| Item |
Date Posted |
Response Date |
Vendor/Bid Information |
| RFQ D610-003-R6 Bulldozer with Operator |
May 28, 2009 |
10:00 a.m. |
Tabulation D610-003-R6 |
| RFQ D610-001-R6 Excavator Rental |
May 21, 2009 |
10:00 a.m. |
Tabulation D610-001-R6 |
RFQ D609-128-R6 Riding Mower For Grover
Addendum 001 D609-128-R6 |
May 21, 2009 |
10:00 a.m. |
ALL BIDS REJECTED |
D609-125-RW Demolition 3
Exhibit A
Exhibit B
Exhibit C (Note: Responses may be faxed)
Addendum 001 |
May 20, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-124-R6 Bridge Jack |
May 19, 2009 |
10:00 a.m. |
Tabulation D609-124-R6 |
| RFQ D609-126-R6 Vehicle Mounted Area Work Lighting Units |
May 18, 2009 |
2:00 p.m. |
Tabulation D609-126-R6 |
| RFQ D609-122-R6 Oil Absorbing Compound |
May 14, 2009 |
10:00 a.m. |
Tabulation D609-122-R6 |
| D609-120-RW Bullnose Guardrail Repair |
May 13, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-123-R6 Vehicle Mounted Balloon Lighting System |
May 12, 2009 |
2:00 p.m. |
REJECTED - BEING RE-ISSUED |
| D609-121-RW MVP810 |
May 7, 2009 |
10:00 a.m. |
Tabulation |
D609-119-RW light Pole Installation
Addendum 001 |
May 7, 2009 |
10:00 a.m. |
Tabulation |
D609-118-RW Seal Parking Lots
Addendum 001 |
May 6, 2009 |
10:00 a.m. |
Tabulation |
D609-117-RW Wash Bay Equipment
Wash Bay Layout |
May 5, 2009 |
10:00 a.m. |
Tabulation |
RFQ D609-111-R6 Hydraulic Drop-Deck Trailer
Addendum 001 D609-111-R6
Addendum 002 D609-111-R6 |
April 23, 2009
April 30, 2009 |
10:00 a.m. |
Tabulation D609-111-R6 |
D609-115-RW Lindbergh Tunnel Pole, Light Replacement |
April 30, 2009 |
10:00 a.m. |
Withdrawn- insufficient data |
| D609-108-RW Fuel Dispensers |
April 28, 2009
April 30, 2009 |
10:00 a.m. |
Tabulation |
D609-105-RW Lighting Supplies
Addendum 001 |
April 22, 2009
April 29, 2009 |
10:00 a.m. |
Tabulation |
RFQ D609-114-RB Hydrodemolotion Rte. A &
Rte. Y, Warren County |
April 28, 2009 |
10:00 a.m. |
All bids Rejected |
| RFQ D609-113-RB Hydrodemolotion Rte. PP, Pike County |
April 28, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-112-RB Hydrodemolition Rte. Z, Lincoln County |
April 28, 2009 |
10:00 a.m. |
All bids Rejected |
RFQ D609-106-R6 Bridge Jack
Addendum 001 D609-106-R6 |
April 28, 2009 |
10:00 a.m. |
REJECTED - BEING RE-ISSUED |
| RFQ D609-116-RB Rollup Signs with Stands and Brackets |
April 27, 2009 |
2:00 p.m. |
Tabulation |
D609-099-RW CTAD Installation
Scope of Work
Plan Sheet |
April 27, 2009 |
10:00 a.m. |
Tabulation |
D609-098-RW Demolition 2
Exhibit A, Exhibit B, Exhibit C, Exhibit D |
April 27, 2009 |
10:00 a.m. |
Tabulation |
D609-109-RW Ice Machines
Addendum 001
Addendum 002 |
April 24, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-107-R7 Water Coolers |
April 23, 2009 |
10:00 a.m. |
Tabulation |
| D609-104-RW Holophane Parts |
April 22, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-101-R6 Bridge Drain Cleaning I-55 Meramec Bridge |
April 21, 2009 |
10:00 a.m. |
Tabulation D609-101-R6 |
D609-096-RW Gate Maintenance
Gate Locations |
April 17, 2009 |
10:00 a.m. |
tabulation |
| D609-103-RW Bridge Paving Lincoln County |
April 16, 2009 |
10:00 a.m. |
Withdrawn |
| D609-102-RW Bridge Paving- Warren County |
April 16, 2009 |
10:00 a.m. |
Tabulation |
| D609-097-RW Light Pole/Pull Box Installation |
April 15, 2009 |
10:00 a.m |
All bids Rejected |
D609-093-RW Pipe Liner
Addendum 001
RFB D609-093-RW Pipe Liner |
April 2, 2009
April 14, 2009 |
10:00 a.m.
1:00 p.m. |
Tabulation |
| D609-095-RW CCTV Cameras |
April 13, 2009 |
10:00 a.m. |
Tabulation |
D609-094-RB Rollup Signs MA
Attachment |
April 6, 2009 |
10:00 a.m. |
Tabulation |
D609-092-RW CMP
Specifications |
April 1, 2009 |
10:00 a.m. |
Tabulation |
| D609-091-RW On Call Portland Type I Concrete |
March 25, 2009 |
10:00 a.m. |
tabulation |
| D609-090-RW On Call Rapid Set Concrete |
March 25, 2009 |
10:00 a.m. |
tabulation |
RFB D609-085-RW Demolition with Friable Asbestos Abatement
Exhibit A Plans
Exhibit B Specifications
Exhibit C Additional Demolition Specifications
Exhibit D Asbestos Surveys |
March 18, 2009 |
10:00 a.m. |
Tabulation |
| D609-089-RW Bag Portland Cement |
March 17, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-088-RW Concrete Blocks |
March 17, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-087-R6 Hydrostatic Stand-On Mower |
March 12, 2009 |
10:00 a.m. |
Tabulation D609-087-R6 |
| D609-083-RW Sweeper Parts |
March 11, 2009 |
10:00 a.m. |
Tabualtion |
D609-082-RW Conveyor with Hopper
Exhibit A Conveyor Specifications
Exhibit B Hopper Specifications |
March 9, 2009 |
10:00 a.m. |
Tabulation |
D609-084-RW Crane Project
Sketch 1
Sketch 2
Photo 1
Photo 2
Photo 3 |
March 4, 2009 |
10:00 a.m. |
Tabulation |
| RFQ D609-080-R6 Manual Bandsaws |
March 3, 2009 |
10:00 a.m. |
Tabulation RFQ D609-080-R6 |
| D609-081-RW Trackhoe Rental |
March 3, 2009 |
10:00 a.m. |
Tabulation |
| D609-078-RW On Call Rock |
March 2, 2009 |
10:00 a.m. |
Tabulation |
D609-077-Joint Sealing - RW
Addendum 001
Specification 711 |
February 20, 2009
February 25, 2009 |
10:00 a.m. |
Tabulation |
D609-079-RW Crane Rental w Operator
Addendum 001
Addendum 002
Addendum 003 |
February 11, 2009
February 18, 2009 |
1:00 p.m.
10:00 a.m. |
Rejected, to be re-issued |
| sfs 7-06090515 Root Pruned Trees |
May 12, 2009 |
May 14, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determined that there is only one source that can provide Root Pruned Trees, achieved by a patented process.A one time purchase is estimated to be approximately $5000.00. Issues with this purchase may be addressed to Terri Mount @ 314-301-1431 or Teresa.Mount@modot.mo.gov until May 14, 2009. |
| sfs 7-06090202 Marketing Advertising |
February 2, 2009 |
February 6, 2009 |
The Missouri Department of Transportation, District 6 St. Louis, has determind the only one source can provide the marketing and advertising in print for the Missouri Department of Transportation, District 6, St. Louis. This market is through the St. Louis American. To our knowledge, the St. Louis American is the only medium that can rpovide the scale of advertisement to the intended target marekt wtih the expected advertisement. Advertising related to this mareting campaign will exceed $5000 cummulatively. A contract to purchase the above advertising packet may be executed with the St. Louis American after February 6, 2009.
