**Note: It is the responsibility of the bidder to access MoDOT's website in order to obtain any and all addenda(s) issued during the course of this RFB Process.
| Title |
Closing
Date |
Closing
Time |
Tabulations/Award |
RFQ D7-11-047 Asphalt Pad for Joplin Airport
Addendum 001
Annual Wage Order 18_WO049 |
May 23, 2011 |
1:00 PM Local Time |
RFQ D7-11-047 Asphalt Pad Joplin Airport-Quote Tabs |
| D7-11-048 RFQ Traffic Signal Mast and Arm |
May 19, 2011 |
1:00 PM Local Time |
|
| D7-11-046 RFQ Elevator Maintenance Services |
May 11, 2011 |
1:00 PM Local Time |
D7-11-046 Elevator Maintenance Service Agreement Bid Tab |
D7-11-037 RFB Streambank Stablization_BigDryWood_Route_54_Vernon Co
D7-11-037 Attachment A_Special Provisions
D7-11-037 Attachment B - Special Provisions Construction
D7-11-037 Exhibit A - Traffic Control
D7-11-037 Exhibit B - Construction and Material Specifications
D7-11-037 Exhibit C - Plan Sheets_DSR 217-10-001 EWP Project
D7-11-037 Exhibit D - General Wage Order 54
Contractor Pre-Qualification Required |
April 26, 2011 |
1:00 p.m. Local Time |
All Bids Rejected. |
| RFB D7-11-044 Salt Conveyor and Hopper |
April 25, 2011 |
1:00 p.m. Local Time |
Bid Cancelled |
D7-11-045 RFB Traffic Signal Battery Backup Systems_Cabinets
D7-11-045 Addendum 001 |
April 20, 2011 |
1:00 p.m. Local Time |
D7-11-045 Traffic Signal Battery Backup Systems_Cabinets Bid Tab |
| D7-11-039 RFB Special Gradation Spec 4C Aggregate |
April 19, 2011 |
1:00 p.m. Local Time |
D7-11-039 Spec 4C Special Gradation Aggregate Bid Tab |
| RFB D7-11-042 Cement Silo 200 Barrel Low-Profile |
April 18, 2011 |
1:00 p.m. Local Time |
RFB D7-11-042 Cement Silo- Bid Tabs |
| D7-11-043 RFB Aluminum Sign Stands |
April 13, 2011 |
1:00 p.m. Local Time |
D7-11-043 TwinFlex Sign Stands TF60-RUB Bid Tab |
D7-11-033 RFB ADA Compliance_WB and EB Rest Area_Rte I-44 Lawrence Co
D7-11-033 ATTACHMENT A Special Provisions
D7-11-033 Exhibit A Plan Sheets for D7-11-033 Project
D7-11-033 Exhibit B - General Wage Order 54
Contractor Pre-Qualification Required |
April 13, 2011 |
1:00 p.m. Local Time |
D7-11-033 ADA Compliance_WB and EB Rest Area_Rte I-44_Lawrence Co_Bid Tab |
D7-11-030 RFB Driveway Improvements_RteFF_Jasper_County
D7-11-030 Exhibit A_Plan_Sheets
D7-11-030 Exhibit B General Wage Order 54
Contractor Pre-Qualification Required |
April 6, 2011 |
1:00 p.m. Local Time |
D7-11-030 Driveway Improvements_RteFF_JasperCo_Bid Tab |
| RFQ D7-11-041 Parking Lot Seal Coating |
April 5, 2011 |
1:00 p.m. Local Time |
BID CANCELLED |
| D7-11-038 RFB Commercial Hot or Cold Mix Price Agreement |
March 31, 2011 |
1:00 p.m. Local Time |
|
D7-11-031 RFB Stream Bank Stablization_Seligman Branch_Route DD_Barry County
D7-11-031 Attachment A Special Provisions
D7-11-031 Attachment B Special Provisions Construction
D7-11-031 Exhibit A Traffic Control
D7-11-031 Exhibit B Construction and Material Specifications
D7-11-031 Exhibit C Plan Sheets DSR_009-10-003
D7-11-031 Exhibit D General Wage Order 54
Contractor Pre-Qualification Required |
March 30, 2011 |
1:00 p.m. Local Time |
D7-11-031 Stream Bank Stablization Route DD Barry Co. Bid Tab |
| RFB D7-11-035 Chip Seal Lease Equipment |
March 28, 2011 |
1:00 p.m. Local Time |
RFB D7-11-035 Chip Seal Rental Equipment- Bid Tabs |
D7-11-029 RFB ADA Compliance_Welcome Center Route I-44_Newton County
D7-11-029 Attachment A - Special Provisions
D7-11-029 Exhibit A - Plan Sheets for ADA Compliance_Welcome Center I44_Newton Co
D7-11-029 Exhibit B - General Wage Order 54
Contractor Pre-Qualification Required |
March 23, 2011 |
1:00 p.m. Local Time |
D7-11-029 ADA Compliance_Welcome Center_I-44 Newton Co Bid Tab |
D7-11-024 RFB Plant Mix Oil Material_ El Dorado Springs
D7-11-024 Addendum 001 |
March 17, 2011 |
1:00 p.m. Local Time |
D7-11-024 Plant Mix Oil Material Bid Tab |
D7-11-023 RFB Streambank Stablization _Trent Creek_Route 90_McDonald County
D7-11-023 Attachment A
D7-11-023 Attachment B
D7-11-023 Exhibit A Traffic Control
D7-11-023 Exhibit B Construction and Material Specifications
D7-11-023 Exhibit C Plan Sheets DSR 119-10-001 EWP Project
D7-11-023 Exhibit D General Wage Order 54
D7-11-023 Addendum 001 |
Feb 23, 2011
March 16, 2011 |
1:00 p.m. Local Time |
D7-11-023 Stream Bank Stablization Route 90 McDonald Co. Bid Tab |
| RFB D7-11-034 -Vibratory Roller Rentals |
March 11, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-034 Vibratory Steel Wheel Rollers- Bid Tabs |
