| |
Missouri Department of Transportation

Social Media Facebook Twitter Flickr Blog YouTube RSS

Addendum 001

Bidding Archives



Title Closing Date

Closing Time

(DST)

Tabulations
SW-13-024AM Bagged and Bulk Winter Cold Mix 12/17/12 1:00 p.m. local time SW-13-024AM Tabulation
SW-13-028CS Aerial Bucket Truck Rentals 12/13/12 1:00 p.m. local time SW-13-018-A-CS Tire Cables-Bid Tabs
SW-13-026CS Husqvarna Concrete Saw 12/10/12 1:00 p.m. local time SW-13-028CS Husqvarna FS413 Concrete Saw-Bid Tabs

SW-13-023CS Emergency Roadside Truck and Equipment Repair Services

12/10/12 1:00 p.m. local time SW-13-023CS Emergency Roadside Truck and Equipment Repair Service-Bid Tabs-
SW-13-019CS Spreader Chains 11/8/12 1:00 p.m. local time SW-13-019-CS Spreader Chains-Bid Tabs
SW-13-018-A-CS Tire Cables 11/6/12 1:00 p.m. local time SW-13-018-A-CS Tire Cables-Bid Tabs.pdf
SW-13-022AM Garmin GPS 11/1/12 1:00 p.m. local time SW-13-022AM Tabulation
SW-13-021AM Propane 10/22/12 1:00 p.m. local time SW-13-021AM Tabulation
SW-13-018CS Tire Chains and Cables 10/22/12 1:00 p.m. local time TO BE REBID
SW-13-020CS Annual Fire Extinguisher Inspections 10/19/12 1:00 p.m. local time ALL BIDS REJECTED

SW-13-017AM Sectional Overhead Doors-Cassville

Addendum 001 SW-13-017AM

10/11/12 1:00 p.m. local time SW-12-017AM Tabulation

SW-13-016AM Concrete Containment Structures

Addendum 001 SW-13-016AM

10/9/12 1:00 p.m. local time SW-13-016AM Tabulation

SW-13-015CS Asphalt Pads for Salt Tents

Annual Wage Order 19-Dallas

Annual Wage Order 19-Stone

Annual Wage Order 19-Webster

10/11/12 1:00 p.m. local time SW-13-015CS Aspahlt Pads-Bid Tabs

SW-13-012AM Signal and Lighting Repair MO 171 Jasper County

Contractor Pre-Qualification Required

10/9/12 1:00 p.m. local time SW-13-012AM Tabulation
SW-13-014CS Hurley School Flashers 9/24/12 1:00 p.m. local time SW-13-014CS Hurley School Flashers-Bid Tabs

RFQ SW-13-013CS Asphalt Pad for Buffalo Salt Tent

Prevailing Wage Order 19_Dallas County

9/21/12 1:00 p.m. local time TO BE REBID
SW-13-011CS NEMA Eberle Devices MMU16LEIP 9/14/12 1:00 p.m. local time SW-13-011CS NEMA-Eberle Devices MMU 16LE IP-Bid Tabs
SW-13-010AM Ready Mix Concrete US 13-Polk County 9/6/12 1:00 p.m. local time SW-12-010AM Tabulation
SW-13-009AM Hay Harvesting 9/10/12 1:00 p.m. local time no award
SW-13-008CS Conflict Monitors 8/24/12 1:00 p.m. local time SW-13-008CS Conflict Monitors-Bid Tabs
SW-13-007CS AXIS Q6032-E PTZ Dome Network Camera 8/20/12 1:00 p.m. local time SW-13-007CS Axis Q6032-E PTZ Dome Network Cameras

SW-13-006AM Spray Foam Insulation-Buffalo

Addendum 001 SW-13-006AM

8/9/12

8/16/12

1:00 p.m. local time SW-12-006AM Tabulation
SW-13-004AM Sectional Overhead Doors-Buffalo 8/7/12 1:00 p.m. local time SW-12-004AM Tabulation

SW-13-003AM Concrete Slab Reclamation

Addendum 001 SW-13-003AM

8/15/12 1:00 p.m. local time SW-13-003AM Tabulation
SW-13-002CS Graders and Loaders w-Operators 8/13/12 1:00 p.m. local time SW-13-002CS Motor Graders and Loaders w operators-Bid Tabsl

SW-13-001AM National DDI Striping

Addendum 001 SW-13-001AM

8/2/12

8/15/12

1:00 p.m. local time SW-13-001AM Tabulation
SW-13-005CS Metal Building Materials 7/30/12 1:00 p.m. local time SW-13-005CS Metal Building Materials Bid Tabs
SW-12-048CS Utility Air Compressor 7/9/12 1:00 p.m. local time SW-12-048CS Utility Air Compressor-Bid Tabs
SW-12-047AM Structural Steel Materials 6/20/12 1:00 p.m. local time SW-12-047AM Tabulation
RFQ SW-12-046CS Floor Saw 6/11/12 1:00 p.m. local time SW-12-046CS Floor Saw-husqvarna FS513 or Equivalent-Bid Tabs
RFQ SW-12-045CS MTX-Series Rammer-80SD Model 6/7/12 1:00 p.m. local time SW-12-045CS MTX-Series Rammer-Model 80 SD-Bid Tabs

SW Joplin CRS2P and CQS Bid Sheet 7-25 Thru 8-5-2012

Open Enrollment

6/6/12

6/20/12

7/3/12

7/18/12

1:00 p.m. local time SW District CRS2P Bid 4 Tabulation 7-23-12 to 8-05-12
SW-12-044 CS Vehicle Computer Mount Desks 6/1/12 1:00 p.m. local time SW-12-044CS-Vehicle Computer Mount Desks -Bid Tabs
SW-12-043AM Truck Wash Building Erection 5/21/12 1:00 p.m. local time SW-12-043AM Tabulation
SW-12-041-A-CS Reversible Tailgate Conveyor 5/16/12 1:00 p.m. local time SW-12-041-A-CS- Reversible Tailgate Conveyor -Bid Tabs
SW-12-042AM Aluminized Corrugated Metal Pipe 5/14/12 1:00 p.m. local time SW-12-042AM Tabulation
SW-12-037CS Plant Pickup Mix-Aggregate 5/24/12 1:00 p.m. local time SW-12-037CS Plant Pick Up Mix-Bid Tabs
SW-12-041CS Reversible Tailgate Conveyor 5/4/12 1:00 p.m. local time TO BE REBID
SW-12-039CS Activated Flashers 5/3/12 1:00 p.m. local time SW-12-039CS Activated Flashers - Bid Tabs
SW-12-038CB Aggregate for Bituminous Surface_AppletonCity 4/24/12 1:00 p.m. local time SW-12-038CB Aggregate for Bituminous Surface_Bid Tab

SW-12-037AM Pole Barn Erection Services - Clinton MO

Addendum 001 SW-12-037AM

Addendum 002 SW-12-037AM

4/16/12 1:00 p.m. local time

ALL BIDS REJECTED

TO BE REBID

SW-12-036CB Signal Change Services Business US 71 4/12/12 1:00 p.m. local time SW-12-036CB Business US 71_Range Line_ Signal Change Services_BidTab

SW-12-035AM Lawn Mowing Service

MoDOT SW District Office Mowing Drawings

4/6/12 1:00 p.m. local time SW-12-035AM Tabulation

SW-12-034CS Heavy Equipment Rentals

GS6MasterEquipmentRentalAgreement

4/23/12 1:00 p.m. local time SW-12-034CS Bid Tabulations
SW-12-32CS Zero Turn Radius Lawn Mower 3/12/12 1:00 p.m. local time SW-12-032CS Zero Turn Mower - Bid Tabs
SW-12-032AM Black Traffic Marking Paint 3/8/12 1:00 p.m. local time SW-12-032AM Tabulation
SW-12-031AM Wavetronix Matrix Radar Detection 3/12/12 1:00 p.m. local time SW-12-031AM Tabulation
SW-12-030AM Alpha FXM 1100 UPS System

3/12/12

3/29/12

1:00 p.m. local time SW-12-030AM Tabulation
SW-12-026CB Plant Mix Oil Material_Monett 3/13/12 1:00 p.m. local time SW-12-026CB BID Tab
SW-12-029AM Bagged and Bulk Winter Cold Mix 3/9/2012 1:00 p.m. local time SW-12-029AM Tabulation
SW-12-028AM Chip Seal Aggregate 3/6/2012 1:00 p.m. local time SW-12-028AM Tabulation
SW-12-027CS -Vibratory Roller Rentals 3/5/2012 1:00 p.m. local time SW-12-027CS Vibratory Rollers Rental - Bid Tabs
SW-12-021CS-A Zero Turn Radius Lawn Mower 3/2/2012 1:00 p.m. local time BID CANCELLED

SW-12-023CS-A Concrete Culvert Pipe - Fixed Pricing Agreement

MGS9210

2/23/2012 1:00 p.m. local time RFB SW-12-023CS-Concrete Pipe Tabulations
SW-12-024CB Plant Mix Oil Material_Quarry Stockpile 2/22/12 1:00 p.m. local time SW-12-024CB BID Tab
SW-12-025 Graders and Loaders w-Operators 2/10/2012 1:00 p.m. local time SW-12-025CS Motor Graders w operators-Bid Tabsl

SW-12-021CS Zero Turn Radius Lawn Mower

2/8/2012 1:00 p.m. local time TO BE REBID
SW-12-022CB Lighting Controller 2/7/2012 1:00 p.m. local time  
SW-12-020CS Lube Skid 2/6/2012 1:00 p.m. local time SW-12-020CS Lube Skid - Bid Tabs
SW-12-019CB Spec 8 Aggregate 1/19/2012 1:00 p.m. local time SW-12-019 Spec 8 Type I Base Aggregate Bid Tab
SW-12-018CS-A Quikrete Concrete 1/9/2012 1:00 p.m. local time SW-12-018CS-A Quickcrete Bid Tabs
SW-12-017AM Bridge Reinforcement Steel Plates 12/29/2011 1:00 p.m. local time SW-12-017AM Tabulation
SW-12-018CS Quikrete Concrete 12/27/11 1:00 p.m. local time TO BE REBID
SW-12-016AM Countdown Pedestrian Signals 12/28/2011 1:00 p.m. local time SW-12-016AM Tabulation

SW-12-015CS Corrugated Metal Pipe-Eldorado Springs

MGS-91-11G

Addendum 001-SW-12-015CS

12/15/2011 1:00 p.m. local time SW-12-015CS Round and Elliptical Corrugated Metal Pipe-Bid Tabs
SW-12-014 Recapped Tires 11/15/2011 1:00 p.m. local time  
SW-12-013AM Safety Harnesses 11/1/2011 1:00 p.m. local time SW-12-013AM Tabulation

SW-12-011AM Stream Bank Stabilization-Polk County

Contractor Pre-Qualification Required

11/15/2011 1:00 p.m. local time ALL BIDS REJECTED

SW-12-012CS Pipe Installation

Addendum 001-Pipe Installation

11/4/11 1:00 p.m. local time SW-12-012CS Pipe Installation Bates County-Bid Tabs
SW-12-009CS Preventive Pest Control Services 10/24/11 1:00 p.m. local time SW-12-009CS Preventive Pest Control Services-Bid Tabs
SW-12-010AM Metal Building Material 10/12/2011 1:00 p.m. local time SW-12-010AM Tabulation
SW-12-008CB Concrete Commercial Mix Fixed Pricing 10/06/2011 1:00 p.m. local time SW-12-008CB Commercial Mix Concrete Bid Tab
SW-12-004RG Propane 9/26/2011 1:00 p.m. local time Tabulation SW-12-004RG Propane
SW-12-006CB Traffic Signal Mast and Arm 9/20/2011 1:00 p.m. local time SW-12-006CB Traffic Signal Mast and Arm Bid Tab
SW-12-007CS Health Fair Catering 2011 9/16/11 1:00 p.m. local time SW-12-007CS Catering Service 2011 Health Fair-Bid Tabs

SW-12-005CB Diamond Grinding_US 71 Newton Co

SW-12-005CB General Wage Order 54

Contractor Pre-Qualification Required

8/25/2011 1:00 p.m. local time SW-12-005CB Diamond Grinding_US 71 Newton Co BID Tab

SW-12-001CB Streambank Stablization_BigDryWood_Route_54_Vernon Co

SW-12-001CB Attachment A_Special Provisions

SW-12-001CB Attachment B - Special Provisions Construction

SW-12-001CB Exhibit A - Traffic Control

SW-12-001CB Exhibit B - Construction and Material Specifications

SW-12-001CB Exhibit C - Plan Sheets_DSR 217-10-001 EWP Project

SW-12-001CB Exhibit D - General Wage Order 54

Contractor Pre-Qualification Required

8/17/2011/ 1:00 p.m. local time SW-12-001CB Stream Bank Stablization Big Dry Wood Creek Rte 54 Vernon Co. Bid Tab

SW-12-003AM Stream Bank Stabilization - Polk County

Contractor Pre-Qualification Required

Addendum 001 SW-12-003AM

8/1/2011 1:00 p.m. local time ALL BIDS REJECTED

SW-12-002AM Signal Hardware

Addendum 001 SW-12-002AM

7/19/2011 1:00 p.m. local time SW-12-002AM Tabulation

SW Joplin CRS2P and CQS Bid Sheet 9-5 thru 9-25

Open Enrollment

7/06/2011

7/20/2011

8/03/2011

8/17/2011

8/31/2011

1:00 p.m. local time Asphalt Pricing 9-5 thru 9-25
D8PP-11055 Mini-Lightbar 5/16/2011 1:00 p.m. local time Tabulation D8PP-11055
D8PP-11054 Truck Tires 05/06/2011 1:00 p.m. local time D8PP-11054 Tabulation
D8PP-11053 Pelco Cameras 05/16/2011 1:00 p.m. local time D8PP-11053 Tabulation
D8PP-11052 General Fabrication Services

5/10/2011

5/27/2011

1:00 p.m. local time D8PP-11052 Tabulation
D8PP-11051 Corrugated Metal Round Pipe 5/03/2011 1:00 p.m. local time D8PP-11051 Tabulation
D8PP-11050 Pole Barn Erection Services-Gainesville 5/05/2011 1:00 p.m. local time D8PP-11050 Tabulation

D8PP-11049 Industrial Lighting

Addendum 001 D8PP-11049

5/05/2011 1:00 p.m. local time  
D8PP-11048 Concrete Ready Mix 4/19/2011 1:00 p.m. local time D8PP-11048 Tabulation

D8PP-11047 Cargo Trailer Equipment - Shelving

Addendum 001 D8PP-11047

4/18/2011 1:00 p.m. local time D8PP-11047 Tabulation
D8PP-11046 Black Traffic Marking Paint 03/31/2011 1:00 p.m. local time D8PP-11046 Tabulation
D8PP-11045 Encom Traffic Signal Radios 03/30/2011 2:00 p.m. local time D8PP-11045 Tabulation

D8PP-11044 Wavetronix Matrix Radar Detection

Addendum 001 D8PP-11044

03/30/2011

04/04/2011

1:00 p.m. local time D8PP-11044 Tabulation
D8PP-10043 Roller and Broom Equipment Rental 03/28/2011 1:00 p.m. local time D8PP-11043 Tabulation
D8PP-11041 Box Culverts 03/17/2011 1:00 p.m. local time D8PP-11041 Tabulation
D8PP-10039 Annual Aggregate Plant Pickup 03/29/2011 1:00 p.m. local time

D8PP-11039 tabulation

Updated 7/21/2011

D8PP-11038 Corrugated Metal Round Pipe 03/17/2011 1:00 p.m. local time D8PP-11038 Tabulation
D8PP-11035 Steel Buildings 03/24/2011 1:00 p.m. local time D8PP-11035 Tabulation
D8PP-11037 Corrugated Metal Arch and Round Pipe 03/08/2011 1:00 p.m. local time D8PP-11037 Tabulation

D8PP-11033 Pole Barn Erection Services

Addendum 001 D8PP-11033

03/10/2011 1:00 p.m. local time D8PP-11033 Tabulation
D8PP-11032 Globug Balloon Lighting System 03/1/2011 1:00 p.m. local time D8PP-11032 Tabulation
D8PP-11031 Asphalt Recycling Trailer 02/18/2010 1:00 p.m. local time D8PP-11031 Tabulation

D8PP-11029 Corrugated Metal Pipe

Addendum 001 D8PP-11029

01/19/2010 1:00 p.m. local time D8PP-11029 Tabulation

D8PP-11028 Recap Tires

Addendum 001 D8PP-11028 Recap Tires

01/28/2010 1:00 p.m. local time D8PP-11028 Tabulation
D8PP-11027 Box Culvert 12/23/2010 1:00 p.m. local time D8PP-11027 Tabulation
D8PP-11026 Building Material 12/10/2010 1:00 p.m. local time D8PP-11026 Tabulation
D8PP-11025 Antifreeze 01/25/2011 1:00 p.m. local time D8PP-11025 Tabulation
D8PP-10024 Bagged and Bulk Winter Cold Mix Material 11/30/2010 1:00 p.m. local time D8PP-11024 Tabulation 12-30-2010
D8PP-11023 LD Salt Spreader 11/23/2010 1:00 p.m. local time D8PP-11023 Tabulation
D8PP-11022 Septic Pumping and Hauling 01/19/2011 1:00 p.m. local time  

D8PP-11021 Spreader Stands

D8PP-11021 Drawing

11/03/2010 1:00 p.m. local time D8PP-11021 Tabulation
D8PP-11020 Tilt Trailer 11/04/2010 1:00 p.m. local time D8PP-11020 Tabulation
D8PP-11019 Compact Roller 10/29/2010 1:00 p.m. local time D8PP-11019 Tabulation
D8PP-11017 Recycling Trailer 10/29/2010 1:00 p.m. local time D8PP-11017 Tabulation
D8PP-11016 Trailer Painting 11/04/2010 1:00 p.m. local time D8PP-11016 Tabulation
D8PP-11015 Dust Collection System 10/15/2010 1:00 p.m. local time D8PP-11015 Tabulation