Issue with this purchase may be directed to Athena Nance at (314) 301-1440 or Athena.Nance@modot.mo.gov |
D609-075-RW Post Driver
ADDENDUM 001 |
January 23, 2009 |
10:00 a.m. |
tab sheet |
| D609-075-RB Crawler Loader Rental |
January 22, 2009 |
10:00 a.m. |
All Bids Rejected |
| D609-074-RW On Call Commercial Mix |
February 9, 2009 |
1:00 p.m. |
Tabulation |
| D609-073-RW Fault Locator |
January 20, 2009 |
10:00 a.m. |
tabulation |
| D609-071-RW Tower Parts |
January 5, 2009 |
10:00 a.m |
Tabulation |
| D609-069-RW Simulated Impaired Driving Vehicle |
January 9, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-068-R6 Various Filters |
December 31, 2008 |
2:00 p.m. |
Tabulation RFQ D609-068-R6 |
| RFQ D609-065-RB Camera System |
December 31, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-067-R6 Triumph Switchblade Mower Parts |
December 31, 2008 |
10:00 a.m. |
Tabulation D609-067-R6 |
RFQ D609-066-R6 Bush-Whacker Mower Parts
Addendum 001 D609-066-R6 |
December 31, 2008 |
10:00 a.m. |
Tabulation D609-066-R6 |
| D609-070-RW Trackhoe Rental |
December 30, 2008 |
10:00 a.m. |
All Bids Rejected |
RFQ D609-063-R6 LED Retractable Arrow Boards
Side View Picture
RearView Up Picture
RearView Down Picture |
December 30, 2008 |
10:00 a.m. |
D609-063-R6 Tabulation |
| D609-064-RW Blank Out Signs |
December 30, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-062-R6 Fence Windscreen
Addendum 001 D609-062-R6 |
December 30, 2008 |
10:00 a.m. |
D609-062-R6 Tabulation |
| D609-061-RB Rock Pile St. Charles/Wentzville |
December 30, 2008 |
10:00 a.m. |
All Bids Rejected |
D609-060-RW Type A Base Replacement
Addendum 001 |
December 15, 2008 |
10:00 a.m. |
Tabulation |
D609-047-RB DBE Supportive Services and Business Consultation Program
Addendum 001
Addendum 002
Attachment I |
December 19, 2008 |
10:00 a.m. |
|
| D609-059-RW On Call Wood Chipper Rental |
December 16, 2008 |
10:00 a.m. |
Tabulation |
| D609-055-RW Jotto Desk Bases |
December 9, 2008 |
10:00 a.m. |
Tabulation |
D609-052-RW Fence Enclosures
Addendum 001
Specification
Addendum 002
Addendum 003 |
December 9, 2008 |
10:00 a.m. |
Tabulation |
D609-0057-RW On Call Rapid Set Cement
Addendum 001 Rapid Set |
December 8, 2008 |
10:00 a.m. |
Tabulation |
| D609-058-RW Fence Glare Slats |
December 3, 2008 |
10:00 a.m. |
Tabulation |
D609-056-RW On Call Portland Cement
Addendum 001 |
December 8, 2008 |
10:00 a.m. |
Tabulation |
| D609-053-RW Silspec Polymer Nosing System |
December 2, 2008 |
10:00 a.m. |
Tabulation |
| 7-06090130 Original Software Coding for Lindbergh Tunnel |
January 26, 2009 |
February 5, 2009 |
The Missouri Department of Transportation, District 6 has determined that one company, Finavon Design, of Forest, VA. can furnish the department with knowledge of the original un-compiled code used for the Lindbergh Tunnel cusotm software.
Purchases for Finvron Design Inc., services may exceed $25,000, individually and/or cumulatively and may be made throughout the calendar year 2009, This authorization may be extended for an additional one year unless additional suppliers are identified upon the expiration of any single feasible source authorization.
.This notice shall meet the single feasible source posting requirements for one year and in association with the needs described.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until February 5, 2009.. |
| 7-06090126 Quad Gaurd Attenuator Parts |
January 21, 2009 |
January 26, 2009 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is one company, HCI – The Hoosier Company, Incorporated, which can provide parts to existing Quad Guard Attenuators. Purchases to repair Quad Guard Attenuators through January 26, 2010 are estimated to be approximately $24,999.99. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described.
Issues with this purchase may be addressed to Kristi Coppinger @ 314-301-1439 or Kristina.Coppinger@modot.mo.gov until January 26, 2009. |
| 7-06090126 Electronic Fueling Equipment |
January 14, 2009 |
January 26, 2009 |
The Missouri Department of Transportation, District 6 has determined that one company,Graham Equipment Company of St. Louis, MO. ( area distributor for Bennett equipment) can furnish and install Bennett fueling equipment that includes but is not limited to pumps,remote dispensers, and future assoiciated installations and supplies that are compatible with the TRAK Sentry GOLD Compact.
Purchases for Bennett equipment and services may exceed $25,000, individually and/or cumulatively and may be made throughout the calendar year 2009, Tis auorization may be extended for an additional one year unless additional suppliers are identified upon the expiration of any single feasible source authorization.
.This notice shall meet the single feasible source posting requirements for one year and in association with the needs described.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until January 26, 2009.. |
| 7-06091201 Wolverine Cold Weather Paint |
November 20, 2008 |
December 1, 2008 |
The Missouri Department of Transportation, District 6 has determined that one company, Ennis Paint can provide specific brand Wolverine Cold Weather Traffic Striping Paint for testing in the St. Louis metro District area . Due to construction projects in District that may have to be striped in cold weather months. This specific brand is currently in the evaluation phase and this is a one time order to test material under actual contitions..This notice shall meet the single feasible source posting requirements for one year and in association with the needs described.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until December 1, 2008. |
| 7-06091125 Intelight Replacement Parts |
November 20,2008 |
November 25, 2008 |
The Missouri Department of Transportation, District has determined that only Brown Traffic, can provide the Department with replacement or extra parts as used in the Intelight SignalSystem.This notice shall meet the single feasible source posting requirements for one year and in association with the needs described. The approximate value of the product is estimated at a cost of $ 10,000year.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until November 25, 2008. |
| 7-06091124 Replacement Parts for TraVis Camera Systems |
November 18, 2008 |
November 24, 2008 |
The Missouri Department of Transportation, District has determined that only Rhythm Engineering, ( formerly Professional Engineering)can provide the Department with replacement or extra parts as used in the TraVis Camera System .This notice shall meet the single feasible source posting requirements for one year and in association with the needs described. The approximate value of the product is estimated at a cost of $ 13,000year.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until November 24, 2008. |
| 7-06091105 DTN Meteorologist Services |
November 3, 2008 |
November 5, 2008 |
The Missouri Department of Transportation, District has determined that only DTN Meteorlogix can provide the Department with DTN Meterorological Services for Weather Sentry On Line Pro .This notice shall meet the single feasible source posting requirements for one year and in association with the needs described. The approximate value of the product is estimated at a cost of $ 5,750/year.
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until November 5, 2008. |
| 7-06091027 Repair and Upgrade of RWIS System |
October 15, 2008 |
October 27, 2008 |
The Missouri Department of Transportation, District has determined that only HCI can provide the Department with specific use, repair and upgrade of District 6 RWIS System.. This specific product has been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one year and in association with the needs described. The approximate value of the product is estimated at a cost of $ 94,000 for 2 (two) locations..
Issues with this purchase may be directed to Teresa (Terri) Mount, Sr. General Services Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov until October 27, 2008. |
| 7-06090929 |
Sept. 18, 2008 |
Sept. 29, 2008 |
The Missouri Department of Transportation, District has determined that only Raytheon Corporation can provide the Department with specific use, ACU1000 units. This specific product has been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one month and in association with the needs described. The approximate value of the product is estimated at a cost of $ 45,000 for 2 (two) units.
Issues with this purchase may be directed to Athena Nance, Senior Procurement Agent, at 314-301-1440 or Athena.nance@modot.mo.gov until September 29, 2008. |
| D609-049-RB Weekly Trash Service |
November 19, 2008 |
10:00 a.m. |
Tabulation |
D609-046-RB MRCC Database Evaluation and Updating
Addendum 001 |
November 13, 2008 |
10:00 a.m. |
Tabulation |
| D609-051-RW Equipment Trailer |
November 12, 2008 |
10:00 a.m. |
Tabulation |
| D609-050-RW Transmission Fluid |
November 6, 2008 |
10:00 a.m. |
Tabulation |
| D609-045-RW TRAILER DOORS REPLACEMENT |
October 23, 2008 |
10:00 a.m. |
Tabulation |
D609-044-RW Pull Box Install
Addendum 001
Addendum 002 |
October 15, 2008 |
10:00 a.m. |
Tabulation |
| D609-043-RW Mobile Mix Unit |
October 9, 2008 |
10:00 a.m. |
Tabulation |
| D609-042-RW Hydrodemolition |
October 9, 2008 |
10:00 a.m. |
tabulation |
| D609-041-RB Tree Removal I44 & S. Forest |
October 8, 2008 |
10:00 a.m. |
Tabulation |
| D609-040-RB Tree Removal Valley Park |
September 30, 2008 |
2:00 p.m. |
Tabulation |
D609-020-RW Beam Clamp Repair
Structure Photo A Sign Overview
Structure photo B Beam Clamp photo1
Beam clamp Photo2 Beam Clamp Detail
Beam clamp Photo4 Sign shop Drawings
Sign Plan Sheets E1