| RFQ -D7-11-036 Galvanized Guardrail Supplies |
March 10, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-036 Galvanized Guard Rail Supplies. Bid Tabulations |
RFQ D7-11-032 Well Drilling at Anderson MoDOT
Annual Wage Order 17_WO060 |
Feb 28, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-032 Well Drilling Services. Bid Tabs |
| RFQ D7-11-027-A Preventive Maintenance Sectional Bay Doors |
Feb 24, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-027-A Preventive Maintenance Sectional Bay Doors- Bid Tabs |
| RFQ D7-11-027 Preventive Maintenance Sectional Overhead Doors |
Feb 10, 2011 |
1:00 p.m. Local Time |
To Be Rebid |
| RFQ -D7-11-025 Under Tail Gate Spreaders |
Feb 8, 2011 |
1:00 p.m. Local Time |
|
| RFQ -D7-11-026 Stump Grinder Rental |
Feb 3, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-026 Stump Grinder Bid Tabs |
| RFB D7-11-018 Recapped tires |
Jan 26, 2011 |
1:00 p.m. Local Time |
RFB D7-11-018 Recapped Tire-Bid Tabs |
| RFQ -D7-11-022 Elliptical Metal Pipe |
Jan 6, 2011 |
1:00 p.m. Local Time |
RFQ D7-11-022 Elliptical Metal Pipe-Quote Tabs |
| RFQ -D7-11-019 Battery Consignment Services |
Dec 27, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-019 Battery Consignment Program- Bid Tabulations |
RFB D7-11-020 Trash Collection and Disposal Services Bid
Page 8-Pricing Sheet |
Dec 17, 2010 |
1:00 p.m. Local Time |
RFB D7-11-020 Trash Collection and Disposal-Bid Tabs |
RFQ D7-11-021 HDPE Pipe
MGS9213
Sec1047 |
Dec 16, 2010 |
1:00 p.m. Local Time |
RFQ D7-11-021-HDPE Pipe-Tabulations |
| Item |
Date Posted |
Response Date |
Vendor/Bid Information |
| SFS 7-111121SW Elgin Parts |
11/17/2011 |
11/21/2011 |
The Missouri Department of Transportation has determined that only one source, Key Equipment & Supply Co., can furnish OEM repair parts for Elgin Street Sweepers. Key Equipment & Supply Co. is the regional distributor of Elgin Street Sweeper Equipment. A purchase order for the approximate amount of $3500.00 may be issue to Key Equipment & Supply Co.,for the above-described equipment. |
| SFS 7-111011 Hot Mix Asphalt |
11/08/2011 |
11/10/2011 |
The Missouri Department of Transportation – Southwest District, has determined that only one source, C. B. Asphalt, Inc., can provide BP-1 hot mix asphalt for plant pickup from a quarry in the Warsaw, Benton County area. C. B. Asphalt has a portable asphalt plant in use in Benton County for producing material for an overlay project and has provided MoDOT with material from this temporary plant. Material from this plant is close to the jobsite and represents a freight savings as opposed to traveling large distances to pick up material. |
| SFS 7-111020 GL400 Parts |
10/20/2011 |
10/31/2011 |
The Missouri Department of Transportation Southwest District has determined that only one source, Certified Power/Component Technology, of Bridgeton, MO can provide the department with proprietary parts for GL400 systems. The approximate value of this purchase is estimated at an approximate cost of between $25,000 to $30,000. Issues with this purchase may be directed to Cathy Bay @ 417-621-6354 or Cathy.Bay@modot.mo.gov. |
| SFS - 7-SW110927 On Line Interactive Oil Analyses with Oil Kits |
9/27/11 |
9/28/11 |
The Missouri Department of Transportation has determined that there is only one known source of Oil Analyses with On-Line Interactive Reporting capabilities. Staveley Services out of Kansas City KS is the only supplier for the On-Line Interactive Oil Analyses process used by our Oil Suppliers in the past two years, supplying us with oil sample kits monthly at $115.20 per 10 packs |
| SFS7 - 110830 Gibraltar Cable Barrier Parts |
08/18/2011 |
08/30/2011 |
|
| SFS 7-100727 Geomelt C |
8/3/11 |
8/5/11 |
|
| SFS 7-071111 Lubra Seal |
07/11/2011 |
07/13/2011 |
|
| SFS SW-110708 SealTekkT Asphalt |
07/08/2011 |
07/12/2011 |
|
| SFS 7-063011 M-B Striper Repair Parts |
06/30/2011 |
07/7/2011 |
|
| SFS 7-062811 Miovision Automated Traffic Counting Systems |
06/28/2011 |
07/11/2011 |
|
| SFS 7-051111 CTS Low P Cement |
05/11/2011 |
05/13/2011 |
|
| SFS 7 - 040611 Quick Stand |
04/06/2011 |
04/08/2011 |
|
| SFS7-032911 Western Material |
3/29/2011 |
4/8/2011 |
|
| SFS7-032511 Industrial Hydraulic Technology Class |
3/25/2011 |
3/30/2011 |
|
| SFS7-010711 RWIS Weather Station Repair |
1/7/2011 |
1/17/2011 |
|