D8PP-11014 Alpha FXM 1100 UPS System

Addendum 001 D8PP-11014

10/15/2010

10/22/2010

1:00 p.m. local time D8PP-11014 Tabulation
D8PP-11013 14000 LB Equipment Trailer 10/13/2010 1:00 p.m. local time D8PP-11013 Tabulation

D8PP-11012 Overhead Doors

Annual Wage Order No. 17 - Greene County

10/5/2010 1:00 p.m. local time D8PP-11012 Tabulation
D8PP-11011 Cargo Trailer 9/30/2010 1:00 p.m. local time D8PP-11011 Tabulation

D8PP-11010 Insulation

Annual Wage Order No. 17 - Greene County

Addendum 001 D8PP-11010

11/15/2010 1:00 P.M. LOCAL TIME D8PP-11010 Tabulation

D8PP-11009 Flu Vaccination

Cancelled

9/24/2010 1:00 p.m. local time  
D8PP-11008 Metal Building Material 9/16/2010 1:00 p.m. local time D8PP-11008 Tabulation

D8PP-11007 Concrete Resurfacing

Attachment A - D8PP-11007 JSP_Final

Attachment B - FinalPlansD8PP-11007

Attachment C - General Wage Order No. 54

9/24/2010 1:00 p.m. local time D8PP-11007 Tabulation

D8PP-11006 Fuel Tank Gauges

Addendum001forPRL

9/02/2010 1:00 p.m. local time D8PP-11006 Tabulation
D8PP-11005 Car Hauler 9/01/2010 1:00 p.m. local time D8PP-11005 Tabulation
D8PP-11004 Wavetronix Matrix Radar Detection 9/01/2010 1:00 p.m. local time D8PP-11004 Tabulation

D8PP-11003 Self Propelled Paver with Operator

General Wage Order No. 54

9/2/2010 1:00 p.m. local time D8PP-11003 Tabulation
D8PP-11001 Vehicle Computer Mount Desks 7/12/2010 1:00 p.m. local time D8PP-11001 Tabulation

D8PP-10068 AC Recovery Recycling Unit

Addendum 001 D8PP-10068

7/08/2010 1:00 p.m. local time D8PP-10068 Tabulation
D8PP-10067 Propane 07/07/2010 1:00 p.m. local time Propane Bid Tabulation
D8PP-10066 Ethernet Video Transmitter 6/10/2010 10:00 a.m. local time D8PP-10066 Tabulation

D8PP-10065 Bridge Paint

Addendum 001 D8PP-10065

06/04/2010

06/09/2010

1:00 p.m. local time D8PP-10065 Tabulation
D8PP-10064 Galvalume Arch Building 06/04/2010 1:00 p.m. local time D8PP-10064 Tabulation
D8PP-10063 Replacement Signal Pole 5/5/2010 1:00 p.m. local time D8PP-10063 Tabulation

D8PP-10062 Safety Harnesses

Addendum 001 D8PP-10062

5/5/2010

5/6/2010

1:00 p.m. local time D8PP-10062 Tabulation

D8PP-10052 Fixed Automated Spray Technology

Addendum 001 D8PP-10052

5/19/2010

5/28/2010

2:00 p.m. local time NO AWARD MADE

D8PP-10061 Structured Telecommunications Cabling System

Annual Wage Order No. 16

District8office FLOORPLAN

Work Hour Restrictions Map

D8PP-10061 Planholder List

Addendum 001 D8PP-10061

Addendum 002 D8PP-10061

Addendum 003 D8PP-10061

5/13/2010

5/21/2010

1:00 p.m. local time D8PP-10061 Tabulation
D8PP-10060 Concrete Ready Mix 3/25/2010 1:00 p.m. local time D8PP-10060 Tabulation
D8PP-10059 Concrete Pipe 3/12/2010 1:00 p.m. local time D8PP-10059 Tabulation
D8PP-10058 Annual Aggregate Plant Pickup 3/26/2010 1:00 p.m. local time D8PP-10058 tabulation

D8PP-10057 Wastewater Treatment Plant Operator

Addendum 001 D8PP-10057

3/25/2010

3/30/2010

1:00 p.m. local time D8PP-10057 Tabulation
D8PP-10056 Chip Seal Equipment Rental 3/8/2010 1:00 p.m. local time D8PP-10056 Tabulation

D8PP-10055 Herbicide Sprayer Parts

Addendum 001 D8PP-10055

2/26/2010 1:00 p.m. local time D8PP-10055 Tabulation
D8PP-10054 Tree Removal 3/5/2010 1:00 p.m. local time D8PP-10054 Tabulation

D8PP-10053 Insulation

annual wage order 16

Cancelled

1/22/2010 1:00 p.m. local time  

D8PP-10051 Steel Flat-Beds

Addendum 001 D8PP-10051

Addendum 002 D8PP-10051

Addendum 003 D8PP-10051

1/25/2010 1:00 p.m. local time D8PP-10051 Tabulation
D8PP-10050 Building Materials - Ava Maintenance 1/5/2010 1:00 p.m. local time D8PP-10050 Tabulation

D8PP-10038 Overhead Crane Installation

Addendum 001 D8PP-10038

Addendum 002 D8PP-10038

Addendum 003 D8PP-10038

1/21/2010

1/26/2010

2/4/2010

2/11/2010

1:00 p.m. local time CANCELLED
       
D8PP-9050 Reversible Tailgate Conveyor 4/30/2009 1:00 p.m. local time D8PP-9050 Tabulation
D8PP-9049 Knuckle Boom Trucks with Operators 4/21/2009 1:00 p.m. local time D8PP-9049 Tabulation
D8PP-9048 Truck Mounted Crane 4/14/2009 1:00 p.m. local time D8PP-9048 tabulation

D8PP-9022 Loop Detector Replacements and Additions

General Wage Order No. 52

4/16/2009 1:00 p.m. local time D8PP-9022 Tabulation
D8PP-9047 Concrete Ready Mix 4/15/2009 1:00 p.m. local time D8PP-9047 Tabulation
D8PP-9046 AC Recovery Recycling Unit 4/01/2009 1:00 p.m. local time D8PP-9046 tabulation

D8PP-9045 Corrugated Metal Pipe

FAXED QUOTATIONS WILL BE ACCEPTED - 417-895-6704

3/19/2009 1:00 p.m. local time D8PP-9045 Tabulation
D8PP-9044 Corrugated Metal Pipe 3/18/2009 1:00 p.m. local time CANCELED - QUOTE WILL BE REISSUED
D8PP-9043 Storm Debris Tub Grinding Service 3/18/2009 1:00 p.m. local time

All QUOTES REJECTED -

MAY BE REBID

D8PP-9042 Trucks with Knuckle Boom Loader and Operator 3/13/2009 1:00 p.m. local time D8PP-9042 Tabulation

D8PP-9040 Bulk Oil

Specifications

4/01/2009 1:00 p.m. local time D8PP-9040 Tabulation
D8PP-9039 Annual Aggregate Plant Pickup 3/17/2009 1:00 p.m. local time  
D8PP-9037 Chip Seal Aggregate 3/3/2009 1:00 p.m. local time D8PP-9037 Tabulation
D8PP-9038 McMillen Hydraulic Drive Heads 2/17/2009 1:00 p.m. local time D8PP-9038 Tabulation

D8PP-9036 Horizontal Elliptical Leg Tanks

Addendum 001 D8PP-9036

02/17/09 1:00 p.m. local time D8PP-9036 Tabulation
D8PP-9035 Rycom Locator 02/17/09 1:00 p.m. local time D8PP-9035 tabulation

D8PP-9028 Class D Wastewater Treatment Plant Operator

Addendum 001 D8PP-9028

Lab Info

02/24/09 1:00 p.m. local time D8PP-9028 Tabulation
D8PP-9034 Quikrete 02/02/09 1:00 p.m. local time D8PP-9034 Tabulation

D8PP-9033 Horizontal Elliptical Leg Tanks

CANCELLED - WILL BE REBID

01/27/09 1:00 p.m. local time BID WILL BE REISSUED BECAUSE OF ADDITIONAL NEEDS THAT HAVE BEEN REQUESTED
Autoscope Solo Detection Cameras SFS7-042409 4/24/2009 05/08/2009  
SFS 7 - 042109 Superpave Bridge Overlay 2/21/2009 2/23/2009  
Tasmanian Digger - SFS7-020609 2/10/2009 2/25/2009  
SFS 8 - 121808 Maddock Repair 12/08/08 12/23/08  
D8PP-9032 Metal Building Materials 1/28/09 1:00 p.m. local time D8PP-9032 tabulation

D8PP-9031 Spreader Stands

D8PP-9031 Drawing

01/27/09 1:00 p.m. local time D8PP-9031 tabulation

D8PP-9030 Bagged Concrete Masonry Repair

Qualified Product List

01/26/09 1:00 p.m. local time D8PP-9030 Tabulation

D8PP-9029 Leica Survey Equipment

Photo - Leica SR530 equipment

***Faxed Quotations Will Be

Accepted - 417-895-6704***

01/23/2009 1:00 p.m. local time D8PP-9029 Tabulation
D8PP-10049 Hose Reels 12/23/2009 1:00 p.m. local time D8PP-10049 Tabulation
D8PP-10048 Herbicide Sprayers 12/30/2009 1:00 p.m. local time D8PP-10048 Tabulation
D8PP-10047 Plastic Septic Tank 12/23/2009 1:00 p.m. local time D8PP-10047 Tabulation
D8PP-10046 On-Call General Fabrication 1/6/2010 1:00 p.m. local time  
D8PP-10045 Tire Chains 12/15/2009 1:00 p.m. local time D8PP-10045 Tabulation
D8PP-10044 Welded Steel Wire Fabric 12/10/2009 1:00 p.m. local time D8PP-10044 Tabulation
D8PP-10043 Quikrete 12/14/2009 1:00 p.m. local time D8PP-10043 Tabulation

D8PP-10042 50 ton Detachable Lowboy Equipment Trailer

                                  Cancelled

12/11/2009 1:00 p.m. local time  

D8PP-10041 Custom Built Fiber Optic Splice Trailer

Addendum 001 - D8PP-10041

12/11/2009 1:00 p.m. local time D8PP-10041 Tabulation

D8PP-10040 Sectional Overhead Doors

Addendum 001 D8PP-10040

11/30/2009 1:00 p.m. local time D8PP-10040 Tabulation
D8PP-10039 Crane Service 11/20/2009 1:00 p.m. local time D8PP-10039 Tabulation
D8PP-10037 Truck Mounted Crane 11/25/2009 1:00 p.m. local time D8PP-10037 Tabulation
D8PP-10036 Barrier Lift Tongs 11/19/2009 1:00 p.m. local time D8PP-10036 Tabulation
D8PP-10035 Rubber Skid Steer Tracks 11/20/09 1:00 p.m. local time D8PP-10035 Tabulation
D8PP-10034 PreMark Pavement Markings 11/09/09 1:00 p.m. local time D8PP-10034 Tabulation
D8PP-10033 Box Culvert 11/4/2009 1:00 p.m. local time D8PP-10033 Tabulation
D8PP-10032 Salt Spreader Tanks 10/30/2009 1:00 p.m. local time D8PP-10032 Tabulation

D8PP-10031 Winter Cold Mix Material

Addendum 001 D8PP-10031

10/22/2009 1:00 p.m. local time D8PP-10031 Tabulation

D8PP-10030 HVAC Materials

Addendum 001 D8PP-10030

9/21/2009 1:00 p.m. local time D8PP-10030 Tabulation

D8PP-10029 Tank Manway Replacement

Annual Wage Order No 16

Pictures

Example Manway

Manway to replace

9/24/2009 1:00 p.m. local time D8PP-10029 Tabulation
D8PP-10028 Lighting 9/30/2009 1:00 p.m. local time D8PP-10028 Tabulation
D8PP-10027 Wabo Flex Expansion Joint 9/22/2009 1:00 p.m. local time  
D8PP-10026 Administration of Flu Shots 9/15/09 1:00 p.m. local time D8PP-10026 Tabulation
D8PP-10025 Lightweight Aggregate 10/7/09 1:00 p.m. local time

D8PP-10025 Tabulation

All Bids Rejected for Budgetary Limitations

D8PP-10024 Chip Seal Aggregate

Addendum 001 D8PP-10024

10/7/09 1:00 p.m. local time

D8PP-10024 Award Sheet

D8PP-10023 Intersection Lighting Installation

General Wage Order No.53

Marshfield Lighting MO 38 and Route W

Gage_St_Lighting updated 9-14-09

Addendum 001 D8PP-10023

Addendum 002 D8PP-10023

9/23/09 1:00 p.m. local time D8PP-10023 Tabulation

D8PP-10022 Track Loader with Operator

General Wage Order No 53

D8PP-10022 sketches

Bridge Photos:

east end of all bridges showing access area

north profile of outer road bridge

north profile of WB bridge

south profile of twin bridges

8/19/2009 1:00 p.m. local time D8PP-10022 Tabulation
D8PP-10021 Rip Rap Material 8/19/2009 1:00 p.m. local time D8PP-10021 Tabulation
D8PP-10020 Ready Mix - Ava Maintenance 8/17/2009 1:00 p.m. local time D8PP-10020 Tabulation

D8PP-10019 Poly Heads and Signal Hardware

Addendum 001

8/21/2009 1:00 p.m. local time D8PP-10019 Tabulation
D8PP-10018 Limestone Boulder 8/20/2009 1:00 p.m. local time D8PP-10018 Tabulation
D8PP-10017 PreMark Pavement Markings 8/14/2009 1:00 p.m. local time D8PP-10017 Tabulation
D8PP-10016 Industrial Lighting 8/18/2009 1:00 p.m. local time D8PP-10016 Tabulation

D8PP-10015 Traficon Video Detector Parts

8/13/2009 1:00 p.m. local time D8PP-10015 Tabulation
D8PP-10014 Metal Siding Material 8/12/2009 1:00 p.m. local time D8PP-10014 Tabulation

D8PP-10013 Building Materials - Ava Maintenance

D8PP-10013 Truss Drawings

8/11/2009 3:00 p.m. local time D8PP-10013 Tabulation
D8PP-10012 A36 Flat Steel 7/21/2009 3:00 p.m. local time D8PP-10012 Tabulation
D8PP-10011 Spill Containment Equipment 7/30/2009 1:00 p.m. local time

D8PP-10011Tabulation

D8PP-10010 Bridge Overlay

General Wage Order No. 52

8/10/2009 1:00 p.m. local time D8PP-10010 Tabulation
D8PP-10009 Traficon Video Detector Parts 7/29/2009 1:00 p.m. local time CANCELED - WILL BE REBID
D8PP-10008 Trackhoe Rental 7/28/2009 1:00 p.m. local time  
D8PP-10007 Commercial Grade Zero Turn Mower 7/30/2009 1:00 p.m. local time D8PP-10007 Tabulation
D8PP-10006 Commercial Grade Zero Turn Mower 7/30/2009 1:00 p.m. local time Cancelled

D8PP-10005 Limestone Boulders

Addendum 001 D8PP-10005

7/28/2009 1:00 p.m. local time D8PP-10005 Tabulation
D8PP-10004 Compact Tractor with Mower 7/27/2009 1:00 p.m. local time D8PP-10004 Tabulation
D8PP-10003 Commercial Grade Zero Turn Mower 7/02/2009 1:00 p.m. local time D8PP-10003 Tabulation
D8PP-10002 Crusher and Pug Mill Service 7/09/2009 1:00 p.m. local time D8PP-10002 Tabulation
D8PP-9056 Hydraulic Post Driver 6/12/2009 10:00 a.m. local time D8PP-9056 tabulation
D8PP-9055 Propane 6/18/2009 1:00 p.m. local time D8PP-9055 Propane Tabulation
D8PP-9054 36 Inch Concrete Saw 5/28/2009 1:00 p.m. local time D8PP-9054 Tabulation
D8PP-9053 LED Mini Light Bar 5/20/2009 1:00 p.m. local time D8PP-9053 tabulation
D8PP-9052 Compact Tractor with Mower 5/6/09 1:00 p.m. local time D8PP-9052 Tabulation

D8PP-9041 Slide Repair

General Wage Order No. 52

SLIDE_J8P0787

Rte 14 Slide Repair_0

Rte 14 Slide Repair_1

Rte 14 Slide Repair_2

Rte 14 Slide Repair_3

Rte 14 Slide Repair_4

Rte 14 Slide Repair_5

05/14/2009 1:00 p.m. local time

D8PP-9041 Tabulation

 

D8PP-9051 Truck Mounted Changeable Message Sign 05/12/2009 1:00 p.m. local time D8PP-9051Tabulation
D8PP-9027 Paint and Bead Gun Parts 01/06/2008 1:00 p.m. local time D8PP-9027 tabulation
D8PP-9026 LED Mini Light Bar 12/30/2008 1:00 p.m. local time D8PP-9026 tabulation
D8PP-9025 Motor Grader 12/30/2008 10:30 a.m. local time  
D8PP-9024 Storage Container 12/12/2008 1:00 p.m. local time D8PP-9024 tabulation
D8PP-9011 Used Oil Disposal 12/9/2008 1:00 p.m. local time D8PP-9011 Tabulation
D8PP-9023 Industrial Lighting 12/04/2008 1:00 p.m. local time D8PP-9023 Tabulation
SFS 8 - 110508 MODIS System 11/05/08 11/10/08  
D8PP-9021 Overhead Door Repair 11/12/2008 1:00 p.m. local time D8PP-9021 Tabulation
D8PP-9019 Crane Service 11/3/2008 1:00 P.M. local time D8PP-9019 Tabulation