Steel Truss Detail |
October 17, 2008 |
10:00 a.m. |
Under review |
| D609-39-RW On Call Bridge Washing |
October 6, 2008 |
10:00 a.m. |
All bids rejected |
D609-038-RW CMP
CMP SPECIFICATIONS |
October 1, 2008 |
10:00 a.m. |
Tabulation |
D609-037-RW Brdg Joint Sealing NB
Addendum 001
Addendum 002 |
October 3, 2008 |
10:00 a.m. |
Tabulation |
| D609-036-RW Brdg Joint Sealing SB |
October 3, 2008 |
10:00 a.m. |
tabulation |
D605-035-RW Bullnose Repair |
October 1, 2008 |
10:00 a.m. |
Tabulation |
| D609-034-RB Tree Removal Service Lemay |
September 26, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-032-R6 Truck Inspections |
September 24, 2008 |
10:00 a.m. |
Tabulation RFQ D609-032-R6 |
| D609-031-RW Bldg Propane |
September 17, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-029-R6 Plows For Chevy Dump and Flatbed |
September 16, 2008 |
10:00 a.m. |
Tabulation RFQ D609-029-R6 |
| D609-027-RW On Call Bridge Washing |
September 16, 2008 |
10:00 a.m. |
All bids rejected |
D609-030-RW Mobile Mix Unit w Operator
ADDENDUM 001 |
September 15, 2008
September 16, 2008 |
10:00 a.m. |
All bids rejected |
D609-028-RW Mill w Conveyor |
September 15, 2008 |
10:00 a.m. |
Tabulation |
D609-026-RB Sand
Attachment I |
September 15, 2008 |
10:00 a.m. |
Tabulation |
D609-025-RW HYDRO DEMOLITION
ADDENDUM 001 |
September 15, 2008
September 16, 2008 |
10:00 a.m |
All bids rejected |
D609-023-RB Entry Monuments
Attachment I
Addendum 001 |
August 26, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-005-R6 Food Service For Roadeo Event
Addendum 001 D609-005-R6
Addendum 002 D609-005-R6 |
Bid Closing Extended Until August 22, 2008 |
2:00 p.m. |
Tabulation RFQ D609-005-R6 |
| D609-022-RW Bridge Seal Coating Service |
August 21, 2008 |
10:00 a.m. |
Tabulation |
| D609-021-RB Lease 36month Color Copier |
August 18, 2008 |
10:00 a.m. |
Tabulation |
| D609-018-RB Floor Mat Service |
August 18, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-016-R6 CMP For Desoto
CMP Specifications MGS-91-11G
Addendum 001 D609-016-R6 |
August 12, 2008 |
10:00 a.m. |
Tabulation RFQ D609-016-R6 |
| D609-015-RW Shot Rock |
August 8, 2008 |
10:00 a.m. |
Tabulation |
| D609-017-RW Dozer Rental |
August 8, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-013-R6 Rubber Track Hoe Pads
D609-013-R6 Specifications For Kobelco SK115SRDZ
Addendum 001 D609-013-R6
Addendum 002 D609-013-R6 |
August 7, 2008 |
10:00 a.m. |
Tabulation RFQ D609-013-R6 |
| RFQ D609-014-RB Welder Generator |
August 6, 2008 |
10:00 a.m. |
Tabulation |
RFQ D609-010-RB Entry Monuments
Attachments I, II, III |
July 29, 2008 |
10:00 a.m. |
Withdrawn due to Plan Redesign |
| D609-012-RW MILBANK METER SERVICE PEDESTALS |
July 29,2008 |
10:00 a.m. |
Tabulation |
| RFQ D609-009-RW ON CALL RAPID SET CONCRETE |
July 23, 2008 |
10:00 a.m. |
D609-009-RW Tabulation |
| D609-011-RW CONCRETE BLOCKS |
July 23, 2008 |
10:00 a.m. |
Tabulation |
| RFB D609-008-RB On Call Sweeping |
July 23, 2008 |
10:00 a.m. |
Tabulation |
RFB D609-007-RB Trailer Pump
Addendum 001 |
July 21, 2008 |
10:00 a.m. |
Tabulation |
RFB D609-003-RW BULK OIL
ATTACHMENT A
ATTACHMENT B |
July 1,2008 |
10:00 a.m. |
Tabulation |
D609-006-RW Tower Cable Replacement
Sketch 2.10 Transition Assbly Parts
Sketch 2.21 Luminaire Ring Parts
Sketch Additional
Addendum 001 |
June 27, 2008 |
10:00 a.m. |
Tabulation |
| RFB D608-133-R6 Truck Painting |
June 17, 2008 |
2:00 p.m. |
Tabulation RFQ D608-133-R6 |
| D609-001-RB On Call Drain Cleaning |
June 6, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-135-R6 Directional Indicator Barriers Type II SHRP |
May 27, 2008 |
10:00 a.m. |
Tabulation |
| 7-06090918 |
Sept.12,2008 |
Sept. 17, 2008 |
The Missouri Department of Transportation,District 6, has determined that only Traffic Systems Solutions a subsidary of Brown Inc., Davenport, IA, can provide the Department with specific service upgrade to expand remote ACTRAservice to 16 additional users.
These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $15,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by September 17, 2008 |
| 7-06090624 Iteris Replacement Parts |
June 24, 2008 |
June 27, 2008 |
The Missouri Department of Transportation,District 6, has determined that only Brown Inc., Davenport, IA, can provide the Department with specific use iteris camera mounted processors and or replacement parts.
These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $15,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 27, 2008. |
| 7-06090718 Top Loading Non-commercial Animal Incinerator |
July 9, 2008 |
July 18, 2009 |
The Missouri Department of Transportation,District 6, has determined that only Lewis Repair & Mfg. of Cedar, Iowa, can provide the Department with specific use large animal non-commercial top loading animal incinerator as previously approved by the University of Missouri Extension Service.
These specific products have been documented as fully and absolutely suitable for all current requirements. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $26,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 27, 2008. |
| 7-06090717 Autoscope Solo Detection Cameras |
July 8, 2008 |
July 17, 2008 |
The Missouri Department of Transportation,District 6, has determined that onlyTraffic Control Corporation, Fenton, Mo., can provide the Department with specific use Econolite Autoscope Solo Detection Cameras.
These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $40,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 27, 2008. |
| 7-06090721 Portable Stop Signs Complete |
July 18, 2008 |
July 21, 2008 |
The State of Missouri, Department of Transportation District 6, has a need portable stop signs for the use of traffic stoppage in the St. Louis County, MO Areas. All signs associated with must be fully and absolutely compatible with all current materials - no exceptions. The Department of Transportation has identified Impact Recovery Systems, Eldon, MO., as the only available vendor capable of providing the specific materials as outlined and intend to clarify the use of that vendor as a single feasible source to meet those needs. The approximate value of the service is estimated at a cost of $6500. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. Issues with this process and/or acquisition may be directed Athena Nance, Senior Procurement Agent, at 314-301-1440 or Athena.nance@modot.mo.gov until July 21, 2004 at 10:00 a.m. local time.
|
| SFS7-06090728 Rapid Set Cement |
July 18, 2008 |
July 28, 2008 |
The Missouri Department of Transportation,District 6, has determined that onlyCTS Mf., of Mexico, MO, can provide the Department with specific use Rapid Set Cement in bulk form as blended to perform a specific use patching material for dense overlays with the ability to reach high strengths in one to two hours and controlled cracking.
These specific products have been documented as fully and absolutely compatible for use with the desired results for patching operations. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $10,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 28, 2008. |
| SFS 7-06090808 Vehicle Arresting Barrier Repair |
July 30,2008 |
August 8, 2008 |
The Missouri Department of Transportation,District 6, has determined that only the Entwistle Company, of Hudson, MA, can provide the Department with specific repair, training, and/or maintnenance as required on D6 reversible lane equipment, specifically the vehicle arresting barrier as manufactured by the vendor indicated above.
This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $20,000.
Issues with this purchase may be directed to Terri Mount at
(314) 301-1431 or teresa.mount@modot.mo.gov by June 28, 2008 |
| 7-0608325 Jet/Vac Sewer Cleaner |
March 25, 2008 |
April 7, 2008 |
The Missouri Department of Transportation District 6, St. Louis has determined that only one source can provide the design build for a roll –off jet/vac sewer cleaner Ecosystems Sewer Drainage Truck parts and labor for the Missouri Department of Transportation District 6, St. Louis. To our knowledge, the Ecosystems Company is the only business that can provide the scale of design build on this antiquated truck. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $120,000.
Issues with this purchase may be directed to Athena Nance at
(314) 301-1440 or athena.nance@modot.mo.gov by April 7, 2008
|
| 7-06080319 Impact Attenuator |
March 17, 2008 |
March 19, 2008 |
The Missouri Department of Transportation, Shreve Maintenance, District 6, has determined that only Trinity Industries, Dallas, TX can provide the Department with specific use of impact attenuator sections. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of this product has an estimated cost of $12,000 and associated costs. Issues with this purchase may be directed to Athena Nance, Senior Procurement Agent at 314-301-1440 or Athena.Nance@modot.mo.gov, until March 19, 2008.
|
| 7-06080319 Star MacroDeck |
March 4, 2008 |
March 19, 2008 |
The Missouri Department of Transportation, General Services, to the best of their knowledge, has determined that there is only one known source, McConnell & Associates, Pevely, MO., that can furnish the department with Star Macro Deck Bridge Deck and Crack Sealer. Material is an OR MoDOT approved penetrating clear product which will waterproof and not discolor bridge deck. the material allows the elimination of blotter material to absorb excess material and may be utilized by traffic as soon as dried without exhibiting residual tracking. Purchase for this item is anticipated to be approximately $18,000 individually and/or cumulatively may be made throughout the calendar year 2008 and expiring on December 31, 2008.
Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo.gov until March 19, 2008. |
| D608-136-RW Holophane Fixtures |
May 27, 2008 |
10:00 a.m. |
Tabulations |
| D609-002-RB Excavator Rental |
May 21, 2008 |
10:00 a.m. |
Tabulation |
| D608-137-RW Asphalt Paver and Roller |
May 21, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-134-R7 Holophane Lights |
May 15, 2008 |
10:00 a.m. |
WITHDRAWN - TO BE RE-ISSUED |
| RFQ D608-130-R6 Various Filters |
April 24, 2008 |
2:00 p.m. |
RFQ D608-130-R6 Tabulation |
| D608-126-RW Microsurfacing Highway Repair |
April 23, 2008 |
10:00 a.m. |
Tabulation |
RFQ D608-129-R6 CMP For Gray Summit
CMP Specifications MGS-91-11G
D608-129-R6 Addendum 001 |
April 22, 2008 |
10:00 a.m. |
RFQ D608-129-R6 Tabulation |
D608-128-RW Waterproof Bridge Piling
Picture1
Picture 2 |
April 18, 2008 |
10:00 a.m. |
Tabulation |
| D608-127-RW Bridge Drain Trough Cleaning |
April 18, 2008 |
10:00 a.m. |
Tabulation |
| D608-125-RW Equipment Trailer |
April 15, 2008 |
10:00 a.m. |
Tabulation |
| D608-123-RW Portable Line Striping System |
April 14, 2008 |
10:00 a.m. |
Tabulation |
| D608-117-RW Installed Automatic Car Wash and Modifications , SEALED BID |
April 14, 2008
Extended April 18, 2008 |
10:00 a.m. |
Tabulation |
| D608-118-RW Epoxy Wall Coating System Installed |
April 10, 2008 |
10:00 a.m. |
Tabulation |
| D608-122-RW Baler |
April 8, 2008 |
10:00 a.m. |
Tabulation |
| D608-121-RW Rubber Flooring |
March 31, 2008 |
10:00 a.m. |
Tabulation |
| D608-120-RW Oak Timbers |
March 31, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-112-R6 Hydraulic System and Spreader For 3 qutr ton Chevy |
March 31, 2008 |
10:00 a.m. |
RFQ D608-112-R6 Tabulation |
| D608-116-RW Rubber Tile |
March 27, 2008 |
10:00 a.m. |
Withdrawn- to be re-issued |
D608-115-RW BRIDGE MIX
ADDENDUM 001 |
March 26, 2008 |
10:00 a.m. |
Tabulation |
D608-114-RW Paver with Operator
Addendum 001 |
March 26, 2008 |
10:00 a.m. |
Tabulation |
D608-113-RW Rotomill Job
Addendum 001 |
March 26, 2008 |
10:00 a.m. |
Tabulation |
| D608-111-RW Bridge Joint Sealing Extraction,Jefferson County,MO |
|
|
Withdrawn- duplicate to RFQ D608-108-RW |
| D608-110-RW Removal and Reseal Bridge Compression Seal Joints Rock Creek Rd |
March 27, 2008 |
10:00 a.m. |
Tabulation |
| D608-109-RW Removal and Reseal Bridge Compression Seal Joints |
March 28,2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-097-R6 Plow and Spreader For Chevy Flatbeds |
March 25, 2008 |
10:00 a.m. |
RFQ D608-097-R6 Tabulation |
| D608-108-RW Bridge Joint Seal |
March 19, 2008 |
10:00 a.m |
Tabulation |
| D608-107-RW Bridge Drain Trough System Cleaning-Vandenventer |
March 14, 2008 |
10:00 a.m. |
Tabulation |
| D608-106-RW- Bridge Drain Trough System cCeaning |
March 14, 2008 |
10:00 am |
Tabulation |
| D608-105-RW Line Bore, Rte 67 and Schuetz |
March 17, 2008 |
10:00 a.m. |
Tabulation |
| D608-104-RW Lighting Repair |
March 17, 2008 |
10:00 a.m. |
tabulation |
| D608-103-RW Bridge Flushing |
March 14, 2008 |
10:00 a.m. |
Tabulation |
RFQ D608-093-R6 Plow and Spreader For Chevy 1-Ton Dump
RFQ D608-093-R6 Addendum 001 |
February 28, 2008 |
10:00 a.m. |
RFQ D608-093-R6 Tabulation |
| D608-100-RB Design 6 Ballas Sign Shop |
February 29, 2008 |
10:00 a.m. |
Tabulation |
| D608-099-RW Moblile Home Roof Over System-extended |
March 21, 2008 |
10:00 a.m. |
Tabulation |
d608-096-RW Riding and Walk Behind Mowers
Specifications Riding Mower
Specifications Walk Behind Mower |
March 6, 2008 |
10:00 a.m. |
tabulation |
| D608-095-RW Line Bore Job Olive and Tempo |
March 4, 2008 |
10:00 a.m. |
WITHDRAWN |
| D608-094-RB Tile St Peters PO |
March 3, 2008 |
10:00 a.m. |
Tabulation |
| D608-101-RW Lego Cement Blocks |
February 28, 2008 |
10:00 a.m. |
Tabulation |
RFQ D608-093-R6 Plows and Spreaders
RFQ D608-093-R6 Addendum 001 |
February 28, 2008 |
10:00 a.m. |
|
| D608-092-RW Truck BedSlides |
February 27, 2008 |
10:00 a.m. |
Tabulation |
| D608-091-RW Landfill |
February 19, 2008 |
10:00 a.m |
tabulation |
| 7-06080225 Direct Digital Control System Monitoring |
February 14, 2008 |
February 25, 2008 |
District 6, of the Missouri Department of Transportation has determined only one known source can furnish the district with a Andover Continuum system to interface with an existing system at District Office.To our knowledge, Eagle Energy of maryland Heights, Mo., is the only experienced vendor in the St. Louis area with pre-existing familiarity with the Andover Continuum system to provide installation, interface and monitoring of new and existing systems. Purchase for items and installation may exceed $25,000 individually or comulatively and may be made throughout the claendar year 2008 and expiring on December 31, 2008. This osting may be extended for up to two (2) additional one(1) year periods unless additional suppliers are identified upon the expirationof any single feasible source authorization period. Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo.gov until February 25, 2008. |
| 7-6080219 REACT Cylinder 6 |
February 19, 2008 |
February 28, 2008 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is a sole distributorship, HCI- Hoosier Company Incorporated, which can supply MoDOT District 6 with the REACT 55 MPH 6 Cylinder TMA product. The approximate value of this product cannot exceed $40,000 during the contract period. |
| D608-090-RW Street Sweeper Replacement Brooms and Parts |
February 14, 2008 |
10:00 a.m. |
Tabulation |
| RFQ D608-061-R6 Mott-Alamo Mower Parts |
February 4, 2008 |
2:00 p.m. |
RFQ D608-061-R6 Tabulation |
| D608-081-RW Commercial Mix |
January 30, 2008 |
1:00 p.m. |
Tabulation |
| RFQ D608-063-R6 Triumph Switchblade Mower Parts |
January 29, 2008 |
10:00 a.m. |
RFQ D608-063-R6 Tabulation |
| RFQ D608-087-R6 Pavement Markers |
January 23, 2008 |
10:00 a.m. |
RFQ D608-087-R6 Tabulation |
RFQ D608-085-R6 Type II SHRP Barricades
RFQ D608-085-R6 Addendum 001 |
January 22, 2008 |
10:00 a.m. |
RFQ D608-085-R6 Tabulation |
D608-084-RW CMP
Addendum 001 CMP Measurement |
January 17,2008 |
10:00 a.m. |
tabulation |
| RFQ D608-062-R6 Bush-Whacker Mower Parts |
January 15, 2008 |
2:00 p.m. |
RFQ D608-062-R6 Tabulation |
| D608-086-RW Black Beauty |
January 11,2008 |
1:00 p.m. |
Tabulation |
| D608-082-RW Fault Locator |
January 11, 2008 |
10:00 a.m. |
Tabulation |
| D608-083-RW Light Tower Rental |
January 10, 2008 |
10:00 a.m |
Tabulation |
| 7-6080111 REACT 55 MPH 6 Cylinder Product |
January 11, 2008 |
January 25,2008 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is a sole distributorhip, HCI-Hoosier Compnay Incorporated of Indianapolis, IN. whcih can supply MoDOT, District 6 with the REACT 55 MPH 6 Cylinder, 36" wide with Steel Backup product. The approximate value of this product cannot exceet $30,000.00 durning the contract period. |
| 7-6080107-R6 Tape Assemblies |
January 7, 2008 |
January 9, 2008 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is only one known source that can supply MoDOT, D6, with 75’ Tape Assemblies for a Vehicle Arresting Barrier System. The approximate value of this product cannot exceed $24,999.99 during the contract period. |
| 7-06080107 Terra Video Detection Cameras |
December 26, 2007 |
January 7, 2008 |
The Missouri Department of Transportation, District 6, St. Louis has determined that only one source can provide specific use parts and Terra Video Detection Cameras in use in the St. Louis Metro Distric-all parts are fully and completely compatible with existing equipment. To our knowledge, Traffic Control Corporation, of Fenton, Missouri, is the sole authorized distributor to provide compatible parts and cameras. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $68,000.00. Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo. gov until January 7, 2008. |
| 7-06080108 PolyFiber Type III |
January 4, 2008 |
January 9, 2008 |
The Missouri Department of Transportation, District 6, St. Louis has determined that only one source can provide specific use Polyfiber Type III material for use in the St. Louis Metro District manufactured by Crafco, Co. To our knowledge, Clayco Midwest, of Granite City, IL. is the sole authorized distributor to provide this material. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $24,000.00. Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo. gov until January 9, 2008. |
| 7-06081210 Video Conferencing Modification |
December 10, 2007 |
December 12, 2007 |
The Missouri Department of Trasportation District 6, St. Louis had determined that only one source can provide the modifications to the existing video conferencing equipment located at the Traffic management Center in Chesterfield, MO. To our knowledge, Antech Labs, is the only authorized vendor in the St. Louis area approved to provide the necessary equipment and repairs to this equipment. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $15,000.00 |
