City Southwest Southeast Central St. Louis iTunes Android