D8PP-9020 14000 LB Tandem Axle Trailer

Addendum 001 D8PP-9020

10/31/2008 1:00 P.M. local time D8PP-9020 Tabulation
D8PP-9018 Winter Cold Mix Material 10/10/08 1:00 P.M. local time D8PP-9018 Tabulation
D8PP-9017 Tire Chains 10/9/08 1:00 P.M. local time D8PP-9017 Tabulation

D8PP-9015 Welded Steel Wire Fabric

MGS9215 Welded Steel Wire Fabric Spec

Addendum 001 D8PP-9015

9/23/08

9/26/08

1:00 p.m. local time D8PP-9015 Tabulation
D8PP-9016 Flu Vaccinations 9/23/08 1:00 P.M. local time D8PP-9016 Tabulation
D8PP-9014 Bobcat 250 Welder 9/22/08 1:00 p.m. local time D8PP-9014 Tabulation

D8PP-9013 LD Salt Spreader

Addendum 001 D8PP-9013

9/22/08 1:00 p.m. local time D8PP-9013 Tabulation

D8X2-9012 Spreader Stands

D8x2-9012 Drawing

9/17/08 1:00 p.m. local time D8PP-9012 tabulation

D8PP-9010 Pre-Cast Box Culvert

Addendum 001 - D8X2-9010

8/21/08 1:00 p.m. local time  
D8PP-9009 Window Tint 8/11/08 1:00 p.m. local time D8PP-9009 Tabulation
D8PP-9008 Corrugated Metal Pipe 7/28/08 1:00 p.m. local time D8PP-9008 Tabulation
D8PP-9007 RT WW-T Seal Chips 7/22/08 10:00 a.m. local time D8PP-9007 Tabulation
D8PP-9006 A36 Steel Plates 7/8/08 3:00 p.m. local time D8PP-9006 Tabulation

D8PP-9005 Gasboy Fuel System

Addendum 001

7/9/08

7/10/08

1:00 p.m. local time D8PP-9005 Tabulation
D8PP-9004 25 ft. Equipment Trailer 7/10/08 1:00 p.m. local time D8PP-9004 Tabulation
D8PP-9003 Aerial Truck Inspections 7/7/08 1:00 p.m. local time D8PP-9003 Tabulation
D8PP-9002 Residential Grade Zero Turn Mower 7/08/08 1:00 p.m. local time D8PP-9002 Tabulation
D8PP-9001 Commercial Grade Zero Turn Mower 7/08/08 1:00 p.m. local time D8PP-9001 Tabulation
D8X2-8056 Grass Seed 5/30/08 1:00 p.m. local time D8X2-8056 tabulation

D8X2-8055 Propane

D8X2-8055 Addendum 001

6/06/08 1:00 p.m. local time D8X2-8055 Tabulation
D8X2-8054 Cargo Trailers 5/30/08 1:00 p.m. local time D8X2-8054 tabulation
D8X2-8053 Transportation of Incarcerated Personnel 5/30/08 1:00 p.m. local time D8X2-8053 Tabulation
D8X2-8052 Pre-Cast Box Culvert 5/11/08 1:00 p.m. local time D8X2-8052 tabulation
D8X2-8051 Summer Aggregate Bid 5/15/08 1:00 p.m. local time D8X2-8051 Tabulation

D8X2-8050 Bagged Concrete Masonry Repair

Qualified Product List

4/18/08 1:00 P.M. local time D8X2-8050 Tabulation

D8X2-8049 Erosion Control and Native Seeding

Project Plan Sheets 465-76

4/18/08 1:00 p.m. local time D8X2-8049 Tabulation
D8X2-8048 Pile Driving

4/1/08

1:00 p.m. local time

D8X2-8048 Tabulation

D8X2-8045 Asphalt Overlay

Strafford Weight Station

D8X2-8045 elevation drawing

4/8/08 1:00 p.m. local time D8X2-8045 Tabulation
D8X2-8046 Video Transmission Equipment 4/4/08 1:00 p.m. local time D8X2-8046 Tabulation
D8X2-8047 Plant Pickup 4/9/08 1:00 p.m. local time D8X2-8047 Tabulation
D8X2-8044 Planetary Auger Drive 3/28/08 1:00 p.m. local time D8X2-8044 Tabulation

D8X2-8043 Concrete Ready Mix

Addendum 001 Concrete Ready Mix D8x2-8043

3/21/08 1:00 p.m. local time D8X2-8043 tabulation 1
D8X2-8042 Shaft Guard 3/14/2008 1:00 p.m. local time D8X2-8042 Tabulation
D8X2-8041 Mowing Services 3/13/2008 1:00 p.m. local time D8X2-8041 Tabulation

D8X2-8040 LED SIGN

D8X2-8040 Specification and Drawing

3/10/08 1:00 P.M. local time D8X2-8040 Tabulation
D8X2-8039 Engine Replacement 2/26/08 10:00 a.m. local time D8X2-8039 Tabulation
D8X2-8038 Hydraulic Pump and Motor Assembly 2/21/08 1:00 p.m. local time D8X2-8038 Tabulation
D8X2-8037 Shindaiwa Trimmer 2/13/08 1:00 p.m. local time D8X2-8037 Tabulation

D8X2-8036 Industrial Lighting

Addendum 001 D8X2-8036

1/24/08 1:00 p.m. local time D8X2-8036 Tabulation
D8X2-8035 Equipment Rental 1/24/08 2:00 p.m. local time  
SFS7 - 121007 Geomelt 12/17/07 4:00 p.m. local time The Missouri Department of Transportation has determined that there is only one known source for GEOMELT 55 Anti-Icing/Deicing fluid in the Springfield, District 8 Areas.
D8X2-8034 Signal Controller Cabinet 12/14/07 1:00 p.m. local time D8X2-8035 Tabulation
D8X2-8033 Tires-Recap 12/20/07 1:00 p.m. local time D8X2-8033 Tabulation
D8X2-8032 Auger drive and Auger 11/07/07 1:00 p.m. local time D8X2-8032 Tabulation
D8X2-8031 Signal Hardware 11/06/07 1:00 p.m. local time D8X2-8031 Tabulation
D8X2-8030 Building Relocation 10/23/07 1:00 p.m. local time D8X2-8030 Tabulation
SFS7-100907 Guardrail Mower 9/25/07 10/09/07 The Missouri Department of Transportation has determined that only one source, US Ditcher, Inc., can provide a hydraulic-drive guardrail mower with capabilities of being front or rear mounted on either the right or left side of a tractor.  Questions may be directed to Richard Gardner at (417) 895-7811 or

richard.gardner@modot.mo.gov

D8X2-8029 Asphalt Overlay 10/15/07 1:00 p.m. local time D8X2-8029 Tabulation
D8X2-8024 Used Trencher 10/10/07 1:00 p.m. local time D8X2-8024 Tabulation
D8X2-8026 Flu Shots 9/25/07 1:00 p.m. local time D8X2-8026 Tabulation
D8X2-8025 Office Chairs 9/26/07 1:00 p.m. local time D8X2-8025 Tabulation
D8X2-8027 V-bed spreader stands 9/20/07 1:00 p.m. local time D8X2-8027 Tabulation
D8X2-8022 Over the road tractor 9/13/07 1:00 p.m. local time D8X2-8022 Tabulation
D8X2-8023 Pressure washers 9/11/07 1:00 p.m. local time D8X2-8023 Tabulation
D8X2-8021 Cargo Trailer 9/11/07 1:00 p.m. local time D8X2-8021 Tabulation
D8X2-8015 Heavy-duty winch straps 9/07/07 1:00 p.m. local time D8X2-8015 Tabulation
D8X2-8020 Backhoe thumb attachment 9/05/07 1:00 p.m. local time D8X2-8020 Tabulation
D8X2-8019 Hydraulic rock drill 8/29/07 1:00 p.m. local time D8X2-8019 Tabulation
D8X2-8018 Ballasts and bulbs 8/23/07 1:00 p.m. local time D8X2-8018 Tabulation
D8X2-8017 Tow-Type Hydraulic 8-Foot Rotary Road Broom 8/22/07 1:00 p.m. local time D8X2-8017 Tabulation
D8X2-8016 Cargo Trailer 8/22/07 2:00 p.m. local time Cancelled
D8X2-8012 Aggregate Material 8/08/07 1:00 p.m. local time D8X2-8012 Tabulation

D8X2-8007 Installation of Interactive Flasher

D8X2-8007 Drawing

Picture 1

Picture 2

Picture 3

Picture 4

Picture 5

Picture 6

Picture 7

Picture 8

8/08/07 1:00 p.m. local time D8X2-8007 Tabulation
D8X2-8010 Metal Building Materials 8/03/07 1:00 p.m. local time D8X2-8010 Tabulation

D8X2-8013 Winter Cold Mix

Addendum 001

8/02/07 1:00 p.m. local time D8X2-8013 Tabulation
D8X2-8011 Reversible Tailgate Conveyor 8/02/07 1:00 p.m. local time D8X2-8011 Tabulation
D8X2-8009 Front Mount Broom 7/31/07 1:00 p.m. local time D8X2-8009 Tabulation

D8X2-8006 Storage containers

Addendum 001

7/31/07 1:00 p.m. local time D8X2-8006 Tabulation
D8X2-8003 Compact Tractor 7/24/07 1:00 p.m. local time D8X2-8003 Tabulation
D8X2-8002 PROPANE 7/24/07 1:00 p.m. local time D8X2-8002 Tabulation
D8X2-8008 Lumber 7/23/07 1:00 p.m. local time D8X2-8008 Tabulation
D8X2-8005 Automatic standby generator system 7/19/07 1:00 p.m. local time D8X2-8005 Tabulation
D8X2-8004 Concrete Saw 7/16/07 1:00 p.m. local time D8X2-8004 Tabulation
D8X2-8001 Snow Plows 7/13/07 1:00 p.m. local time D8X2-8001 Tabulation
D8X2-7061 Zero Turn Mower 7/12/07 1:00 p.m. local time D8X2-7061 Tabulation
D8X2-7060 Concrete Saw 7/11/07 1:00 p.m. local time Cancelled

D8X2-7058 Installation of Permanent Lighting

D8X2-7058 Addendum 001

D8X2-7058 Addendum 002

6/29/07 1:00 p.m. local time  
D8X2-7057 Drive unit and bits 6/26/07 1:00 p.m. local time D8X2-7057 Tabulation

D8X2-7056 Installation of Interactive Flasher

D8X2-7056 Addendum 001

Drawing of RT H and Z

existing picture 1

existing picture 2

existing picture 3

existing picture 4

existing picture 5

existing picture 6

existing picture 7

existing picture 8

6/28/07 1:00 p.m. local time Cancelled
SFS7 - 072707 Tasmanian Digger 7/27/07 7/31/07 The Missouri Department of Transportation has determined that there is only one known source for the Tasmanian Digger, which is a one-man truck mounted hydraulic post-hole drilling machine.  Accent Sales  & Service Company is the sole manufacturer of the Tasmanian Digger and does not sell through dealers at this point.
D8X2-7055 Chain link fence materials 6/5/07 1:00 p.m. local time D8X2-7055 Tabulation
D8X2-7054 Lumber and materials 5/31/07 1:00 p.m. local time D8X2-7054 Tabulation

D8X2-7053 Automatic standby generator system

Addendum 001

5/29/07 1:00 p.m. local time D8X2-7053 Tabulation

D8X2-7051 Installation of Interactive Flasher

Addendum 001 D8X2-7051

Drawing of RT H and Z

existing picture 1

existing picture 2

existing picture 3

existing picture 4

existing picture 5

existing picture 6

existing picture 7

existing picture 8

5/29/07 1:00 p.m. local time NO BIDS RECEIVED.  WILL BE RE-BID AT A LATER DATE.
D8X2-7052 Concrete sidewalk forming, pouring, and finishing 5/23/07 1:00 p.m. local time D8X2-7052 Tabulation
D8X2-7050 Electrical Supplies 5/14/07 1:00 p.m. local time D8X2-7050 Tabulation
D8X2-7049 Trucks with Knuckle Boom Loader and Operator 4/30/07 1:00 p.m. local time D8X2-7049 Tabulation
D8X2-7048 Metal Building Materials 4/27/07 1:00 p.m. local time D8X2-7048 Tabulation
D8X2-7047 Directional Fault Finder 4/13/07 1:00 p.m. local time D8X2-7047 Tabulation
D8X2-7045 Metal Building Materials 4/11/07 1:00 p.m. local time cancelled
D8X2-7039 Aggregate Material 4/11/07 1:00 p.m. local time D8X2-7039 Tabulation
D8X2-7044 Paint Drain and Separator Cleaning 4/10/07 1:00 p.m. local time D8X2-7044 Tabulation
D8X2-7043 Portable Toilets 4/05/07 1:00 p.m. local time D8X2-7043 Tabulation
D8X2-7041 Cargo Trailer 3/29/07 1:00 p.m. local time D8X2-7041 Tabulation
D8X2-7037 Plant Pickup Aggregate 03/14/07 1:00 p.m. local time D8X2-7037 Tabulation
D8X2-7027 Concrete Ready-Mix 03/13/07 1:00 p.m. local time D8X2-7027 Tabulation
D8X2-7036 Cargo Trailer 03/07/07 2:00 p.m. local time D8X2-7036 Tabulation
D8X2-7035 Dimas 8700 conversion parts 03/02/07 2:00 p.m. local time D8X2-7035 Tabulation
D8X2-7038 Engine Replacement 03/01/07 10:00 a.m. local time D8X2-7038 Tabulation

D8X2-7034 25 ft. Equipment Trailer

Addendum 001

02/26/07 2:00 p.m. local time D8X2-7034 Tabulation

D8X2-7029 Educational Tools to Promote Roadway Safety

Addendum 001

02/26/07 10:00 a.m. local time  
D8X2-7033 Backhoe Mechanical Thumb Attachment 01/30/07 1:00 p.m. local time D8X2-7033 Tabulation Sheet
D8X2-7028 40 ft High Cube Storage Containers 01/19/07 1:00 p.m local time D8X2-7028 Tabulation
D8X2-7032 Power Box Tractor Rake 01/29/07 2:00 p.m. local time D8X2-7032 Tabulation
D8X2-7030 Self-propelled aerial lift rental 01/17/07 1:00 p.m. local time D8X2-7030 Tabulation

D8X2-7023 Native Seeding and Erosion Control

Plan sheets

01/09/07 2:00 p.m. local time D8X2-7023 Tabulation
D8X2-7024 Grass and forb seed 01/05/07 1:00 p.m. local time D8X2-7024 Tabulation
D8X2-7025 Tire Chains 12/22/06 1:00 p.m. local time D8X2-7025 Tabulation
D8X2-7022 Diamond saw blades 12/08/06 1:00 p.m. local time D8X2-7022 Tabulation

D8X2-7020 Wood Fence Material

Addendum 001

11/17/06 1:00 p.m local time D8X2-7020 Tabulation
D8X2-7016 Reinforced Concrete Pipe 11/15/06 1:00 p.m. local time D8X2-7016 Tabulation
D8X2-7021 Tailgate Spreader 11/14/06 1:00 p.m. local time D8x2-7021 Tabulation
D8X2-7018 Winter Cold Patching Material 11/08/06 1:00 p.m. local time D8X2-7018 Tabulation
D8X2-7019 Propane 11/01/06 1:00 p.m. local time D8X2-7019 Tabulation
D8X2-7017 Canopy Cutter 10/25/06 1:00 p.m. local time D8X2-7017 Tabulation Sheet
D8X2-7015 Snow Plow 09/28/06 1:00 p.m. local time D8X2-7015 Tabulation Sheet
D8X2-7012 Unit Heaters 09/28/06 1:00 p.m. local time D8X2-7012 Tabulation Sheet
D8X2-7013 RFQ Precast Box Culvert 09/26/06 1:00 p.m D8X2-7013 Tabulation Sheet
D8X2-7014 RFQ Office Chairs 09/19/06 1:00 p.m. D8X2-7014 Tabulation Sheet
D8X2-7010 D8 Window Replacement 09/12/06 1:00 p.m. D8X2-7010 Tabulation Sheet
D8X2-7009 School Flasher 09/13/16 1:00 p.m. D8X2-7009 Tabulation Sheet
D8X2-7008 Precast Box Culvert 09/08/06 1:00 p.m. Cancelled

D8X2-7004 Rotary Mowers

Addendum 001

09/06/06 1:00 p.m. D8X2-7004 Tabulation Sheet
D8X2-7007 Zero Turn Residential 08/31/06 1:00 p.m. D8X2-7007 Tabulation Sheet
D8X2-7006 Commercial Grade Zero Turn Mower 08/21/06 2:00 p.m. D8X2-7006 Tabulation Sheet

D8X2-7003 Aluminum Box Culvert

Addendum 001

Addendum 002

08/17/06 1:00 p.m. D8X2-7003 Tabulation Sheet
D8X2-7002 ADIEM Replacement Modules 08/01/06 1:00 p.m. D8X2-7002 Tabulation Sheet

D8X2-7001 Labor & Materials to Install Overhead Door in Concrete Wall

D8X2-7001 Addendum 001

D8X2-7001 Addendum 002

07/28/06 1:00 p.m.  