| 7-06080103 Daktronic Replacement Parts |
December 21, 2007 |
January 2, 2008 |
The Missouri Department of Transportation, District 6, St. Louis has determined that only one source can provide specific replacement parts for Daktronic DMS Boards in use in the St. Louis Metro Distric-all parts are fully and completely compatible with existing Boards. To our knowledge, Daktronics, is the only authorized vendor to provide compatible OEM replacement parts. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $30,000.00. Issues with this purchase may be directed to Teresa (Terri) Mount at (314) 301-1431 or teresa.mount@modot.mo. gov until January 2, 2008. |
| D608-080-RW Bag Portland Cement Type I |
December 20, 2007 |
10:00 a.m. |
Tabulation |
D608-079-RW Hole Drilling
ADDENDUM 001 |
December 20, 2007 |
10:00 a.m. |
Tabulation |
| RFQ D608-078-R6 Plow and Spreader for Festus |
December 19, 2007 |
10:00 a.m. |
Withdrawal Letter |
| D608-077-RW UTILITY TRUCK TOPS |
December 11, 2007 |
10:00 a.m. |
Tabulation |
| D608-074-RW Installed Truck Lift |
December 7, 2007 |
10:00 a.m. |
Tabulation |
D608-069-RW CMP REPLACEMENT
Addendum 001
Addendum 002 |
December 7, 2007 |
10:00 a.m. |
Rejected |
D608-075-RW Lego Concrete Blocks
Site Drawing |
December 5, 2007 |
10:00 a.m. |
Tabulation |
| D608-072-RW Wood Chipper Rentals |
December 4,2007 |
10:00 a.m. |
Tabulation |
D608-076-RB Excavator Rental
Addendum 001 |
December 3, 2007 |
10:00 a.m. |
Tabulation |
D608-073-RB Sand
Attachment I |
December 3, 2007 |
2:00 p.m. |
Tabulation |
| D608-071-RW Weatherguard Saddle Box |
November 27, 2007 |
10:00 a.m. |
Tabulation |
| RFQ D608-068-RB 20 Yard Roll Off Containers |
November 16, 2007 |
10:00 a.m. |
Tabulation |
RFQ D608-064-R6 Break-Out Post Hardware
RFQ D608-064-R6 Addendum 001 |
November 15, 2007 |
10:00 a.m. |
RFQ D608-064-R6 Tabulation |
RFQ D608-065-R6 Perforated Square Tubing Post Hardware
RFQ D608-065-R6 Addendum 001 |
November 13, 2007 |
10:00 a.m. |
RFQ D608-065-R6 Tabulation |
| D608-060-RW Replacement Type A Base |
November 8, 2007 |
10:00 a.m. |
Tabulation |
| D608-058-RW Multiple Switch Tester |
November 2, 2007 |
10:00 a.m |
Tabulation |
| D608-057-RW BackRacks |
November 2, 2007 |
10:00 a.m. |
Tabulation |
| D608-059-RW Mini Light Bars |
November 1, 2007 |
10:00 a.m. |
Tabulation |
| D608-056-RW Black Magnum |
November 1, 2007 |
10:00 a.m. |
no bid |
| RFB D608-037-RW On Call Painting |
October 30, 2007 |
10:00 a.m. |
Tabulation |
RFQ D608-055-R6 Guardrail Repair-Hwy. 21 Picture 1
Picture 2
Picture 3
Picture 4 |
October 23, 2007 |
10:00 a.m. |
RFQ D608-055-R6 Tabulation |
RFP D608-043-RW Video Wall
Addendum 001
Addendum 002
Addendum 003 |
October 17, 2007 |
12:00 p.m. |
|
RFQ D608-054-R6 E85 Fuel
RFQ D608-054-R6 Addendum 001 |
October 16, 2007 |
10:00 a.m. |
REJECTED |
D608-053-RW Bullnose Guard Rail Repair
photo 1 photo 3 photo 5
photo 2 photo 4 photo 6 |
October 16, 2007 |
10:00 a.m. |
Tabulation |
D608-047-RW Fence, Jefferson Avenue, St. Louis
Addendum 001 |
October 9, 2007 |
10:00 a.m. |
Tabulation |
| RFQ D608-052-R6 Epoxy Bridge Seal |
October 4, 2007 |
2:00 p.m. |
RFQ D608-052-R6 Tabulation |
| D608-050-RB Tree Removal |
October 1, 2007 |
10:00 a.m. |
Tabulation |
RFB D608-020-RW Project Office Weekly Janitorial
Floor Plan St. Peters Office
Floor Plan Chesterfield Office
Floor Plan Fenton Office
Floor Plan Festus Office
Floor Plan Hampton Office
Floor Plan Maryland Hts. Office
Floor Plan Melville Office
Floor Plan St. Clair Office
Floor Plan Bellfontaine Office |
September 27, 2007 |
10:00 a.m. |
Tabulation |
| D608-045-RW Airless Gas Powered Sprayer |
September 24, 2007 |
10:00 a.m. |
Tabulation |
D608-049-RW Bridge Seal Coat
Addendum 001 |
September 24, 2007 |
10:00 a.m. |
Tabulation |
| D608-048-RW Bridge Mix |
September 20, 2007 |
10:00 am. |
No bids, will be re-issued |
D608-042-RB Scrap Metal Container Service
RFB D608-042-RB Addendum 001 |
September 18, 2007 |
10:00 a.m. |
Tabulation |
| 7-06081101 Surface Patrol Sensor |
November 1, 2007 |
November 5, 2007 |
The Missouri Department of Transportation District 6, St. Louis, has determined that there is a sole distributorship, HCI- Hoosier Company Incorporated, which can supply MoDOT District 6 with the Surface Patrol Pavement Sensor product. The approximate value of this product cannot exceed $24,999.99 during the contract period. |
| 7-06081123 Police Motorcycle Radar Units |
November 9, 2007 |
November 13, 2007 |
The Missouri Department of Transportation, District 6, has determined that only Stalker, Inc., can provide the Blueprint for Safety Program with specific use of police waterproof motorcycle radar units as units already in use by the St. Louis Police Department. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year in association with the needs described. The approximate value of this product has an estimated cost of $20,000.00 |
| 7-06081019 ACTRA Maintenance Program |
October 10, 2007 |
October 19, 2007 |
The Missouri Department of Transportation District 6, St. Louis has determined that only one source can provide the annual operational program maintenenace agreement for phone and on site support for the District 6 ACTRA signal system. To our knowledge, Traffic Systems Solutions Company, a wholly owned subsidiary of Brown Traffic products, Inc., is the only authorized vendor in the St. Louis area approved by Siemens ITS for the ACTRA signal system. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $40,000. Issues with this purchase may be directed to Terea (Terri) Mount at (314)301-1431 or teresa.mount@modot.mo.gov by October 19, 2007. |
| 7-06081005 Pump Repair |
October 3, 2007 |
October 5, 2007 |
The Missouri Department of Transportation District 6, St. Louis has determined that only one source can provide the replacement parts and repair of the Ecosystems Sewer Drainage Truck containing porcelain pistols parts for the Missouri Department of Transportation District 6, St. Louis. To our knowledge, the Missouri Machinery and Engineering Company is the only business that can provide the scale of repair on this antiquated design built truck. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of parts and service has an estimated cost of $6,000. Issues with this purchase may be directed to Athena Nance at (314) 301-1440 or athena.nance@modot.mo.gov by October 5, 2007. |
7-06081003 STLPost advertising |
September 20, 2007 |
October 3, 2007 |
The Missouri Department of Transportation, District 6, has determined that only the St. Louis Post-Dispatch Newspaper can provide the Department with advertising to a specific intended market.
To our knowledge the St. Louis Post-Dispatch is the only medium that can provide this scale of expected advertisement to a specific intended market. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described.
The approximate value of this product, service, and other associated costs has an estimated cost of $25,000.
Issues with this purchase may be directed to Athena Nance, General Services Procurement Suprevisor at 314-301-1440 or Athena.Nance@modot.mo.gov until October 3, 2007. |
| 7-06080924 GEOMELT |
September 21, 2007 |
September 24, 2007 |
The Missouri Department of Transportation, District 6, St. Louis, has determined that there is only one known source that can supply MoDOT, D6, with GEOMELT 55 Anti-Icing/Deicing Fluid. The approimate value of this prouct cannot exceed $24,999.99 during the contract period. Questions may be directed to Kristi Coppinger at (314) 301-1439 or
Kristina.Coppinger@modot.mo.gov
|
| D608-041-RW Rotomill Job- Fairgrounds Rd. |
September 11, 2007 |
10:00 a.m. |
Tabulation |
| D608-040-RW Rotomill Job Holly Hills and Delor |
September 11, 2007 |
10:00 a.m. |
Tabulation |
RFB D608-029-R6 DMS Boards
RFB D608-029-R6 Addendum 001
RFB D608-029-R6 Addendum 002
RFB D608-029-R6 Addendum 003
RFB D608-029-R6 Addendum 004 |
September 11, 2007 |
2:00 p.m. |
RFB D608-029-R6 Tabulation |
| D608-038-RW Tideland Navigation Fixtures |
September 10, 2007 |
10:00 a.m. |
Rejected |
D608-039-RB Roadeo
RFB D608-039-RB Addendum 001 |
September 5, 2007 |
2:00 p.m. |
Tabulation |
| RFQ D608-036-R6 Signal Control Stations |
August 30, 2007 |
10:00 a.m. |
WITHDRAWN |
D608-028-RW Rapid Concrete Repair Material
Addendum 1 |
August 16, 2007 |
10:00 a.m. |
Tabulation |
D608-032-RW Guard Rail Repair
Photo 1 photo 3
Photo 2 Photo 4 |
August 14, 2007 |
10:00 a.m |
Tabulation |
D608-024-RW Commuter Lot Fence
Site plan
Site plan 2
Site plan signs |
August 14, 2007 |
10:00 a.m |