RFB 6-060706G D08 District Uniform Bid

RFB 6-060706G Addendum 001

July 6, 2006 2:00 p.m.  
D8X2-6067 36" Reinforced Concrete Pipe & End Sections 07/06/06 2 p.m. CDT D8X2-6067 Tabulation Sheet
D8X2-6066 20' Flex Wing Rotary Cutter 07/05/06 1 p.m. CDT D8X2-6066 Tabulation Sheet
D8X2-6063 RXQ ProLine, High Performance Polymer Modified Cold Asphalt 05/26/06 06/02/06 The Missouri Department of Transportation has determined that there is only one known source for ProLine, High Performance Polymer Modified Cold Asphalt, that is supplied in a proprietary blend
D8X2-6061 RXQ Modified Aggregate Quick Set Surfacing System Installed 05/12/06 05/18/06 The Missouri Department of Transportation has determined that there is only one known source for Modified Aggregate Quick Set Surfacing System installed.
D8X2-6064 7-12 Ton Dual Drum Vibratory Roller - 5 Month Lease 06/20/06 1 p.m. CDT D8X2-6064 Tabulation Sheet
D8X2-6065 Truck Mounted Electric Crane - 3200 lb 06/08/06 1 p.m. CDT D8X2-6065 Tabulation Sheet
D8X2-6062 New 4 Wheel Pneumatic Diesel Forklift – 6,000 LB. capacity 06/01/06 1 p.m. CDT D8X2-6062 Tabulation Sheet
D8X2-6060 Flink HD6 Tail-Gate Replacement Spreader or equivalent 05/23/06 1 p.m. CDT D8X2-6060 Tabulation Sheet
D8X2-6059 Sokkia model# SET1130R3 Long-Range Reflectorless Total Station surveying instrument or equivalent 05/22/06 1 p.m. CDT D8X2-6059 Tabulation Sheet
D8X2-6058 Safety Slope End Sections for 15" pipe 05/12/06 1 p.m. CDT D8X2-6058 Tabulation Sheet
D8X2-6057 Precast Box Culvert and Tapered End Sections 05/04/06 1 p.m. CDT D8X2-6057 Tabulation Sheet
Single Feasible Source Bidding Opportunities:
Item Date Posted Response Date Vendor/Bid Information
SFS 7-12072012 Double Bladed Concrete Walk Behind Saw with Operator 12/07/12 12/10/12 The Missouri Department of Transportation has determined that there is only one known source, Chester Bross Construction Company with Equipment and Operator for a double bladed walk-behind concrete saw capable of sawing 4-1/2” depth and sawing 3 slots per joint with1” slot spacing.  This includes mobilization for all equipment to Benton County. 
SFS 7-110912 Compact Skid Steer with 72 in Brush Hog -Bobcat 11/9/12 11/13/12 The Missouri Department of Transportation has determined that there is only one known source of a 80 HP Compact Skid Steer with a 72” Brush Hog, Bobcat of Springfield has this equipment for $2800 per month and $1800 per month for the brush hog.
SFS 7-121105 Fastrac -Western Material and Design LLC 11/05/12 11/09/12 The Missouri Department of Transportation has determined that there is only one known source of MoDOT Rapid Cement Premix (RPC) for pavement repair now referred to as “Fastrac”, Western Material & Design, LLC.  Rapid Cement Premix (RPC) / Fastrac is one-component shrinkage compensated proprietary blend of cement, aggregates and performance enhancing chemical additives in 50lbs, 60lbs and 70lbs bags.  This is used for horizontal concrete repairs that require high-early strength gain.  Rapid Cement Premix (RPC) / Fastrac is a patent pending formulation that was developed exclusively for the DOT market.  Included is the Bulk Fastrac Products not blended with aggregates at time of delivery.
SFS 7-102612 Best-Cormax Key System 10/26/12 11/6/12 The Missouri Department of Transportation has determined that only one source, Stanley Security Systems., can provide BEST-Cormax door lock systems to provide consistent access through the Southwest District.  Stanley Security Systems is the exclusive manufacturer and distributor for the BEST-Cormax door lock system.  Purchases for BEST-Cormax door lock systems may exceed $25,000.00, initially or during the next year. A purchase order will be issued to Stanley Security Systems, on November 6, 2012 for the above-described material.
SFS 7-102912 Quick Change Oil Adapters 10/29/12 10/31/12 Description:  The Missouri Department of Transportation has determined that there is only one known source, Unique Truck Equipment has the following Quick Change Oil Drain Adapters,  25mm x 1.5 at $40.50 each,  18mm x 1.5 at $34.98 each, 1” x 18 UNF at $40.50 each, Small Adapter Drain Hoses at $14.63 and Large Adapter Hoses at $16.85 each, delivered. 
SFS 7-102512 Leica Equipment Calibration 10/25/12 10/29/12 The Missouri Department of Transportation has determined that only one source, Leica Geosystems, Inc., can provide calibration services for MoDOT owned Leica Model HDS4050 survey instrument.  Leica Geosystems, Inc., is the sole manufacturer and distributor for Leica service and re-calibration.  A purchase order for the approximate amount of $4400.00 may be issue to Leica Geosystems, Inc. on October 29, 2012 for the above-described material.
SFS 7-101012 PreMark Contrast Markings 10/10/12 10/12/12 The Missouri Department of Transportation has determined that only one source, Flint Trading, Inc.., can supply PreMark® Contrast Markings.  Flint Trading, Inc., is the sole manufacturer and distributor for PreMark® Contrast Markings.  A purchase order for the approximate amount of $3500.00 may be issue to Flint Trading, Inc. on August 16, 2012 for the above-described material.
SFS 7-081612CS Rapid Installation Barrier System -RIBS- for Earth Stabilization 8/16/12 8/20/12 The Missouri Department of Transportation has determined that there is only one known source for rapid installation Barrier System (RIBS) for earth stabilization that shall include Concrete fill in 2’ polypropylene bags with Technical Support and application of product by Certified Construction Co of Kentucky.  MoDOT to supply labor and concrete pump and backfill equipment.  900 bags of concrete at $30.50 each, technical support at 16 hours at $145.00 per hour and mobilization to Southwest District $1,500.00, totaling $ 31,270.00.
SFS 7-081412 Etnyre Chipspreader Parts 8/14/12 8/16/12 The Missouri Department of Transportation has determined that only one source, G.W. Van Keppel Co., can furnish repair parts for Etnyre Chipspreaders.  G. W. Van Keppel Co., is the regional distributor of Etnyre Chipspreader Equipment.  A purchase order for the approximate amount of $3800.00 may be issue to G. W. Van Keppel Co. on August 16, 2012 for the above-described equipment.
SFS 7-061412SW Lura Lightning Screed 6/14/12 6/18/12 The Missouri Department of Transportation has determined that only one source, Lura Enterprises, Inc., can provide the Department with a Lura Lightning Screed.  Lura Enterprises is the sole source for sales, parts and services for Lura Lightning Screeds in the Missouri region.  A purchase order for the approximate amount of $8800.00 may be issued to Lura Enterprises, Inc., for the above-described equipment.
SFS 7-051112SW Ultralyte 100LR with DBC 5/11/12 5/15/12

The Missouri Department of Transportation has determined that only one source, Laser Technology, Inc., can provide the Department with a Ultralyte 100 LR w/DBC radar speed gun.  Laser Technology, Inc., is the sole distributor of Ultralyte 100LR w/DBC radar guns in the United States.  This equipment will be purchased as part of the Blueprint for Safer Roadways Program and the purchase price will not exceed $4000.00.

SFS 7-050212SW Pro-Tainer Pro-Tilt Recycling Trailer 5/2/12 5/4/12 The Missouri Department of Transportation has determined that only one source, Pro-Tainer, Inc., can provide the Department with a Pro-Tainer, Pro-Tilt Recycling Trailer. Pro-Tainer, Inc. is the sole manufacturer of Pro-Tainer Pro-Tilt Recycling trailers.  A purchase order for the approximate amount of $11,000.00 may be issued to Pro-Tainer, Inc., for the above-described equipment.
SFS 7-050112SW Haenni Load O Meter 5/1/12

5/3/12

The Missouri Department of Transportation has determined that only one source, Loadometer Corporation, can provide the Department with Haenni Model WL101 wheel load weighers.  Loadometer is the sole source for sales, parts and services for Haenni and Cie.AG’s in the United States.  A purchase order for the approximate amount of $19,5800.00 may be issued to Loadometer Corporation, for the above-described equipment.
SFS 7-040212 Easy Cover Housing 4/2/12 4/4/12 The Missouri Department of Transportation has determined that there is only one known source, Aero Industries, for Easy Cover Housing, P/N: ECK450UH25V5 at $1495.00 each.  
SFS 7-031512 Pave Patch 3000 3/15/12 3/18/12 The Missouri Department of Transportation has determined that there is only one known source, Construction Anchor, for Conspec Pave Patch 3000 rapid set concrete patching material used for bridge repairs.  The Pave Patch 3000 is supplied in 50 lb bags at $16.25 per bag and is an approved material.
SFS 7-031212 ATSI Conflict Monitor 3/12/2012 3/14/2012 The Missouri Department of Transportation has determined that there is only one known source for the ATSI Conflict Monitors and Testing Equipment.  Pinkley Sales Company  is the sole Distributor for the state of Missouri, for the ATSI conflict monitors and testing equipment.
SFS7 - 030612 NSC Training Literature 3/6/2012 3/8/2012 The Missouri Department of Transportation has determined that there is only one known source, Safety Council of the Ozarks, as the regional distributor for National Safety Council CPR/AED/First Aid training literature.  A purchase order for the approximate amount of $4700.00 may be issued to the Safety Council of the Ozarks, on March 8, 2012.
SFS 7-111121SW Elgin Parts 11/17/2011 11/21/2011 The Missouri Department of Transportation has determined that only one source, Key Equipment & Supply Co., can furnish OEM repair parts for Elgin Street Sweepers.  Key Equipment & Supply Co. is the regional distributor of Elgin Street Sweeper Equipment.  A purchase order for the approximate amount of $3500.00 may be issue to Key Equipment & Supply Co.,for the above-described equipment.
SFS 7-111011 Hot Mix Asphalt 11/08/2011 11/10/2011 The Missouri Department of Transportation – Southwest District, has determined that only one source, C. B. Asphalt, Inc., can provide BP-1 hot mix asphalt for plant pickup from a quarry in the Warsaw, Benton County area.  C. B. Asphalt has a portable asphalt plant in use in Benton County for producing material for an overlay project and has provided MoDOT with material from this temporary plant. Material from this plant is close to the jobsite and represents a freight savings as opposed to traveling large distances to pick up material.
SFS 7-111020 GL400 Parts 10/20/2011 10/31/2011 The Missouri Department of Transportation Southwest District has determined that only one source, Certified Power/Component Technology, of Bridgeton, MO can provide the department with proprietary parts for GL400 systems. The approximate value of this purchase is estimated at an approximate cost of between $25,000 to $30,000. Issues with this purchase may be directed to Cathy Bay @ 417-621-6354 or Cathy.Bay@modot.mo.gov.
SFS - 7-SW110927 On Line Interactive Oil Analyses with Oil Kits 9/27/11 9/28/11 The Missouri Department of Transportation has determined that there is only one known source of Oil Analyses with On-Line Interactive Reporting capabilities.  Staveley Services out of Kansas City KS is the only supplier for the On-Line Interactive Oil Analyses process used by our Oil Suppliers in the past two years, supplying us with oil sample kits monthly at $115.20 per 10 packs
SFS7 - 110830 Gibraltar Cable Barrier Parts 08/18/2011 08/30/2011  
SFS 7-100727 Geomelt C 8/3/11 8/5/11  
SFS 7-071111 Lubra Seal 07/11/2011 07/13/2011  
SFS SW-110708 SealTekkT Asphalt 07/08/2011 07/12/2011  
SFS 7-063011 M-B Striper Repair Parts 06/30/2011 07/7/2011  
SFS 7-062811 Miovision Automated Traffic Counting Systems 06/28/2011 07/11/2011  
SFS 7-051111 CTS Low P Cement 05/11/2011 05/13/2011
SFS 7 - 040611 Quick Stand 04/06/2011 04/08/2011  
SFS7-032911 Western Material 3/29/2011 4/8/2011  
SFS7-032511 Industrial Hydraulic Technology Class 3/25/2011

3/30/2011

SFS7-010711 RWIS Weather Station Repair 1/7/2011 1/17/2011  
       
       
ATSI 2600 - T Monitor Tester SFS7-110310 11/03/2010 11/08/2010  
SFS7-100510 Microline 1000 10/5/2010 10/8/2010  
SFS 7 - 0090910 Silspec 900 9/9/2010 9/13/2010  
Audible Pedestrian Signal - SFS7-090110 9/01/2010 9/07/2010  
SFS 7 - 082010 Parts for GL 400 System 8/20/2010 8/30/2010  
SFS 7 - 081910 Repair Parts for Daimond Boom Mower 8/19/2010 8/24/2010  
SFS7 - 070610 Kimco Salt Conveyor Parts 7/6/2010 7/9/2010  
SFS7 - 052610 Bridge-Mate 5/26/2010 6/7/2010  
Tasmanian Digger - SFS9-011110 1/25/2010 02/05/2010  
SFS Quote -9-011110 Tasmanian Digger 01/12/2010 01/20/2010  
SFS 7-110509 Striper Rebuild 10/23/2009 11/5/2009  
SFS7 - 101309 Dredging 9/29/2009 10/13/2009  
SFS7 - 100109 Toilet Paper 9/25/2009 10/01/2009  
SFS 7 - 081209 Quixote Surface Patrol System 8/12/2009 8/14/2009  
SFS 7 - 081109 John Deere Industrial Engine repair 8/11/2009 8/13/2009  
SFS 7-071409 Western Material 7/14/2009 7/26/2009  
SFS 7 - 0600209 Elgin Street Sweeper Parts 6/2/2009 6/5/2009  
SFS 7 - 050109 Forney Material Testing Equipment 5/1/2009 5/5/2009
SFS7 - 082208 Gibraltar Cable Barrier System 8/22/08 9/4/08 The Missouri Department of Transportation has determined that there is only one known source for median guard cable replacement parts for the Gibraltar Cable Barrier System that is installed on MODOT maintained roadways in the Springfield – District 8 Area.  Multiple purchases shall be made during the contract period.  Total expenditures during the contract period, in whole or in part, may exceed $25,000.
SFS7-062608 Modified Aggregate Quick Set 6/26/08 7/7/08 The Missouri Department of Transportation has determined that only one source, Donelson Construction Company, LLC, can provide the department with Modified Aggregate Quick Set (MAQS) Surfacing System®.  Modified Aggregate Quick Set (MAQS) Surfacing System®, is an asphalt resurfacing material that is produced and installed on the job site, often in ¼” thickness.
SFS 8 - 042808 Quick Stand 4/28/08 5/06/08 The Missouri Department of Transportation has determined that there is only once source who can provide the the producted listed below. Quick Stand is a NCHRP 350 compliant temporary ground mount sign support.  It is specifically used as a sign support for rollup work zone signs.  Sierra Safety is the sole manufacturer and sole distributor of Quick Stand.
SFS7 - 032907 ENCOM Wireless Data Solutions 03/29/07 4/10/07 The Missouri Department of Transportation has determined that there is only one authorized dealer for ENCOM Wireless Data Solutions products in the state of Missouri.  ENCOM radio systems are the only systems available that provide full support for the capabilities of existing BiTRAN signal firmware.  Estimated expenditures for ENCOM products are expected to exceed $25,000 for a one year period.
SFS 7-011007 Interstate Grade Curb System 01/10/07 01/18/07 The Missouri Department of Transportation has determined that there is only one known source for FG 300 Interstate Grade Curb System to fit current "Flexi-Guide, 300 Series FG336 UR and FG318 UR" Island Tubular Delineators.
SFS 7 - 010907 Rapid Cement 01/09/07 01/17/07 The Missouri Department of Transportation has determined that only one source, Western Material & Design, LLC, can provide the department with Rapid Cement-Rapid Pavement Repair Cement.  Rapid Cement is a one-component shrinkage compensated proprietary blend of cements and performance enhancing chemical additives. 
SFS7 - 102506 Geomelt 55 Deicing Fluid 10/25/06 10/31/06 The Missouri Department of Transportation has determined that there is only one known source for GEOMELT 55 Anti-Icing / deicing fluid in the Springfield, District 8 areas.

 

Archives from former District 7

 

Title

Closing Date

Closing Time
(DST)

Tabulations

RFQ D7-11-047 Asphalt Pad for Joplin Airport

Addendum 001

Annual Wage Order 18_WO049

May 23, 2011 1:00 PM Local Time RFQ D7-11-047 Asphalt Pad Joplin Airport-Quote Tabs
D7-11-048 RFQ Traffic Signal Mast and Arm May 19, 2011 1:00 PM Local Time  
D7-11-046 RFQ Elevator Maintenance Services May 11, 2011 1:00 PM Local Time D7-11-046 Elevator Maintenance Service Agreement Bid Tab

D7-11-037 RFB Streambank Stablization_BigDryWood_Route_54_Vernon Co

D7-11-037 Attachment A_Special Provisions

D7-11-037 Attachment B - Special Provisions Construction

D7-11-037 Exhibit A - Traffic Control

D7-11-037 Exhibit B - Construction and Material Specifications

D7-11-037 Exhibit C - Plan Sheets_DSR 217-10-001 EWP Project

D7-11-037 Exhibit D - General Wage Order 54

Contractor Pre-Qualification Required

April 26, 2011 1:00 p.m. Local Time All Bids Rejected.
RFB D7-11-044 Salt Conveyor and Hopper April 25, 2011 1:00 p.m. Local Time Bid Cancelled

D7-11-045 RFB Traffic Signal Battery Backup Systems_Cabinets

D7-11-045 Addendum 001

April 20, 2011 1:00 p.m. Local Time D7-11-045 Traffic Signal Battery Backup Systems_Cabinets Bid Tab
D7-11-039 RFB Special Gradation Spec 4C Aggregate April 19, 2011 1:00 p.m. Local Time D7-11-039 Spec 4C Special Gradation Aggregate Bid Tab
RFB D7-11-042 Cement Silo 200 Barrel Low-Profile April 18, 2011 1:00 p.m. Local Time RFB D7-11-042 Cement Silo- Bid Tabs
D7-11-043 RFB Aluminum Sign Stands April 13, 2011 1:00 p.m. Local Time D7-11-043 TwinFlex Sign Stands TF60-RUB Bid Tab

D7-11-033 RFB ADA Compliance_WB and EB Rest Area_Rte I-44 Lawrence Co

D7-11-033 ATTACHMENT A Special Provisions

D7-11-033 Exhibit A Plan Sheets for D7-11-033 Project

D7-11-033 Exhibit B - General Wage Order 54

Contractor Pre-Qualification Required

April 13, 2011 1:00 p.m. Local Time D7-11-033 ADA Compliance_WB and EB Rest Area_Rte I-44_Lawrence Co_Bid Tab

D7-11-030 RFB Driveway Improvements_RteFF_Jasper_County

D7-11-030 Exhibit A_Plan_Sheets

D7-11-030 Exhibit B General Wage Order 54

Contractor Pre-Qualification Required

April 6, 2011 1:00 p.m. Local Time D7-11-030 Driveway Improvements_RteFF_JasperCo_Bid Tab
RFQ D7-11-041 Parking Lot Seal Coating April 5, 2011 1:00 p.m. Local Time BID CANCELLED
D7-11-038 RFB Commercial Hot or Cold Mix Price Agreement March 31, 2011 1:00 p.m. Local Time  

D7-11-031 RFB Stream Bank Stablization_Seligman Branch_Route DD_Barry County

D7-11-031 Attachment A Special Provisions

D7-11-031 Attachment B Special Provisions Construction

D7-11-031 Exhibit A Traffic Control

D7-11-031 Exhibit B Construction and Material Specifications

D7-11-031 Exhibit C Plan Sheets DSR_009-10-003

D7-11-031 Exhibit D General Wage Order 54

Contractor Pre-Qualification Required

March 30, 2011 1:00 p.m. Local Time D7-11-031 Stream Bank Stablization Route DD Barry Co. Bid Tab
RFB D7-11-035 Chip Seal Lease Equipment March 28, 2011 1:00 p.m. Local Time RFB D7-11-035 Chip Seal Rental Equipment- Bid Tabs

D7-11-029 RFB ADA Compliance_Welcome Center Route I-44_Newton County

D7-11-029 Attachment A - Special Provisions

D7-11-029 Exhibit A - Plan Sheets for ADA Compliance_Welcome Center I44_Newton Co

D7-11-029 Exhibit B - General Wage Order 54

Contractor Pre-Qualification Required

March 23, 2011 1:00 p.m. Local Time D7-11-029 ADA Compliance_Welcome Center_I-44 Newton Co Bid Tab

D7-11-024 RFB Plant Mix Oil Material_ El Dorado Springs

D7-11-024 Addendum 001

March 17, 2011 1:00 p.m. Local Time D7-11-024 Plant Mix Oil Material Bid Tab

D7-11-023 RFB Streambank Stablization _Trent Creek_Route 90_McDonald County

D7-11-023 Attachment A

D7-11-023 Attachment B

D7-11-023 Exhibit A Traffic Control

D7-11-023 Exhibit B Construction and Material Specifications

D7-11-023 Exhibit C Plan Sheets DSR 119-10-001 EWP Project

D7-11-023 Exhibit D General Wage Order 54

D7-11-023 Addendum 001

Feb 23, 2011

March 16, 2011

1:00 p.m. Local Time D7-11-023 Stream Bank Stablization Route 90 McDonald Co. Bid Tab
RFB D7-11-034 -Vibratory Roller Rentals March 11, 2011 1:00 p.m. Local Time RFQ D7-11-034 Vibratory Steel Wheel Rollers- Bid Tabs
RFQ -D7-11-036 Galvanized Guardrail Supplies March 10, 2011 1:00 p.m. Local Time RFQ D7-11-036 Galvanized Guard Rail Supplies. Bid Tabulations

RFQ D7-11-032 Well Drilling at Anderson MoDOT

Annual Wage Order 17_WO060

Feb 28, 2011 1:00 p.m. Local Time RFQ D7-11-032 Well Drilling Services. Bid Tabs
RFQ D7-11-027-A Preventive Maintenance Sectional Bay Doors Feb 24, 2011 1:00 p.m. Local Time RFQ D7-11-027-A Preventive Maintenance Sectional Bay Doors- Bid Tabs
RFQ D7-11-027 Preventive Maintenance Sectional Overhead Doors Feb 10, 2011 1:00 p.m. Local Time To Be Rebid
RFQ -D7-11-025 Under Tail Gate Spreaders Feb 8, 2011 1:00 p.m. Local Time  
RFQ -D7-11-026 Stump Grinder Rental Feb 3, 2011 1:00 p.m. Local Time RFQ D7-11-026 Stump Grinder Bid Tabs
RFB D7-11-018 Recapped tires Jan 26, 2011 1:00 p.m. Local Time RFB D7-11-018 Recapped Tire-Bid Tabs
RFQ -D7-11-022 Elliptical Metal Pipe Jan 6, 2011 1:00 p.m. Local Time RFQ D7-11-022 Elliptical Metal Pipe-Quote Tabs
RFQ -D7-11-019 Battery Consignment Services Dec 27, 2010 1:00 p.m. Local Time RFQ D7-11-019 Battery Consignment Program- Bid Tabulations

RFB D7-11-020 Trash Collection and Disposal Services Bid

Page 8-Pricing Sheet

Dec 17, 2010 1:00 p.m. Local Time RFB D7-11-020 Trash Collection and Disposal-Bid Tabs

RFQ D7-11-021 HDPE Pipe

MGS9213

Sec1047

Dec 16, 2010 1:00 p.m. Local Time RFQ D7-11-021-HDPE Pipe-Tabulations
     

D7-11-016 RFQ Fire Extinguisher Inspections

Oct 18, 2010

1:00 p.m. Local Time

 

RFQ D7-11-017 REBAR

Oct 15, 2010

1:00 p.m. Local Time

RFQ D7-11-017 Number 4 Rebar-Quote Tabs.xlsx

RFQ D7-11-013 Right of Entry Preparation Work

Oct 13,2010

1:00 p.m. Local Time

RFQ D7-11-013 Right of Entry Preparation Work-Quote Tabs

D7-11-012 RFB Concrete Commercial Mix Fixed Pricing

D7-11-012 RFB Exhibit 1 B-2 Mix Design

Oct 6, 2010

1:00 p.m. Local Time

D7-11-012 Commercial Mix Concrete Bid Tab

RFQ D7-11-015 Precast 3 x 6 Wash Bay Pits

Sept 30, 2010

1:00 p.m. Local Time

RFQ D7-11-015 Precast 3 x 6 Wash Bay Pits-Quote Tabs

RFQ -D7-11-014 Concrete Separator Tanks

Separator Tank

Sept 28, 2010

1:00 p.m. Local Time

RFQ D7-11-014 Concrete Separtor Tanks -Quote Tabs

RFQ D7-11-011 Concrete Blocks for Lamar Fabric Building

Sept 9, 2010

1:00 p.m. Local Time

RFQ D7-11-011 Concrete Blocks Lamar Fabric Building-Quote Tabs

RFQ D7-11-010 Asphalt Pad for Lamar Fabric Building

Sept 8, 2010

1:00 p.m. Local Time

Quote Cancelled

RFQ -D7-11-006 Catering Meals-2010 Health Fair

August 17, 2010

1:00 p.m. Local Time

D7-11-006 Catering Meals 2010 Health Fair-Bid Tabs

RFQ -D7-11-009 Materials for Weigh Station Scale Repairs

August 13, 2010

1:00 p.m. Local Time

RFQ D7-11-009 Various Steel Materials Weigh Station Scale Repair-Quote Tabs

D7-11-007 RFQ Vending Machine Canopy

August 12, 2010

1:00 p.m. Local Time

CANCELED - TO BE REBID

RFQ -D7-11-008 Portable Water Coolers -Evaporative

August 10, 2010

1:00 p.m. Local Time

RFQ D7-11-008 Portable Water Coolers-Evaporative-Quote Tabs

RFB D7-11-002 Heavy Equipment with Operators

Addendum 001

Annual Wage Order 18_WO049

July 19, 2010

1:00 p.m. local time

Blanket Bid

RFB D7-11-001 Bulk Oil-Semi-Annual-2011

July 15, 2010

1:00 p.m. Local Time

D7-11-001 Bulk Oil Bid Tabulation

D7-11-004 RFQ Cleaning Service for Rags_Mops

July 14, 2010

1:00 p.m. Local Time

D7-11-004 Cleaning Services for Rags_Mops Bid Tab

D7-11-005 Diamond Product Saw Blades

MGS9001

July 12, 2010

1:00 p.m. Local Time

RFQ D7-11-005 Diamond Saw Blades-Quote Tabs

D7-11-003 RFQ TwinFlex Sign Stands

July 8, 2010

1:00 p.m. Local Time

D7-11-003 RFQ TwinFlex Sign Stands Bid Tab

D7-10-064 Schulte Mower Parts

June 23, 2010

1:00 p.m. Local Time

Quote Canceled

RFQ D7-10-062 Tree Removal-Bates and St. Clair Counties

June 9, 2010

1:00 p.m. Local Time

To be Rebid

RFQ D7-10-063 Computer Mount Desk for Automobiles

June 6, 2010

1:00 p.m. Local Time

RFQ D7-10-063 Computer Mount Desks-Quote Tabs

RFQ D7-10-061 Truck Shells - Caps

May 25, 2010

1:00 p.m. Local Time

RFQ D7-10-061 Truck Shells-Caps-Quote Tabs

RFQ D7-10-060 Culvert Pipe Installation Bates County

May 10, 2010

1:00 p.m. Local Time

D7-10-060 Bid Tabs- Pipe Installation-Bates County

D7-10-058 RFQ Remove Tile_ Repair and Overlay Bathroom Floors Main Office

May 6, 2010

1:00 p.m. Local Time

 

D7-10-057 RFB Traffic Signal Battery Backup Systems_Cabinets

May 5, 2010

1:00 p.m. Local Time

D7-10-057 Bid Tab Traffic Signal Battery Backup Systems_Cabinets

RFQ D7-10-059 Oil Tanks

April 29, 2010

1:00 p.m. Local Time

RFQ D7-10-059 Oil Tanks -Quote Tabs

RFQ D7-10-056 Concrete Blocks for Neosho Fabric Building

April 21, 2010

1:00 p.m. Local Time

RFQ D7-10-056 Concrete Blocks Neosho Fabric Building-Quote Tabs

D7-10-014 RFQ Elevator Maintenance Services

April 21, 2010

1:00 p.m. Local Time

No Responses

RFB D7-10-053 Guardrail Installation Route 71 Bates County

D7-10-053 Addendum 001-Guardrail Installation Bates County

April 20, 2010

1:00 p.m. Local Time

RFB D7-10-053 Bid Tab Guardrail Installation Rte 71 Bates County

RFQ D7-10-055 Asphalt Pad for Neosho Fabric Building

D7-10-055 Addendum 001-Asphalt Pad for Neosho Fabric Building

D7-10-055 Addendum 002-Asphalt Pad for Neosho Fabric Building

Apirl 15, 2010

1:00 p.m. Local Time

RFQ D7-10-055 Asphalt Pad Neosho Fabric Building-Quote Tabs

D7-10-27 Oil tank bid form

Bid Canceled

April 15, 2010

1:00 p.m. Local Time

Bid Canceled

D7-10-054 RFQ Aggregate Price Agreement_Plant Pickup

April 14, 2010

1:00 p.m. Local Time

 

D7-10-051 RFQ Fuel Island Electrical Upgrade Anderson

D7-10-051 Attachment A_NEC Article 514

April 8, 2010

2:00 p.m. Local Time

D7-10-051 RFQ Fuel Island Electrical Upgrade Anderson Bid Tab

D7-10-050 RFQ Fuel Island Electrical Upgrade Neosho

D7-10-050 Attachment A_NEC Article 514

April 8, 2010

1:30 p.m. Local Time

D7-10-050 RFQ Fuel Island Electrical Upgrade Neosho Facility Bid Tab

D7-10-049 RFQ Fuel Island Electrical Upgrade Joplin General Services

D7-10-049 Attachment A_NEC Article 514

April 8, 2010

1:00 p.m. Local Time

D7-10-049 RFQ Fuel Island Electrical Upgrade Joplin GS Facility Bid Tab

D7-10-048 RFQ Fuel Island Electrical Upgrade Monett

D7-10-048 Attachment A_NEC Article 514

April 7, 2010

2:00 p.m. Local Time

D7-10-048 RFQ Fuel Island Electrical Upgrade Monett Facility Bid Tab

D7-10-047 RFQ Fuel Island Electrical Upgrade Sarcoxie

D7-10-047 Attachment A_NEC Article 514

April 7, 2010

1:30 p.m. Local Time

D7-10-047 RFQ Fuel Island Electrical Upgrade Sarcoxie Facility Bid Tab

D7-10-046 RFQ Fuel Island Electrical Upgrade Mt. Vernon

D7-10-046 Attachment A_NEC Article 514

April 7, 2010

1:00 p.m. Local Time

D7-10-046 RFQ Fuel Island Electrical Upgrade Mt. Vernon Facility Bid Tab

D7-10-041 RFB Commercial Hot or Cold Mix Price Agreement

March 30, 2010

1:00 p.m. Local Time

D7-10-041 Hot Mix_Cold Mix Bid Tabulation

D7-10-052 Shot Rock for Rte 90_McDonald Co 

March 29. 2010

10:00 a.m.

Local Time

D7-10-052 RFQ Shot Rock to Rte 90 McDonald Co bid tab

D7-10-045 RFQ Fuel Island Electrical Upgrade Carthage

D7-10-045 Attachment A_NEC Article 514

March 25, 2010

2:30 p.m. Local Time

D7-10-045 RFQ Fuel Island Electrical Upgrade Carthage Facility Bid Tab

D7-10-044 RFQ Fuel Island Electrical Upgrade Lamar

D7-10-044 Attachment A_NEC Article 514

March 25, 2010

2:00 p.m. Local Time

D7-10-044 RFQ Fuel Island Electrical Upgrade Lamar Facility Bid Tab

D7-10-043 RFQ Fuel Island Electrical Upgrade Greenfield

D7-10-043 Attachment A_NEC Article 514

March 25, 2010

1:30 p.m. Local Time

D7-10-043 RFQ Fuel Island Electrical Upgrade Greenfield Facility Bid Tab

D7-10-042 RFQ Fuel Island Electrical Upgrade Stockton

D7-10-042 Attachment A_NEC Article 514

March 25, 2010

1:00 p.m. Local Time

D7-10-042 RFQ Fuel Island Electrical Upgrade Stockton Facility Bid Tab

D7-10-040 RFQ Fuel Island Electrical Upgrade Collins

D7-10-040 Attachment A_NEC Article 514

March 24, 2010

2:30 p.m. Local Time

D7-10-040 RFQ Fuel Island Electrical Upgrade Collins Facility Bid Tab

D7-10-039 RFQ Fuel Island Electrical Upgrade El Dorado Springs

D7-10-039 Attachment A_NEC Article 514

March 24, 2010

2:00 p.m. Local Time

D7-10-039 RFQ Fuel Island Electrical Upgrade ElDorado Springs Facility Bid Tab

D7-10-038 RFQ Fuel Island Electrical Upgrade Nevada

D7-10-038Attachment A_NEC Article 514

March 24, 2010

1:30 p.m. Local Time

D7-10-038 RFQ Fuel Island Electrical Upgrade Nevada Facility Bid Tab

D7-10-037 RFQ Fuel Island Electrical Upgrade Butler Facility

D7-10-037 Attachment A_NEC Article 514

March 24, 2010

1:00 p.m. Local Time

D7-10-037 RFQ Fuel Island Electrical Upgrade Butler Facility Bid Tab

RFQ D7-10-036 Culvert Pipe Installation Vernon County

March 23,

1:00 p.m. Local Time

D7-10-036 Bid Tabs- Pipe Removal and Installation-Vernon County

RFB D7-10-034 Tree Removal Services

March 22, 2010

1:00 p.m. Local Time

 