Tabulation |
| D608-033-RW Rotomill with Operator |
August 8, 2007 |
10:00 am. |
Tabulation |
| D608-031-RW Epoxy |
August 8, 2007 |
10:00 a.m. |
Tabulation |
| D608-030-RW Shotblast Job |
August 8, 2007 |
10:00 a.m. |
REJECTED |
| D608-023-RW Transformer Base |
August 8, 2007 |
10:00 a.m. |
D608-023-RW Tabulation |
RFP D608-003-RW Traffic Management Center Janitorial Services
First floor Buiilding Plan TMC
Second Floor Building Plan TMC
D608-003-RW Addendum 001- |
August 7, 2007 |
10:00 a.m. |
|
RFP D608-002-RW Janitorial Services District Office Operations Complex
First Floor Building Plan District Office
Second Floor Building Plan District Office
Third Floor Building Plan District Office
D608-002-RW Addendum 001- |
August 7, 2007 |
10:00 a.m. |
|
| RFQ D608-022-R6 Pavement Markers |
August 7, 2007 |
10:00 a.m. |
RFQ D608-022-R6 Tabulation |
RFQ D608-025-R6 Slotted Drain
Corrugated Metal Pipe Specifications MSG-91-11G |
August 6, 2007 |
10:00 a.m. |
RFQ D608-025-R6 Tabulation |
| D608-027-RW CMS Boards |
August 3, 2007 |
10:00 a.m. |
Tabulation |
| D608-021-RW CMS Board |
August 3, 2007 |
10:00 a.m. |
Withdrawn;Will Be Re-issued |
| RFQ D608-026-R6 Aggregate For Antire Hill Lot |
August 1, 2007 |
10:00 a.m. |
RFQ D608-026-R6 Tabulation |
| RFQ D608-009-R6 Tent Purchase |
August 1, 2007 |
10:00 a.m. |
RFQ D608-009-R6 Tabulation |
| D608-019-RW On Call Sweeping |
July 31, 2007 |
10:00 a.m. |
Tabulation |
| D608-017-RW Replacement Vehicle Dectector Part |
July 25,2007 |
10:00 a.m. |
Tabulation |
RFQ D608-018-R6 Walk Behind Mower with Sulky for St. Charles Mt. Building
RFQ D608-018-R6 Attached Mower Specifications |
July 23, 2007 |
10:00 a.m. |
RFQ D608-018-R6 Tabulation |
RFQ D608-008-R6 Tent Rental
RFQ D608-008-R6 Addendum 001
RFQ D608-008-R6 Addendum 002 |
July 16, 2007 |
10:00 a.m. |
RFQ D608-008-R6 Tabulation |
| RFQ D608-016-R6 Push Bumpers |
July 12, 2007 |
2:00 p.m. |
RFQ D608-016-R6 Tabulation |
RFQ D608-015-R6 LED Arrowboards
Picture 1
Picture 2
Picture 3 |
July 12, 2007 |
2:00 p.m. |
RFQ D608-015-R6 Tabulation |
| RFQ D608-014-RW Mill Attachment for Skidsteer |
July 12, 2007 |
10:00 a.m. |
tab sheet |
| RFB D608-008-RB Surplus Steel & Aluminum |
July 12, 2007 |
10:00 a.m. |
Tabulation Revised |
| RFB D608-007-RW Preformed Thermo Plastic Striping Material |
July 10, 2007 |
1:00 p.m. |
Tabulation |
| RFQ D608-012-R6 Crane With Power Rotation RFQ D608-012-R6 Addendum 001 |
July 10, 2007 |
10:00 a.m. |
RFQ D608-012-R6 Tabulation |
| D608-011-RW Asphalt Paverwith Operators |
July 3, 2007 |
10:00 a.m. |
Tabulation |
RFP D607-083-RW ITS Maintenance
Addendum 001
Addedum 002
Addendum 003- Pre-Proprosal Meeting
Addendum 003- Device Models
Addendum 004 |
June 22, 2007 |
2:00 p.m. |
|
| RFQ D608-005-R6 Wireless Remote Control Spot Lights |
June 14, 2007 |
10:00 a.m. |
RFQ D608-005-R6 Tabulation |
| D607-151-RW Epoxy, Lo Mod |
June 7, 2007 |
10:00 a.m. |
D607-151-RW Tabulation |
| D607-150-RW On Call Quickset Concrete |
June 7, 2007 |
10:00 a.m. |
D607-150-RW Tabulation |
RFQ D608-004-R6 Culvert Pipe Liner
Addendum 001 |
June 7, 2007 |
10:00 a.m. |
RFQ D608-004-R6 Tabulation |
| D608-001-RW As Needed Drain Cleaning Service |
June 4, 2007 |
1:00 p.m. |
D608-001-RW Tabulation |
| SFS 7-06070606 Marketing/Advertising Cardinals Sports |
June 6,2007 |
June 18, 2007 |
The Missouri Department of Transportation District 6, St. Louis has determined that only one source can provide the marketing and advertising through sporting events for the Missouri Department of Transportation District 6, St. Louis for its intended market. This market is through the St. Louis Cardinals LLC and its radio and television coverage of sporting events. To our knowledge, the St. Louis Cardinals LLC is the only medium that can provide the scale of advertisement to the intended target market with the expected advertisement. Advertising related to this marketing campaign will exceed $25,000 cumulatively. A contract to purchase the above advertising packet may be executed with the St. Louis Cardinals LLC on or before July 1, 2007.
Marketing/Advertising to include, but not limited to the following:
In-Stadium Messaging Text Messaging
Pre-Game Video On-Site “The Convincer”
Broadcast Opportunity Branding “MoDOT” Safety
Issues with this purchase may be directed to Athena Nance at
(314) 301-1440 or athena.nance@modot.mo.gov by June 18, 2007
|
| D607-149-RB Loops |
May 29, 2007 |
10:00 a.m. |
D607-149-RB Tabulation |
| D607-148-RW Bridge Surface Finishing |
May 23, 2007 |
10:00 a.m. |
D607-148-RW Tabulation |
D607-146-RW Double Wall Tank
Exhibit A- Drawing |
May 15, 2007 |
10:00 a.m. |
D607-146-RW Tabulation |
| D607-145-RW Radar Speed Message Trailer |
May 11, 2007 |
10:00 a.m. |
D607-145-RW Tabulation |
| D607-143-RW Traffic Radar Speed Sign |
May 9, 2007 |
10:00 a.m. |
D607-143-RW Tabulation |
| D607-144-RW Silica Fume Wearing Surface |
May 9, 2007 |
10:00 a.m. |
D607-144-RW Tabulation |
| RFB D607-124-RW Temporary Personnel Services |
May 9,2007 |
1:00 p.m. |
D607-124-RW Tabulation |
D607-142-RW Bridge Cap Sealing
Addendum 001 |
May 7, 2007 |
10:00 a.m. |
All Quotes Rejected |
D607-140-RW Installation Door Jambs and Hardware
Exhibits: Magna Lock,Card Reader.Crash Bar,
Receptacles,Site Plan
Addendum I, Additional Exhibit |
May 2, 2007 |
10:00 a.m. |
D607-140-RW Tabulation |
| SFS7-06070515 Star Macrodeck Deck Sealer |
5/11/07 |
5/15/07 |
The Missouri Department of Tranportation, District 6, to the best of their knowledge, has determined that there is only one known source, McConnell & Associates, Pevely, MO, that can furnish the department with Star Macro Deck Sealer. Material is an OR MoDOT approved penetrating clear product which will waterproof and not discolor Bridge deck. The material allows the elimination of blotter material and may be used by traffic immediately after drying without exhibiting residual tracking. Purchases for this item is anticipated to be approximately $18,000.
Issues with this purchase may be directed to Terri Mount, General Services, D6, at 314-301-1431 or Teresa.Mount@modot.mo.gov until May 15, 2007. |
| SFS 7-060705525 Electronic Fueling Equipment |
5/14/07 |
5/25/07 |
The Missouri Department of Transportation, District 6 has determined that only one source, Graham Equipment Co. of St. Louis MO. (area distributor for Bennett equipment, and a PEI member) can furnish and install the department with aBennett Electronic Fueling Equipment that includes but may not be limited to pumps, remote dispensers, and associated installations, supplies that are compatible with the TRAK SENTRYGOLD COMPACT at eleven sites in the St. Louis Area District counties of Franklin, St. Charles, Jefferson, and St. Louis. This project shall consist of supplying Bennett Electronic fuel equipment, installing it, replacing lines, fittings, accessories and tank part. Purchases for Bennett equipment and its installation may exceed $25,000 individuallyand/or cumulatively and may be made throughout calendar year 2007 and expiring on December 31, 2007. This authorization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization.
Issues with this purchase may be directed to Terri Mount, General Services Procurement Specialist at 314-301-1431 or Teresa.Mount@modot.mo. gov, until May 25, 2007. |
| SFS 7-060705522 Ingersol-Rand Replacement Parts |
5/18/07 |
5/22/07 |
The Missouri Department of Transportation , D6, has determined that only one source, Farrar Pump , of St. Louis, Mo. (the area distributor of Ingersol-Rand) can furnish and install specific replacement parts as installed for specific use pumps as installed on D6 Striper vehicles.purchaes for IR replacement parts is $10,000 individualy and/or cumulatively and may be made throughout the calendar year 2007 and expiring on December 31, 2007. This authrization may be extended for an additional one year period unless additional suppliers are identified upon the expiration of any single feasible source authorization.
Issues with this purchase may be directed to Terri mount, General Services Procurement specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov, until May 22, 2007 |
| sfs 7-06070723 Trailer TMA |
5/21/07 |
5/23/07 |
The Missouri Department of Transportation, D6, has determined that only Safety Trailers, Inc. can provide the Department with an apparently proprietary truck mounted trailer TMA. This specific product is unique in that it is considered suitable for use with small sedan and light truck vechicles which may be attached to the support truck using a standard pintle hook. This notice shall meet the single feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of this product and service has an estimated cost of $15,000.