RFB D7-10-035- Pumping Sewage Holding Tanks

March 16, 2010

1:00 p.m. Local Time

RFQ D7-10-035 Pumping Holding Tanks Bid Tabs

RFB D7-10-029 Fabrication of Spreader Stands

Sander Stand Drawing

D7-10-029 Addendum 001

10 ft spreader stands Drawings.tif

10 foot Stand P1010367

10 foot Stand P1010371

March 2 , 2010

1:00 p.m. Local Time

D7-10-029 Sander Stand Fabrication-Bid Tabs

RFB-D7-10-032 Heavy Equipment Rental-Lease

D7 Location of Buildings

Feb 18, 2010

1:00 p.m. Local Time

D7-10-032 Heavy Equip Rental-Bid Tabs-protected

D7-10-033 RFQ Signal Change Services_College and Coler

Feb 17, 2010

1:00 p.m. Local Time

D7-10-033 BidTab Signal Change Services

D7-10-013R RFB Solar_Cell Phone School Flashers

Jan 20, 2010

1:00 p.m. Local Time

D7-10-013R Bid Tab Solar School Flashers

RFQ D7-10-027 Pumping Out Separator Tank-Monett MO

Jan 15, 2010

1:00 p.m. Local Time

D7-10-027 Pumping Out Separator Tank- Quote Tabulations

D7-10-030 RFQ Rental of Aerial Bucket Truck

Jan 14, 2010

1:00 p.m. Local Time

D7-10-030 RFQ Rental of Aerial Bucket Truck Bid Tab

RFQ D7-10-028 Zero Turn Radius Mower

Jan 14, 2010

1:00 p.m. Local Time

RFQ D7-10-028 Zero Turn Radius Mower-Quote Tabs

RFQ D7-10-031 Reconditioned Oil Containers

Jan 11, 2010

1:00 p.m. Local Time

D7-10-031 Reconditioned Oil Containers-bid tabs

d7-10-018-a bulk oil bid

MGS9212

Addendum 001-D7-10-018-A Bulk Oil Bid

Jan 12, 2010

1:00 p.m. Local Time

D7-10-018-A-Bulk Oil Bid Tabulations

RFQ D7-10-026 Auger Bucket Truck Rentals

Dec 31, 2009

1:00 p.m. Local Time

RFQ D7-10-026 Auger Bucket Truck Rentals-Quote Tabs

RFQ D7-10-025 Auger Bucket Truck Rental

Dec 23, 2009

1:00 p.m. Local Time

To be Rebid

D7-10-017 RFB Harvest Timber

Dec 22, 2009

1:00 p.m. Local Time

No Responses

RFQ D7-10-023 Purchase and Installation Tower Lighting System

Addendum 001-D7-10-023 Tower Lighting System with Alarm

Dec 18, 2009

1:00 p.m. Local Time

Quote Tabs D7-10-023 -Purchase Installation of Tower Lighting System

RFQ D7-10-022 Purchase and Installation Wireless lighting Alarm

Addendum 001-D7-10-022 Wireless Lighting Alarm

Addendum 002-D7-10-022 Wireless Lighting Alarm

Dec 18, 2009

1:00 p.m. Local Time

Quote Tabs D7-10-022 -Purchase Installation of Alarm System

RFB D7-10-018 Bulk Oil Bid-Semi-Annual-2010

MGS9212

Dec 16, 2009

1:00 p.m. Local Time

To be Rebid

RFQ D7-10-024 Aerial Bucket Truck Rental

Dec 10, 2009

1:00 p.m. Local Time

D7-10-024 Aerial Bucket Truck Rental-Quote Tabs

RFQ D7-10-021 Corrugated Metal Pipe

MGS9111

Sec0725

Sec1020

Sec1022

Dec 10, 2009

1:00 p.m. Local Time

D7-10-021 Corrugated Metal Pipe-Quote Tabulations

D7-10-019 RFQ Type 4 Rock Ditch Liner

Dec 3, 2009

1:00 p.m. Local Time

D7-10-019 RFQ Type 4 Rock Ditch Liner Bid Tab

D7-10-007 Streambank Stablization Route DD Barry County

D7-10-007 Attachments A and B_NRCS_BigSugarCreek

D7-10-007 Exhibit A Construction Specifications

D7-10-007 Exhibit B DSR 009_09_002 EWP Plan Sheets_Sealed

D7-10-007 Exhibit C Traffic Control

D7-10-007 Exhibit D and E Worker Eligibility Affidavits

Dec 2, 2009

1:00 p.m. Local Time

D7-10-007 Streambank Stablization Route DD Barry County Bid Tab

D7-10-020 Bark Oil Blue LT

Nov 18, 2009

1:00 p.m. local Time

D7-10-020 Bark Oil Blue LT and Herbicides-Bid Tabulations

D7-10-015 RFB Guardrail Installation Route 86 Barry County

D7-10-015 Addendum 001

Nov 10, 2009

Nov 17, 2009

1:00 p.m. Local Time

D7-10-015 Bid Tab Guardrail Installation Rte 86 Barry County

D7-10-012-A Rug cleaning

Nov 6, 2009

1:00 p.m. Local Time

D7-10-012-A Rug Rental-Cleaning Tabulations

D7-10-013 RFB Solar_Cell Phone School Flashers

Nov 3, 2009

1:00 p.m. Local Time

To be rebid

D7-10-016 Corrugated Metal Pipe-48 Inch

Oct 29, 2009

1:00 p.m. Local Time

RFQ D7-10-016 Corrugated Metal Pipe - Tabulations

D7-10-011 RFB On-Call Detector Loop Installation Fixed Pricing

Oct 14, 2009

1:00 p.m. Local Time

D7-10-011 Installation of Inductance Loops Bid Tab

D7-10-012 RFQ Rug Cleaning

Oct 6, 2009

1:00 p.m. Local Time

No responses/to be rebid

D7-10-010 RFQ Fire Extinguisher Inspections

Oct 6, 2009

1:00 p.m. Local Time

D7-10-010 Annual Fire Extinguisher Inspection Bid Tab

RFQ D7-10-009 Telescopic Pole Trailer

Sept 30, 2009

1:00 p.m. Local Time

Bid Cancelled

D7-10-006 Preventive Pest Control Services

D7-10-006 ADDENDUM 001

Sept 15, 2009

1:00 p.m. Local Time

D7-10-006 Pest Control Bid Tabulations

RFQ D7-10-002-A Underbelly Plow Installation

Sept 8, 2009

1:00 p.m. Local Time

Bid Cancelled

RFQ -D7-10-008 Catering Service 2009 Snow Academy

Sept 4, 2009

1:00 p.m. Local Time

Quote Tabs D7-10-008 -Catering Service 2009-10 Snow Academy

RFQ D7-10-005 Fifth Wheel Converter Dolly

Sept 2, 2009

1:00 p.m. Local Time

Bid Tab-D7-10-005 Fifth Wheel Converter Dolly

D7-10-004 RFB Concrete Fixed Pricing

August 20, 2009

1:00 p.m. Local Time

D7-10-004 Commercial Mix Concrete Bid Tab

RFQ D7-10-002 Underbelly Plow Installation

August 8, 2009

1:00 p.m. Local Time

To be rebid

RFQ D7-10-005 Fifth Wheel Converter Dolly

July 28, 2009

1:00 p.m. Local Time

No Responses

RFQ D7-10-001 Culvert Pipe Installation Vernon County

July 28, 2009

1:00 p.m. Local Time

D7-10-001 Bid Tabs- Pipe Removal and Installation-Vernon County

D7-10-003 RFQ Lateral Rock

July 27, 2009

1:00 p.m. Local Time

D7-10-003 RFQ Lateral Rock Bid Tab

D7-09-070 Sidewalk and Curb Construction_Rte Y Barry County

D7-09-070 Addendum 001

D7-09-070 Addendum 002

July 16, 2009

1:00 p.m. Local Time

D7-09-070 Sidewalk and Curb Construction_ Rte Y Barry County Bid Tab

RFQ D7-09-071 Parking Lot Seal Coating

Addendum-001-D7-09-071 Parking Lot Seal Coating

July 10, 2009

1:00 p.m. Local Time

D7-09-071 Tabulations-Parking Lot Seal Coating

D7-09-065 RFB Demolition Project 7th Street_Duquesne to Rte 249

July 1, 2009

1:00 p.m. Local Time

D7-09-065 Demoltion and Improvement Services Bid Tab

RFB-D7-09-068-Heavy Equipment with Operators

June 30, 2009

1:00 p.m. Local Time

RFB D7-09-068 Heavy Equipment-Operator Services-Tabulations

RFB D7-09-069 Bulk Oil-Semi-Annual-2009

MGS9212

June 26, 2009

1:00 p.m. Local Time

D7-09-069-Bulk Oil Bid Tabulations

RFQ D7-09-064 Culvert Pipe Installation Barton-Vernon Cty

June 17, 2009

1:00 p.m. Local Time

D7-09-064 Bid Tabulations- Pipe Installation Projects

D7-09-067 RFQ Bridge Crane

June 16, 2009

1:00 p.m. Local Time

D7-09-067 BidTab

RFB-D7-09-063 Janitorial Services- MoDOT District Office

June 10 , 2009

1:00 p.m. Local Time

Bid Cancelled

D7-09-057 RFQ Spec 4 Grade C Seal Rock

June 8, 2009

1:00 p.m. Local Time

D7-09-057 BidTab

D7-09-058A RFB Lightweight Aggregate for Chip Seal

May 21, 2009

1:00 p.m. Local Time

D7-09-058A BID Tab

RFB D7-09-060A Concrete Pipe and Curb Inlets

MGS9210; Sec1026

May 14, 2009

1:00 p.m. Local Time

D7-09-060A-Concrete Pipe and Curb Inlets-Bid Tabulations

SFS 7-101207 Trimble GPS Equipment

Dec 7, 2010

Dec 17, 2010

The Missouri Department of Transportation has determined that only Seiler Instrument can provide MoDOT with proprietary upgrades and compatible GPS equipment. District 7 is currently needing to replace aging and outdated parts of the Trimble GPS systems that MoDOT Distruct 7 is using. Seiler Instrument is the regional distributor for Trimble equipment in the District 7 area. Seiler Instrument is also allowing trade-in discounts when purchaseing new equipment. Purchases relating to this Trimble GPS equipment are estimated to be $63,408.00

Please direct questions regarding this SFS to Cathy Bay at (417) 621-6354 or via email at Cathy.Bay@modot.mo.gov

SFS-100825-Coreslab Structures-Bridge Panels

Aug 25, 2010

Sept 7, 2010

The Missouri Department of Transportation has determined that there is only one known source for manufacturing concrete bridge slabs/panels to a specific size of 17’.  Coreslab Structures, Kansas City MO will manufacturer (14) each 6” Precast Concrete Bridge Panels to 17’ long for $3,012.50 a panel.  Delivery is included in this price. 

SFS 7-100811 Pave Patch 3000

Aug 11, 2010

Aug 13, 2010

The Missouri Department of Transportation has determined that there is only one known source, Construction Anchor, for Conspec Pave Patch 3000 rapid set concrete patching material use for bridge repairs.  The Pave Patch 3000 is supplied in 50 lb bags at $15.75 per bag and is an approved material. 

SFS 7-100727 Geomelt C

July 27, 2010

Aug 9, 2010

The Missouri Department of Transportation has determined that only one source, Smith Fertilizer & Grain, Knoxville, Iowa can furnish the Department with Geomelt C (Beet Juice and Calcium Chloride mixed) at $1.20 per gallon.  MoDOT plans to use a couple of loads of this product to compare against straight Calcium Chloride and Straight Geomelt 55 and record the differences between products. 

SFS 7-100727 Geomelt C

July 27, 2010

Aug 8, 2010

The Missouri Department of Transportation has determined that only one source, Smith Fertilizer & Grain, Knoxville, Iowa can furnish the Department with Geomelt C (Beet Juice and Calcium Chloride mixed) at $1.20 per gallon.  MoDOT plans to use a couple of loads of this product to compare against straight Calcium Chloride and Straight Geomelt 55 and record the differences between products. 

SFS 7-100721 SealTekk

July 21, 2010

July 23, 2010

The Missouri Department of Transportation (Distrct 7) has determined that only one known source can provide the department with SealTekk asphalt. SealTekk is a polymerized cationic emulsified asphalt product utilized as a high performance emulsion for use in chip seal applications. It shall be capable of allowing a faster break and superior adhesion to aggregate than  conventional chip seal emulsions such as CRS-2P. The emulsion shall be engineered to the specific aggregate on the project to ensure maximum compatibility and highest performance. Performance of the end product will be validated using the ASTM D-7000 sweep testing procedure. Application rate shall vary according to the demands of the pavement but shall typically be in the range of 0.30-0.40 gal/sq yard for use with MoDOT Spec 4 chip seal aggregate limestone. Purchases relating to this product are not expected to exceed $25,000.00 individually and/or cumulatively during the MoDOT pilot project. This pilot project is needed for additional testing.

Please direct questions regarding this SFS to Mary Teel at (417) 621-6356 or via email at Mary.Teel@modot.mo.gov

SFS 7-100714 Rapid Crete-Fastrac Cement

July 14, 2010

July 19, 2010

The Missouri Department of Transportation has determined that there is only one known source of MoDOT Rapid Cement Premix (RPC) for pavement repair now referred to as “Fastrac”, Western Material & Design, LLC.  Rapid Cement Premix (RPC) / Fastrac is one-component shrinkage compensated proprietary blend of cement, aggregates and performance enhancing chemical additives in 50lbs, 60lbs and 70lbs bags.  This is used for horizontal concrete repairs that require high-early strength gain.  Rapid Cement Premix (RPC) / Fastrac is a patent pending formulation that was developed exclusively for the DOT market.  Included is the Bulk Fastrac Products not blended with aggregates at time of delivery.

SFS 7-100630 SealTekk

June 30, 2010

July 6, 2010

The Missouri Department of Transportation (Distrct 7) has determined that only one known source can provide the department with SealTekk asphalt. SealTekk is a polymerized cationic emulsified asphalt product utilized as a high performance emulsion for use in chip seal applications. It shall be capable of allowing a faster break and superior adhesion to aggregate than  conventional chip seal emulsions such as CRS-2P. The emulsion shall be engineered to the specific aggregate on the project to ensure maximum compatibility and highest performance. Performance of the end product will be validated using the ASTM D-7000 sweep testing procedure. Application rate shall vary according to the demands of the pavement but shall typically be in the range of 0.30-0.40 gal/sq yard for use with MoDOT Spec 4 chip seal aggregate. Purchases relating to this product will not exceed $25,000.00 individually and/or cumulatively during the MoDOT pilot project.

Please direct questions regarding this SFS to Mary Teel at (417) 621-6356 or via email at Mary.Teel@modot.mo.gov

SFS 7-100517-Snap Tite Pipe Liner

May 17, 2010

May 19, 2010

The Missouri Department of Transportation has determined that there is only one known source, ISCO for Snap-Tite Culver Lining system that allows snap together pieces using solid wall high density polyethylene pipe meeting ASTM D3212 requirements.  The snap-tite pipe is then filled with a low density cellular grout, which fills any voids between roadway and cuvert, delivering a rehabbed culvert.  ISCO can offer this product at $21.27 a foot for 14” which will include 32.5 m/f of snap tite pipe, HDPE 3408, 50’ lay length, 3 pieces of 50’.

SFS 7-100401 Tra Vis Traffic Vision with InSync Traffic Adaptive System

04/01/10

04/13/10

The Missouri Department of Transportation has determined that there is only one known source for purchasing Tra Vis Traffic Vision with InSync Traffic Adaptive System. This system is an adaptive traffic signal control system, which detects and collects vehicle data by processing video images and automatically optimizes the changing of traffic signals in response to real-time traffic demands. Unlike other traffic control systems that use common cycle lengths, this system uses principles of robotics and artificial intelligence to optimize traffic flow. Purchases relating to this system are estimated @$450,000 over a 2 year period.

Please direct questions regarding this SFS to Cathy Bay at (417) 621-6354 or via email at Cathy.Bay@modot.mo.gov

SFS 7-100326 Precision Daylighting Inc-UPRHD Drilling

03/26/10

03/30/10

The Missouri Department of Transportation has determined that there is only one known source for drilling through solid rock in minutes using a Mission Sandvic Drill Hammer, with a 875 Sullair Compressor, while maintaining a 125PSI.  Precision Daylighting Inc. will perform drilling through solid rock and cleaning out culvert pipe with a 3000 PSI Tornado Hydro Vac Truck.  MoDOT Plans to have Precision Daylighting perform these tasks for a one day period each at $2700 per day for rock drilling and $2800 per day for Hydro Vacuuming Culverts. If (2) days is required, the cost will drop $100 per day for each task.  

SFS - 7-100226 On Line Interactive Oil Analyses and sample kits

02/26/10

03/02/10

The Missouri Department of Transportation has determined that there is only one known source of Oil Analyses with On-Line Interactive Reporting capabilities.  Staveley Services out of Kansas City KS is the only supplier for the On-Line Interactive Oil Analyses process used by our Oil Suppliers in the past two years, supplying us with oil sample kits monthly at $105.00 per 10 packs

SFS 7-100205 Wash Bay Pits

02/05/10

02/09/10

The Missouri Department of Transportation has determined that there is only one known source, Scurlock Industries that can supply the Department with Precast 3 X 6 wash bay pits, 6” walls and Neenah R-4990 mx Trench drain with frame for $2091.00 each.

SFS 7-091022 Concrete Screed

10/22/09

10/26/09

The Missouri Department of Transportation has determined that Lura Enterprises, LLC is the only one known source for a Gas Powered, Lightweight, adjustable to different lengths Concrete Screed.   The Luralightning Strike Power Screed comes complete with Contractor Package: 50 cc Gas Motor, 20ft tube, 12 ft tube, 6 ft tube, 4 ft tube, tripod stands (3 ea), metal handle, Motor Side Riser Wheel, 6 in wall plug and 18 in wall plug for $7, 645.26 with shipping.   This is being offered as 30 demo with option to purchase. 

SFS 7-090702-All Steel Weed Wiper

07/02/09

07/05/09

The Missouri Department of Transportation has determined that there is only one known source, Glassworks Weed Wiper in Strafford MO for an All Steel Construction including roller and frame weed wiper including a 3-point tractor hitch and 60 gallon tank.

SFS 7-090605 Pave Patch 3000

06/05/09

06/09/09

The Missouri Department of Transportation has determined that there is only one known source, Construction Anchor, for Conspec Pave Patch 3000 rapid set concrete patching material used for bridge repairs.  The Pave Patch 3000 is supplied in 50 lb bags and is an approved material

D7-09-059 RFQ Relocation of Traffic Signal and Pull Box M66 and Maiden Lane

May 12, 2009

1:00 p.m. Local Time

D7-09-059 BidTab

RFQ-D7-09-060 Concrete Pipe and Curb Inlets

MGS9210

Sec1026

May 7, 2009

1:00 p.m. Local Time

Cancelled-To Be Rebid.

D7-09-058 RFB Lightweight Aggregate for Chip Seal

April 30, 2009

1:00 p.m. Local Time

Rejected; Being Re-Issued

D7-09-056 RFQ Crushed Porphyry Trap Rock

April 21, 2009

1:00 p.m. Local Time

D7-09-056 Bid Tabulation

RFQ D7-09-054 Force Fed Tail Gate Conveyers

April 9, 2009

1:00 p.m. Local Time

D7-09-054 Force Fed Tail Gate Conveyer-Bid Tabs

D7-09-051 Demolition Project Route 66 Jasper County J7S0594B2

D7-09-051 Addendum 001

April 7, 2009

April 16, 2009

1:00 p.m. Local Time

D7-09-051 Demoltion and Improvement Services Bid Tab

D7-09-052 RFQ B-2 Commercial Mix Concrete for Bridge Deck Repair

D7-09-052 Exhibit 1

March 27, 2009

1:00 p.m. Local Time

D7-09-052 Bid Tabulation

RFB D7-09-053 - Schulte 20 Foot Mowers-FX520 Rotary Mower

March 26, 2009

1:00 p.m.

D7-09-053 Tabulations - Schulte 20 Foot Mowers

RFB D7-09-050 -Vibratory Roller Rentals

March 23, 2009

1:00 p.m. Local Time

D7-09-050 Vibratory Roller Rental Tabulations-2009

D7F-09-003 FM06 Signal roof re-coat

Scope of Work for Signal roof re-coat

Terms and Conditions Standard

March 27, 2009

1:00 p.m. Local Time

D7F-09-003 Bid Tab

D7-09-048 RFB Hot and Cold Mix Price Agreement

March 18, 2009

1:00 p.m. Local Time

D7-09-048 Hot Mix_Cold Mix Bid Tabulation

D7-09-049 RFQ Service to install Interactive Flasher System and Street Lighting at Intersection of M37 and RteB_C_Barry Co

March 16, 2009

1:00 p.m. Local Time

 

D7-09-045 RFQ AMP Electrical Components

D7-09-045 Addendum 001

March 13, 2009

Changed to

March 16, 2009

same time

1:00 p.m. Local Time

D7-09-045 Bid Tabulation

RFB D7-09-046 - Chip Seal Lease Equipment

March 12, 2009

1:00 p.m. Local Time

D7-09-046 Chip Seal Equipment-Bid Tabs

D7-09-042RFB Route 60 and 60B Signal Change

March 6, 2009

1:00 p.m. Local Time

D7-09-042 BidTab Signal Change Services on Rt 60 and 60B

D7-09-047 RFQ Service to install Interactive Flasher System and Street Lighting at Intersection of M96 and M43_Jaspser Co

March 3, 2009

1:00 p.m. Local Time

D7-09-047 Bid Tab

D7-09-043 RFQ Self Propelled Airless Striper

Feb 17, 2009

1:00 p.m. Local Time

D7-09-043 Self-Propelled Airless Striper Bid Tab

RFQ D7-09-044 Auger Bucket Truck Rental

Feb 17, 2009

1:00 p.m. Local Time

D7-09-044 Auger Bucket Truck Rental-Bid Tabs

RFB D7-09-038 Bulk Oil Bid

MGS9212

D7-09-038-ADDENDUM 001

Feb 11, 2009

1:00 p.m. Local Time

D7-09-038-Bulk Oil Bid Tabulations

D7-09-041 RFQ Advance Wireless Flashers

Feb 4, 2009

1:00 p.m. Local Time

D7-09-041 Bid Tab Advance Wireless Flashers

D7-09-040 RFQ Truck Mounted Full Matrix Changeable Message Sign

Feb 3, 2009

1:00 p.m. Local Time

D7-09-040 RFQ Bid Tab Truck Mounted Full Matrix Changeable Message Sign

D7-09-032 Consignment Supplies

Stock Inventory Turns Information

D7-09-032 addendum001

Feb 3, 2009

Addendum Changed to 

Feb 14 2009

1:00 p.m. Local Time

Canceled

SFS 7-090414-Hydro-Static Culvert Pipe Cleaner

04/14/09

04/24/09

The Missouri Department of Transportation has determined that there is only one known source CIMCOR-Fort Worth, Texas can supply a Rota-JETTER - Hydro-Static Self Propelled Power Culvert Pipe Cleaner with dual hydro-static pump system (21cc & 10cc), 16 HP, 435 gallon water tank, PTO & w/powered wheel drive, 21” x 11”-6” Tubeless Mud Tires, controls and 9”, 11”, 13”, 16”, 18”, 22” and 28” augers. Boring Pilot Bit: 3-1/2” bit, dirt/soft rock, carbide teeth, and safety control tool/aiming device, with 12 each 10’ long cleaning rods. Included is 7,000GVWR Heavy Duty Dual Axle trailer. Includes in-field training. $28,650

SFS 7-090407 Vertical Drill

04/07/09

04/09/09

The Missouri Department of Transportation has determined that there is only one known source, Logan Contractors that can supply a vertical EZ Drill, Model 20UTL for $7,385.00

SFS 7-090402 TTMA-Folding Arrowboard-Assembled

04/02/09

04/06/09

The Missouri Department of Transportation has determined that there is only one known source for a TMA-100 Trailer Mounted Attenuator and FLF 4X8 Folding Arrowboard frame (installed) for $17,275.00

SFS 7-090209 GL400 Parts

02/09/09

02/20/09

The Missouri Department of Transportation District 7 has determined that only one source, Certified Power/Component Technology, of Bridgeton, MO can provide the department with proprietary parts for GL400 systems.  The approximate value of this purchase is estimated at a cost of $26,673.93.  Issues with this purhase may be directed to Cathy Bay @ 417-629-3223 or Cathy.Bay@modot.mo.gov.

D7-09-037 RFB Interactive Flasher Equipment

Jan 30, 2009

1:00 p.m. Local Time

D7-09-037 Bid Tab Interactive Flasher Equipment

D7-09-030 Demolition and Improvement Services Route 66 Jasper County

D7-09-030 RFB Addendum 001

Jan 27, 2009

1:00 p.m. Local Time

D7-09-030 Demoltion and Improvement Services Bid Tab

RFB-D7-09-031 Janitorial Services-Construction Offices

ADDENDUM 001- D7-09-031

Jan 23, 2009

1:00 p.m. Local Time

RFB D7-09-031 Tabulations-Janitorial Services

D7-09-039 RFQ GL400 Parts

Jan 20, 2009

1:00 p.m. Local Time

ALL BIDS REJECTED

WILL REBID

RFQ D7-09-036 High Pressure Hot Water Washer

Jan 13, 2009

1:00 p.m. Local Time

ALL BIDS REJECTED

WILL REBID

SPECIFICATION CHANGE AND CLARIFICATIONS

RFQ D7-09-035 Aerial Bucket Truck Rental

D7-09-035 ADDENDUM 001

Jan 9, 2009

1:00 p.m. Local Time

D7-09-035 Aerial Bucket Truck Rental-Tabulations

RFQ - D7-09-034 Cargo Trailer

Jan 9, 2009

1:00 p.m. Local Time

RFQ D7-09-034 Cargo Trailer-Bid Tabulations

D7-09-033 RFQ Service to install Interactive Flasher System and Street Lighting at Intersection of M66_Black Cat Rd

Dec 31, 2008

1:00 p.m. Local Time

D7-09-033 Install Interactive Flasher and Street Lighting Bid Tab

RFB-D7-09-029 -Concrete Culvert Pipe

MGS9210

Dec 30, 2008

1:00 P.M. Local Time

RFB D7-09-029-Concrete Pipe Tabs

D7-09-028 RFQ HDPE Pipe

MGS9213

Dec 18, 2008

1:00 P.M. Local Time

D7-09-028 HDPE Pipe- Bid Tabulations

D7-09-027 RFQ Traffic Signal Mast and Arm

Dec 17, 2008

1:00 P.M. Local Time

D7-09-027 Bid Tab Signal Mast and Arm

D7-09-026 QuickCrete Concrete

Dec 03, 2008

1:00 P.M. Local Time

D7-09-026 Quickcrete Bid Tabs

SFS 7-090113 Mastr III_SXHMCX VHF Repeater

01/13/09

01/15/09

The Missouri Department of Transportation District 7 has determined that only A&W Communications Inc. can provide the Department with a proprietary radio VHF Repeater (Mastr III-SXHMCX). The approximate value of this purchase is estimated at a cost of $8,100.83. issues with this purchase may be directed to Cathy Bay @ 417-629-3223 or Cathy.Bay@modot.mo.gov.

SFS 7-081219 Herbicide Blend

12/19/08

12/22/08

The Missouri Department of Transportation has determined that there is only one known source, UAP, that can supply the Department with a herbicide blend of 20% Garlon, 3% Stalker and 77% Bark Oil Blue for $42.25 per gallon.

SFS 7-091125 Portable Traffic Control System

12/3/08

12/13/08

The Missouri Department of Transportation has determined that only one source, Horizon Signal Technologies Inc., Malvern, PA can provide the Department with at least one Portable Traffic Control System ( PTCS) with enclosed transportation trailer with lock downs. The PTCS shall consist of four self-contained, portable signal carts. Each cart shall provide a vertical telescoping upright with one signal head, radio communication system, controller, 12-volt battery system to provide minimum 72 hours of continuous operation and a 110-volt battery charger. The signal head shall consist of three (red, amber and green) 12-inch diameter LED signal indications and visors. The System shall include a wireless radio communication package, micro-terminal, work zone indicator light, wireless remote, unlimited technical support and training on the system.  The PTCS shall be able to operate in a fix-time, traffic-actuated or manual-control mode. Design and operations of the units shall comply with the Federal Highways Administration’s (FHWA) Manual on Uniform Traffic Control Devices and must meet NCHRP 350 Test Level 3.

D7-09-020 Demolition and Improvement Services Route FF Newton_Jasper Counties.

Nov 26, 2008

1:00 P.M. Local Time

D7-09-020 Demoltion and Improvement Services Bid Tab

D7-09-025 Henke Underbelly Plow Installation

Nov 25, 2008

1:00 P.M. Local Time

D7-09-025 Henke Underbelly Plow Installation Bid Tabs

D7-09-024 Tilt-Equipment Trailer

Addendum-1 D7-09-024

Nov 21, 2008

1:00 P.M. Local Time

D7-09-024 Tilt Equipment Trailer-Tabulations

D7-09-022 RFQ LED Radar Speed Display Sign Rebid

Nov 18, 2008

10:00 A.M. Local Time

D7-09-022 BidTab

RFB D7-08-021 Trash Collection and Disposal Services Bid

Nov 18, 2008

1:00 P.M. Local Time

D7-09-021Trash Collection and Disposal - Bid Tabs

D7-09-022 RFQ LED Radar Speed Display Sign

Nov 3, 2008

1:00 P.M. Local Time

No Award - All bids rejected

Will be re-bid.

D7-09-019 RFQ Cleaning of Paint Separators

Oct 28, 2008

1:00 P.M. Local Time

D7-09-019BidTab

D7-09-018 RFQ Propane Tank Rental for Joplin Welcome Center

Oct 15, 2008

1:00 P.M. Local Time

 

D7-09-013 RFB Boulder Removal and Ditch Clearing Services_Rte 54 St.Clair County

Oct 8, 2008

1:00 P.M. Local Time

D7-09-013 Bid Tab Boulder Removal Rte 54 St. Clair Co.

SFS 7-081001 Sasco Macro Deck

10/01/08

10/11/08

The Missouri Department of Transportation has determined that only one source, Sasco Pavement Coatings, Inc., Springfield MO can furnish District 7’s Bridge Department with Star Macro Deck Bridge Deck and Crack Sealer.  This material is an OR MoDOT approved penetrating clear product, which will waterproof and not discolor bridge deck.  The material allows the elimination of blotter material to absorb excess material and may be utilized by traffic as soon as dried without exhibiting residual tracking.

SFS - 7-080930 Rapid Crete

09/30/08

10/10/08

The Missouri Department of Transportation has determined that there is only one known source of MoDOT Rapid Cement Premix (RPC) for pavement repair, Western Material & Design, LLC.  Rapid Cement Premix (RPC) is one-component shrinkage compensated proprietary blend of cement, aggregates and performance enhancing chemical additives in 70lbs bags.  This is used for horizontal concrete repairs that require high-early strength gain.  Rapid Cement Premix (RPC) is a patent pending formulation that was developed exclusively for the DOT market. 

SFS 7-080925 Trimble GPS

09/25/2008

10/06/2008

The Missouri Department of Transportation (District 7) has determined that only Seiler Instrument can provide the Department with proprietary upgrades and compatible GPS equipment.  District 7 is currently using Trimble GPS systems in our Survey and Construction Departments.  MoDOT District 7 has determined the need to have compatibility of using the same brand of GPS equipment to integrate crews, without having to acquire additional training because of purchasing different types of equipment.  This will reduce training time and allow more opportunities to share resources.  If equipment problems develop and the system doesn’t work properly then pieces can be replaced a piece at a time to identify the source of the problem.  The Trimble office software is compatible with District 7’s existing GPS systems.  Seiler Instrument is the regional distributor for Trimble equipment in the District 7 area.  Seiler Instrument is also offering the previous Missouri contract price on this purchase and allowing a trade-in offer for a limited time on specific pieces.  Purchases relating to this product are estimated to be $68,508.  Questions relating to this single feasible source posting may be directed to Cathy Bay at 417-629-3223 or via email at cathy.bay@modot.mo.gov.

SFS 7-080916 Save a life Tour

09/10/2008

09/16/2008

  • We are providing the Save a  Life tour to three high schools in the area.  They are East Newton,  Miller, and Webb City.  It costs about $5400 for each school.

 The save a life tour multi-million dollar drinking and driving simulators are the only simulators in the nation that give participants a completely realistic, sober perspective on the effects of driving while intoxicated. With massive tour posters on display, high intensity videos rolling on huge monitors, and our charismatic show presenters engaging both participants and onlookers alike, no one that experiences the Save a Life Tour will leave unaffected. Just call us and ask why we're considered the "shock jocks of anti-drunk driving."

Please direct any questions regarding this SFS to Janet Doty at (417) 629-3227 or via email at janet.doty@modot.mo.gov

D7-09-017 RFQ Commercial Mix Concrete for Partial Depth Bridge Deck Repair

Sept 29, 2008

1:00 P.M. Local Time

 

RFQ - D7-09-016-A 6- Ton Static or Vibratory Roller

Sept 18, 2008

1:00 P.M. Local Time

Bid Tabs-D7-09-016-A - Six -6-Ton Static Rollers

RFQ D7-09-016 One-Ton Static Rollers

Sept 12, 2008

1:00 P.M. Local Time

Bid Tabs-D7-09-016 - One-Ton Static Rollers

RFQ D7-09-015 Box Culvert Pipe- St. Clair County

Sept 11, 2008

1:00 P.M. Local Time

D7-09-015 Tabulations - Box Culvert Pipe

D7-09-014 Crane with Operator-McDonald CO Pipe

Sept 11, 2008

1:00 P.M. Local Time

Bid Tabs-D7-09-014 Crane w Operator-Box Culvert McDonald CO

RFQ -D7-09-011- Catering Service 2008 Rodeo

Sept 3, 2008

1:00 P.M. Local Time

D7-09-011-Bid Tabs -Catering Service 2008 Rodeo

SFS 7-080811 ProLine TM

08/11/2008

08/21/2008

The Missouri Department of Transportation (District 7) has determined that only one known source, Logan County Asphalt Co. located in Guthrie, Oklahoma, can produce ProLine TM.  ProLine TM is a proprietary design of a polymer modified high performance cold asphalt pothole patching material.  Multiple purchases shall be made during the contract period     ( August 21, 2008 - December 31, 2009). Total expenditures during the contract period, in whole or in part, may exceed $25,000.00.

Please direct any questions regarding this SFS to Cathy Bay at (417) 629-3223 or via email at Cathy.Bay@modot.mo.gov

D7-09-010 RFQ Rental of Aerial Bucket Truck

Sept 3, 2008

1:00 P.M Local Time

D7-09-010 RFQ Bid Tab Rental of Aerial Bucket Truck

RFQ -D7-09-009 Tree Cutting and Removal Service

August 14, 2008

1:00 P.M. Local Time

D7-09-009-Quote Tabulations-Tree Removal Halltown

D7-09-007 RFB Cabinet-Type Fuel Pumps

August 13, 2008

1:00 P.M. Local Time

D7-09-007 RFB Bid Tab Cabinet-Type Fuel Pumps

Concrete Fixed Pricing RFB D7-09-005

August 6, 2008

1:00 P.M. Local Time

D7-09-005 RFB Bid Tab Concrete Fixed Pricing

RFB-D7-08-077-B Janitorial Services- Nevada Const. Office

August 4, 2008

1:00 P.M. Local Time

D7-08-077-B Tab - Nevada Construction Office Janitorial Services-B

RFQ -D7-09-008 Box Culvert Pipe-Dade County

July 28, 2008

1:00 P.M. Local Time

D7-09-008 Tabulations - Box Culvert Pipe

RFQ - D7-09-006 Cargo Trailer for Signals Dept

July 27, 2008

1:00 P.M. Local Time

D7-09-006 -Tabs- Cargo Trailer for Signals Dept

RFQ - D7-09-004 Wacker Vibratory Roller

July 25, 2008

1:00 P.M. Local Time

D7-09-004 Tabulations- Vibratory Roller

RFB-D7-09-001 -Heavy Equipment with Operators Rental

July 21, 2008

1:00 P.M. Local Time

RFB D7-09-001-Heavy Equipment-Operator Services-Bid Tabs-Final

D7-08-088- Equipment Parts

addendum 001 d7-08-088

Equipment Parts Price Page Addendum

July 17, 2008

1:00 P.M. Local Time

 

D7-09-003 RFQ Construction Harnesses

July 16, 2008

1:00 P.M. Local Time

D7-09-003 RFQ Bid Tabulation Construction Harnesses

D7-08-084 RFB Hot Asphalt Underseal

June 20, 2008

1:00 P.M. Local Time

D7-08-084 RFB BID Tab

D7-08-076 RFQ Establish Operator of Lawrence Co. I-44 Rest Area Sand Filter Sewage Treatment System

June 19, 2008

1:00 P.M. Local Time

D7-08-076 Bid Tab Operator for Sand Filter Sewage System

RFQ - D7-09-002 Concrete Barrier Lift

June 18, 2008

4:00 P.M. Local Time

RFQ D7-09-002 Tabulations- Concrete Barrier Lift

RFB-D7-08-087 Janitorial Services- MoDOT District Office

June 17, 2008

1:00 P.M. Local Time

D7-08-087 Tabulations -D7 Office Janitorial Services

RFB-D7-08-077-A Janitorial Services- Nevada Const. Office

June 16, 2008

1:00 P.M. Local Time

D7-08-077-A Tab - Nevada Construction Office Janitorial Services

SFS 7-080514 Datalux Computer

May 14, 2008

May 16, 2007

The Missouri Department of Transportation (District 7) has determined that only one known source, M-B Companies, Inc., can provide the department with a Datalux computer loaded with Paint Master Pro sorftware.  This is a proprietary purchase to operate the monitoring system of G8868, and MB Striper.