Issues with this purchase may be directed to Terri Mount, General Services Intermediate Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov, until may 23, 2007. |
| D607-138-RW Hydrodemolition |
April 30, 2007 |
10:00 a.m. |
D607-138-RW Tabulation |
| D607-137-RW Rotomill Rental w Operator |
April 30, 2007 |
10:00 a.m. |
D607-137RW Tabulation |
| D607-136-RW Concrete Wearing Surface |
April 30, 2007 |
10:00 a.m. |
rejected |
| D607-135-RW Formed Concrete Repair |
April 30, 2007 |
10:00 a.m. |
D607-135-RW Tabulation |
| D607-139-RW Broom Parts |
April 27, 2007 |
10:00 a.m. |
D607-139-RWTabulation |
D607-134-RW Gate Operators
Site Plan |
April 25, 2007 |
10:00 a.m. |
D607-134-RW Tabulation |
| D607-133-RW Polyurea Application |
April 25, 2007 |
10:00 a.m. |
D607-133-RW Tabulation |
RFP D607-120-RW Vehicle Tracking Service
Addendum I
EXHIBIT CHANGEABLE MESSAGE BOARD |
April 25, 2007 |
1:00 p.m. |
|
| D607-130-RW Unformed Concrete Repair and Sealing |
April 23,2007 |
10:00 a.m. |
Withdrawn-No Award |
| D607-131-RW Concrete Wearing Surface |
April 18, 2007 |
10:00 a.m. |
D607-131-RW Tabulation |
| D607-129-RW Hydrodemolition |
April 18, 2007 |
10:00 a.m. |
D607-129-RW Tabulation |
| D607-115-RW Seal Parking Lot Seal |
April 18,2007 |
10:00 a.m. |
D607-115-RW Tabulation |
| D607-123-RW Trailer Mounted Diesel Generator |
April 17,2007 |
10:00 a.m. |
D607-127-RW Tabulation |
| D607-128-RW Rotomill Rental with Operator |
April 17, 2007 |
10:00 a.m. |
D607-124-RW Tabulation |
| D607-123-RW Zero Turn Riding Commercial Mower |
April 17, 2007 |
10:00 a.m. |
D607-123-RW Tabulation |
RFQ D607-125-R6 Plows for Broadway
D607-125-R6 Snow Plow Specifications
D607-125-R6 Addendum 001
D607-125-R6 Addendum 002 |
April 16, 2007 |
10:00 a.m. |
RFQ D607-125-R6 Tabulation |
| D607-122-RW Acrylic Polymer Deck Sealer |
April 11, 2007 |
10:00 a.m. |
D607-122-RW Tabulation |
D607-121-RW Concrete Beam Cap Sealing Material
MoDOT Approved Products List |
April 10, 2007 |
10:00 a.m. |
D607-121-RW Tabulation |
D607-119-RW Truck LED Arrowboard
Picture 1, Picture 2,Picture 3 |
April 10, 2007 |
10:00 a.m. |
D607-119-RW Tabulation |
| D607-118-RW Polymer Mortar Expansion Dam |
April 6, 2007 |
10:00 a.m. |
D607-118-RW Tabulation |
RFB D607-114-RW Inertial Profiling System
ADDENDUM 1 |
April 4, 2007 |
1:00 p.m. |
D607-114-RW Tabulation |
RFP-COVER PAGE-PORTABLE TRAFFIC MANAGMENT SERVICE
RFP D607-106-RW Portable Traffic Management Services |
March 30, 2007 |
2:00 p.m. |
D607-106-RW Tabulation |
| sfs 7-06070425 Security,Fire Protection Hardware and Monitoring Services |
April 11, 2007 |
April 25, 2007 |
The Missouri Department of Transportation, General Services, to the best of their knowledge, has determined that there is only one known source, Sonitrol of jefferson City, MO. that can furnish the department with maglocks, prox readers, exit devices, fire protection devices that provide access control and is compatible with the existing access, fire and security systems currently in use at the Missouri Department of Transportation facilities located in District 6, Metro St. Louis Area and is currently provided by Sonitrol of Jefferson City, Missouri. No other manufacturer's detection system provides the necessary operational and characteristics that are compatible with the existing monitoring services currently being provided. Purchases for various items may exceed $25,000 individually and/or cumulatively may be made throughtout the calender year 2007 and expiring on December 31, 2007. This authorization may be extended for five additional 1-year priods unless additional suppliers are identified upon the expiration of any single feasible source authorization period.
Issues with the contractural agreement may be directed to Terri Mount, General Services Specialist at 314-301-1431 or Teresa.MOunt@modot.mo. gov until April 25, 2007 |
D607-116-RW Equipment Trailer
Addendum 1 |
March 26, 2007 |
10:00 a.m. |
D607-116-RW Tabulation |
| D607-101-RW Truck Painting |
March 23, 2007 |
1:00 p.m. |
D607-101-RW Tabulation |
| D607-113-RW Padlocks |
March 20, 2007 |
10:00 a.m. |
D607-113-RW Tabulation |
D607-112-RW Conduit
ADDENDUM 1- CORRECTION |
March 21, 2007 |
10:00 a.m. |
D607-112-RW Tabulation |
| D607-105-TW Used Portable Metal Storage Containers |
March 19, 2007 |
1:00 p.m. |
D607-105-RW Tabulation |
D607-111-RW Platform Truck Rental
ADDENDUM 1 |
March 16, 2007 |
10:00 a.m. |
D607-111-RW Tabulation |
D607-110-RW Fence Repair
Exhibit 1 |
March 13, 2007 |
10:00 a.m. |
D607-110-RW Tabulation |
| D607-109-RW Dunn Rd Line Bore |
March 13, 2007 |
10:00 a.m. |
D607-109-RW Tabulation |
D607-108-RW Mast Arm Job
Addendum 1 |
March 13, 2007 |
10:00 a.m. |
D607-108-RW Tabulation |
D607-100-RW Demolition -St. Charles County
Exhibit A Location Plans
Exhibit B ACM Report
Exhibit C MODOT Demolition Specifications
Exhibit D Additional Required Demolition Specifications |
March 6, 2007 |
1:00 p.m. |
D607-100-RW Tabulation |
SFS 7-0670223 Impact Attenuator Sections |
2/21/07
|
2/23/07 |
The Missouri Department of Transportation, Weldon Springs Maintenance, District 6,,
has determined that only Trinity Industries, Dallas, TX can providethe Department with specific use of concrete foam sections for a damaged impact attentuator. These specific products have been documented as fully and absolutely compatible with all current systems. This notice shall meet thesingle feasible source posting requirements for one calendar year and in association with the needs described. The approximate value of this product and service has an estimated cost of $10,000 and associated costs. Issues with this purchase may be directed to Athena Nance, General Services Procurement Suprevisor at 314-301-1440 or Athena.Nance@modot.mo. gov until February 23, 2007.
|
| SFS 70670107 Safe Stop System |
1/12/07 |
1/29/07 |
The Missouri Department of Transportation, District 6,
has determined that only HCI, The Hoosier Company, Indianapolis, IN.,
can provide the Department with Safe Stop System and parts, and as
the only available vendor capable of providing the general requirements as
outlined and intend to clarify the use of this vendor as a single feasible source
to meet those needs. The approximate value of the product is estimated at a
cost of $62,000.00 Issues with this agreement may be directed to Terri Mount,
Procurement Int.Specialist at 314-301-1431 or Teresa.Mount@modot.mo.gov
until January 29, 2007 .
|
| D607-103-RW Lumber- Signal Bldg |
February 28, 2007 |
10:00 a.m. |
D607-103-RW Tabulation |
| D607-102-RW Tree Removal |
February 20, 2007 |
10:00 a.m. |
D607-102-RW Tabulation |
| D607-098-RW Bore Job Lackland |
February 14, 2007 |
10:00 a.m. |
D607-098-RW Tabulation |
| D607-099-RW Bore Job Halls Ferry |
February 14, 2007 |
10:00 a.m. |
Withdrawn |
| RFQ D607-097-R6 Perforated Square Tubing PST - Post Hardware |
February 13, 2007 |
10:00 a.m. |
RFQ D607-097-R6 Tabulation |
RFQ D607-096-R6 Break-Out Post Hardware
D607-096-R6 Addendum 001
E15 Form for D607-096-R6 |
February 8, 2007 |
10:00 a.m. |
RFQ D607-096-R6 Tabulation |
RFQ D607-087-R6 Bushwhacker Mower Parts
RFQ D607-087-R6 Addendum 001
D607-087-R6 Addendum 002
E15 Form for D607-087-R6 |
February 7, 2007 |
2:00 p.m. |
RFQ D607-087-R6 Tabulation |
| D607-094-RW InvisiConnect Units |
February 5, 2007 |
10:00 a.m. |
D607-094-RW Tabulation |
D607-095-RW GC2 Batteries
Addendum 001 |
February 5, 2007 |
10:00 a.m. |
D607-095-RW Tabulation |
| D607-091-R6 Fluid Handling System for Eureka and Grover |
February 5, 2007 |
10:00 a.m. |
RFQ D607-091-R6 Tabulation |
| RFQ D607-088-R6 Triumph Switchblade Mower Parts |
January 31, 2007 |
10:00 a.m. |
RFQ D607-088-R6 Tabulation |
| D607-093-RW Displacement Pump Part |
January 30, 2007 |
10:00 a.m. |
D607-093-RW Tabulation |
| D607-090-RW Portland Cement Type I Bagged |
January 30,2007 |
10:00 a.m. |
D607-090-RW Tabulation |
| RFQ D607-086-R6 Mott-Alamo Mower Parts |
January 29, 2007 |
10:00 a.m. |
RFQ D607-086-R6 Tabulation |
| D607-084-RW Tire Changer |
January 27, 2007 |
10:00 a.m. |
D607-084-RW Tabulation |
RFB D607-077-RW Commercial Mix
Addendum 001 |
January 25, 2007 |
1:00 p.m. |
D606-077-RW Tabulation |
RFB D607-082-RW-Dynamic Message Sign (DMS) Post Spools
Exhibit 1- Drawing 1 of 2
Exhibit 2- Drawing 2 of 2 |
January 24, 2007 |
1:00 p.m. |
D607-082-RW Tabulation |
| D607-089-RW Patcher Equipment Rental |
January 22, 2007 |
10:00 a.m. |
D607-089-RW Tabulation |
| D607-085-RW Trackhoe Rental |
January 19, 2007 |
10:00 a.m. |
D607-085-RW Tabulation |
| D607-080-RW Push Bumpers |
January 12, 2007 |
10:00 a.m. |
D607-080-RW Tabulation |
D607-075-RW Rest Area Doors
Drawing
Addendum 001 |
January 3, 2007 |
10:00 a.m. |
D607-075-RW Tabulation |
RFB D607-071-RW RTMS Replacement
Exhibit 1 Drawings,Exhibit 1a Drawings,Exhibit 1b Drawings
Exhibit 2 Quantities, Location
Exhibit 3 TCP Shoulder Closure
Exhibit 4 TCP Lane Closure
Exhibit 5 Detector Pole,Foundation Detail
Exhibit 6 Pull Box Detail
Exhibit 7 Type 7 Detail
Exhibit 8 Detector Wiring Diagram
Addendum 001 |
January 2 , 2006 |
1:00 p.m. |
Tabulation |
| D607--076-RW Ice machine |
December 20,2006 |
10:00 a.m. |
D607-076-RW Tabulation |
| D607-078-RW Tree Removal |
December 20, 2006 |
10;00 a.m. |
D607-078-RW Tabulation |
| D607-073-RW Bulk Tank |
December 12, 2006 |
10:00 a.m. |
D607-073-RW Tabulation |
| D607-069-RW LED Vehicle Beacon Arrow Lights |
December 8, 2006 |
10:00 a.m. |
D607-069-RW Tabulation |
| RFB D607-068-RW Used Oil Pick Up |
December 8, 2006 |
1:00 p.m. |
D607-068-RW Tabulation |
| D607-072-RW Sand |
December 6, 2006 |
10:00 a.m. |
D607-072-RW Tabulation |
| RFB D607-066-RW Rapid Concrete Repair Material |
December 1, 2006 |
10:00 a.m. |
D607-066-RW Tabulation |
| RFQ D607-070-R6 Post Driver-Breaker for New Haven |
November 27, 2006 |
10:00 a.m. |
REVISED D607-070-R6 Tabulation |
| D607-052-RW Roll OffTrash Bid |
November 22, 2006 |
10:00 a.m. |
D607-052-RW Tabulation |
| D607-052-RW Trash Pick Up Service Bid |
November 22, 2006 |
10:00 a.m. |
D607-053-RW Tabulation |
D607-067-RW Wood Materials
Addendum I
Addendum 2 |
November 17, 2006 |
10:00 a.m. |
D607-067-RW Tabulation
D607-067-RW Tabulation page 2 |
| sfs 7-0671120 DOT Negotiation Training Seminar |
November 16, 2006 |
November 20, 2006 |
The Missouri Department of Transportation, District 6, has determined that only KARRASS can provide the Department with specific training on DOT Negotiations. The approximate value of this seminar has an estimated cost of $24,880 for the training and associated costs.