SFS 7-080421 CQS-1F Asphalt

April 21, 2008

April 24, 2008

The Missouri Department of Transportation (District 7) has determined that only one known source, SemMaterials, can provide the department with CQS-1F asphalt.  CQS-1F is a cationic emulsified asphalt product for use as a fast breaking, fast curing emulsion for use in fog seal applications.  It shall be capable of allowing return to traffic faster than conventional fog seal emulsions such as SS-1 or CSS-1.  It shall be delivered to the jobsite in a ready-to-apply dilution not to exceed water to residual asphalt ratio of 60:40.  Application rate shall vary according to the demands of the pavement but shall typically be in the range of 0.08-0.10 gal/sq yd for use on chip seals, and 0.05-0.10 gal/sq yd over bituminous mixtures.  Purchases relating to this product will not exceed $25,000 individually and /or cumulatively during the MoDOT pilot project.

SFS 7-080320 Proprietary Repair Parts For CMS

March 20, 2008

March 25, 2008

The Missosuri Department of Transportation District 7 Joplin location has determined that only one source, American Signal Company, Inc., can provide the department with proprietary repair parts for their changeable message signs.

RFQ D7-08-083-14000 lb Capacity Low Profile Trailers

EquipmentTrailer Specs

May 16, 2008

1:00 P.M. Local Time

D7-08-083-tabs 14000 lb capacity low profile trailer

D7-08-081 RFQ Equipment to Install InSync Traffic Adaptive Coordination System

May 7, 2008

1:00 P.M. Local Time

D7-08-081 RFQ Bid Tabulation

D7-08-078 - 3000-4000 Lb Capacity Forklift

Spec Forklift Electric 3000-4000 lb

May 2, 2008

1:00 P.M. Local Time

D7-08-078 Forklifts Bid Tabulations

D7-08-080 RFQ 6V-AGM Gell Cell Batteries

April 30, 2008

10:00 A.M. Local Time

D7-08-080 RFQ Bid Tab 6V-AGM Gell Cell Batteries

D7-080-075 Round Culvert Pipe-54-60 Inch

April 16, 2008

1:00 P.M. Local Time

RFQ D7-08-075 Tabulations 54-60 Inch Concrete Pipe

D7-080-074 Box Culvert Pipe-McDonald CO

April 15, 2008

1:00 P.M. Local Time

NO RESPONSES

D7- 08-061A Gas tank and supply bid

April 15, 2008

2:00 P.M. Local Time

D7-08-061A tabulation

RFQ - D7-08-073-10 Foot schulte mowers

April 11, 2008

1:00 P.M. Local Time

D7-08-073 Tabulations - Schulte 10 Foot Mowers

D7-08-072 RFQ Crushed Porphyry Trap Rock

April 8, 2008

1:00 P.M. Local Time

D7-08-072 RFQ Bid Tab Crushed Porphyry

D7-08-071 RFQ Gas Powered Hammer Drill

April 3, 2008

1:00 P.M. Local Time

D7-08-071 RFQ Bid Tab Hammer Drill

FM06 RFQ 031408 flooring GS Main

031408 GS floor scope

D7F-08-002 STANDARD SOLICITATION PROVISION

April 3, 2008

1:00 P.M. Local Time

D7F002 contractor bid tab

D7F-08-001 Roofing Project

D7F-08-001 Scope of Work

D7F-08-001 Terms and Conditions

March 28,2008

1:00 P.M. Local Time

 

RFB-D7-08-063 Janitorial Services- Construction Offices

March 26, 2008

1:00 P.M. Local Time

D7-08-063 Tabs - Neosho - Janitorial Services

D7-08-063 Tabs -Carthage - Janitorial Services

RFB-D7-08-069 Mowing Service District Offices

March 25, 2008

1:00 P.M. Local Time

D7-08-069 Mowing Bid Tabulations

RFB D7-08-057-A - Pumping Sewage Holding Tanks

March 20, 2008

1:00 P.M. Local Time

D7-08-057-A Bid Tabulations- Pumping Sewage Holding Tanks

D7 08 061 Gas tank and supply bid

March 18, 2008

 2:00 P.M. Local Time

 

D7-08-065 RFB Adaptive Traffic Signal Control System

March 18, 2008

1:00 P.M. Local Time

D7-08-065 RFB Bid Tabulation

RFB D7-08-067 - Lease Equipment-Chip Seal Process

March 12, 2008

1:00 P.M. Local Time

D7-08-067-Tabulations-Chip Seal Equipment Rental

D7-08-066 RFQ Wireless Communication Equipment

February 27, 2008

1:00 P.M. Local Time

D7-08-066 RFQ BID Tabulation

D7-08-062 RFB Hot and Cold Mix

February 26, 2008

1:00 P.M. Local Time

D7-08-062 Hot Mix and Cold Mix Bid Tabulation

D7-08-064 Culvert pipe removal and installation

February 25, 2008

1:00 P.M. Local Time

Tabulations-D7-08-064 Culvert Pipe Removal and Installation

D7-08-057 - Pumping Waste Pits

February 20, 2008

1:00 P.M. Local Time

No Bids-To Be Re-Bid

D7-08-052 - Detachable Gooseneck Trailer

Detachable Gooseneck Trailer Specs

Addendum 001

February 7, 2008

1:00 P.M. Local Time

Bid Tabulation- 35 Ton Gooseneck Trailer

D7-08-060-A Crane with Operator

February 7, 2008

1:00 P.M. Local Time

Bid Tabs-D7-08-060-A Crane w Operator-Box Culvert Unloading

D7-08-059 Preformed Thermoplastic Pavement Marking Tape

February 4, 2008

10:00 A.M.

Local Time

D7-08-059 RFQ BID Tabulation

D7-08-058 Pre-assembled 8 inch Redi-torque Slipbases

January 30, 2008

10:00 A.M.

Local Time

D7-08-058 RFQ BID Tabulation

D7-08-053 RFQ Fiber Optic Training

January 29, 2008

1:00 P.M. Local Time

D7-08-053 RFQ Bid Tabulation

D7-08-056 RFQ Video Detection Systems

January 29, 2008

10:00 A.M.

Local Time

D7-08-056 RFQ BID Tabulation

RFB D7-08-048 Bulk Oil-Year 2008

MGS9212J-Spec

January 22, 2008

1:00 P.M. Local Time

D7-08-048-Bulk Oil Bid Tabulations

D7-08-054 Crane and Clam bucket w-Operator

January 18, 2008

1:00 P.M. Local Time

Quote Tabulations-D7-08-054 Crane-Clam Bucket-Operator

RFQ-D7-08-050 -Heavy Equipment Rental-Lease

January 18, 2008

1:00 P.M. Local Time

D7-08-050 Heavy Equipment Bid Tabulation

SFS 7-080322 NCAA campaign

01/18/08

01/22/08

The Missouri Department of Transportation, District 7 Public Information, has determined CBS is the only network that can provide an advertising service for our primary target markets of non seat belt wearing teenage boys that watch NCAA Basketball Tournaments. KOAM-TV, Channel 7 is the CBS affiliate for our district that is carrying these games

D7-08-051 RFQ Fiber Optic Cable Test Set - Kit

January 17, 2008

1:00 P.M. Local Time

D7-08-051 RFQ BID Tabulation

D7-08-046- High Performance Motor Oil

January 9, 2008

1:00 P.M. Local Time

Bid Cancelled

D7-08-045 RFB Generator

D7-08-045 Emergency Power Generator and Scope of Work

D7-08-045 T and C

D7-08-045 Office_Plans Generator Electrical

D7-08-045 addendum 001

December 21, 2007

1:00 P.M. Local Time

 

D7-08-044 Roofing projects

D7-08-044 Roof Coating Spec

STANDARD SOLICITATION PROVISION

December 17,2007

1:00 P.M. Local Time

 

D7-08-042 RFQ Mt. Vernon Building insulation project

December 7, 2007

1:00 P.M. Local Time

RFQ D7-08-042 Bid Tabs Mt. Vernon

RFB D7-08-028-A Trash Collection and Disposal Services Bid

December 10, 2007

1:00 P.M. Local Time

Trash Collection and Disposal-A- Bid Tabulations

SFS 7-021207 Joplin Globe Blueprint

11/29/07

12/02/07

The Missouri Department of Transportation has determined that only one source  The Joplin Globe can provide an Arrive Alive print advertising campaign targeting the Joplin metropolitan population.

SFS 7-071129 Screening Bucket

11/29/07

12/13/07

The Missouri Department of Transportation has determined that only one source; National Attachments that can provide a screening bucket with aerating blades, equivalent or better than the REMU Screening bucket.

D7-08-037 Recapped tires

November 16, 2007

1:00 P.M. Local Time

 

D7-08-036 Neosho Bathroom Remodel

D7-08-036 Addendum 001

D7-08-036 Addendum 002

November 16, 2007

1:00 P.M. Local Time

 

D7-08-022 RFQ Sheldon Bathroom Remodel

November 16, 2007

1:00 P.M. Local Time

Canceled

D7-08-035 RFQ Mt. Vernon Building insulation project

November 6, 2007

1:00 P.M. Local Time

 

D7-08-030 RFQ Fire Extinguisher Inspections

October 31, 2007

1:00 P.M. CST

D7-08-030 Bid Tab

D7-08-032 RFQ Flu Shot Vaccines

October 15, 2007

2:00 P.M. Local Time

D7-08-032 BID Tabulation

D7-08-031 RFB Asphalt Repair Projects

RFB D7-08-031-Addendum 001

October 18, 2007

2:00 P.M. Local Time

BID TABULATION RFB D7-08-031 Asphalt Repair Services

RFQ -D7-08-034 Concrete pipe removal and installation-A001

RFQ D7-08-034-Addendum 001

October 19, 2007

1:00 P.M. Local Time

RFQ D7-08-034 Concrete Pipe Removal-Installation-Tabulations

RFB D7-08-028 Trash Collection and Disposal Services Bid

November 1, 2007

1:00 P.M. Local Time

D7-08-028 Bid Tabulations - Trash Collection and Disposal

SFS 7-070921 Trimble R8 GNSS Rover Kit and Accessories for GPS Unit

Sept 21, 2007

Sept 26, 2007

The Missouri Department of Transportation has determined that Seiler Instrument is the only authorized dealer to  provide proprietary replacement parts and accessories in the State of Missouri for a Trimble GPS unit.

D7-08-021 RFQ Replace Well House Mt Vernon

D7-08-021 Scope of Work

D7-08-021 T and C

Sept. 20, 2007

1:00 P.M. Local Time

 

D7-08-20 RFQ Replace Well House Nevada

D7-08-020 Scope of work

D7-08-020 T and C

Sept. 20, 2007

1:00 P.M. Local Time

 

RFP- D7-08-012 Recap tires

D7-08-012 Addendum 001

Sept 19, 2007

4:00 P.M Local Time

 Canceled Rebid

SFS-7-070914-Star Macro Deck

Sept 14, 2007

Sept 18, 2007

The Missouri Department of Transportation has determined that only one source, Sasco Pavement Coatings, Inc., Springfield MO can furnish District 7’s Bridge Department with Star Macro Deck Bridge Deck and Crack Sealer.  This material is an OR MoDOT approved penetrating clear product, which will waterproof and not discolor bridge deck.  The material allow the elimination of blotter material to absorb excess material and may be utilized by traffic as soon as dried without exhibiting residual tracking.  Pricing will be $16.50 per gallon.

RFQ D7-08-027- Corrugated Metal Pipe

Sept 11, 2007

1:00 P.M. Local Time

RFQ D7-08-027 Tabulations - Corrugated Metal Pipe

D7-08-026 RFQ Shot Rock Rte 13 Stream Mitigation Project

August 23, 2007

2:00 P.M. Local Time

D7-08-026BidTab

D7-08-018 RFQ Trac-hoe with Operator for Rte 13 Stream Mitigation

August 23, 2007

1:00 P.M. Local Time

D7-08-018 BID Tabulation

D7-08-019 RFQ Concrete Compression Testing Machine

August 17, 2007

10:00 A.M. Local Time

D7-08-019 Bid Tab

SFS 7-070908 Tween Safety Initiative

August 7,2007

August 9,2007

MoDOT is partnering with the Alliance of SW Missouri in the Tween Safety Initiative - Fall Semester 2007 and Spring Semester 2008 at a cost of  $6,500 per semester total cost of $13,000.00.  This joint project includes school visits, safety incentives and a safety presentation including reinforcement with a take home parent magazine.

RFQ -D7-08-017 Trac-hoe and Dozer with Operator

August 7, 2007

1:00 P.M. Local Time

Quote Tab-D7-08-13 Trac-hoe-Dozer-Operator

RFQ -D7-08-016A- Catering Service

August 7, 2007

1:00 P.M. Local Time

Quote Tabulations D7-08-016A -Catering Service

Concrete bid D7-08-005

July 30, 2007

1:00 P.M. Local Time

Concrete Bid Tab D7-08-005

RFQ -D7-08-013 Bridge Concrete Breakup Project

July 27, 2007

1:00 P.M. Local Time

Withdrawn - Will be re-issued.

RFQ - D7-08-014 Interactive Sign-No Right Turn

July 25, 2007

4:00 P.M. Local Time

Quote Tabulations - Signs-Interactive with Traffic Signal

RFQ - D7-08-008 Sign-Interactive with Traffic Signal

July 20, 2007

1:00 P.M Local Time

Quote Tabulations - Signs-Interactive with Traffic Signal

RFQ D7-08-006 Used-Oil Polyethylene Tank

July 19, 2007

1:00 P.M Local Time

Quote Tabulations - Used-Oil Polyethylene Tank

SFS 7-071507 Fox ad campaign

July 11,2007

July 16,2007

The Missouri Department of Transportation, District 7 Public Information, has determined FOX 14 as a sole source media provider for a 52 week safety campaign called “Think About it” that will include messages airing the day of the sponsorship, logo included as a sponsor, segments production of messages encouraging the use of seat belts.

SFS 7-070710 Truck beds

July 10,2007

July 18,2007

The Missouri Department of Transportation has determined that there is only one known source for truck beds that is supplied in a proprietary design for trucks owned by MoDOT.

SFS 7-070703 Crushed Porphyry Rock

July 3, 2007

July 18, 2007

The Missouri Department of Transportation has determined that only one source within the State of Missouri, Iron Mountain Trap Rock Company of Maryland Heights, MO can produce and supply to District 7, Crushed Porphyry/Igneous Rock.

D7-07-072 RFQ Proline High Performance Cold Asphalt Pothole Patching Material

May 18, 2007

1:00 PM

 

D7-07-052 Filter Bid Form 2007

April 20, 2007

1:00 PM

D7-07-052 Bid Tab

D7-07-51 Used oil pick-up

March 14, 2007

2:00 PM

BID Tabulation D7-07-051

D7-07-042 MO 66 at Florida Signal Change

March 29, 2007

1:00 PM

 

SFS 7-070323 Rapid Pavement Repair

March 9,2007

March 23,2007

The Missouri Department of Transportation has determined that there is only one known source for MoDOT Rapid Cement Premix (RPC) for pavement repair, Western Material & Design, LLC. Rapid Cement Premix (RPC) is a one-component shrinkage compensated proprietary blend of cement, aggregates and performance enhancing chemical additives in 70 lb bags. This is used for horizontal concrete repairs that require high-early strength gain. Rapid Cement Premix (RPC) is a patent pending formulation that was developed exclusively for the DOT market.

SFS 7-070319 Sensys Vehicle Detection Sensor

March 19, 2007

March 22, 2007

The Missosuri Department of Transportation has determined that only one source, Brown Traffic Products, can provide the department with a vehicle detection sensor that has the ability to communicate and interface wireless to traffic signal equipment located at a central point.

D7-07-043-Mowing Bid

March 5, 2007

1:00 PM

Mowing Bid Tabulation

RFB D7-07-039 Bulk Oil

MGS9212J-Spec

February 9, 2007

1:00PM

D7-07-039-Bulk Oil Bid Tabulations

D7-07-040 Hot and Cold Mix

February 15, 2007

1:00 PM

D7-07-040 Hot Mix and Cold Mix Bid Tabulation

RFQ D7-07-017 Asphalt Roof Halltown

D7-07-017 Scope of Work

11/17/2006

2:00 PM

Bid Cancelled

RFQ D7-07-021 Remodel District Office Breakroom

11/02/2006

1:00PM

Bid Tabulation D7-07-021

D7-07-030 Bid Request for Flu Shot Vaccines

11/02/2006

1:00 PM

 

D7-07-029 Bid Request for Hydroseeding

11/01/2006

10:00 AM

 

RFQ D7-07-028 Polytite N

10/30/2006

4:00 PM

Polytite Bid Tabulation D7

D7-07-031 Annual Inspection Services of Fire Extinguishers

11/15/2006

1:00 PM

 

D7-06-037 pest control RFQ

April 19th 2006

1:00 PM

 

 

The documents are provided in Acrobat Reader format. Free Acrobat Reader download PDF Icon

Southwest District

3025 East Kearney

Springfield, MO
(417) 895-7645


About Us
How Do I...
Contact Us
Missouri Department of Transportation
Central Office
105 W. Capitol Avenue
Jefferson City, MO 65102
1-888-ASK-MODOT (275-6636)
1-866-831-6277 (Motor Carrier Services)
Drivers License Offices
horz_bar
| | |
Missouri State Government
© 2013 Missouri Department of Transportation. All Rights Reserved.   Privacy Policy.
 
 
 
 
RSS FeedYoutubeBlogFlickrTwitter Facebook