Issues with this purchase may be directed to Kristi Coppinger,
General Services Technician at 314-301-1439 or Kristina.Coppinger@modot.mo.gov, until November 20, 2006.
|
sfs 7-067117 Updates and Installation to Lindbergh System |
November 15, 2006
|
November 17, 2006 |
The Missouri Department of Transportation, Traffic Management Center District 6, has determined that only Sonitrol can provide the Department with specific use of parts and service to our current system that controls access to the Lindbergh Tunnel. This specific product has been documented as fully and absolutely compatible with all current systems. The approximate value of this update and service has an estimated cost of $12,000 for the changes to the system and associated costs.
Issues with this purchase may be directed to Kristi Coppinger,
General Services Technician at 314-301-1439 or Kristina.Coppinger@modot.mo.gov, until November 17, 2006.
|
| D607-064-RW On Call Wood Chipper Rentals |
November 15, 2006 |
10:00 a.m. |
D607-064-RW Tabulation |
D607-065-RW Insulation Materials
Exhibit A Pricing page |
November 15, 2006 |
10:00 a.m. |
D607-065-RW Tabulation |
| D607-061-RW Message Board Batteries |
November 6, 2006 |
10:00 a.m |
WITHDRAWN |
D607-059-RW Steel Doors
Attachment A
Attachment B
ADDENDUM 1 |
November 02, 2006 |
10:00 a.m. |
D607-059-RW Tabulation |
| D607-058-RW Exterior Doors |
October 31, 2006 |
10:00 a.m. |
D607-058-RW Tabulation |
| RFQ D607-060-RG Windshield Fluid |
October 30, 2006 |
10:00 a.m. |
D607-060-RG Tabulation |
| RFQ D607-057-R6 Rear Mott Mowers for Sunset Hills |
October 30, 2006 |
10:00 a.m. |
D607-057-R6 Tabulation |
| RFQ D607-056-R6 Flail Mower for Broadway |
October 20, 2006 |
10:00 a.m. |
D607-056-R6 Tabulation |
| RFQ D607-054-R6 Scissor Lift for Buildings and Grounds |
October 13, 2006 |
10:00 a.m. |
D607-054-R6 Tabulation |
D607-046-RW Retaining Wall
P9120009Attachment 1
P9120010Attachment 2
P9120011Attachement 3 |
October 10, 2006 |
10:00 a.m. |
D607-046-RW Tabulation |
| D607-050-RW Flag pole |
October 6, 2006 |
10:00 a.m. |
D607-050-RW Tabulation |
| D607-051-RW Insulation |
October 5, 2006 |
10:00 a.m. |
CANCELLED |
| RFQ D607-049-R6 Equipment Mover Trailer |
October 5, 2006 |
10:00 a.m. |
D607-049-R6 Tabulation |
| RFQ D607-048-R6 Plow and Spreader for Weldon Spring |
October 4, 2006 |
10:00 a.m. |
RFQ D607-048-R6 Plow and Spreader for Weldon Spring |
| D607-047-RW Bridge Mix |
September 21, 2006 |
10:00 a.m. |
D607-047-RW Tabulation |
| D607-045-RW Bridge Seal CoatR |
September 21, 2006 |
10:00 a.m. |
D607-045-RW Tabulation |
| D607-044-RW Asphalt Paver with Operators |
September 21, 2006 |
10:00 a.m. |
D607-044-RW Tabulation |
RFQ D607-039-RW Hydro demolition |
September 14, 2006 |
10:00 a.m. |
CANCELLED |
RFQ D607-041-RW Silica Fume Concrete |
September 13, 2006 |
10:00 a.m. |
CANCELLED |
| RFQ D607-040-RW TechCrete |
September 13, 2006 |
10:00 a.m. |
D607-040-RW Tabulation |
RFQ D607-029-RW Tree Removal
Exhibit A |
September 8, 2006 |
10:00 a.m. |
D607-029-RW Tabulation |
RFQ D607-036-RW Rotomill Job |
September 6, 2006 |
10:00 a.m. |
D607-036-RW Tabulation |
RFQ D607-037-R6 Walk Behind Mower with Stand On Sulky for Weldon Spring
D607-037-R6 Mower Specifications |
September 1, 2006 |
10:00 a.m. |
D607-037-R6 Tabulation |
| RFQ D607-035-RW Portable Message Board |
August 25, 2006 |
10:00 a.m. |
D607-035-RW Tabulation |
D607-030-R6 Walk Behind Mower for Lemay Mt. Building
D607-030-R6 Addendum 001 |
August 24, 2006 |
10:00 a.m. |
D607-030-R6 Tabulation |
| D607-034-R6 Weigh Station Portable Toilet Units |
August 22, 2006 |
10:00 a.m. |
WITHDRAWN |
D607-028-R6 Fluid Handling System for Sign Shop
D607-028-R6 Addendum 001 |
August 21, 2006 |
10:00 a.m. |
D607-028-R6 Tabulation |
| D607-027-R6 Fluid Handling System for Sign Shop |
August 21, 2006 |
10:00 a.m. |
WITHDRAWN |
| RFQ D607-032-RW Metal Roofing Material |
August 18, 2006 |
10:00 a.m. |
D607-032-RW Tabulation |
RFQ D607-031-RW Signal Modification
Exhibit A |
August 18, 2006 |
10:00 a.m. |
D607-031-RW Tabulation |
| RFQ D607-022-RW Weldon Spring Fence Job |
August 15, 2006 |
10:00 a.m. |
D607-022-RW Tabulation |
| RFQ D607-026-RW Fault Locator |
August 14, 2006 |
10:00 a.m. |
D607-026 Tabulation |
| RFQ D607-023-RW Deck Sealing Material |
August 11, 2006 |
10:00 a.m. |
D607-023-RW Tabulation |
| RFQ D607-025-RW Latex Modified Concrete |
August 9, 2006 |
10:00 a.m. |
D607-025-RW Tabulation |
| RFQ D607-024-RW Hydro Demolition |
August 8, 2006 |
10:00 a.m. |
D607-024-RW Tabulation |
RFQ D607-021-RW Signal Change and Modification
Exhibit 1 |
August 8, 2006 |
10:00 a.m. |
Withdrawn |
RFQ D607-019-RW Tree and Brush Removal
Exhibit A Site Map |
August 8, 2006 |
10:00 a.m. |
Withdrawn- to be re-issued |
RFQ D607-020-RW Fiber Optic Repairs
Exhibit I Drawings |
August 4, 2006 |
10:00 a.m. |
D607-020-RW Tabulation |
| RFQ D607-013-RW Rapid Concrete Repair Material |
July 24, 2006 |
10:00 a.m. |
D607-013-RW Tabulation |
RFB 6-060706E D06 Uniform Bid
RFB 6-060706E Addendum 001 |
July 6, 2006 |
2:00 p.m. |
|
| RFB D607-008-RW Bulk Oil |
July 20, 2006 |
10:00 CDT |
D607-008-RW Tabulation |
| RFB D607-006-RW Techcrete |
June 30, 2006 |
10.00 CDT |
D607-006-RW Tabulation |
RFP D606-108-RB Traffic Data Collection Services
Addendum I Traffic Data Collection Services |
May 24,2006 |
3:00 CDT |
District 6, Ballwin, MO. |